CN203756119U - Sleeve subassembly for simulated cementation test - Google Patents

Sleeve subassembly for simulated cementation test Download PDF

Info

Publication number
CN203756119U
CN203756119U CN201420067388.2U CN201420067388U CN203756119U CN 203756119 U CN203756119 U CN 203756119U CN 201420067388 U CN201420067388 U CN 201420067388U CN 203756119 U CN203756119 U CN 203756119U
Authority
CN
China
Prior art keywords
sleeve
layer sleeve
cement sheath
cementing
assembly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420067388.2U
Other languages
Chinese (zh)
Inventor
朱江林
罗宇维
赵琥
王永松
方国伟
文守成
赵军
邓金根
朱培科
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Petroleum Beijing
China Oilfield Services Ltd
Yangtze University
China National Offshore Oil Corp CNOOC
Original Assignee
China University of Petroleum Beijing
China Oilfield Services Ltd
Yangtze University
China National Offshore Oil Corp CNOOC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Petroleum Beijing, China Oilfield Services Ltd, Yangtze University, China National Offshore Oil Corp CNOOC filed Critical China University of Petroleum Beijing
Priority to CN201420067388.2U priority Critical patent/CN203756119U/en
Application granted granted Critical
Publication of CN203756119U publication Critical patent/CN203756119U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

The utility model discloses a sleeve subassembly. The sleeve subassembly comprises an inner sleeve, wherein a rubber cover, an outer sleeve and an outer autoclave body sequentially sleeve the outer side of the inner sleeve; the outer sleeve is used for supporting the rubber cover; a cement sheath is accommodated in a first annular cavity between the inner sleeve and the rubber cover; a heat-transferring and pressurizing medium is accommodated in a second annular cavity between the outer sleeve and the outer autoclave body; an autoclave cover structure is arranged on the top of the sleeve subassembly; an autoclave bottom structure is arranged on the bottom of the sleeve subassembly; the autoclave cover structure is provided with a gas injection hole channel; the autoclave bottom structure is provided with a gas discharging hole channel; the gas injection hole channel is used for injecting nitrogen, so that the first annular cavity and the second annular cavity become equal-pressure cavities; and the gas discharging hole channel is used for detecting the leakage condition of the cement sheath. The sleeve subassembly can be applied to the technical field of research on cementation of cement paste and the outer sleeve; gas channeling of the cement sheath can be detected by using the sleeve subassembly; gas can be accurately acquired; and a reasonable technical well cementation measure and correct selection operation parameters can be set.

Description

A kind of for simulating the thimble assembly of cementing test
Technical field
The utility model relates to the cementing studying technological domain of cement paste and outer layer sleeve in cementing technology, especially a kind of for simulating the thimble assembly of cementing test.
Background technology
Both having there is high pressure in South China Sea warbler fine jade basin, also has high temperature, is one of marine three large HTHP areas, the current world.Data according to incompletely statistics, 1984 to 2011, China's South China Sea bored 25 mouthfuls of HTHP prospect pits altogether.From drilling well situation, most of well concentrates between 4000m-5000m.In completed 25 mouthfuls of wells, temperature surpasses 200 ℃, and the superhigh-temperature and-pressure well that mud balance surpasses more than 2.20sg has 4 mouthfuls.1984-2004,15 mouthfuls, South Sea hp-ht well, the operator's of China and foreign countries operation process is all extremely hard, and well cementation success rate is not high, drilling liner cementing particularly, success rate only 47%.
According to statistics, east block has 53 mouthfuls at present at exploitation gas well, wherein 44 mouthfuls with pressure, major part is that tubing and casing is with pressure, but also have table cover and skill cover with pressure, more serious: DF1-1-D4(skill cover is with pressure) and happy Dong22-1-A3Jing (skill is overlapped with pressure).Understand the mechanical mechanism losing efficacy under cement sheath subsurface environment, can instruct and formulate targetedly cementing technology measure and selecting properly later stage job parameter, particularly optimize cement sheath deformation parameter and damage parameter, thereby reach the object that improves cementing quality, prevents the cementing inefficacy of cement sheath waterpower, extend the HTHP Oil/gas Well life-span.
In well cementation, cement sheath is significant to the production safety of Oil/gas Well, life-span and oil field development benefit to the packing performance on stratum, have higher envelope alter the cement sheath of ability be safety, environmental protection develop oil reservoir, realize the maximized important foundation of exploration and development benefit.Practical production experience shows, after cement paste replaces and puts in place, CBL/VDL test shows the good well of cementing quality, in experience, follow-up creep into, drilling fluid density increase, FIT, perforation, pressure break, variations in temperature, ask product, closing well to ask after the operations such as pressure, can cause the cement plane on cement sheath and outer layer sleeve, cement sheath and stratum to produce micro chink, cause the problems such as the channelling of Oil/gas Well well head, well head annular space be with pressure.This problem causes safety, environmental protection hidden danger, has a strong impact on Productivity Construction, greatly reduces exploration and development benefit.
This problem belongs to the long-term has channeling problem after well cementation, under current technical condition, usually occurs in the HTHP Oil/gas Well of underground working complicated condition.The reason that causes wellheadpressure is mainly that down-hole formation condition changes and the stress of outer layer sleeve-cement sheath-stratum system that later stage operation causes changes, cause annular space cement sheath stress-strain to change, cement sheath has occurred to destroy loses hydraulic seal, and gases at high pressure are altered gradually and moved to well head by the microcrack interface of inefficacy cement sheath inside.
Existing simulation STRESS VARIATION causes that the device of the cementing inefficacy of well cementation exists following features:
1) the outer layer sleeve processing experimental device not using according to reality;
Experimental facilities is inconsistent with the size of actual outer layer sleeve on external diameter and wall thickness.Experimental facilities adds man-hour in design, does not have to adopt to have the outer layer sleeve of actual use external diameter and wall thickness, but according to certain ratio, dwindles in physical dimension, and these are different from actual condition;
2) cementing process with test that to alter experimentation separated;
Having there is change in the environment while being glued to analog temperature-cementing inefficacy experiment by cement sheath, specifically comprises whether the maintenance environment of cement paste is HTHP, whether when analog temperature-cementing inefficacy experiment, whether added confined pressure, cementing environment and experimental situation separate.Now equipment generally can not guarantee that cement paste can complete cementing and carry out the experiment of temperature-cementing inefficacy in same set of equipment, and this and actual condition are not inconsistent;
3) can not quantitative assessment has channeling;
In factors such as analog temperatures, change and cause the cementing inefficacy of cement sheath, cause in the process of has channeling, just qualitative reaction has channeling has or not generation, causes the amount of has channeling when the certain operating mode of quantitative testing does not change;
4) cement sheath length is less than normal;
Aspect the cement sheath length of simulation, be generally less than 50cm, length is less than normal, can not reflect the problem that actual condition exists in experiment comparatively comprehensively;
5) test the scope of altering not comprehensive;
Testing in the method for altering, what generally adopt is at cement sheath one end injecting gas, and can the other end of usining collect gas as judging whether cement sheath and outer layer sleeve produce the standard of microannulus and the cementing quality of evaluation cement sheath.Can not detect in the centre position of cement sheath short transverse and produce microannulus and the operating mode of two ends strong bonding.
6) experimental cost is high;
All scrap after once testing with internal layer outer layer sleeve, outer field artificial stratum or outer layer sleeve that cement sheath is cementing, cause experimental study high cost.
7) experiment condition parameter is lower;
Bottom-hole static temperature can not be simulated simultaneously the highest 160 ℃, formation pore pressure 6000psi, the operating mode of maximum pressure load 10000psi in sleeve pipe.
Utility model content
The technical problem that the utility model solves is to provide a kind of for simulating the thimble assembly of cementing test, can in analog casing, press, the cyclically-varying of confined pressure and has channeling flow etc., can realize real time data acquisition; The has channeling of cement sheath can be detected, and gather accurately; Can be according to different cement sheath mechanical characteristics rule that affects on its cementing inefficacy under different temperatures, the applicable tough elastic cement formula of design, formulates rational cementing technology measure and selecting properly job parameter targetedly.
For solving the problems of the technologies described above, the utility model provides a kind of and it is characterized in that for simulating the thimble assembly of cementing test,
Comprise inner layer sleeve, described inner layer sleeve outside is arranged with gum cover, outer layer sleeve, outer kettle successively, and described outer layer sleeve is used for supporting described gum cover;
First ring cavity body between described inner layer sleeve and described gum cover is used for holding cement sheath, and the second annular space cavity between described outer layer sleeve and described outer kettle is used for holding heat transfer pressure medium;
Described thimble assembly top is provided with kettle cover structure, and described thimble assembly bottom is provided with still bottom structure, and described kettle cover structure is provided with injecting hole road, and described still bottom structure is provided with steam vent road; Described injecting hole road, for nitrogen injection operation, forms isobaric cavity by described first ring cavity body and described the second annular space cavity; Described steam vent road is for detection of the leak case of described cement sheath.
Above-mentioned also can have following features for simulating the thimble assembly of cementing test:
Also comprise balance assembly, the gas that discharge on described steam vent road is realized the has channeling amount occurring in cement sheath described in quantitative measurment by described balance assembly;
The has channeling amount occurring in cement sheath described in the quantitative measurment of described balance assembly employing drainage.
Above-mentioned also can have following features for simulating the thimble assembly of cementing test:
Described outer layer sleeve is symmetrically arranged two semicircle pipe fittings, and described semicircle pipe fitting is provided with aperture, and described aperture is for being applied to described gum cover by confined pressure.
Above-mentioned also can have following features for simulating the thimble assembly of cementing test:
Between described kettle cover structural base and described outer layer sleeve, be provided with gland, described kettle cover structure outside is symmetrically arranged with two still handles, and described kettle cover structural top is provided with long adapter, short adapter.
Above-mentioned also can have following features for simulating the thimble assembly of cementing test:
Between described outer layer sleeve and described outer kettle, be provided with righting pipe clamp.
Above-mentioned also can have following features for simulating the thimble assembly of cementing test:
Place, described steam vent road is filled with industrial felt.
Above-mentioned also can have following features for simulating the thimble assembly of cementing test:
Described cement sheath height is 1000mm.
Above-mentioned also can have following features for simulating the thimble assembly of cementing test:
Described inner layer sleeve is 4-1/2 " sleeve pipe.
The utility model technique scheme has following beneficial effect:
The utility model comprises inner layer sleeve, and inner layer sleeve outside is arranged with gum cover, outer layer sleeve, outer kettle successively, and outer layer sleeve is used for supporting gum cover; First ring cavity body between inner layer sleeve and gum cover is used for holding cement sheath, and the second annular space cavity between outer layer sleeve and outer kettle is used for holding heat transfer pressure medium; Thimble assembly top is provided with kettle cover structure, and thimble assembly bottom is provided with still bottom structure, and kettle cover structure is provided with injecting hole road, and still bottom structure is provided with steam vent road; Injecting hole road, for nitrogen injection operation, forms isobaric cavity by first ring cavity body and the second annular space cavity; Steam vent road is for detection of the leak case of cement sheath; The utility model can be realized according to different cement sheath mechanical characteristics rule that affects on its cementing inefficacy under different temperatures, and the applicable tough elastic cement formula of design, formulates rational cementing technology measure and selecting properly job parameter targetedly; Can simulate bottom-hole static temperature the highest 160 ℃, formation pore pressure 6000psi, the operating mode of maximum pressure load 10000psi in sleeve pipe, the operation situations such as the pressure testing after simulated field well cementing operation, geostatic stress variation, the check tough elasticity of shaft bottom cement sheath and interlayer packing performance, for on-site voltage-measuring operation provides reliable parameter, size as withstand voltage in this type of Behavior of Hardened Cement Paste, how many times of number of times of pressure testing, the interlayer packing of Behavior of Hardened Cement Paste was lost efficacy.
Other features and advantages of the utility model will be set forth in the following description, and, partly from manual, become apparent, or understand by implementing the utility model.The purpose of this utility model and other advantages can be realized and be obtained by specifically noted structure in manual, claims and accompanying drawing.
Accompanying drawing explanation
Accompanying drawing is used to provide the further understanding to technical solutions of the utility model, and forms a part for manual, is used from explanation the technical solution of the utility model with the application's embodiment mono-, does not form the restriction to technical solutions of the utility model.
Fig. 1 is cement the well the first structural representation of cementing testing arrangement of the utility model;
Fig. 2 is cement the well the second structural representation of cementing testing arrangement of the utility model;
Fig. 3 is the structural representation of the utility model embodiment middle sleeve assembly.
The specific embodiment
For making the purpose of this utility model, technical scheme and advantage clearer, hereinafter in connection with accompanying drawing, embodiment of the present utility model is elaborated.It should be noted that, in the situation that not conflicting, embodiment and the feature in embodiment in the application can be combined mutually.
The utility model provides a kind of evaluating apparatus of the cementing inefficacy of cementing the well, shown in Fig. 1, Fig. 2, can comprise main body still assembly, recirculating still assembly 8, interior circulation fan pump assembly 7, discharge pump assembly 4, high pressure pump assembly 5, fuel tank assembly 3 and Control Component 2; Wherein,
Main body still component internal is provided with thimble assembly 1, and outside winding of main body still assembly is provided with heating arrangement, and main body still assembly is used to thimble assembly 1 to provide test required temperature, pressure; Recirculating still assembly 8 is by interior circulation fan pump assembly 7 and main body still assembly, and recirculating still assembly 8 is used to thimble assembly 1 that heat transfer medium is provided.
High pressure pump assembly 5 is connected with thimble assembly 1, and high pressure pump assembly 5 is used to thimble assembly 1 to provide test required pressure; Discharge pump assembly 4 is connected with main body still assembly, recirculating still assembly 8, and discharge pump assembly 4 is for collecting fuel tank assembly 3 by the heat transfer medium in main body still assembly, recirculating still assembly 8 after having tested.
Between Control Component 2 and main body still assembly, recirculating still assembly 8, interior circulation fan pump assembly 7, discharge pump assembly 4, high pressure pump assembly 5, fuel tank assembly 3, be provided with electromagnetic valve, Control Component 2 is realized the test to thimble assembly 1 by controlling electromagnetic valve.
As shown in Figure 3, the utility model provides a kind of for simulating the thimble assembly of cementing test accordingly; Wherein, thimble assembly 1 can comprise inner layer sleeve 11, and inner layer sleeve 11 outsides are arranged with gum cover 12, outer layer sleeve 13, outer kettle 14 successively, and outer layer sleeve 13 is for supporting gum cover 12; First ring cavity body 16 between inner layer sleeve 11 and gum cover 12 is for holding cement sheath, and the second annular space cavity 15 between outer layer sleeve 13 and outer kettle 14 is for holding heat transfer pressure medium.
Wherein, thimble assembly 1 top is provided with kettle cover structure 18, and thimble assembly 1 bottom is provided with still bottom structure 10, and kettle cover structure 18 is provided with injecting hole road, and still bottom structure 10 is provided with steam vent road; Injecting hole road, for nitrogen injection operation, forms isobaric cavity by first ring cavity body 16 and the second annular space cavity; Steam vent road is for detection of the leak case of cement sheath.
Preferably, in the utility model concrete operations, can the outside environment simulation to thimble assembly 1 be can realize by the outside heating arrangement arranging that is wound around of main body still assembly, temperature, pressure specifically comprised; Can realize and provide heat transfer medium to the inner side sleeve pipe in thimble assembly 1 with interior circulation fan pump assembly 7 by recirculating still assembly 8.The heating of above-mentioned inner side sleeve pipe, pressurized control and first ring cavity body 16, the heating of the second annular space cavity 15, pressurized control are two independently control systems, can realize the simulation of true ground environment separately, can for cement sheath, carry out corresponding performance test more really.
Preferably, in the utility model concrete operations, also comprise balance assembly, the gas that discharge on steam vent road is realized the has channeling amount occurring in quantitative measurment cement sheath by balance assembly; Balance assembly adopts the has channeling amount occurring in drainage quantitative measurment cement sheath.Above-mentioned balance assembly can be realized the has channeling amount occurring in quantitative measurment cement sheath, and can, according to pressure, the different test environments of temperature, carry out the statistical analysis of corresponding has channeling amount; And draw different cement sheath mechanical characteristics rule that affects on its cementing inefficacy under different temperatures, and then the tough elastic cement formula that design is suitable for targetedly, rational cementing technology measure and selecting properly job parameter formulated.
Preferably, in the utility model concrete operations, also comprise loaded plate 6, loaded plate 6 is arranged on the below of fuel tank assembly 3 and high pressure pump assembly 5; The setting of above-mentioned loaded plate 6 can improve high pressure pump assembly 5 and the stability of installing integrated connection.
Preferably, in the utility model concrete operations, outer layer sleeve 13 is for being symmetrically arranged with two semicircle pipe fittings, and semicircle pipe fitting is provided with aperture, and aperture is for being applied to gum cover 12 by confined pressure.Above-mentioned gum cover 12 by employing have elasticity, can compression seal rubber sleeve 12 chamber of more true ground environment is provided for cement sheath is cementing at present, concrete and outer layer sleeve 13 is processed into two halves, during experiment, two half-covering tubes are combined and fastening; And on sleeve pipe, process porosely, confined pressure can be added in above gum cover 12; After use, can open, reach the effect of recycling.
Preferably, between kettle cover structure 18 bottoms and outer layer sleeve 13, be provided with gland 17, kettle cover structure 18 outsides are symmetrically arranged with two still handles 22, and kettle cover structure 18 tops are provided with long adapter 20, short adapter 21, and long adapter 20 places are provided with thermocouple 19.By above-mentioned long adapter, short adapter and can realize the detection to inner layer sleeve 11 internal environments with inner layer sleeve 11 internal communication Kong roads, as pressure detecting, temperature detection etc.Preferably, by what arrange on outer kettle 14, be communicated with Kong road with the second annular space cavity 15 and can realize the detection to the second annular space cavity 15 internal environments, as pressure detecting, temperature detection etc.; Wherein, first ring cavity body 16 and the second annular space chamber are isobaric cavity.
The accuracy of preferably, installing in order to improve the utility model concrete operations middle sleeve assembly 1; Can between outer layer sleeve 13 and outer kettle 14, righting pipe clamp 23 be set; By above-mentioned righting pipe clamp 23, can effectively guarantee the accuracy that the structures such as outer layer sleeve 13 are installed in thimble assembly 1.Preferably, in the utility model concrete operations, place, steam vent road can be filled with industrial felt; For testing the pore of scurrying out at the bottom of still, adopt industrial felt to fill, can guarantee not by cement paste shutoff, can make again gas pass through, do not affect to test and alter; Meanwhile, the utility model can be tested the device of the cementing situation in cement sheath middle part, the cementing poor and blind area that cannot detect of cleaning cement sheath two ends strong bonding, interlude.Preferably, the utility model can be realized well cementation, test operation adopts same tubing string, can effectively guarantee that the confined pressure in cement sheath outside in well cementing process is identical with the confined pressure in test environment; Can effectively avoid in prior art, cement paste forming operation and test operation adopt the situation of different tubing strings, forming operation, the test operation of tubing string unified in above-mentioned employing, can effectively guarantee to test required pressure environment, can effectively guarantee the accuracy of test.
Preferably, in order further to improve the close of test operating mode and true ground environment, in the utility model concrete operations, cement sheath height is 1000mm, and inner layer sleeve is 4-1/2 " sleeve pipe.
The utility model, with simulation hp-ht well underground working, is carried out variations in temperature and is caused the cementing inefficacy experiment of cementing concrete ring, analyze cementing concrete ring failure cause, the mechanism of the cementing inefficacy of research cement sheath is object, for the cementing crash simulation experimental facilities of cementing the well at present, can not simulate hp-ht well down-hole actual condition both at home and abroad, lack quantitative test cement sheath has channeling flow, lack the cementing situation that detects cement sheath interlude, can not in an equipment, complete cement paste cementing and carry out the problems such as the cementing inefficacy experiment of temperature-cement sheath, design " well a kind of for 6, 4-1/2 " tail pipe, can simulate bottom-hole static temperature the highest 160 ℃, formation pore pressure 6000psi, the operating mode of maximum pressure load 10000psi in sleeve pipe, can press in analog casing, cement sheath temperature cycle changes and quantitative test has channeling flow, detect the cementing situation of cement sheath interlude, can be for cement sheath cementing and realize temperature-cementing failure testing, the test parts such as inner layer sleeve can reuse, realize the device of real time data acquisition.
Preferably, in the utility model concrete operations, can realize in the following way:
1. on workbench, by 4-1/2, " inner layer sleeve, gum cover are installed;
2. two halves outer layer sleeve is arranged on outside gum cover, by this two half-covering tube be combined, fastening, now should be noted that coordinating of rubber sleeve epimere portion and sleeve pipe;
3. inject the cement paste configuring, in injection process, stir, prevent from having cavity in the cementing process of cement sheath;
4. cement paste is injected into behind precalculated position, at 4-1/2 " auxiliary coupling device is installed in upper end, by device for lifting by thimble assembly by workbench, be placed in main body still assembly;
5. take off 4-1/2 " auxiliary coupling device of sleeve pipe upper end, the end cover of mounting sleeve density end cap and autoclave;
6. connect high pressure gas transmission, pipeline road;
7. by Servocontrol device, high pressure temperature in the kettle, pressure are risen to consistent with actual underground working, according to real time curing water mudstone, make cement sheath cementing;
8., after the cementing time finishes, adjust the suffered confined pressure of thimble assembly and measure has channeling pressure; By adding of equipment gentle cooling unit simulate quickly and accurately the feature that the underground working temperature difference is large;
9. in experimentation, utilize balance drainage, detect with the cementing state of temperature change cement sheath, and gather with computer settling signal.
The technique scheme that the utility model provides is pressed in can analog casing, the cyclically-varying of confined pressure and has channeling flow etc., can realize real time data acquisition; The has channeling of cement sheath can be detected, and gather accurately; Can be according to different cement sheath mechanical characteristics rule that affects on its cementing inefficacy under different temperatures, the applicable tough elastic cement formula of design, formulates rational cementing technology measure and selecting properly job parameter targetedly; Meanwhile, technique scheme forms rationally, is easy to raise and implement.
Although it is apparent to those skilled in the art that the disclosed embodiment of the utility model as above, the embodiment that only adopts for ease of understanding the utility model of content, not in order to limit the utility model.Those of skill in the art under any the utility model; do not departing under the prerequisite of the disclosed spirit and scope of the utility model; can in the form of implementing and details, carry out any modification and variation; but scope of patent protection of the present utility model, still must be as the criterion with the scope that appending claims was defined.

Claims (8)

1. for simulating a thimble assembly for cementing test, it is characterized in that,
Comprise inner layer sleeve, described inner layer sleeve outside is arranged with gum cover, outer layer sleeve, outer kettle successively, and described outer layer sleeve is used for supporting described gum cover;
First ring cavity body between described inner layer sleeve and described gum cover is used for holding cement sheath, and the second annular space cavity between described outer layer sleeve and described outer kettle is used for holding heat transfer pressure medium;
Described thimble assembly top is provided with kettle cover structure, and described thimble assembly bottom is provided with still bottom structure, and described kettle cover structure is provided with injecting hole road, and described still bottom structure is provided with steam vent road; Described injecting hole road, for nitrogen injection operation, forms isobaric cavity by described first ring cavity body and described the second annular space cavity; Described steam vent road is for detection of the leak case of described cement sheath.
2. according to claim 1ly for simulating the thimble assembly of cementing test, it is characterized in that,
Also comprise balance assembly, the gas that discharge on described steam vent road is realized the has channeling amount occurring in cement sheath described in quantitative measurment by described balance assembly;
The has channeling amount occurring in cement sheath described in the quantitative measurment of described balance assembly employing drainage.
3. according to claim 2ly for simulating the thimble assembly of cementing test, it is characterized in that,
Described outer layer sleeve is symmetrically arranged two semicircle pipe fittings, and described semicircle pipe fitting is provided with aperture, and described aperture is for being applied to described gum cover by confined pressure.
According to described in claim 1 or 2 or 3 for simulating the thimble assembly of cementing test, it is characterized in that,
Between described kettle cover structural base and described outer layer sleeve, be provided with gland, described kettle cover structure outside is symmetrically arranged with two still handles, and described kettle cover structural top is provided with long adapter, short adapter.
According to described in claim 1 or 2 or 3 for simulating the thimble assembly of cementing test, it is characterized in that,
Between described outer layer sleeve and described outer kettle, be provided with righting pipe clamp.
According to described in claim 1 or 2 or 3 for simulating the thimble assembly of cementing test, it is characterized in that,
Place, described steam vent road is filled with industrial felt.
According to described in claim 1 or 2 or 3 for simulating the thimble assembly of cementing test, it is characterized in that,
Described cement sheath height is 1000mm.
According to described in claim 1 or 2 or 3 for simulating the thimble assembly of cementing test, it is characterized in that,
Described inner layer sleeve is 4-1/2 " sleeve pipe.
CN201420067388.2U 2014-02-14 2014-02-14 Sleeve subassembly for simulated cementation test Expired - Fee Related CN203756119U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420067388.2U CN203756119U (en) 2014-02-14 2014-02-14 Sleeve subassembly for simulated cementation test

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420067388.2U CN203756119U (en) 2014-02-14 2014-02-14 Sleeve subassembly for simulated cementation test

Publications (1)

Publication Number Publication Date
CN203756119U true CN203756119U (en) 2014-08-06

Family

ID=51251406

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420067388.2U Expired - Fee Related CN203756119U (en) 2014-02-14 2014-02-14 Sleeve subassembly for simulated cementation test

Country Status (1)

Country Link
CN (1) CN203756119U (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104181287A (en) * 2014-08-18 2014-12-03 中国海洋石油总公司 Equipment for testing self-repairing capacity of well cementation set cement
CN104405366A (en) * 2014-10-22 2015-03-11 西南石油大学 Device and method for testing mechanical integrity of high-temperature high-pressure well cementation cement sheath
CN105019885A (en) * 2014-12-23 2015-11-04 中国石油化工股份有限公司 Upright pressure compensation type high temperature and high pressure simulation device
CN105178944A (en) * 2015-10-22 2015-12-23 中国石油大学(北京) Simulation experiment device for deepwater underwater shaft
CN105300803A (en) * 2015-10-28 2016-02-03 西安石油大学 HTHP well cementation cement sheath integrity simulation evaluation tester
CN104500034B (en) * 2014-12-29 2017-04-12 西南石油大学 Device and method for evaluating influence of pressure change on completeness of cement sheath
CN108894773A (en) * 2018-06-20 2018-11-27 长江大学 Supercritical CO2Pressure break cement gel junction fracturing experimental facilities and method
CN113062714A (en) * 2019-12-31 2021-07-02 中国石油天然气股份有限公司 Medium double-circulation thermal production tool test cased well
CN113482581A (en) * 2021-08-10 2021-10-08 中海石油(中国)有限公司 Double-layer casing perforation simulation experiment device and method

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104181287A (en) * 2014-08-18 2014-12-03 中国海洋石油总公司 Equipment for testing self-repairing capacity of well cementation set cement
CN104181287B (en) * 2014-08-18 2016-02-03 中国海洋石油总公司 A kind of testing apparatus of well-cementing cement self-reparing capability
CN104405366A (en) * 2014-10-22 2015-03-11 西南石油大学 Device and method for testing mechanical integrity of high-temperature high-pressure well cementation cement sheath
CN104405366B (en) * 2014-10-22 2017-07-11 西南石油大学 A kind of HTHP cementing concrete ring mechanical integrity test device and method
CN105019885A (en) * 2014-12-23 2015-11-04 中国石油化工股份有限公司 Upright pressure compensation type high temperature and high pressure simulation device
CN105019885B (en) * 2014-12-23 2017-11-24 中国石油化工股份有限公司 Place formula pressure compensation HTHP analogue means vertically
CN104500034B (en) * 2014-12-29 2017-04-12 西南石油大学 Device and method for evaluating influence of pressure change on completeness of cement sheath
CN105178944A (en) * 2015-10-22 2015-12-23 中国石油大学(北京) Simulation experiment device for deepwater underwater shaft
CN105300803A (en) * 2015-10-28 2016-02-03 西安石油大学 HTHP well cementation cement sheath integrity simulation evaluation tester
CN108894773A (en) * 2018-06-20 2018-11-27 长江大学 Supercritical CO2Pressure break cement gel junction fracturing experimental facilities and method
CN113062714A (en) * 2019-12-31 2021-07-02 中国石油天然气股份有限公司 Medium double-circulation thermal production tool test cased well
CN113482581A (en) * 2021-08-10 2021-10-08 中海石油(中国)有限公司 Double-layer casing perforation simulation experiment device and method

Similar Documents

Publication Publication Date Title
CN203756119U (en) Sleeve subassembly for simulated cementation test
CN203756155U (en) Well cementation failure evaluation device
CN112557203B (en) Hot hydraulic coupling triaxial test method for fractured rock
CN105484729B (en) One kind containing hydrate, ice stratum cementing concrete ring second interface cementing strength test device
CN102778554B (en) Experimental device for improving permeability of shale gas storage layer in supercritical CO2 fracturing process
CN106522923A (en) Oil/gas well cement sheath sealing integrity testing device and method for carrying out evaluation through device
CN204679347U (en) A kind of drilling fluid pressurization sealing crushing test device
CN206233918U (en) Oil/gas Well cement sheath sealing integrity test device
CN203191180U (en) Test device for rubber barrel of packer
CN103808652B (en) A kind of analog temperature change causes the method for cementing inefficacy of cementing the well
CN103953332B (en) Experimental device and experimental method for simulating dynamic leakage and leaking stoppage of drilling fluid
CN110593811B (en) Cement sheath initial stress state monitoring experiment method
CN205982015U (en) Rock fracture seepage flow parameter testing device under high temperature high pressure condition
CN103806865B (en) A kind of simulated pressure changes the method causing cementing inefficacy of cementing the well
CN210105843U (en) High-temperature high-pressure gas well cement sheath sealing integrity evaluation system
CN111287731A (en) Device and method for evaluating integrity of well cementation cement sheath
CN112485125A (en) Tunnel model test device and method capable of controlling soil loss rate
CN107956430B (en) Intelligent well completion pipe string suitable for land test well and well logging test method thereof
CN202081890U (en) All-service gas lifting stratum testing tubular column
CN212671758U (en) Well cementation cement sheath integrality evaluation device
CN205277401U (en) Contain hydrate, two interface cementing strength testing arrangement on ice stratum well cementation cement ring
CN110578494B (en) Cement sheath initial stress state monitoring experiment device
CN112443288B (en) Experimental device for evaluating sealing capacity of two interfaces of well cementation cement sheath
CN202946094U (en) Double-power-source packer for air-tight seal detection of oil sleeve
CN109781538B (en) Device and method for evaluating repair capability of exogenous self-repairing material of well cementation set cement

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140806

Termination date: 20220214

CF01 Termination of patent right due to non-payment of annual fee