CN106120502B - Fill roadbed structure - Google Patents

Fill roadbed structure Download PDF

Info

Publication number
CN106120502B
CN106120502B CN201610724298.XA CN201610724298A CN106120502B CN 106120502 B CN106120502 B CN 106120502B CN 201610724298 A CN201610724298 A CN 201610724298A CN 106120502 B CN106120502 B CN 106120502B
Authority
CN
China
Prior art keywords
slope
roadbed
soil
filled
earth
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610724298.XA
Other languages
Chinese (zh)
Other versions
CN106120502A (en
Inventor
王传波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Guiyang Engineering Corp Ltd
Original Assignee
PowerChina Guiyang Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Guiyang Engineering Corp Ltd filed Critical PowerChina Guiyang Engineering Corp Ltd
Priority to CN201610724298.XA priority Critical patent/CN106120502B/en
Publication of CN106120502A publication Critical patent/CN106120502A/en
Application granted granted Critical
Publication of CN106120502B publication Critical patent/CN106120502B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Architecture (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention provides a filling roadbed structure which comprises a roadbed, wherein a stone square cushion layer is laid at the bottom of the outer side of a roadbed side slope, soil and stone mixed fillers are filled above the stone square cushion layer and the roadbed side slope to form a filling side slope, the slope ratio of the filling side slope is less than or equal to 1:4.0, and the stone square cushion layer and the soil and stone mixed fillers on the outer side of the roadbed jointly form a protection system to protect a conventional roadbed and serve as a foundation of slope soil. The method solves the problems of high protection cost, no environmental protection, large accident loss, high cost for building and abandoning the slag yard and the like of the traditional filling roadbed. The invention belongs to the technical field of roadbed construction.

Description

A kind of filled-up ground structure
Technical field
The present invention relates to a kind of road structures, belong to roadbed and construct technical field.
Background technology
In highway engineering construction, especially in mountain area place, subgrade engineering generally has excavation section and embankment section. In filled-up ground, height of embankment is in 20m or less, by 1:1.3~1:1.75 slope ratio fills the cubic metre of earth and stone.Then on the outside of side slope Using dry stone pitching or use frame gird type slope protection.
Traditional filled-up ground design is only from the angle for considering subgrade stability, safety of the roadbed side slope in code requirement It can keep stablizing under coefficient.In this case the Slope obtained is bigger, and usually 1:1.5, while to prevent water and soil Be lost in, the safeguard procedures such as sash beam or loose stone need to be sets in slope surface, these safeguard procedures it is costly and not environmentally, lack and give birth to Machine.Accident occurs for vehicle when going out guardrail, since grade of side slope is big, and does not have secondary protection measure, suffers heavy losses, usually vehicle is ruined People dies.
In addition in roadbed earthwork, especially mountain area place, the cubic metre of earth and stone are often difficult to balance, and digging soil is more, needs Dumping Sites are built in additional expropriation of land, and cinder field protection is costly.
Invention content
It is an object of the invention to:A kind of filled-up ground structure and its construction method are provided, to solve traditional filled-up ground Protect that costly, not environmentally protective, causality loss is big, builds the problems such as Dumping Sites are costly.
To solve the above problems, quasi- use such a filled-up ground structure, including roadbed, the bottom on the outside of roadbed side slope Cubic meter of stone bed course is equipped with, filled with earth-rock mixture object to form embankment side slope, embankment side above the side slope of cubic meter of stone bed course and roadbed The slope ratio on slope is less than or equal to 1:4.0, embankment cubic meter of stone bed course, earth-rock mixture object collectively constitute guard system on the outside of roadbed, and protection is normal Roadbed is advised, while as the basis of Soil Slope.
In aforementioned filled-up ground structure, the side slope top of the slope of roadbed is provided with guardrail;
In aforementioned filled-up ground structure, Soil Slope is equipped on earth-rock mixture object, being planted on Soil Slope there are trees, sets Wood is ascended a height plantation, and green coverage is increased, and is conducive to build environment-friendly type highway;Top of the slope guardrail, very slow embankment side slope and tree The collective effect of wood, can substantially reduce the loss that traffic accident is brought;
In aforementioned filled-up ground structure, cubic meter of stone bed course and earth-rock mixture object are the digging soil excavated section and generated, cubic meter of stone bed course It is required that being compacted by particular requirement according to certain grading, native stone mixture is stacked by waste requirement, can be turned waste into wealth, and is reduced cinder field and is held Amount even can avoid setting cinder field, to investment reduction;
In aforementioned filled-up ground structure, Soil Slope derives from the clear table of roadbed, is not required to additionally fetch earth.
The construction method of above-mentioned filled-up ground structure is as follows:
A. satisfy the need the clear table of base face progress, and clear table soil is concentrated and is stacked, so that the later stage uses as Soil Slope;
B. when ground horizontal slope is larger, geology step is excavated by code requirement, to ensure the stabilization of conventional roadbed;
C. according to compaction requirement routinely roadbed side slope slope than placement in layers routine roadbed, while construct cubic meter of stone bed course and Earth-rock mixture object, cubic meter of stone bed course are compacted by the requirement not less than conventional roadbed, earth-rock mixture object routinely waste mode with routine Roadbed gradually raising;
D. subgrade and pavement has filled, timely construction subgrade guardrail, after earth-rock mixture object tends towards stability, according to embankment side slope Slope is than construction Soil Slope;
E. after Soil Slope stabilization, contour cultivation slope surface trees.
Compared with prior art, the present invention with digging soil on the outside of existing roadbed by thickening roadbed filling to Slope than small In 1:4.0 structure, while improving safety, it is possible to reduce subgrade protection project amount, while can reach reduction cinder field capacity The purpose that expense is taken over the land for use and protected to reduce cinder field, has higher economic benefit.It is calculated by 10m filled-up ground height, unilateral side is filled out Fang Bianpo can reduce dry-laid rubble 9m3/m.Reduce cinder field capacity 125m3/m.Due to having spread certain thickness soil in slope surface, Trees are planted above, it is possible to reduce soil erosion, beautification highway environment reduce driver and conductor's fatigue, have higher environmental protection Benefit.Simultaneously because grade of side slope becomes smaller significantly, and still there are trees to block outside conventional roadbed guardrail, traffic thing can be greatly reduced Therefore the harm brought, there is higher economic and social benefit.
The configuration of the present invention is simple, easy for construction, securely and reliably, remarkable in economical benefits can be wide in filled-up ground technical field General popularization and application.
Description of the drawings
Fig. 1 is the sectional view of roadbed side slope of the present invention;
Wherein, reference numeral 1- roadbeds (conventional filling roadbed), 2- cubic meter of stone bed courses, 3- earth-rock mixture objects, 4- slope surface soil Earth, 5- guardrails, 6- trees, the 8- routine roadbed side slope gradients, 9- roadbed filling height, 10- ground lines, the road surfaces 11-.
Specific implementation mode
To make the object, technical solutions and advantages of the present invention clearer, the present invention will be made below into one by attached drawing Step ground detailed description.
Embodiment:
With reference to attached drawing 1, the present embodiment provides a kind of filled-up ground structure, including roadbed 1, the bottom on the outside of 1 side slope of roadbed It is equipped with cubic meter of stone bed course 2, is filled out filled with earth-rock mixture object 3 with forming embankment side slope above the side slope of cubic meter of stone bed course 2 and roadbed 1 The slope ratio of Fang Bianpo is less than or equal to 1:4.0, embankment cubic meter of stone bed course, earth-rock mixture object collectively constitute guard system on the outside of roadbed, protect The conventional roadbed of shield, while as the basis of Soil Slope, the side slope top of the slope of roadbed 1 is provided with guardrail 5,3 upper berth of earth-rock mixture object Being planted equipped with Soil Slope 4, on Soil Slope 4 has trees 6, and trees 6 ascend a height plantation, cubic meter of stone bed course 2 and earth-rock mixture object 3 to open The digging soil that road breaking section generates, Soil Slope 4 derive from the clear table of roadbed, are not required to additionally fetch earth.
Construction method is as follows:
First, satisfy the need the clear table of base face progress, and clear table soil is concentrated and is stacked, so that the later stage uses as Soil Slope 4 (when ground horizontal slope is larger, geology step being excavated by code requirement, to ensure the stabilization of conventional roadbed 1);
Then, according to compaction requirement, routinely 1 Slope of roadbed is than placement in layers routine roadbed 1, while the cubic meter of stone of constructing Bed course 2 and earth-rock mixture object 3, cubic meter of stone bed course 2 are compacted by the requirement not less than conventional roadbed 1, the routinely waste of earth-rock mixture object 3 Mode is with the gradually raising of conventional roadbed 1;
1 road surface of roadbed has been filled, timely construction subgrade guardrail 5, after earth-rock mixture object 3 tends towards stability, according to embankment side Slope slope is than construction Soil Slope 4;
Finally, wait for that Soil Slope is stablized, contour cultivation slope surface trees 6.

Claims (4)

1. a kind of filled-up ground structure, including roadbed (1), it is characterised in that:Bottom on the outside of roadbed (1) side slope is equipped with the cubic meter of stone Filled with earth-rock mixture object (3) to form embankment side slope, embankment above the side slope of bed course (2), cubic meter of stone bed course (2) and roadbed (1) The slope ratio of side slope is less than or equal to 1:4.0, the construction method of the filled-up ground structure is as follows:
A. satisfy the need the clear table of base face progress, and clear table soil is concentrated and is stacked, so that the later stage uses as Soil Slope (4);
B. when ground horizontal slope is larger, geology step is excavated by code requirement, to ensure the stabilization of conventional roadbed (1);
C. according to compaction requirement, routinely roadbed (1) Slope is than placement in layers routine roadbed (1), while cubic meter of stone bed course of constructing (2) it is compacted by the requirement not less than conventional roadbed (1) with earth-rock mixture object (3), cubic meter of stone bed course (2), earth-rock mixture object (3) is by normal Waste mode is advised with conventional roadbed (1) gradually raising;
D. roadbed (1) road surface has been filled, timely construction subgrade guardrail (5), after earth-rock mixture object (3) tends towards stability, according to filling out Square Slope is than construction Soil Slope (4);
E. after Soil Slope stabilization, contour cultivation slope surface trees (6).
2. a kind of filled-up ground structure according to claim 1, it is characterised in that:The side slope top of the slope of roadbed (1) is provided with shield Column (5).
3. a kind of filled-up ground structure according to claim 1, it is characterised in that:Earth-rock mixture object is equipped with slope surface on (3) Soil (4), on Soil Slope (4) plantation have trees (6).
4. a kind of filled-up ground structure according to claim 1, it is characterised in that:Cubic meter of stone bed course (2) and earth-rock mixture object (3) To excavate the digging soil that section generates.
CN201610724298.XA 2016-08-25 2016-08-25 Fill roadbed structure Active CN106120502B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610724298.XA CN106120502B (en) 2016-08-25 2016-08-25 Fill roadbed structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610724298.XA CN106120502B (en) 2016-08-25 2016-08-25 Fill roadbed structure

Publications (2)

Publication Number Publication Date
CN106120502A CN106120502A (en) 2016-11-16
CN106120502B true CN106120502B (en) 2018-09-25

Family

ID=57274543

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610724298.XA Active CN106120502B (en) 2016-08-25 2016-08-25 Fill roadbed structure

Country Status (1)

Country Link
CN (1) CN106120502B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107339107A (en) * 2017-06-27 2017-11-10 华能伊敏煤电有限责任公司 Treatment method for greening step slope of strip mine refuse dump

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20090069865A (en) * 2007-12-26 2009-07-01 동서철강 주식회사 Construction method of wellbeing slope use props
CN201473846U (en) * 2009-08-18 2010-05-19 冯守中 Anti-scouring structure for silt fill subgrade side slope
CN203212971U (en) * 2013-04-19 2013-09-25 中交第一公路勘察设计研究院有限公司 Thermal probe insulation board type expressway subgrade widening structure on soil-containing ice layer segment
CN204703019U (en) * 2015-06-09 2015-10-14 山西省交通规划勘察设计院 Soft rock is filling roadbed
CN205975241U (en) * 2016-08-25 2017-02-22 中国电建集团贵阳勘测设计研究院有限公司 Fill roadbed structure

Also Published As

Publication number Publication date
CN106120502A (en) 2016-11-16

Similar Documents

Publication Publication Date Title
CN203188065U (en) Ballastless track railway expansion soil cutting bedding and slope protection structure
CN202718138U (en) Self-locking type ecological retaining wall structure
CN107419630A (en) A kind of the soft soil foundation high-filled embankment and construction method of effectively control settlement after construction
CN206902488U (en) A kind of soft soil foundation high-filled embankment of effectively control settlement after construction
CN204849508U (en) Roadbed structure of soft soil foundation highway road bridge changeover portion
CN101598028A (en) Lining structure for super large section water-rich loess tunnel of high-speed railroad
CN108978385A (en) A kind of roadbed construction method on the road Tong Cun
CN203808088U (en) Gabion gully detention structure for top of hydropower station slag yard
CN203716019U (en) Widening structure for littoral soft soil foundation river embankment
CN207295358U (en) A kind of platform back of the body for preventing bumping at bridge-head and road surface drainage structure
CN106567404A (en) Expansive soil cutting semi-rigid top retaining wall design and construction method
CN104358196A (en) Construction method for embankment settlement treatment structure of road open to traffic
CN102518136A (en) Flexible reinforced combined protection structure for preventing and treating humidifying damage of soft rock strongly weathered zone
CN102493485B (en) Method for building slope protection retaining wall during filling
CN106703053A (en) Construction method for reinforced soil drainage composite revetment structure
CN207525567U (en) A kind of pile plate composite structure suitable for Steep Slope Embankment
CN212405094U (en) High water content clay fill foundation drainage system
CN109113045A (en) A kind of soft-soil foundation treatment method
CN106120502B (en) Fill roadbed structure
CN206385525U (en) A kind of timber structure for preventing the high backfill earthwork from sinking
CN209603112U (en) Shallow karst cave processing structure that buries
CN205975241U (en) Fill roadbed structure
CN116377780A (en) Mountain highway high-fill roadbed filling construction method
CN206768838U (en) A kind of Protection of Expansive Soil structure
CN114109394B (en) Method for determining pile length of tunnel shallow-buried weak surrounding rock high-pressure jet grouting pile method ground surface reinforcement

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant