CN205975241U - Fill roadbed structure - Google Patents

Fill roadbed structure Download PDF

Info

Publication number
CN205975241U
CN205975241U CN201620942002.7U CN201620942002U CN205975241U CN 205975241 U CN205975241 U CN 205975241U CN 201620942002 U CN201620942002 U CN 201620942002U CN 205975241 U CN205975241 U CN 205975241U
Authority
CN
China
Prior art keywords
slope
roadbed
stone
earth
filled
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620942002.7U
Other languages
Chinese (zh)
Inventor
王传波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Guiyang Engineering Corp Ltd
Original Assignee
PowerChina Guiyang Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Guiyang Engineering Corp Ltd filed Critical PowerChina Guiyang Engineering Corp Ltd
Priority to CN201620942002.7U priority Critical patent/CN205975241U/en
Application granted granted Critical
Publication of CN205975241U publication Critical patent/CN205975241U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model provides a fill roadbed structure, including the road bed, the stone side bed course has been laid to the bottom in the road bed side slope outside, and the side slope top packing of stone side bed course and road bed has the mixed filler of earth and stone in order to form the side slope of filling, and the slope ratio of side slope of filling is less than or equal to 1:4.0, and the road bed outside is filled the stone side bed course, the mixed filler of earth and stone and is constituteed protection system jointly, protects conventional road bed, is regarded as the basis of domatic soil simultaneously. The method solves the problems of high protection cost, no environmental protection, large accident loss, high cost for building and abandoning the slag yard and the like of the traditional filling roadbed. The utility model belongs to the technical field of the road bed builds.

Description

A kind of filled-up ground structure
Technical field
This utility model is related to a kind of road structure, belongs to roadbed and constructs technical field.
Background technology
In highway engineering construction, particularly local in mountain area, subgrade engineering typically has excavation section and embankment section.? In filled-up ground, height of embankment in below 20m, by 1:1.3~1:1.75 slope ratio fills the cubic metre of earth and stone.Then outside side slope Using dry stone pitching or using frame gird type slope protection.
Only from the angle considering subgrade stability, roadbed side slope is in the safety of code requirement for traditional filled-up ground design Can keep stable under coefficient.In this case the Slope ratio drawing is larger, and usually 1:1.5, simultaneously for preventing water and soil Run off, need to the safeguard procedures such as sash beam or loose stone be sets on domatic, these safeguard procedures costly and not environmentally, lack and give birth to Machine.Vehicle has an accident when going out guardrail, because grade of side slope is big, and does not have secondary protection measure, suffers heavy losses, usually car is ruined People dies.
In addition in roadbed earthwork, particularly mountain area is local, and the cubic metre of earth and stone is often difficult to balance, and the side of abandoning is more, needs Dumping Sites are built in extra expropriation of land, and slag field is protected costly.
Utility model content
The purpose of this utility model is:There is provided a kind of filled-up ground structure, to solve traditional filled-up ground protection expense Height, not environmental protection, causality loss is big, the problems such as build Dumping Sites costly.
For solving the above problems, intend adopting such a filled-up ground structure, including roadbed, the bottom outside roadbed side slope It is equipped with cubic meter of stone bed course, be filled with earth-rock mixture thing above the side slope of cubic meter of stone bed course and roadbed to form embankment side slope, embankment side The slope on slope is than less than or equal to 1:4.0, outside roadbed, embankment cubic meter of stone bed course, earth-rock mixture thing collectively constitute guard system, and protection is often Rule roadbed, simultaneously as the basis of Soil Slope.
In aforementioned filled-up ground structure, the Slope top of roadbed is provided with guardrail;
In aforementioned filled-up ground structure, earth-rock mixture thing is equipped with Soil Slope, plantation on Soil Slope has trees, tree Wood is ascended a height plantation, increases green coverage, is conducive to building environment-friendly type highway;Guardrail, very slow embankment side slope and tree are pushed up in slope The collective effect of wood, can substantially reduce the loss that vehicle accident brings;
In aforementioned filled-up ground structure, cubic meter of stone bed course and earth-rock mixture thing are to excavate the side of abandoning that section produces, cubic meter of stone bed course Require to join by particular requirement compacting according to a deciding grade and level, native stone mixture is stacked by waste requirement, can be turned waste into wealth, and reduces slag field and holds Amount even can avoid arranging slag field, thus investment reduction;
In aforementioned filled-up ground structure, Soil Slope derives from the clear table of roadbed, is not required to additionally fetch earth.
The construction method of above-mentioned filled-up ground structure is as follows:
A. base face of satisfying the need carries out clear table, clear table soil is concentrated and stacks, so that the later stage uses as Soil Slope;
B., when ground horizontal wall inscription is larger, excavate geology step by code requirement, to guarantee stablizing of conventional roadbed;
C. according to compaction requirement routinely roadbed side slope slope than placement in layers routine roadbed, simultaneously construction cubic meter of stone bed course and Earth-rock mixture thing, cubic meter of stone bed course by be not less than conventional roadbed requirement be compacted, earth-rock mixture thing routinely waste mode with routine Roadbed progressively raising;
D. subgrade and pavement has filled, timely construction subgrade guardrail, after earth-rock mixture thing tends towards stability, according to embankment side slope Slope is than construction Soil Slope;
E. after Soil Slope is stable, the domatic trees of contour cultivation.
Compared with prior art, this utility model passes through to thicken roadbed filling to Slope with the side of abandoning outside existing roadbed Than less than 1:4.0 structure, while improving safety, it is possible to reduce subgrade protection project amount, can reach reduction slag field simultaneously Capacity, to reduce the purpose of the expropriation of land of slag field and protection expense, has higher economic benefit.Calculate by 10m filled-up ground is high, single Embankment side slope in side can reduce dry-laid rubble 9m3/m.Reduce slag field capacity 125m3/m.Due to having spread certain thickness soil on domatic Earth, plants trees above, it is possible to reduce soil erosion, beautification highway environment, reduces driver and conductor's fatigue, has higher ring Protect benefit.Simultaneously because grade of side slope diminishes significantly, and still there are trees to block outside conventional roadbed guardrail, traffic can be greatly reduced The harm that accident is brought, has higher economic and social benefit.
This utility model structure is simple, easy construction, and safe and reliable, remarkable in economical benefits can be led in filled-up ground technology Domain wide popularization and application.
Brief description
Fig. 1 is the sectional view of roadbed side slope described in the utility model;
Wherein, reference 1- roadbed (conventional filling roadbed), 2- cubic meter of stone bed course, 3- earth-rock mixture thing, 4- Soil Slope, 5- guardrail, 6- trees, the 8- routine roadbed side slope gradient, 9- roadbed filling height, 10- above-ground route, 11- road surface.
Specific embodiment
For making the purpose of this utility model, technical scheme and advantage clearer, below will be new to this practicality by accompanying drawing Type is described in further detail.
Embodiment:
Referring to the drawings 1, the present embodiment provides a kind of filled-up ground structure, including roadbed 1, the bottom outside roadbed 1 side slope It is equipped with cubic meter of stone bed course 2, be filled with earth-rock mixture thing 3 above the side slope of cubic meter of stone bed course 2 and roadbed 1 to form embankment side slope, fill out The slope of Fang Bianpo is than less than or equal to 1:4.0, outside roadbed, embankment cubic meter of stone bed course, earth-rock mixture thing collectively constitute guard system, protect The conventional roadbed of shield, simultaneously as the basis of Soil Slope, the Slope top of roadbed 1 is provided with guardrail 5, earth-rock mixture thing 3 upper berth It is provided with Soil Slope 4, plantation on Soil Slope 4 has trees 6, and trees 6 ascend a height plantation, cubic meter of stone bed course 2 and earth-rock mixture thing 3 are for opening The side of abandoning that road breaking section produces, Soil Slope 4 derives from the clear table of roadbed, is not required to additionally fetch earth.
Construction method is as follows:
First, base face of satisfying the need carries out clear table, clear table soil is concentrated and stacks, so that the later stage uses as Soil Slope 4 (when ground horizontal wall inscription is larger, excavating geology step by code requirement, to guarantee stablizing of conventional roadbed 1);
Then, according to compaction requirement routinely roadbed 1 Slope than placement in layers routine roadbed 1, simultaneously construct the cubic meter of stone Bed course 2 and earth-rock mixture thing 3, cubic meter of stone bed course 2 is compacted by the requirement being not less than conventional roadbed 1, earth-rock mixture thing 3 routinely waste Mode is with conventional roadbed 1 progressively raising;
Roadbed 1 road surface has been filled, timely construction subgrade guardrail 5, after earth-rock mixture thing 3 tends towards stability, according to embankment side Slope slope is than construction Soil Slope 4;
Finally, treat that Soil Slope is stable, the domatic trees of contour cultivation 6.

Claims (4)

1. a kind of filled-up ground structure, including roadbed (1) it is characterised in that:Bottom outside roadbed (1) side slope is equipped with the cubic meter of stone Bed course (2), is filled with earth-rock mixture thing (3) to form embankment side slope, embankment above the side slope of cubic meter of stone bed course (2) and roadbed (1) The slope of side slope is than less than or equal to 1:4.0.
2. according to claim 1 a kind of filled-up ground structure it is characterised in that:The Slope top of roadbed (1) is provided with shield Hurdle (5).
3. according to claim 1 a kind of filled-up ground structure it is characterised in that:It is equipped with domatic on earth-rock mixture thing (3) Soil (4), the upper plantation of Soil Slope (4) has trees (6).
4. according to claim 1 a kind of filled-up ground structure it is characterised in that:Cubic meter of stone bed course (2) and earth-rock mixture thing (3) For excavating the side of abandoning that section produces.
CN201620942002.7U 2016-08-25 2016-08-25 Fill roadbed structure Active CN205975241U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620942002.7U CN205975241U (en) 2016-08-25 2016-08-25 Fill roadbed structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620942002.7U CN205975241U (en) 2016-08-25 2016-08-25 Fill roadbed structure

Publications (1)

Publication Number Publication Date
CN205975241U true CN205975241U (en) 2017-02-22

Family

ID=58034940

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620942002.7U Active CN205975241U (en) 2016-08-25 2016-08-25 Fill roadbed structure

Country Status (1)

Country Link
CN (1) CN205975241U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106120502A (en) * 2016-08-25 2016-11-16 中国电建集团贵阳勘测设计研究院有限公司 Fill roadbed structure and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106120502A (en) * 2016-08-25 2016-11-16 中国电建集团贵阳勘测设计研究院有限公司 Fill roadbed structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN202718138U (en) Self-locking type ecological retaining wall structure
CN203960700U (en) The closed road structure of stake holder U-lag
CN107419630A (en) A kind of the soft soil foundation high-filled embankment and construction method of effectively control settlement after construction
CN202369864U (en) Salinized soil railroad bed structure
CN206902488U (en) A kind of soft soil foundation high-filled embankment of effectively control settlement after construction
CN101598028A (en) Lining structure for super large section water-rich loess tunnel of high-speed railroad
CN110080051A (en) A kind of soil engineering bag bridge-type embankment structure and its construction method
CN204228155U (en) A kind of shallow-depth-excavation tunnel construction land tenure table settlement monitoring point buries structure underground
CN105625446B (en) A kind of construction method of tunnel undercrossing tunnel
CN102817298B (en) Construction method on frozen soil
CN207333947U (en) A kind of oil-gas pipeline protective device
CN205975241U (en) Fill roadbed structure
CN109098191A (en) A kind of depth cheats method for reinforcing side slope of paddling suddenly
CN212077510U (en) High-speed railway light soil embankment U type groove supporting construction
CN102966109A (en) Method for constructing zonal deep foundation pit bottom sealing of soft soil foundation
CN203050779U (en) Tunnel drainage structure suitable for bias pressure rich water strata
CN106120502B (en) Fill roadbed structure
CN204875404U (en) Pre -buried formula pipeline intersecting structure in road surface
CN110205982A (en) Improve the channel design and its construction method of existing river levee flood control standard
CN203795260U (en) New roadbed and old roadbed combined road structure
CN205329429U (en) Subtract shock insulation honeycomb wave drag area structure in succession
CN204385575U (en) Fill Reinforced With Geogrids clay bound edge CHARACTERISTICS OF TAILINGS SAND roadbed
CN205088528U (en) Cause of a quarrel height piece of smooth land concrete roadbed structure that fills is abandoned to soft ground
CN210658236U (en) Slag stacking structure
CN209975499U (en) Processing structure capable of repeatedly adjusting settlement difference on two sides of pile foundation track beam of deep soft soil foundation

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant