CN206766292U - Middle-size and small-size submarine handling torpedo new exclusive landing stage - Google Patents
Middle-size and small-size submarine handling torpedo new exclusive landing stage Download PDFInfo
- Publication number
- CN206766292U CN206766292U CN201720357618.2U CN201720357618U CN206766292U CN 206766292 U CN206766292 U CN 206766292U CN 201720357618 U CN201720357618 U CN 201720357618U CN 206766292 U CN206766292 U CN 206766292U
- Authority
- CN
- China
- Prior art keywords
- size
- torpedo
- submarine
- handling
- small
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Jib Cranes (AREA)
Abstract
The utility model discloses a kind of middle-size and small-size submarine handling torpedo new exclusive landing stage, including branch type hull, bollard, wooden buoyancy rubbing strake, hoisting eye plate and conveying winch, the bollard, hoisting eye plate and conveying winch are separately mounted on branch type hull, and the wooden buoyancy rubbing strake is by baffle plate and is bolted on branch type hull.The middle-size and small-size submarine handling torpedo new exclusive landing stage of the utility model, torpedo operation is loaded and unloaded suitable for middle-size and small-size submarine, operating personnel is on special landing stage, middle-size and small-size submarine handling torpedo work can be completed in the case where truck crane or fixed crane coordinate, have very great help to improving submarine handling torpedo operating efficiency, Liftable disembarkation is placed after operation, is saved harbour resource, is reduced cost of upkeep.
Description
Technical field
It the utility model is related to a kind of middle-size and small-size submarine handling torpedo new exclusive landing stage.
Background technology
In the prior art, in submarine loads and unloads torpedo operation process, typically handling work is carried out using common buoyant raft or barge
Industry, because common buoyant raft or barge are without the operation specificity of first dichotomous hull so that handling torpedo operation convenience is not high, separately
On the one hand, common buoyant raft or barge typically need long-term landing pier, take harbour resource situation seriously and service life is not grown.
Utility model content
It is convenient that the purpose of this utility model is to provide a kind of handling torpedo operation, the convenient middle-size and small-size submarine handling fish of lifting
Thunder new exclusive landing stage.
Used technical scheme is the utility model to achieve the above object:A kind of middle-size and small-size submarine handling torpedo is new
Special landing stage, including branch type hull, bollard, wooden buoyancy rubbing strake, hoisting eye plate and conveying winch, the bollard,
Hoisting eye plate and conveying winch are separately mounted on branch type hull, and the wooden buoyancy rubbing strake passes through baffle plate and bolt connection
On branch type hull.
Maintenance and prestowage manhole are additionally provided with the branch type hull.
The manhole is provided with manhole cover.
A kind of middle-size and small-size submarine handling torpedo new exclusive landing stage of the utility model, torpedo is loaded and unloaded suitable for middle-size and small-size submarine
Operation, operating personnel can complete middle-size and small-size submarine handling torpedo work in the case where truck crane or fixed crane coordinate on special landing stage
Make, have very great help to improving submarine handling torpedo operating efficiency, Liftable disembarkation placement after operation, save harbour resource, drop
Low cost of upkeep.
Brief description of the drawings
Fig. 1 is a kind of top view on middle-size and small-size submarine handling torpedo new exclusive landing stage of the utility model.
Fig. 2 is a kind of side view on middle-size and small-size submarine handling torpedo new exclusive landing stage of the utility model.
Fig. 3 is a kind of wooden buoyancy rubbing strake on middle-size and small-size submarine handling torpedo new exclusive landing stage of the utility model with dividing
Forked type hull connection diagram.
Fig. 4 is a kind of hoisting eye plate structure signal on middle-size and small-size submarine handling torpedo new exclusive landing stage of the utility model
Figure.
Fig. 5 is a kind of bollard structural representation on middle-size and small-size submarine handling torpedo new exclusive landing stage of the utility model.
In figure:1st, branch type hull;2nd, bollard;3rd, wooden buoyancy rubbing strake;4th, manhole;5th, hoisting eye plate;6th, convey
Winch.
Embodiment
As shown in Figures 1 to 5, middle-size and small-size submarine handling torpedo new exclusive landing stage, including branch type hull 1, bollard
2nd, wooden buoyancy rubbing strake 3, hoisting eye plate 5 and conveying winch 6, bollard 2, hoisting eye plate 5 and conveying winch 6 are separately mounted to
On branch type hull 1, wooden buoyancy rubbing strake 3 is by baffle plate and is bolted on branch type hull 1, on branch type hull 1
Maintenance and prestowage manhole 4 are additionally provided with, manhole is provided with manhole cover, and special landing stage arrangement permanent hoisting eye plate is convenient to be hung at any time
Dress, arranges that simple bollard can be used for harbour heaving pile, arranges that wooden buoyancy rubbing strake effectively resists the impact of submarine, harbour, also
It can play a part of increasing reserve buoyancy, arrangement hand-rail type conveying winch can efficiently aid in loading and unloading torpedo operation, branch type hull
Structure 1, can be according to operation submarine model or bow outline designed openings angle using the steel hull of bow open front structure type
Degree, in order to mitigate deadweight, outside plate and internal structure are relatively thin with respect to thickness of slab, full frame spacing 600mm, in length and breadth bound form, with
Reach intensity and forming requirements, internal structure sets horizontal deepbar using 3 rib positions of interval, and longitudinal direction is total to away from medium spacing 1400mm
3 stringers strong structures are set, and simple bollard 2 is used for harbour band cable, plays a part of fixed special landing stage, hoisting eye plate 4 is simultaneously
Coordinate steel padding and the common stress of internal deep bracket, wherein single eye plate design load is 8t, this special landing stage, carry out close
Property testing inspection is qualified and coating paint after its entirety can be hung in by the operation water surface by crane, provided for operating personnel good
Operation at sea platform.By the cooperation of crane and winch, operating personnel can efficiently carry out the loading, unloading operation of submarine torpedo, this
The special landing stage size of utility model, bow bifurcated line style angle and structure design situation can be adjusted according to manipulating object situation and set,
But it should not change excessive, otherwise need to carry out strength check and floating condition calculation to Ship Structure again.
Claims (3)
- A kind of 1. middle-size and small-size submarine handling torpedo new exclusive landing stage, it is characterised in that:Including branch type hull, bollard, wood Matter buoyancy rubbing strake, hoisting eye plate and conveying winch, the bollard, hoisting eye plate and conveying winch are separately mounted to branch type On hull, the wooden buoyancy rubbing strake is by baffle plate and is bolted on branch type hull.
- A kind of 2. middle-size and small-size submarine handling torpedo new exclusive landing stage according to claim 1, it is characterised in that:Described point Maintenance and prestowage manhole are additionally provided with forked type hull.
- A kind of 3. middle-size and small-size submarine handling torpedo new exclusive landing stage according to claim 2, it is characterised in that:The people Hole is provided with manhole cover.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720357618.2U CN206766292U (en) | 2017-04-07 | 2017-04-07 | Middle-size and small-size submarine handling torpedo new exclusive landing stage |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720357618.2U CN206766292U (en) | 2017-04-07 | 2017-04-07 | Middle-size and small-size submarine handling torpedo new exclusive landing stage |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206766292U true CN206766292U (en) | 2017-12-19 |
Family
ID=60631604
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720357618.2U Active CN206766292U (en) | 2017-04-07 | 2017-04-07 | Middle-size and small-size submarine handling torpedo new exclusive landing stage |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206766292U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112660318A (en) * | 2021-01-11 | 2021-04-16 | 青岛浩赛机械有限公司 | Pontoon system and process for overwater operation |
CN114295015A (en) * | 2021-12-13 | 2022-04-08 | 宜昌测试技术研究所 | Torpedo filling rack |
-
2017
- 2017-04-07 CN CN201720357618.2U patent/CN206766292U/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112660318A (en) * | 2021-01-11 | 2021-04-16 | 青岛浩赛机械有限公司 | Pontoon system and process for overwater operation |
CN112660318B (en) * | 2021-01-11 | 2022-07-26 | 青岛浩赛机械有限公司 | Pontoon system and process for overwater operation |
CN114295015A (en) * | 2021-12-13 | 2022-04-08 | 宜昌测试技术研究所 | Torpedo filling rack |
CN114295015B (en) * | 2021-12-13 | 2023-06-02 | 宜昌测试技术研究所 | Torpedo filling rack |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102328733B (en) | Semi-submersible lifting living platform | |
CN103910044B (en) | A kind of large-scale the floating structures semi-submersible type lifting platform and application process thereof | |
CN102079363A (en) | Anchoring ocean observation and research buoy laying system and method based on small-sized ship | |
CN1932160A (en) | Component assembling construction auxiliary apparatus in hydraulic engineering and using method thereof | |
CN207346050U (en) | A kind of onshore terminals are to barge, the device of transferring of barge to barge | |
CN206766292U (en) | Middle-size and small-size submarine handling torpedo new exclusive landing stage | |
CN103883273A (en) | Method for utilizing two cranes on saturation diving support vessel to mount vertical pipe | |
CN206634166U (en) | A kind of working ship | |
CN206635654U (en) | A kind of barging device of underwater narrow-bore tunnel super long type prefabricated case beam | |
CN104097750B (en) | A kind of multi-functional repair and maintenance ship | |
CN101941510A (en) | Method for improving ship handling efficiency of containers (or bulk cargo) and equipment thereof | |
CN204432979U (en) | Ton horizontal launching building berth | |
CN211281408U (en) | A assistance-localization real-time frock that is used for different positions of engineering ship to fall mound | |
CN102071652A (en) | Method and device for dragging large-tonnage object ashore | |
CN202322211U (en) | Water lifting platform | |
CN201834176U (en) | Tooling for underwater anchor chock modification work | |
CN109237124B (en) | Sand bag piling construction device for seabed suspended pipeline treatment | |
CN106379495A (en) | Wharf pile foundation underwater maintenance operation device with self-propulsion capability | |
CN203186550U (en) | Multifunctional maintenance vessel | |
CN207631439U (en) | Large-tonnage synchronization lifting system | |
CN202164066U (en) | Hoisting device for large-scale articles | |
CN204714399U (en) | Be convenient to the bull tower crane peculiar to vessel of oil transportation | |
CN204548441U (en) | A kind of dock | |
CN2846285Y (en) | Movable wharf | |
CN206125353U (en) | Pier pile foundation underwater maintenance operation device with self -navigation ability |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |