CN204920983U - Pipe installation suitable for collapsible loess tunnel advance support - Google Patents

Pipe installation suitable for collapsible loess tunnel advance support Download PDF

Info

Publication number
CN204920983U
CN204920983U CN201520456614.0U CN201520456614U CN204920983U CN 204920983 U CN204920983 U CN 204920983U CN 201520456614 U CN201520456614 U CN 201520456614U CN 204920983 U CN204920983 U CN 204920983U
Authority
CN
China
Prior art keywords
slip casting
grouting pipe
pipe
casting pipe
scale
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520456614.0U
Other languages
Chinese (zh)
Inventor
张宗清
余洋
梁陆源
张亚文
张学祯
叶勇军
廖丛炜
殷鹏
曹成心
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Building Materials Industrial Construction Xi'an Engineering Co Ltd
Original Assignee
China Building Materials Industrial Construction Xi'an Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Building Materials Industrial Construction Xi'an Engineering Co Ltd filed Critical China Building Materials Industrial Construction Xi'an Engineering Co Ltd
Priority to CN201520456614.0U priority Critical patent/CN204920983U/en
Application granted granted Critical
Publication of CN204920983U publication Critical patent/CN204920983U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a pipe installation suitable for collapsible loess tunnel advance support, including the support of arch steelframe, on supporting, the arch steelframe is equipped with the concrete placement layer, and the concrete placement in situ is equipped with arch keel frame, and arch keel frame is connected with the slip casting pipe through the spliced pole, and the slip casting pipe includes small -size slip casting pipe and large -scale slip casting pipe, and one side of small -size slip casting pipe and large -scale slip casting pipe is passed to spliced pole one end, and small -size slip casting pipe and large -scale slip casting pipe interval set up. The utility model discloses a slip casting method that big ductule interval set up, to packing, solidify in hole, the gap in tunnel solution -cavity filling district, for the tunnel becomes to encircle, the condition that provides that is difficult for caving in, keel frame sets up the fastness of having strengthened overall structure, and one side of small -size slip casting pipe and large -scale slip casting pipe is passed to connecting rod one end simultaneously for connection structure is more firm.

Description

A kind of pipe guide being applicable to collapsible loess tunnel advance support
Technical field
The utility model relates to a kind of suspension device, is specifically related to a kind of pipe guide being applicable to collapsible loess tunnel advance support.
Background technology
Karst is geologic process and the phenomenon of a kind of uniqueness of growing in carbonate solublerock distributed area, and the distribution of China Karst landforms is wide, area is large, and therefore highway tunnel construction unavoidably will pass through karst area.The tunnel, the Xi Mage village of speedway Baoding, such as Zhangjiakou to Zhuozhou section LJ-S4 contract section is positioned at the low mountain zone in Taihang Mountain, it passes through stratum, district and is mainly in Paleozoic group Cambrian system group stratum, Fengshan of uniting, principal lithologic is limestone, joint, crack are comparatively grown, and karst extensively distributes and in stratiform and beading uneven distribution, connectedness is good, in half charges shape, charges are limestone gravel and sandy soil mainly, and water outlet form in tunnel is based on humidity and drips, and may occur rainy season drenching stream.Common support apparatus is exactly support with arch girder steel the tunnel excavated, between the neighboring and crag of arch support, set up one deck steel mesh reinforcement, concrete perfusion between the gap between girder steel support with crag.But, due to the geology characteristic of big cross section karst, very easily produce in work progress and cave in and roof fall.
Utility model content
For solving the problem, the utility model provides a kind of pipe guide being applicable to collapsible loess tunnel advance support.
For achieving the above object, the technical scheme that the utility model is taked is:
A kind of pipe guide being applicable to collapsible loess tunnel advance support, comprise arch-shaped steel frame to support, arch-shaped steel frame supports and is provided with concrete lift, arch keel shoe is provided with in concrete lift, arch keel shoe is connected with grouting pipe by joint pin, grouting pipe comprises small-sized grouting pipe and large-scale grouting pipe, and the side of small-sized grouting pipe and large-scale grouting pipe is passed in joint pin one end, and small-sized grouting pipe and large-scale grouting pipe interval are arranged.
As preferably, described small-sized grouting pipe and large-scale grouting pipe all adopt hot rolled seamless steel tube, and arrange injected hole along pipe shaft circumference interval, steel pipe leading section is coniform, and afterbody is welded with reinforcing rib.
The utility model has following beneficial effect:
Adopt the spaced grouting method of large ductule, the hole in tunnel solution-cavity filling district, gap are filled, consolidation, for tunnel arching, not easily cave in and provide condition, the setting of keel shoe strengthens integrally-built fastness, the side of small-sized grouting pipe and large-scale grouting pipe is passed in connecting rod one end simultaneously, makes syndeton more firm.
Accompanying drawing explanation
Fig. 1 is the structural representation of the utility model embodiment.
Detailed description of the invention
In order to make the purpose of this utility model and advantage clearly understand, below in conjunction with embodiment, the utility model is further elaborated.Should be appreciated that specific embodiment described herein only in order to explain the utility model, and be not used in restriction the utility model.
As shown in Figure 1, the utility model embodiment provides a kind of pipe guide being applicable to collapsible loess tunnel advance support, comprise arch-shaped steel frame and support 1, arch-shaped steel frame supports 1 and is provided with concrete lift 2, arch keel shoe 6 is provided with in concrete lift 2, arch keel shoe 6 is connected with grouting pipe by joint pin 3, grouting pipe comprises small-sized grouting pipe 4 and large-scale grouting pipe 5, the side of small-sized grouting pipe 4 and large-scale grouting pipe 5 is passed in joint pin 3 one end, and small-sized grouting pipe 4 and large-scale grouting pipe 5 interval are arranged.
Described small-sized grouting pipe 4 and large-scale grouting pipe 5 all adopt hot rolled seamless steel tube, and arrange injected hole along pipe shaft circumference interval, steel pipe leading section is coniform, and afterbody is welded with reinforcing rib.
Wherein, between adjacent two joint pins 3, be provided with reinforcing rib, joint pin 3 one end and keel shoe affixed, the other end is provided with external screw thread.
This concrete enforcement adopts the spaced grouting method of large ductule, the hole in tunnel solution-cavity filling district, gap are filled, consolidation, for tunnel arching, not easily cave in and provide condition, the setting of keel shoe strengthens integrally-built fastness, the side of small-sized grouting pipe 4 and large-scale grouting pipe 5 is passed in connecting rod one end simultaneously, makes syndeton more firm.
The above is only preferred embodiment of the present utility model; it should be pointed out that for those skilled in the art, under the prerequisite not departing from the utility model principle; can also make some improvements and modifications, these improvements and modifications also should be considered as protection domain of the present utility model.

Claims (2)

1. one kind is applicable to the pipe guide of collapsible loess tunnel advance support, it is characterized in that, comprise arch-shaped steel frame and support (1), arch-shaped steel frame supports (1) and is provided with concrete lift (2), arch keel shoe (6) is provided with in concrete lift (2), arch keel shoe (6) is connected with grouting pipe by joint pin (3), grouting pipe comprises small-sized grouting pipe (4) and large-scale grouting pipe (5), the side of small-sized grouting pipe (4) and large-scale grouting pipe (5) is passed in joint pin (3) one end, small-sized grouting pipe (4) and large-scale grouting pipe (5) interval are arranged.
2. a kind of pipe guide being applicable to collapsible loess tunnel advance support according to claim 1, it is characterized in that, described small-sized grouting pipe (4) and large-scale grouting pipe (5) all adopt hot rolled seamless steel tube, along pipe shaft circumference interval, injected hole is set, steel pipe leading section is coniform, and afterbody is welded with reinforcing rib;
Wherein, the distance between described small-sized grouting pipe (4) and large-scale grouting pipe (5) can adjust as required.
CN201520456614.0U 2015-06-26 2015-06-26 Pipe installation suitable for collapsible loess tunnel advance support Expired - Fee Related CN204920983U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520456614.0U CN204920983U (en) 2015-06-26 2015-06-26 Pipe installation suitable for collapsible loess tunnel advance support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520456614.0U CN204920983U (en) 2015-06-26 2015-06-26 Pipe installation suitable for collapsible loess tunnel advance support

Publications (1)

Publication Number Publication Date
CN204920983U true CN204920983U (en) 2015-12-30

Family

ID=54970120

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520456614.0U Expired - Fee Related CN204920983U (en) 2015-06-26 2015-06-26 Pipe installation suitable for collapsible loess tunnel advance support

Country Status (1)

Country Link
CN (1) CN204920983U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106917627A (en) * 2017-03-24 2017-07-04 中建交通建设集团有限公司 The advanced support method of pilot tunnel under a kind of water rich strata boring construction
CN108590713A (en) * 2018-06-12 2018-09-28 北京市政路桥股份有限公司 A kind of Tunnel Passing cavity canopy protection structure and method for protecting support
CN109538236A (en) * 2018-12-07 2019-03-29 中铁十局集团有限公司 A kind of tunnel structure and tunnel construction method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106917627A (en) * 2017-03-24 2017-07-04 中建交通建设集团有限公司 The advanced support method of pilot tunnel under a kind of water rich strata boring construction
CN108590713A (en) * 2018-06-12 2018-09-28 北京市政路桥股份有限公司 A kind of Tunnel Passing cavity canopy protection structure and method for protecting support
CN108590713B (en) * 2018-06-12 2024-05-14 北京市政路桥股份有限公司 Tunnel crossing cavity canopy protection structure and supporting method
CN109538236A (en) * 2018-12-07 2019-03-29 中铁十局集团有限公司 A kind of tunnel structure and tunnel construction method
CN109538236B (en) * 2018-12-07 2024-04-02 中铁十局集团有限公司 Tunnel entering structure and tunnel entering construction method

Similar Documents

Publication Publication Date Title
CN204152521U (en) A kind of tunnel supporting and protection structure
CN102562075B (en) Large cross-section weak surrounding rock tunnel three-step and six-part short-distance construction method
CN100577986C (en) Goaf surrounding rock around gob-side supporting method under three soft geological condition
CN203515597U (en) Tunnel structure applicable to soft stratum
CN103306683A (en) Construction method for comprehensive precipitation in hole in deep-buried tunnel excavation process
CN204572015U (en) A kind of tunnel shunting combined type waterproof and water drainage system
CN102226407A (en) Four-line large-span tunnel cable-arch combined primary support structure
CN101592032A (en) Wear the preliminary bracing structure of speedway uneven strata large section tunnel under the shallow embedding
CN104612713A (en) Super-shallow-buried section tunnel construction method
CN204920983U (en) Pipe installation suitable for collapsible loess tunnel advance support
CN105274922A (en) Anti-slide tie-steel pipe pile composite structure for repairing cave-in roadbed and method
CN102720498A (en) Gob-side entry retaining mining process for coal face
CN102966359A (en) Working face ventilation oxidization zone roof control method
CN206000543U (en) A kind of supporting construction protecting lane for gob side entry retaining
CN110847195A (en) Construction method for stable treatment of side and upward slope of large-block-diameter loose rock pile body opening
CN104863588A (en) Advanced pier column pre-arranging gob-side entry retaining method
CN203130109U (en) Large-section karst tunnel supporting equipment
CN103437789B (en) Build waterproof structure, adopt the method for water proof mode constructing underground building
CN108442953B (en) Using the coal mine roadway roof collapse area processing method of the radar exploration technique and grouted anchor bar
CN106677806B (en) A kind of tubular type canopy frame support structure for underworkings, tunnel
CN110273700A (en) It is a kind of to control red shale tunnel strength bolt-grouting support structure and its construction method
CN103741708B (en) Prefabricated concrete rod sleeve basis
CN106640148A (en) Permanent reinforcing technology for coal mine underwell superhigh tunnel
CN110513129B (en) Advanced roof-protecting supporting structure and method for roadway of soft and thick coal seam working face
CN104453915A (en) Large-section vertical shaft pre-grouting reinforcement quick excavation method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151230

Termination date: 20160626