CN203625740U - Temporary service road in desert - Google Patents

Temporary service road in desert Download PDF

Info

Publication number
CN203625740U
CN203625740U CN201320730727.6U CN201320730727U CN203625740U CN 203625740 U CN203625740 U CN 203625740U CN 201320730727 U CN201320730727 U CN 201320730727U CN 203625740 U CN203625740 U CN 203625740U
Authority
CN
China
Prior art keywords
layer
straw
desert
roadbed
sand
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320730727.6U
Other languages
Chinese (zh)
Inventor
徐存东
张先起
张宏洋
王燕
韩立炜
贾广钰
刘慧卿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
North China University of Water Resources and Electric Power
Original Assignee
North China University of Water Resources and Electric Power
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by North China University of Water Resources and Electric Power filed Critical North China University of Water Resources and Electric Power
Priority to CN201320730727.6U priority Critical patent/CN203625740U/en
Application granted granted Critical
Publication of CN203625740U publication Critical patent/CN203625740U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model discloses a temporary service road in desert. According to the temporary service road in the desert, a roadbed is a thick macadam layer; the middle layer is a straw layer; the surface layer is a mixed layer; rectangular caulking grooves are formed downwards in the both sides of the roadbed respectively, and sand-straw mixture layers are arranged in the rectangular caulking grooves in a paving manner; side slopes of the rectangular caulking grooves are paved with straw lattices to form revetments. The temporary service road in the desert is wide in material range, low in cost and high in construction speed; the caulking grooves are formed in the both sides of the roadbed and filled with sand-straw mixtures, a constraining force is provided for a pavement, and thus the support strength of the pavement is enhanced and the service life of the pavement is prolonged; the side slope surfaces of the caulking grooves adopt the straw lattice revetments, and the functions of dyke strengthening and slumping prevention are realized, and thus the practical life of the pavement is prolonged; the three-layer structures are combined, and have the characteristics of being firm, economic, durable and the like; macadam, straws and mixed sand are arranged in a paving manner on the basis of the original road again, so as to form a new firm service road.

Description

The interim sidewalk in desert
Technical field
The utility model belongs to the road construction field of Desert Control, is specifically related to a kind of building method of temporary construction sidewalk of surface layer of desert.
Background technology
Conquering desert, march the important content that desert is development of the West Regions, is also that 21 century people thirst for one of problem solving.Along with the steady enforcement of strategy to develop western regions, large quantities of engineerings will be built in desert area, need to be by heavy mechanical equipment.And desert is because of its particularity, need to builds specially builder's road and use for main equipment.But, insecure due to ground in desert, be difficult to lay highway according to common construction technology, build road difficulty in desert very large, need to there be firm roadbed and strong non-deformability, on the other hand, because desert dust storm is large, sand dune mobility can affect road gradually, even destroys the normal use of road.Due to desert road, generally to have the life-span short, and just causing can not the too high construction cost of disposable input in desert.So far also do not have a kind of pioneer road structure of normalization to occur.
Utility model content
The purpose of this utility model is to provide a kind of building method of temporary construction sidewalk of surface layer of desert, can be convenient, fast, economical at surface layer of desert building operations sidewalk, make construction machinery can enter smoothly building site, accelerate engineering construction progress.
For realizing above-mentioned utility model object, the technical scheme that the utility model adopts is as follows: the interim sidewalk in a kind of desert, comprise roadbed, intermediate layer and surface layer, and wherein, roadbed is that thickness is the macadam of 8~12cm, ballast grain sizes scope is 2~5cm; Intermediate layer is that thickness is the straw layer of 3~5cm; The natural river sand that surface layer is 0.5~3cm by particle diameter forms the mixing layer of sand that thickness is 9~11cm.Be respectively arranged with the caulking groove of rectangle in roadbed both sides downwards, in rectangle caulking groove, lay sand grass mixture layer; In the side slope of rectangle caulking groove, lay straw sash and form bank protection.
Further, roadbed is that thickness is the macadam of 10cm, and ballast grain sizes scope is 2~5cm; Intermediate layer is that thickness is the straw layer of 5cm; The natural river sand that surface layer is 0.5~3cm by particle diameter forms the mixed layer that thickness is 10cm.In the side slope of rectangle caulking groove, lay 40cm × 40cm straw sash and form bank protection.
The utlity model has following advantage: pavement material of the present utility model consists of rubble, straw and mixed sand, draw materials easily, with low cost, speed of application is fast.Caulking groove heap sand grass mixture are established in road foundation both sides, and road pavement provides restraint forces, improves road surface support strength and application life.The side slope face of caulking groove adopts straw grid bank protection, has the effect of dyke strengthening slumping, improves road surface physical life.
The utility model is easily constructed, and in the time of smooth Shamian Island, can design caulking groove according to desert terrain, can in desert, not be subject to landform restriction ground laying construction sidewalk fast.The rubble of bottom greater particle size provides supporting layer, straw layer is conducive to rubble and mixed sand keeps together and is difficult for loose destruction, mixed sand is also conducive to road surface leveling when providing upper strata to support, three layer construction combine have solid, economical and durable etc. a little.
The utility model can also, because of after long-term dust storm erosion damage road, again be laid rubble, straw and mixed sand on original road basis, although original road is destroyed, but still can be the same material road of the new laying solid new sidewalk of formation that combines.
Accompanying drawing explanation
Fig. 1 is the structural representation of the construction method of the interim sidewalk in the utility model desert;
Fig. 2 is that the A of Fig. 1 is to structural representation.
In figure, number 1 for desert, 2 is macadam, and 3 is straw layer, and 4 for mixing layer of sand, and 5 is rectangle caulking groove, and 6 is sand grass mixed layer, and 7 is side slope, and 8 is straw grid.
The specific embodiment
Embodiment 1: the interim sidewalk in a kind of desert, referring to Fig. 1 and Fig. 2, comprises roadbed, intermediate layer and surface layer.Wherein, roadbed is that thickness is the macadam 2 of 10cm, and ballast grain sizes scope is 2~5cm; Intermediate layer is that thickness is the straw layer 3 of 5cm; The natural river sand that surface layer is 0.5~3cm by particle diameter forms the mixing layer of sand 4 that thickness is 10cm.Be respectively arranged with rectangle caulking groove 5 downwards in roadbed both sides, the interior laying sand grains of rectangle caulking groove 5 and straw form sand grass mixed layer 6, and sand grains and the configuration of straw arbitrary proportion all can; In the side slope 7 of rectangle caulking groove 5, lay 40cm × 40cm straw sash 8 and form bank protection.
The construction method of the present embodiment is as follows:
First,, in the sidewalk position of pre-construction, smooth Shamian Island, keeps Shamian Island level; Shamian Island after smooth is laid macadam formation roadbed, and macadam thickness is 10cm, and ballast grain sizes scope is 2~5cm.
Secondly, lay straw layer at macadam upside, straw layer thickness is 5cm; Lay and mix layer of sand at straw layer upside again, mixed sand layer thickness is 10cm.The natural river sand that described mixing layer of sand is all 0.5~3cm by particle diameter forms.
Then, at roadbed both sides excavation rectangle caulking groove, the wide 30cm of bottom land, dark 50cm; In rectangle caulking groove, lay sand grains and straw and form sand grass mixture; And in the side slope of rectangle caulking groove, lay 40cm × 40cm straw sash and form bank protection.
In addition, can also be in the situation that interim sidewalk cannot normally use after being badly damaged for the first time, can be using original pioneer road as roadbed, adopt same method again to implement interim sidewalk.Thereby cost-saving and reduce construction volume, avoid must be again constructing roadbed in traditional road construction drawback.

Claims (5)

1. the interim sidewalk in desert, comprises roadbed, intermediate layer and surface layer, it is characterized in that, roadbed is that thickness is the macadam of 8~12cm; Intermediate layer is that thickness is the straw layer of 3~5cm; Surface layer is that thickness is the mixing layer of sand of 9~11cm; Be respectively arranged with the caulking groove of rectangle in roadbed both sides downwards, in rectangle caulking groove, lay sand grass mixture layer; In the side slope of rectangle caulking groove, lay straw sash and form bank protection.
2. the interim sidewalk in desert according to claim 2, is characterized in that, roadbed is that thickness is the macadam of 10cm, and ballast grain sizes scope is 2~5cm.
3. the interim sidewalk in desert according to claim 2, is characterized in that, intermediate layer is that thickness is the straw layer of 5cm.
4. the interim sidewalk in desert according to claim 6, is characterized in that, the natural river sand that surface layer is 0.5~3cm by particle diameter forms the mixed layer that thickness is 10cm.
5. the interim sidewalk in desert according to claim 6, is characterized in that, lays 40cm × 40cm straw sash and form bank protection in the side slope of rectangle caulking groove.
CN201320730727.6U 2013-11-19 2013-11-19 Temporary service road in desert Expired - Fee Related CN203625740U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320730727.6U CN203625740U (en) 2013-11-19 2013-11-19 Temporary service road in desert

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320730727.6U CN203625740U (en) 2013-11-19 2013-11-19 Temporary service road in desert

Publications (1)

Publication Number Publication Date
CN203625740U true CN203625740U (en) 2014-06-04

Family

ID=50812232

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320730727.6U Expired - Fee Related CN203625740U (en) 2013-11-19 2013-11-19 Temporary service road in desert

Country Status (1)

Country Link
CN (1) CN203625740U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105484120A (en) * 2015-12-14 2016-04-13 广州大学 Desert highway and construction method thereof
CN113481771A (en) * 2021-08-05 2021-10-08 常熟市第二市政路桥建设工程有限公司 Permanent-temporary combined construction structure for municipal road and construction method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105484120A (en) * 2015-12-14 2016-04-13 广州大学 Desert highway and construction method thereof
CN105484120B (en) * 2015-12-14 2017-08-25 广州大学 Desert highway and its construction method
CN113481771A (en) * 2021-08-05 2021-10-08 常熟市第二市政路桥建设工程有限公司 Permanent-temporary combined construction structure for municipal road and construction method thereof

Similar Documents

Publication Publication Date Title
CN102704364B (en) Clay serging tailings subgrade structure and construction method thereof
CN108978623B (en) Composite reinforced gravel cushion layer doped with construction waste and waste tires and construction method
CN101403209B (en) Fast water-permeable brick for stopping pad and laying method
CN204212018U (en) A kind of road structure preventing and treating the soft soil roadbed freeze thawing disease of high and cold mountain area cheuch section
CN112211159A (en) Ecological revetment and ecological revetment combined system and construction method
CN203625740U (en) Temporary service road in desert
CN204825539U (en) Control difference in temperature prevents roadbed structure of cold mountain area highway inhomogeneous deformation
CN202830673U (en) Existing embankment heightening structure for limited using land area
CN208884292U (en) Soft soil roadbed and normal roadbed intersection anti-settling structure
CN109537389B (en) EPS (expandable polystyrene) lower embankment structure and construction method thereof
CN103603250B (en) The interim sidewalk in desert and construction method thereof
CN208266797U (en) Ecological embankment for stabilizing river bank slope
CN213740874U (en) Ecological bank protection structure
CN108396774A (en) A kind of variable slope wave mutually-embedded ecological building block retaining wall system and its construction method
CN203096697U (en) Ballast field structure at earth and rockfill dam toe
CN215758302U (en) High liquid limit soil roadbed structure
CN205347921U (en) Concrete road surface brick permeates water + permeates water certainly in gap
CN105525551B (en) Transformation method for temporary construction road of wind power field and grass planting pavement structure
CN108360321B (en) Structure and method for controlling post-construction settlement of fine-grained soil high-fill embankment
CN206986661U (en) A kind of prefabricated sash ecology curb
CN113605416A (en) Slope protection supporting structure for ecological management of side slope water and construction method thereof
CN203129156U (en) High steep reinforcement side slope structure
CN106337409A (en) Method for treating peat soil foundation through preloading in combination with salt piles
CN106120502B (en) Fill roadbed structure
CN102912785A (en) Similarly arch stacked bagged gravel and sandy soil foundation reinforcement treatment method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140604

Termination date: 20151119

EXPY Termination of patent right or utility model