CN107339107A - Open-pit mine blast afforests the processing method of bench face - Google Patents

Open-pit mine blast afforests the processing method of bench face Download PDF

Info

Publication number
CN107339107A
CN107339107A CN201710501663.5A CN201710501663A CN107339107A CN 107339107 A CN107339107 A CN 107339107A CN 201710501663 A CN201710501663 A CN 201710501663A CN 107339107 A CN107339107 A CN 107339107A
Authority
CN
China
Prior art keywords
domatic
surface treatment
greening
slope surface
processing method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710501663.5A
Other languages
Chinese (zh)
Inventor
王喜贤
潘博
李伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huaneng Yimin Coal and Electricity Co Ltd
Original Assignee
Huaneng Yimin Coal and Electricity Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huaneng Yimin Coal and Electricity Co Ltd filed Critical Huaneng Yimin Coal and Electricity Co Ltd
Priority to CN201710501663.5A priority Critical patent/CN107339107A/en
Publication of CN107339107A publication Critical patent/CN107339107A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/32Reclamation of surface-mined areas

Abstract

The invention discloses a kind of processing method of open-pit mine blast greening bench face, comprise the following steps:Step 1, the shoulder height h of step to be afforested and original domatic angle [alpha] are obtained;Step 2, when original domatic angle [alpha] >=30 °, slope surface treatment operation is proceeded by;Step 3, the domatic angle beta after slope surface treatment operation is determined, the extended distance d of face toe needs is calculated according to domatic angle [alpha], β and shoulder height h;Step 4, according to the extended distance d in step 3, select suitable equipment to treat greening step and carry out slope surface treatment operation;Step 5, the domatic of new formation after slope surface treatment operates is afforested.The processing method can improve greening work efficiency, and largely reduce souring of the rainwater to slope greening, so as to contribute to the long-term preservation of opencut greening work achievement.

Description

Open-pit mine blast afforests the processing method of bench face
Technical field
A kind of processing method the present invention relates to opencut to boundary refuse dump greening bench face.
Background technology
Opencut greening work in China's is highly valued in recent years, and greening technique is quickly grown.Due to opencut to boundary Refuse dump is acted on by wind and rain all the year round, easily produces airborne dust and bench face is subject to heavy damage, thus to ring around mining area Border produces ill effect, while have impact on the normal life of mining area surrounding resident, therefore opencut is controlled to boundary refuse dump Manage particularly significant.
Being in progress to the greening work of boundary's casting step for current domestic opencut is rapid, but due to the original slope of casting step Face angle degree is big, thus very big difficulty is brought to greening work personnel and its equipment, the effect of rain drop erosion in addition, and leads Causing the greening soil of greening bench face Surface mulch can not deposit for a long time, so as to have a strong impact on the long-term preservation of Result of afforestation.
The information for being disclosed in the background section is merely intended to understanding of the increase to the general background of the present invention, without answering It has been the prior art well known to persons skilled in the art when being considered as recognizing or implying the information structure in any form.
The content of the invention
A kind of processing method it is an object of the invention to provide opencut to boundary refuse dump greening bench face, so that gram Take the problem of being difficult to protect opencut Result of afforestation in existing method.
To achieve the above object, the invention provides the processing method of open-pit mine blast greening bench face, including such as Lower step:
Step 1, the shoulder height h of step to be afforested and original domatic angle [alpha] are obtained;
Step 2, when original domatic angle [alpha] >=30 °, slope surface treatment operation is proceeded by;
Step 3, the domatic angle beta after determining slope surface treatment operation is calculated by analyzing, according to domatic angle [alpha], β and step Height h calculates the extended distance d of face toe needs;
Step 4, according to the extended distance d in step 3, select suitable equipment to treat greening step and carry out the domatic place Reason operation;With
Step 5, the domatic of new formation after slope surface treatment operation is afforested.
Preferably, in above-mentioned technical proposal, step, equipment is crawler dozer in 3.
Preferably, in above-mentioned technical proposal, the slope surface treatment operation of step 4 is from face toe extended distance d end Bulldozed towards domatic direction, be compacted process, it is new domatic so as to be formed.
Compared with prior art, the present invention has the advantages that:Greening work efficiency, and very great Cheng can be improved Degree reduces souring of the rainwater to slope greening, so as to contribute to the long-term preservation of opencut greening work achievement.
Brief description of the drawings
Fig. 1 is the contrast schematic diagram according to bench face of the invention before and after the processing.
Main Reference Numerals explanation:
H- shoulder heights;
α-original domatic angle;
Domatic angle after β-slope surface treatment operation;
The extended distance that d- face toes need.
Embodiment
Below in conjunction with the accompanying drawings, the embodiment of the present invention is described in detail, it is to be understood that the guarantor of the present invention Shield scope is not limited by embodiment.
Explicitly indicated that unless otherwise other, otherwise in entire disclosure and claims, term " comprising " or its change Change such as "comprising" or " including " etc. and will be understood to comprise stated element or part, and do not exclude other members Part or other parts.
The processing method of the open-pit mine blast greening bench face of the present invention, comprises the following steps:
Step 1, step shoulder height h to be afforested and original domatic angle [alpha] are obtained;
Step 2, when original domatic angle [alpha] >=30 °, slope surface treatment operation is proceeded by;
Step 3, the domatic angle beta after slope surface treatment operation is determined, is calculated according to domatic angle [alpha], β and shoulder height h The extended distance d that face toe needs;
Step 4, according to the extended distance d in step 3, select suitable equipment to treat greening step and carry out the domatic place Reason operation;With
Step 5, the domatic of new formation after slope surface treatment operation is afforested.
Wherein, equipment is crawler dozer in step 3.
Wherein, the slope surface treatment operation of step 4 is carried out from face toe extended distance d end towards domatic direction Bulldoze, compacting process, it is new domatic so as to be formed.
It according to the original domatic angle of the present invention is 30 ° that Fig. 1, which is, and shoulder height is 20 meters of step to be afforested through step slope The contrast schematic diagram of face before and after the processing.
The shoulder height h for measuring greening step first is 20 meters, and domatic angle [alpha] is 30 °, it is therefore desirable to carries out slope surface treatment Operation;
It is 15 ° by analyzing the domatic angle beta calculated after determining slope surface treatment operation, is gone out by α, β and h numerical computations The extended distance d that face toe needs is 40 meters.
Bulldozed, be compacted towards domatic direction from face toe extended distance d end using crawler dozer Operational sequence, it is new domatic so as to be formed.
Finally, newly formed it is domatic on afforested, can select non-rock high gradient slope non-woven bag greening technique, Planting groove slope protection greening technology, reinforced concrete frame banket in bulkhead tech and side slope anchor pole thick photoresist spray seeding technique one Kind.
Greening work efficiency can be improved using the processing method of the open-pit mine blast greening bench face of the present invention, and And souring of the rainwater to slope greening is largely reduced, so as to contribute to the long-term guarantor of opencut greening work achievement Deposit.
The description of the foregoing specific illustrative embodiment to the present invention is to illustrate and the purpose of illustration.These descriptions It is not wishing to limit the invention to disclosed precise forms, and it will be apparent that according to above-mentioned teaching, can be much changed And change.The purpose of selecting and describing the exemplary embodiment is that explain that the certain principles of the present invention and its reality should With so that those skilled in the art can realize and utilize the present invention a variety of exemplaries and Various chooses and changes.The scope of the present invention is intended to be limited by claims and its equivalents.

Claims (3)

1. a kind of processing method of open-pit mine blast greening bench face, it is characterised in that the treating method comprises as follows Step:
Step 1, the shoulder height h of step to be afforested and original domatic angle [alpha] are obtained;
Step 2, when original domatic angle [alpha] >=30 °, slope surface treatment operation is proceeded by;
Step 3, the domatic angle beta after the slope surface treatment operation is determined, according to the domatic angle [alpha], β and the shoulder height H calculates the extended distance d of face toe needs;
Step 4, the extended distance d according to step 3, suitable equipment is selected to carry out the step to be afforested described domatic Processing operation;With
Step 5, the domatic of new formation after slope surface treatment operation is afforested.
2. processing method according to claim 1, it is characterised in that equipment described in step 3 is crawler dozer.
3. processing method according to claim 1, it is characterised in that the slope surface treatment operation is from described in face toe Extended distance d end is bulldozed towards the domatic direction, is compacted process, new domatic so as to be formed.
CN201710501663.5A 2017-06-27 2017-06-27 Open-pit mine blast afforests the processing method of bench face Pending CN107339107A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710501663.5A CN107339107A (en) 2017-06-27 2017-06-27 Open-pit mine blast afforests the processing method of bench face

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710501663.5A CN107339107A (en) 2017-06-27 2017-06-27 Open-pit mine blast afforests the processing method of bench face

Publications (1)

Publication Number Publication Date
CN107339107A true CN107339107A (en) 2017-11-10

Family

ID=60221096

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710501663.5A Pending CN107339107A (en) 2017-06-27 2017-06-27 Open-pit mine blast afforests the processing method of bench face

Country Status (1)

Country Link
CN (1) CN107339107A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110258585A (en) * 2019-06-13 2019-09-20 国家能源投资集团有限责任公司 Open-pit mine blast greening method
CN112982447A (en) * 2021-02-27 2021-06-18 中国矿业大学 Strip mine refuse dump with ecological step slope surface structure

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1397718A (en) * 2002-08-09 2003-02-19 洪浩 Palnt growing soil and method for redaiming quarry with it
CN1540108A (en) * 2003-10-31 2004-10-27 三峡大学 Method and equipment for protecting and greening side slope
CN102671908A (en) * 2011-03-11 2012-09-19 河北农业大学 Improvement method for biological environment of tailing pond
CN103133003A (en) * 2013-02-25 2013-06-05 中国矿业大学 Opencast mine end slope near-slope mining method
CN105672326A (en) * 2016-01-25 2016-06-15 西安科技大学 Strip mine slope treatment method
CN105961120A (en) * 2016-05-26 2016-09-28 北京林业大学 Mine ecological remediation and slope vegetation fast restoring method suitable for arid region
CN106120502A (en) * 2016-08-25 2016-11-16 中国电建集团贵阳勘测设计研究院有限公司 A kind of filled-up ground structure and construction method thereof
CN106284378A (en) * 2016-08-30 2017-01-04 西北大学 A kind of Canal in Loess Area side slope soil and water conservation method

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1397718A (en) * 2002-08-09 2003-02-19 洪浩 Palnt growing soil and method for redaiming quarry with it
CN1540108A (en) * 2003-10-31 2004-10-27 三峡大学 Method and equipment for protecting and greening side slope
CN102671908A (en) * 2011-03-11 2012-09-19 河北农业大学 Improvement method for biological environment of tailing pond
CN103133003A (en) * 2013-02-25 2013-06-05 中国矿业大学 Opencast mine end slope near-slope mining method
CN105672326A (en) * 2016-01-25 2016-06-15 西安科技大学 Strip mine slope treatment method
CN105961120A (en) * 2016-05-26 2016-09-28 北京林业大学 Mine ecological remediation and slope vegetation fast restoring method suitable for arid region
CN106120502A (en) * 2016-08-25 2016-11-16 中国电建集团贵阳勘测设计研究院有限公司 A kind of filled-up ground structure and construction method thereof
CN106284378A (en) * 2016-08-30 2017-01-04 西北大学 A kind of Canal in Loess Area side slope soil and water conservation method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110258585A (en) * 2019-06-13 2019-09-20 国家能源投资集团有限责任公司 Open-pit mine blast greening method
CN112982447A (en) * 2021-02-27 2021-06-18 中国矿业大学 Strip mine refuse dump with ecological step slope surface structure

Similar Documents

Publication Publication Date Title
CN104102525B (en) A kind of risk stratification control method for passing through city track traffic engineering
CN107562977B (en) The prediction technique that construction causes existing tunnel to deform is worn under a kind of shield
CN101422094A (en) Thick-bed mining subsidence-land dynamic pre-reclamation method at plane mining-area
CN104389606A (en) Novel mine mining technical scheme based on environment protection
CN104541650B (en) A kind of open-pit mine stope dynamic reclamation method
CN109811757B (en) Method for preventing and treating geological disasters of surface cracks of mining area
CN110043312A (en) A kind of control method of grouting filling ground settlement range
CN104653195B (en) A kind of coombe landforms tunnel portal structure and its construction method
CN107339107A (en) Open-pit mine blast afforests the processing method of bench face
CN105952462B (en) Shield tunnel deformation control method in neighbouring Process of Engineering Construction
CN106285683B (en) Openpit or Subsidence Area bottom store water pumping method in mine reclamation
CN107908901A (en) The computational methods that artesian water precipitation influences surrounding enviroment in a kind of foundation pit construction
CN106640083B (en) The restorative procedure of mining subsidence basin association ground fissure
CN110159296A (en) A kind of structural system and its construction method of the deformation of control Shield-bored tunnels
CN107675715A (en) A kind of high-steep slope protection structure and its construction method
CN204920983U (en) Pipe installation suitable for collapsible loess tunnel advance support
CN108243647B (en) A kind of new method that coal field dynamic in Midwest is reclaimed in advance
CN104631465A (en) Deep foundation pit excavation construction method adopted under pebble bed red sandstone geological condition
CN115486311A (en) Plant community configuration method for ecological restoration of alpine lozenite and application
Moh et al. Preconsolidation of soft Bangkok clay by non-displacement sand drains and surcharge
CN105926396B (en) A kind of town road subgrade drainage structure and its construction method
CN108517738A (en) A kind of laying method in sponge football pitch
CN209538196U (en) The structure of engineering slope and underground chamber excavation and support simultaneously in a kind of Toppling Deformation rock mass
CN107447673B (en) Method for adjusting frame bridge upper box jacking height difference
CN109804833B (en) Method for reducing damage of vegetation root system in mining area surface subsidence process

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20171110

RJ01 Rejection of invention patent application after publication