CN203923918U - The one-tenth arch structure of high Longspan Bridge Bailey beam - Google Patents

The one-tenth arch structure of high Longspan Bridge Bailey beam Download PDF

Info

Publication number
CN203923918U
CN203923918U CN201420327170.6U CN201420327170U CN203923918U CN 203923918 U CN203923918 U CN 203923918U CN 201420327170 U CN201420327170 U CN 201420327170U CN 203923918 U CN203923918 U CN 203923918U
Authority
CN
China
Prior art keywords
bailey beam
support
bridge
tapered
arch structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420327170.6U
Other languages
Chinese (zh)
Inventor
李杨
冯念
田永正
张新阳
朱春海
赵飞虹
王东青
高立伟
林磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Engineering Co Ltd of China Railway 11th Bureau Group Co Ltd
Original Assignee
Second Engineering Co Ltd of China Railway 11th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Engineering Co Ltd of China Railway 11th Bureau Group Co Ltd filed Critical Second Engineering Co Ltd of China Railway 11th Bureau Group Co Ltd
Priority to CN201420327170.6U priority Critical patent/CN203923918U/en
Application granted granted Critical
Publication of CN203923918U publication Critical patent/CN203923918U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model provides the one-tenth arch structure of high Longspan Bridge Bailey beam, between the bridge pier on both sides, to set up and become a fixing support with many support posts and crossbeam, the top of every two support posts is tapered planes, multiple tapered planes form a basic cambered surface, the wherein added standard Bailey beam that is provided with of each tapered plane, standard Bailey beam connects again; On each tapered plane, be provided with again arc support, on arc support, set up again casting template and become into arch structure; Set up default difference of height by support post, tentatively reach the requirement of arch (arc) shape after allowing support post set up moulding, make Bailey beam be assembled into multiple interconnective tapered planes, Bailey beam is set up on tapered plane; On each tapered plane, be provided with again arc support.Have difficulty of construction little, construction technology is simple, easy to operate, and safety factor is high, and etc. advantage, can be applied to widely the bottom such as arch bridge, arch ring has in the span bridge construction of radian.

Description

The one-tenth arch structure of high Longspan Bridge Bailey beam
Technical field
It is assembled that the utility model relates to Bailey beam in field of bridge construction, the specifically one-tenth arch structure of high Longspan Bridge Bailey beam.
Background technology
In bridge column cast-in-place construction, for making bridge become bridge line style and rigidity to meet the demands, in the situation that physical features is smooth, general full hall column or the steel pipe scaffold of adopting set up.Advantage: be that difficulty of construction is little, easy operating; Limitation: construction height, span are limited.
When job site relief is large, structure construction height is when higher, conventionally adopts the construction of steel pipe post+Bailey bracket.Advantage: material stiffness is large, construction span is large; Shortcoming: construction hoisting only limits to plane operations.
" Shanxi architecture " 7 monthly magazines in 2008: Bailey beam bow member assembled and and calculation on Construction, be the long-pending catenary box-shaped arch of steel concrete uniform section by Main Bridge arch ring, its construction method adopts bow member cast-in-situ construction method, and bow member adopts cable lifting free cantilever erection construction method.In the method, cable lifting free cantilever erection need to be by auxiliary stand, and difficulty of construction coefficient is larger, and safety factor is low.
" Chinese science and technology information " the 6th phase in 2005: the application of Bailey beam bow member in Arch Bridge Construction, be the assembled bow member of Bailey beam as Arch Bridge Ribs construction bracket, the constructure scheme that is comparative superiority to the higher leap cheuch of headroom.Method is to be also barricaded as the cast-in-place arch ring of support leveling with steel pipe in Bailey beam, uses comparatively trouble.
2014202034544 1 kinds of Bailey beam arc supports, and mono-kind of 201420203453X is for setting up the Bailey beam of arc bridge.The enforcement of these two utility models has solved the arc problem of Bailey beam, for the construction of arc bridge more for convenience, but use and just seem unable to do what one wishes for high Loads of Long-span Bridges construction, because when the setting up of high Loads of Long-span Bridges, not only its span is large, and Bailey beam also can form inclined-plane, construction being not easy very.
Summary of the invention
The purpose of this utility model is the troublesome problem when solving the construction of high Loads of Long-span Bridges, the special one-tenth arch structure that proposes high Longspan Bridge Bailey beam.
Technical solutions of the utility model are for this reason: the one-tenth arch structure of high Longspan Bridge Bailey beam, comprise bridge pier and Duo Gen support post and the crossbeam on both sides, it is characterized in that: between the bridge pier on both sides, set up the fixed support that becomes a differing heights with many support posts and crossbeam, the top of every two support posts is tapered planes, multiple tapered planes form a basic cambered surface, the wherein added standard Bailey beam that is provided with of each tapered plane; Between standard Bailey beam and bridge pier, be connected by Bailey beam one, between standard Bailey beam, connect by Bailey beam two; Make Bailey beam be assembled into multiple interconnective tapered planes, on tapered plane, be provided with again arc support, on arc support, set up again casting template and become into arch structure.
Improvement to such scheme is: stamping die sand cylinder is installed at support post top.
Improvement to such scheme is: the top of stamping die sand cylinder is provided with transverse distribution beam.
Improvement to such scheme is: distribution beam is that i iron is made.
Improvement to such scheme is: the top of every support post is respectively equipped with voussoir one and voussoir two.
Bailey beam becomes the construction method of arch structure, comprise the lifting of the setting up of support post, Bailey beam, it is characterized in that: set up default difference of height by support post, after allowing support post set up moulding, tentatively reach the requirement of arch (arc) shape, then Bailey beam is lifted into support post top, make Bailey beam be assembled into multiple interconnective tapered planes, on each tapered plane, be provided with again arc support; On arc support, set up again casting template and become into arch structure;
Specific construction step is as follows:
A, support post apolegamy
Before construction, according to drawing and scheme requirement, match support post length;
B, support post are installed
According to precalculated height, start assembled support post piecemeal;
C, support post top absolute altitude repetition measurement
After support post installs, need measure support post top absolute altitude, the deviation producing is adjusted in time;
D, installation stamping die sand cylinder
Stamping die sand cylinder is installed at support post top, support post absolute altitude is carried out trickle adjustment, reaches better bridge molding effect simultaneously;
E, installation i iron distribution beam
After sand cylinder installs, horizontal i iron distribution beam is installed at its top;
F, installation wedge
The stability of installing for strengthening Bailey beam, installs wedge at i iron distribution beam top, by shellfish thunder pin, it is connected on tapered plane with Bailey beam, is fixed;
G, segmented assembly standard Bailey beam
On smooth location, in advance standard Bailey beam is carried out to segmented assembly;
H, segmental hoisting Bailey beam
Intersegmental at longitudinal two adjacent supporting sections, lifting standard Bailey beam;
I, Bailey beam connect arching
After the installation of each sections standard Bailey beam, start to install being connected of Bailey beam one and bridge pier, and will between sections standard Bailey beam, connect into entirety by Bailey beam two, and make Bailey beam be assembled into multiple interconnective tapered planes, on each tapered plane, be provided with again arc support; On arc support, set up again casting template and become into arch structure.
Beneficial effect:
The utility model, mainly in high Loads of Long-span Bridges construction, while adopting Bailey beam support cast-in-place to execute, is set up in the situation that certain angle need to be set and is used when support;
Difficulty of construction is little, and construction technology is simple; Can first ground on the scene Bailey beam be carried out assembled, then install by hanging device; Between wedge and Bailey beam, only need to be connected, to fix by shellfish thunder pin; Easy to operate, safety factor is high; Construct at the scene in normal situation, lift one group of Bailey beam more 20 minutes, can save a large amount of durations; Because Bailey beam has good rigidity, laterally connect into the rear structural stability of entirety good, fitting operation safety factor is high.
The installation of stamping die sand cylinder is carried out trickle adjustment, is reached better bridge molding effect support post absolute altitude simultaneously.
Stamping die sand cylinder top is installed horizontal i iron distribution beam and has not only been solved installation and fine setting, and the use of distribution beam simultaneously makes its structure more firmly solid.
The use of voussoir one and voussoir two, convenient fine setting and dismounting.
In sum, the utility model, in high Loads of Long-span Bridges construction, has quite significantly advantage compared with prior art.
Brief description of the drawings
Fig. 1 is that support post of the present utility model is set up structural representation.
Fig. 2 is that whole Bailey beam of the present utility model is set up schematic diagram.
Fig. 3 is the schematic diagram that sets up of standard Bailey beam of the present utility model.
Fig. 4 is the syndeton schematic diagram of two standard Bailey beams of the present utility model.
Fig. 5 is the syndeton enlarged diagram of Bailey beam two in Fig. 4.
Fig. 6 is the syndeton enlarged diagram of Bailey beam one and bridge pier in Fig. 2.
Fig. 7 is the structural representation after the utility model installation forming.
Fig. 8 is cross-sectional configuration schematic diagram in Fig. 7.
In figure, 1 is support post, the 2nd, and bridge pier, the 3rd, standard Bailey beam, the 4th, Bailey beam one, 5th, Bailey beam two, 6th, voussoir one, 7th, voussoir two, 8th, stamping die sand cylinder, the 9th, casting template, the 10th, i iron distribution beam, the 11st, arc support.
Detailed description of the invention
The utility model is as shown in Fig. 1,2,3,4,5,6,7,8.
The one-tenth arch structure of high Longspan Bridge Bailey beam, comprise bridge pier 2 and Duo Gen support post 1 and the crossbeam on both sides, between the bridge pier 2 on both sides, set up the fixed support that becomes a differing heights with many support posts 1 and crossbeam, the top of every two support posts 1 is a tapered plane, multiple tapered planes form a basic cambered surface, the wherein added standard Bailey beam 3 that is provided with of each tapered plane, between standard Bailey beam 3 and bridge pier 2, be connected by Bailey beam 1, between standard Bailey beam 3, connect by Bailey beam 25; Make Bailey beam be assembled into multiple interconnective tapered planes, on tapered plane, be provided with again arc support 11, on arc support 11, set up again casting template 9 and become into arch structure.
At support post 1 top, stamping die sand cylinder 8 is installed.
The top of stamping die sand cylinder 8 is provided with horizontal i iron distribution beam 10.
The top of every support post 1 is respectively equipped with voussoir 1 and voussoir 27.
Bailey beam is assembled arching on tapered plane: refer to after support post 1 is set up, at two 1 adjacent of support post, Bailey beam is installed, because adjacent supports column 1 scaffolding height is different, therefore produced the assembled Bailey beam of tapered plane.
Bailey beam becomes the construction method of arch structure, comprise the lifting of the setting up of support post 1, Bailey beam, set up default difference of height by support post 1, after allowing support post 1 set up moulding, tentatively reach the requirement of arch (arc) shape, then Bailey beam is lifted into support post 1 top, Bailey beam is set up on the tapered plane of support post 1, makes Bailey beam be assembled into multiple interconnective tapered planes, is provided with arc support on tapered plane again; Tapered plane is set up into arch structure Bailey beam, and Specific construction step is as follows:
A, support post 1 are matched
Before construction, according to drawing and scheme requirement, match support post 1 length; For ease of installing and removing, single support post 1 length should not exceed 5m in principle.
B, support post 1 are installed
According to precalculated height, start assembled support post 1 piecemeal; In installation process, should strengthen the inspection to each support post 1 weld seam, flange tie point.
C, support post 1 top absolute altitude repetition measurement
After support post 1 installs, need measure support post 1 top absolute altitude, the deviation producing is adjusted in time.
D, installation stamping die sand cylinder 8
At support post 1 top, stamping die sand cylinder 8 is installed, support post 1 absolute altitude is carried out trickle adjustment, reaches better bridge molding effect simultaneously.
E, installation i iron distribution beam 10
After stamping die sand cylinder installs, horizontal i iron distribution beam 10 is installed at its top.
F, installation wedge
The stability of installing for strengthening Bailey beam, installs wedge at i iron distribution beam 10 tops, by shellfish thunder pin, it is connected on tapered plane with Bailey beam, is fixed.
G, segmented assembly standard Bailey beam
On smooth location, in advance standard Bailey beam 3 is carried out to segmented assembly.
H, segmental hoisting standard Bailey beam 3
Intersegmental at longitudinal two adjacent supporting sections, lifting standard Bailey beam 3.
I, Bailey beam connect arching
After 3 installations of each sections standard Bailey beam, start to install being connected of Bailey beam 1 and bridge pier 1, and will between sections standard Bailey beam 3, connect into entirety by Bailey beam 25, Bailey beam is connected to multiple tapered planes, on each tapered plane, be provided with again arc support 11, on arc support 11, set up again casting template 9.

Claims (5)

1. the one-tenth arch structure of high Longspan Bridge Bailey beam, comprise bridge pier and Duo Gen support post and the crossbeam on both sides, it is characterized in that: between the bridge pier on both sides, set up the fixed support that becomes multiple height with many support posts and crossbeam, the top of every two support posts is tapered planes, and multiple tapered planes form a basic cambered surface; The wherein added standard Bailey beam that is provided with of each tapered plane, between standard Bailey beam and bridge pier, be connected by Bailey beam one, between standard Bailey beam, connect by Bailey beam two, make Bailey beam be assembled into multiple interconnective tapered planes, tapered plane is provided with arc support, sets up casting template again and become into arch structure on arc support.
2. the one-tenth arch structure of high Longspan Bridge Bailey beam according to claim 1, is characterized in that: stamping die sand cylinder is installed at support post top.
3. the one-tenth arch structure of high Longspan Bridge Bailey beam according to claim 2, is characterized in that: the top of stamping die sand cylinder is provided with transverse distribution beam.
4. the one-tenth arch structure of high Longspan Bridge Bailey beam according to claim 3, is characterized in that: distribution beam is that i iron is made.
5. the one-tenth arch structure of high Longspan Bridge Bailey beam according to claim 1 and 2, is characterized in that: the top of every support post is respectively equipped with voussoir one and voussoir two.
CN201420327170.6U 2014-06-19 2014-06-19 The one-tenth arch structure of high Longspan Bridge Bailey beam Expired - Fee Related CN203923918U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420327170.6U CN203923918U (en) 2014-06-19 2014-06-19 The one-tenth arch structure of high Longspan Bridge Bailey beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420327170.6U CN203923918U (en) 2014-06-19 2014-06-19 The one-tenth arch structure of high Longspan Bridge Bailey beam

Publications (1)

Publication Number Publication Date
CN203923918U true CN203923918U (en) 2014-11-05

Family

ID=51819772

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420327170.6U Expired - Fee Related CN203923918U (en) 2014-06-19 2014-06-19 The one-tenth arch structure of high Longspan Bridge Bailey beam

Country Status (1)

Country Link
CN (1) CN203923918U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104099871A (en) * 2014-06-19 2014-10-15 中铁十一局集团第二工程有限公司 Arching structure of high large-span bridge bailey beams and construction method thereof
CN105297630A (en) * 2015-10-10 2016-02-03 正平路桥建设股份有限公司 Construction method for double-component steel tubes of main arch arcs

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104099871A (en) * 2014-06-19 2014-10-15 中铁十一局集团第二工程有限公司 Arching structure of high large-span bridge bailey beams and construction method thereof
CN105297630A (en) * 2015-10-10 2016-02-03 正平路桥建设股份有限公司 Construction method for double-component steel tubes of main arch arcs

Similar Documents

Publication Publication Date Title
CN104099871A (en) Arching structure of high large-span bridge bailey beams and construction method thereof
CN101922143B (en) Construction method of bent cap
CN103306208A (en) Formwork creeping method for novel 1.6 parabola-shaped four-column type hollow variable section high pier
CN103938533B (en) The construction method of Simply supported non-uniform structure
CN104695337B (en) Self-lifting sliding and turnover construction system and construction method
CN104594204B (en) Urban light rail viaduct mountain type U beam Construction Supporting System and construction method
CN103306206B (en) A kind of construction method adopting thin-wall hollow high-pier reinforcement bar support fixing of the forming frame reinforcing bar
CN102561690A (en) Construction method for supporting structures on two sides of post-cast strip by use of brick column
CN104372947A (en) Integral mold plate feeding and retreating construction method for elevator shaft
CN102134832B (en) Movable support and movable support assisted method for erecting steel box beams through non-variable amplitude frame beam crane
CN202766972U (en) Circular pier column hoop
CN103572703A (en) Construction method of outer wrapped concrete obliquely pulling and buckling and ring and section dividing combination method
CN203923918U (en) The one-tenth arch structure of high Longspan Bridge Bailey beam
CN105401719A (en) Aluminum alloy stair step template
CN204023424U (en) A kind of Hanging Basket You Ding back-pressure mechanism
CN102061668A (en) Vertical swiveling construction method of dual-steel-arch tower
CN203113793U (en) Large formwork installation system of oblique structure
CN204475184U (en) Urban light rail viaduct mountain type U beam Construction Supporting System
CN202466431U (en) Bridge specific model vase pier construction device
CN208167536U (en) A kind of operation platform removed for bridge temporary support
CN105442453A (en) Construction method for suspension bridge tower crossbeam combination support
CN203795315U (en) High pier cable-stayed bridge No.0 block non-bracket construction structure
CN203213019U (en) Cast-in-situ construction bracket system of long cantilever bent cap
CN205012217U (en) Overpass vase mound formwork support unites structure
CN103835238A (en) High-pier cable-stayed bridge zero-number block non-bracket construction method and structure in construction process

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141105

Termination date: 20200619

CF01 Termination of patent right due to non-payment of annual fee