CN108590713A - A kind of Tunnel Passing cavity canopy protection structure and method for protecting support - Google Patents

A kind of Tunnel Passing cavity canopy protection structure and method for protecting support Download PDF

Info

Publication number
CN108590713A
CN108590713A CN201810602200.2A CN201810602200A CN108590713A CN 108590713 A CN108590713 A CN 108590713A CN 201810602200 A CN201810602200 A CN 201810602200A CN 108590713 A CN108590713 A CN 108590713A
Authority
CN
China
Prior art keywords
protection structure
canopy
pipe
steel
canopy protection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810602200.2A
Other languages
Chinese (zh)
Inventor
马瑞
吕嘉
孙西濛
周世生
叶春琳
王丽群
曹艳辉
王博
邓洪亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Municipal Administration Road And Bridge Ltd Co
Beijing Municipal Road and Bridge Co Ltd
Original Assignee
Beijing Municipal Administration Road And Bridge Ltd Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Municipal Administration Road And Bridge Ltd Co filed Critical Beijing Municipal Administration Road And Bridge Ltd Co
Priority to CN201810602200.2A priority Critical patent/CN108590713A/en
Publication of CN108590713A publication Critical patent/CN108590713A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/18Arch members ; Network made of arch members ; Ring elements; Polygon elements; Polygon elements inside arches
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/06Measuring temperature or pressure
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/003Linings or provisions thereon, specially adapted for traffic tunnels, e.g. with built-in cleaning devices
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/105Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete

Abstract

The invention discloses a kind of Tunnel Passing cavity canopy protection structure and method for protecting support, belong to engineering construction technology field.The structure includes canopy protection structure operating room (1), it is oriented to wall (2), canopy protection structure steel pipe (3), reinforced mesh (4), shaped steel arch (5), wing plate (6) and orientation filling system (7).When Tunnel Passing cavity, and when empty bigger, in order to save construction time and operating expenses, ensure construction safety and construction quality, it devises and passes through empty canopy protection structure and method for protecting support, include mainly supporting and protection two parts, retaining portion includes pipe canopy and arch, and guard section is to increase protection wing plate on pipe booth structure to form tunnel structure protective layer, the height for the Level Change wing plate that can be pushed up according to hole, overcoat thickness is adjusted, hole roof fall stone is effectively prevented, the safety accidents such as cave in.

Description

A kind of Tunnel Passing cavity canopy protection structure and method for protecting support
Technical field
Canopy protection structure and method for protecting support when the present invention is a kind of Tunnel Passing cavity are a kind of tunnel canopy protection structure and branch Maintaining method belongs to engineering construction technology field.
Background technology
It is encountered in constructing tunnel when passing through the unfavorable geological conditions such as cavity, due to the complexity and not really of its geological conditions It is qualitative etc., it is be easy to cause tunnel cave, the engineering accidents such as chip off-falling generally use back-pressure to avoid engineering accident and quality problems Backfill method is constructed, and the duration is delayed, and country rock generates moderate finite deformation, influences construction safety, causes bigger economic waste.
Invention content
The present invention is a kind of Tunnel Passing cavity canopy protection structure and method for protecting support, and when Tunnel Passing cavity, and cavity is relatively When big, in order to save construction time and operating expenses, ensure construction safety and construction quality, devise and pass through empty canopy protection structure And method for protecting support, include mainly supporting and protection two parts, retaining portion includes pipe canopy and arch, and guard section is in pipe canopy knot Increase protection wing plate on structure and forms tunnel structure protective layer, the height for the Level Change wing plate that can be pushed up according to hole, adjustment protection Layer thickness effectively prevents hole roof fall stone, the safety accidents such as cave in.
In the technical solution adopted by the present invention, a kind of Tunnel Passing cavity canopy protection structure, the structure includes canopy protection structure work Make room (1), is oriented to wall (2), canopy protection structure steel pipe (3), reinforced mesh (4), shaped steel arch (5), wing plate (6) and orientation slip casting system It unites (7).
Canopy protection structure operating room (1) is made of first circulation pipe canopy (8) and second circulation pipe canopy (9), first circulation pipe canopy (8) and second circulation pipe canopy (9) interlaced arrangement it, is equipped between first circulation pipe canopy (8) and second circulation pipe canopy (9) and is oriented to wall (2);Canopy protection structure steel pipe (3) is arranged at the top of canopy protection structure operating room (1), and reinforced mesh (4) is laid on canopy protection structure work Make on room (1);Shaped steel arch (5) setting is arranged in the bottom of canopy protection structure steel pipe (3), wing plate (6) in canopy protection structure steel pipe (3) Outside, orientation filling system (7) be arranged at the mounting hole of canopy protection structure steel pipe (3).Canopy protection structure steel pipe (3), bar-mat reinforcement Piece (4) and wing plate (6) form guard section, wing plate (6) it is height-adjustable, canopy protection structure steel pipe (3) and shaped steel arch (5) are The retaining portion of canopy protection structure.
Longitudinally connected reinforcing bar (14) is equipped between shaped steel arch (5).
Canopy protection structure steel pipe (3) and the outer limb α being oriented between wall (2) are determined according to canopy protection structure length, are 1 °~3 °.
Canopy protection structure operating room (1) is the work-yard that canopy protection structure performs, including excavates operating room and first supporting.First In a certain range of tunnel tunnel face arch (including canopy protection structure vault and canopy protection structure haunch), tunnel tunnel face is excavating ratio just Normal tunnel diameter extends out certain distance D, D and two times of first lining thickness, operating room's excavation length is taken often to save long determination according to steel pipe, The steel arch-shelf of canopy protection structure operating room (1) is installed, and excavate the first supporting of operating room, is formed canopy protection structure operating room (1).
It is oriented to the arch wall that wall (2) is guide tunnel direction, be oriented to pre-buried canopy protection structure guide pipe in wall (2) and is oriented to steel Frame, guide pipe and guiding steelframe are equipped with wing plate hole simultaneously, and wing plate hole is oriented as winged plate penstock installation.It is oriented to first when wall performs Vertical arch and template, installation is oriented to steelframe and guide pipe, Reperfu- sion concrete are formed.To ensure canopy protection structure construction precision, lead I-steel is set into wall (2), steelframe peripheral hardware is oriented to steel pipe, and steel pipe is along the reserved guiding wing plate jack in pipe canopy exterior normal direction, width It is determined by numerical computations according to empty size with height, is oriented to steel pipe there are a certain range of outer limb α, steel pipe is welded with steelframe It connects.Steelframe each unit is by connecting plate welding fabrication, by being bolted between unit.
Canopy protection structure steel pipe (3) use caliber forSeamless steel pipe,For 89~150mm, according to canopy protect section length and Construction technology determines that circumferential spacing is with the caliber no more than 3-5 times.When needing to increase the strength and stiffness of steel pipe, in pipe Setting steel reinforcement cage is then filled with cement mortar, the intensity of reinforcement canopy pipe.
Reinforced mesh (4) is laid on the outside of canopy protection structure, is welded on canopy protection structure steel pipe (3), rise fixed steel pipe and Carry out concrete spray shield effect.Reinforced mesh (4) uses round steel, spacing to be determined as 5cm × 15cm, reinforcing bar according to the size of arch Net single installation at the scene.Reinforced mesh (4) is connected firmly with canopy protection structure steel pipe (3), is laid with the fluctuating of spray plane.Reinforcing bar It is overlapped securely between mesh sheet (4) and with the bar-mat reinforcement for having sprayed concrete section, and the lap of splice is not less than A (A is generally 200mm).Reinforcing bar Mesh sheet (4) need to be affiliated to securely, and in gunite concrete, bar-mat reinforcement must not shake.The position demarcated by drawing when linked network hangs processing Good reinforced mesh (4), reinforced mesh (4) are laid with the fluctuating of first spray plane, the canopy protection structure steel that banding fixed is constructed early period On pipe, then reinforced mesh (4) welded together, reinforced mesh (4) lap of splice is 1~2 grid.
Its effect of shaped steel arch (5) is that strata pressure and constraint change are undertaken before gunite concrete is not up to desired strength Shape improves the ability of just supporting, it is both temporary support and a part for permanent support.Shaped steel arch (5) uses I-steel, It is welded to connect steel plate at per Pin I-steel two ends, bracing members are all made of two-sided welding.The steel arch-shelf processed is in smooth field It is assembled to carry out examination on the ground, control plane warpage should be less than B (B is generally 5mm), periphery assembly tolerance be C (C generally takes ± 30mm).It is tethered and is connect with flange valve snail between steel arch-shelf and steel arch-shelf, and the junction of the edges of two sheets of paper welds, it is longitudinal that bar connecting, circumferential direction is used to use Dowel is attached, and welding uses welding by both sides, it is ensured that and it is longitudinally connected to be connected firmly with arch, it constitutes whole.Steel arch-shelf is bent It is bent using forming mill, shaped steel connection can be used steel plate and tie up a full weld, should first expire shaped steel butt welding before tying up item weldering, it is ensured that wait strong Connection.Junction steel plate thickness, size, jewel hole have to comply with requirement, and all throat depths cannot be less than design thickness, and weld seam is full It is full.Bracing members should be welded with anchor pole head and bar-mat reinforcement as far as possible, to reinforce its combined supporting effect.
Wing plate (6) is made using seamless steel plate, is welded on the steel pipe of canopy protection structure, is oriented parallel to tunneling method Line, the length of wing plate is identical as often section length of steel pipe, and the thickness of wing plate is determined by the distance from top of cavity top to canopy protection structure, The height of wing plate is obtained according to the size and height of cavity by dynamics calculation.
It includes slurries vectored injection system and purpose monitoring system to orient filling system (7).Slurries vectored injection system packet Include drilling tool and grouting port (7.1.1), high-pressure slip-casting pipe (7.1.2) and slurry injection nozzle (7.1.3);
Purpose monitoring system, including terminal (7.2.2), data line (7.2.1), tool joint (7.2.3), Bar (7.2.4) is detected, end (7.2.5) and pressure sensor (7.2.6) are detected;Terminal (7.2.2) passes through data Transmission line (7.2.1) is connect with pressure sensor (7.2.6), and pressure sensor (7.2.6) is laid in high-pressure slip-casting pipe (7.1.2) On, drilling tool and grouting port (7.1.1) are arranged at the center of drilling, drilling tool and grouting port (7.1.1) and high-pressure slip-casting pipe (7.1.2) is connected, and slurry injection nozzle (7.1.3) is arranged on high-pressure slip-casting pipe (7.1.2);
Tool joint (7.2.3), detection bar (7.2.4) and detection end (7.2.5) are sequentially connected with composition detecting structure, visit Parallel arrangement ensures slip casting orientation, tool joint (7.2.3) and drilling tool and slip casting to geodesic structure vertically with high-pressure slip-casting pipe (7.1.2) The position of mouth (7.1.1) is corresponding.
High-pressure slip-casting pipe (7.1.2) is glass reinforced plastic pipe.
Slurries vectored injection system will be prepared slurries by drilling tool and grouting port (7.1.1) by design requirement and inject high pressure In Grouting Pipe (7.1.2), slurries under pressure, are sprayed by the slurry injection nozzle (7.1.3) of high-pressure slip-casting pipe (7.1.2) tube wall To between the wing plate (6) and bed die shaped steel (11) of canopy protection structure and solidifying, is formed and consolidate protective layer.
Purpose monitoring system, including terminal (7.2.2), data line (7.2.1), detection bar (7.2.4), are visited End (7.2.5) and pressure sensor (7.2.6) are surveyed, protective layer and high pressure are reinforced for that can be monitored in real time in slip casting Interlayer pressure between Grouting Pipe (7.1.2) and slip casting overpressure adjust slip casting pressure at any time according to gathered data situation of change Power, grouting amount parameter.
When canopy protection structure passes through no charges cavern, backform shaped steel (10) is arranged at the top of canopy protection structure steel pipe (3), The effect of wing plate be in canopy protection structure slip casting, slurries by wing plate of the reserved injected hole at the top of canopy protection structure on steel pipe it Between form firm protective layer (12), the thickness of protective layer (12) is determined by the height of wing plate, bed die shaped steel (11) be arranged in type The bottom of steel arch-shelf (5), backform shaped steel (10) and bed die shaped steel (11) are arranged symmetrically along tunnel center line (13).
Protective layer (12) refers in canopy protection structure slip casting, and slurries are by the reserved injected hole on steel pipe on canopy protection structure top Firm protective layer is formed between the wing plate in portion.The thickness of protective layer (12) depends on the height of wing plate, and the height of wing plate can root Determine that the height that hole is lifted off the more big then wing plate of distance of pipe canopy is also bigger, instead to the vertical distance of pipe canopy according to the top in cavity It is as the same.
It is provided by the present invention to pass through empty canopy protection structure and method for protecting support, it has the following advantages:
The present invention can adjust wing plate height, and then change the thickness of structure protective layer according to empty hole heights of roofs, to The stability of effective guarantee canopy protection structure.And slip casting and monitoring system are oriented, it can be monitored in real time in slip casting and be reinforced protection Interlayer pressure between layer and Grouting Pipe and slip casting overpressure, achieve the purpose that monitor in real time, and can ensure that slip casting is imitated Fruit, without there is a phenomenon where excessive slip casting or falling flat.In addition to this, the present invention effectively inhibits in construction The airborne dust that site operation generates selects noise devices to construct, and noise is greatly controlled, and shunts rainwater, and engineering is dirty Water mitigates influence of the sewage discharge to environment, has environmentally protective construction concept.
Description of the drawings
Fig. 1 canopy protection structures pass through no charges macroscopic-void skiagraph.
Canopy protection structure steel pipe section artworks of the Fig. 2 with wing plate.
Connection diagrams of the Fig. 3 between canopy protection structure steel pipe, reinforced mesh and wing plate.
Connection diagrams of the Fig. 4 between filling system and shaped steel arch.
Fig. 5 canopy protection structures construction orientation filling system schematic diagram.
Fig. 6 is that canopy protection structure passes through no charges cavern cross-sectional view.
Specific implementation mode
The specific embodiment of the invention is illustrated in conjunction with attached drawing, attached drawing is schematic diagram, is only said in a schematic way Bright this patent basic structure, based on the embodiment of the present invention, those skilled in that art are not making creative work premise Lower obtained every other embodiment, all belongs to the scope of protection of the present invention.
A kind of method for protecting support of Tunnel Passing cavity canopy protection structure, this method are as follows:
S1 is oriented to wall construction:(a) according to tunnel axis and excavation contour line, two Pin of installation are oriented to wall shaped steel arch, two Pin The spacing being oriented between wall shaped steel arch is 60cm, firm welding.(b) positioned with total powerstation, installation canopy protection structure guide pipe and It is oriented to steelframe, canopy protection structure guide pipe is that 140 wall thickness of Ф is 5mm steel pipes, the method outside canopy protection structure above canopy protection structure guide pipe Line direction is reserved to be oriented to wing plate jack, and width 2cm, height 3m are (according to numerical result, the concrete cover of cover arch of tunnel Thickness is determined as 3m), it checks the guide pipe gradient with slope ruler, is accurately positioned according to 1~3 ° of outer limb, connection reinforcing bar and type is used in combination Steel arch-shelf is securely welded as a whole.(c) after canopy protection structure guide pipe and leading truck meet required precision after testing, internal model is installed Arch, internal model arch are formed with two Pin section steel manufactures, and after support is firm, outboard template is installed on the outside of internal model arch.(d) it pours It is oriented to wall, wall is oriented to and uses C25 concretings, sectional dimension 2.0m × (1+3) m.(e) after the completion of guiding wall pours, injection Slope surface is faced upward around the closing of 15cm thickness C25 concretes, wall for grouting when as slip casting.(f) outer side mold is removed after concrete strength satisfaction Plate.
S2 canopy pipes make and installation:(a) canopy protection structure steel pipe uses outer diameter 108mm, on the hot rolled seamless steel tube of wall thickness 6mm Wing plate is welded, overall length 30m (length of steel pipe can also determine according to cyclic advance length scene, but section length is no more than 50m) divides Section connection, every section of 3m long with screwed connection, nozzle screw thread vehicle depth are 6cm female threads at pipe orifice joint, and connecting tube uses Φ 127 × 8mm seamless steel pipes, the long 12cm of pin thread.1m is reserved as only slurry section in canopy pipe tail portion, and slip casting is played at remaining position of canopy protection structure steel pipe Hole, injected hole aperture 16mm, injected hole pitch of holes 15cm, quincuncial arrangement.(b) loading machine jacking canopy under hand fit is used to protect Structured steel pipe, be staggered before and after the connector of adjacent canopy protection structure steel pipe 1.5m, is mounted on after first steel pipe welding upper flange and is oriented to wall On, later section canopy protection structure steel pipe is manually loaded onto, chain wrench is manually held and carries out the connection of canopy protection structure steel pipe, make two section canopy protection structure steel Pipe joins together in connection place, then welds guide pipe wing plate, heads into successively.(c) when canopy pipe is installed, 3m canopy protection structure steel is often installed Pipe performs five Pin shaped steel archs, and shaped steel arch is equipped with canopy pipe limiter, with to the positioning of canopy protection structure steel pipe and supporting.Successively Piecemeal erection canopy protection structure steel pipe and shaped steel arch.
S3 shaped steel archs make and installation:(a) I-steel arch uses 20b i shaped steels, per Pin i shaped steel two ends The junction steel plate of 220 × 220 × 10mm of place's welding, bracing members are all made of two-sided welding, and throat thickness is not less than 5mm, finishing type The processing of steel arch-shelf.The shaped steel arch processed carries out examination assembly on smooth place, and control plane warpage is less than 20mm, week Assembly tolerance in side is ± 30mm.Check whether solder joint meets code requirement, if solder skip;It is satisfactory to number, it keeps away Exempt to use with.(b) it is tethered and is connect with flange valve snail between steel arch-shelf and shaped steel arch, and the junction of the edges of two sheets of paper welds, longitudinal steel for using Φ 22mm Muscle connects, spacing 60cm, and circumferential direction is attached using the dowel of 1m, and welding uses welding by both sides, it is ensured that longitudinally connected and type Steel arch-shelf is connected firmly, and constitutes whole.(c) shaped steel arch is bent is bent using forming mill, shaped steel connection use 20cm*h (h for Shaped steel height subtracts 4cm) thickness 1cm steel plates tie up a full weld, first shaped steel butt welding should be expired before tying up item weldering, it is ensured that wait strong ties.Even It connects steel plate thickness, size, jewel hole and has to comply with requirement, all throat depths cannot be less than design thickness, and weld seam is full.Steel branch Support is welded with anchor pole head and bar-mat reinforcement, to reinforce its combined supporting effect.
The making and installation of S4 reinforced mesh:(a) it is 5cm × 15cm, bar-mat reinforcement that reinforced mesh, which uses 6 round steel of Φ, spacing, Single installation at the scene.Reinforced mesh couples securely with steel pipe, is laid with the fluctuating of spray plane.Between bar-mat reinforcement and with sprayed concrete The bar-mat reinforcement overlap joint of section is secured, and the lap of splice is not less than 200mm.Bar-mat reinforcement need to be affiliated to securely, the reinforcing bar in gunite concrete Net must not shake.(b) before reinforcement welding will first by the oil stain of rebar surface, paint is dirty, cement mortar and pounding with a hammer can peel off floats Skin, iron rust etc. are removed totally;Reinforced mesh after completion of processing answers smooth, scar of the rebar surface without weakening steel area. (c) reinforced mesh processed is hung by the position of drawing calibration when linked network, reinforced mesh is laid with the fluctuating of first spray plane, binding It is fixed on the pipe boron steel pipe constructed in advance, then reinforced mesh is welded together, the lap of splice between reinforced mesh is 1 ~2 grids.
S5 fabrication of reinforcing cage and installation:To increase the bending resistance and impact resistance of canopy protection structure, steel is set in steel pipe Muscle cage carries out reinforcement to structure, is made of four Φ 22mm reinforcing bars and fixed ring, with loading machine jacking under hand fit.
S6 slip castings and protective layer construction:(a) face must first element one layer concrete of spray be as wall for grouting before slip casting, to the palm It is closed in sub- face, it is ensured that slip casting process not spillage;Tube shed grouting mode uses intermittent slip casting, i.e. a machine holes to change hole note Slurry.(b) slip casting carries out canopy protection structure using orientation filling system, including slurries vectored injection system and purpose monitoring system Orient slip casting and monitoring.(c) intermittent time cannot be more than 1.5 hours, allow slurries to have certain setting time, prevent continuous grouting Slurry is spread without limitation.(d) grouting sequence is first low holes Kong Hougao, and water hole is marked with after first noting no water hole, from two arch springings to Vault symmetrically carries out.(e) slip casting standard is that tunnel structure protective layer thickness meets design requirement, and single-pipe grouting amount reaches and sets Evaluation or grouting pressure reach final pressure and voltage stabilizing 20 minutes or more, no longer can stop slip casting into slurry in hole.(f) slip casting terminates It closes grouting stop-valve in time afterwards, checks that aperture, adjacent hole, whether there is or not grout leaking phenomenons at coating relatively thin position during slip casting, as gone here and there Slurry, stops the hole slip casting immediately, and grout leaking mouth is blocked using intermittent slip casting, is spaced a hole or number hole slip casting, or using the dimity, wood Wedge, quick-hardening cement mortar or Anchor Agent block, and slip casting is further continued for when no longer grout leaking, and pressure such as rises suddenly during slip casting Height may then occur plugging, answer shutdown inspection.
S7 cycle constructions:It is that (cyclic advance can be determined by scene, but divided a cyclic advance unit with every inside propulsion 30m Segment length is no more than 50m), longitudinal two groups of canopy protection structures cycle lap of splice is not less than 3.0m, until being fully completed end.

Claims (6)

1. a kind of Tunnel Passing cavity canopy protection structure, it is characterised in that:The structure includes canopy protection structure operating room (1), is oriented to wall (2), canopy protection structure steel pipe (3), reinforced mesh (4), shaped steel arch (5), wing plate (6) and orientation filling system (7);
Canopy protection structure operating room (1) is made of first circulation pipe canopy (8) and second circulation pipe canopy (9), first circulation pipe canopy (8) and Second circulation pipe canopy (9) interlaced arrangement is equipped between first circulation pipe canopy (8) and second circulation pipe canopy (9) and is oriented to wall (2);Canopy Protection structure steel pipe (3) is arranged at the top of canopy protection structure operating room (1), and reinforced mesh (4) is laid on canopy protection structure operating room (1) On;In the bottom of canopy protection structure steel pipe (3), wing plate (6) is arranged in the outside of canopy protection structure steel pipe (3) for shaped steel arch (5) setting, Filling system (7) is oriented to be arranged at the mounting hole of canopy protection structure steel pipe (3);Canopy protection structure steel pipe (3), reinforced mesh (4) and Wing plate (6) forms guard section, wing plate (6) it is height-adjustable, canopy protection structure steel pipe (3) and shaped steel arch (5) are that canopy shield is tied The retaining portion of structure;
It includes slurries vectored injection system and purpose monitoring system to orient filling system (7);Slurries vectored injection system includes boring Tool and grouting port (7.1.1), high-pressure slip-casting pipe (7.1.2) and slurry injection nozzle (7.1.3);
Purpose monitoring system, including terminal (7.2.2), data line (7.2.1), tool joint (7.2.3), detection Bar (7.2.4) detects end (7.2.5) and pressure sensor (7.2.6);Terminal (7.2.2) passes through data transmission Line (7.2.1) is connect with pressure sensor (7.2.6), and pressure sensor (7.2.6) is laid on high-pressure slip-casting pipe (7.1.2), Drilling tool and grouting port (7.1.1) are arranged at the center of drilling, drilling tool and grouting port (7.1.1) and high-pressure slip-casting pipe (7.1.2) Connection, slurry injection nozzle (7.1.3) are arranged on high-pressure slip-casting pipe (7.1.2);
Tool joint (7.2.3), detection bar (7.2.4) and detection end (7.2.5) are sequentially connected with composition detecting structure, detection knot Parallel arrangement ensures slip casting orientation, tool joint (7.2.3) and drilling tool and grouting port to structure vertically with high-pressure slip-casting pipe (7.1.2) The position of (7.1.1) is corresponding.
2. a kind of Tunnel Passing cavity canopy protection structure according to claim 1, it is characterised in that:Between shaped steel arch (5) Equipped with longitudinally connected reinforcing bar (14).
3. a kind of Tunnel Passing cavity canopy protection structure according to claim 1, it is characterised in that:Canopy protection structure steel pipe (3) It is determined according to canopy protection structure length with the outer limb α being oriented between wall (2), is 1 °~3 °.
4. a kind of Tunnel Passing cavity canopy protection structure according to claim 1, it is characterised in that:High-pressure slip-casting pipe (7.1.2) is glass reinforced plastic pipe.
5. a kind of Tunnel Passing cavity canopy protection structure according to claim 1, it is characterised in that:Canopy protection structure passes through nothing and fills When filling out object cavern, backform shaped steel (10) setting in the top of canopy protection structure steel pipe (3), the effect of wing plate is noted in canopy protection structure When slurry, slurries form firm protective layer (12) by the reserved injected hole on steel pipe between the wing plate at the top of canopy protection structure, The thickness of protective layer (12) is determined that bed die shaped steel (11) is arranged in the bottom of shaped steel arch (5), backform shaped steel by the height of wing plate (10) it is arranged symmetrically along tunnel center line (13) with bed die shaped steel (11).
6. a kind of method for protecting support of Tunnel Passing cavity canopy protection structure, this method are as follows:
S1 is oriented to wall construction:(a) according to tunnel axis and excavation contour line, two Pin of installation are oriented to wall shaped steel arch, and two Pin are oriented to Spacing between wall shaped steel arch is 60cm, firm welding;(b) it is positioned with total powerstation, canopy protection structure guide pipe and guiding is installed Steelframe, canopy protection structure guide pipe are that 140 wall thickness of Ф is 5mm steel pipes, the canopy protection structure exterior normal side above canopy protection structure guide pipe To reserved guiding wing plate jack, width 2cm, height 3m check the guide pipe gradient with slope ruler, accurate according to 1~3 ° of outer limb Positioning is used in combination connection reinforcing bar to be securely welded as a whole with shaped steel arch;(c) canopy protection structure guide pipe and leading truck are full after testing After sufficient required precision, internal model arch is installed, internal model arch is formed with two Pin section steel manufactures, after support is firm, in outside internal model arch Install outboard template in side;(d) guiding wall is poured, wall is oriented to and uses C25 concretings, sectional dimension 2.0m × (1+3) m;(e) After the completion of guiding wall pours, slope surface is faced upward around injection 15cm thickness C25 concretes closing, wall for grouting when as slip casting;(f) concrete is waited for Intensity removes outboard template after meeting;
S2 canopy pipes make and installation:(a) canopy protection structure steel pipe uses outer diameter 108mm, is welded on the hot rolled seamless steel tube of wall thickness 6mm Wing plate, overall length 30m, segmentation connection, every section of 3m long with screwed connection, nozzle screw thread vehicle depth are 6cm female threads at pipe orifice joint, Connecting tube uses Φ 127 × 8mm seamless steel pipes, the long 12cm of pin thread;1m is reserved as only slurry section, canopy protection structure steel pipe in canopy pipe tail portion Injected hole, injected hole aperture 16mm, injected hole pitch of holes 15cm, quincuncial arrangement are beaten in remaining position;(b) use loading machine artificial Coordinate lower jacking canopy protection structure steel pipe, be staggered 1.5m before and after the connector of adjacent canopy protection structure steel pipe, first steel pipe welding upper flange It is mounted on and is oriented on wall afterwards, manually load onto later section canopy protection structure steel pipe, manually hold chain wrench and carry out the connection of canopy protection structure steel pipe, make Two section canopy protection structure steel pipes join together in connection place, then weld guide pipe wing plate, head into successively;(c) when canopy pipe is installed, often pacify 3m canopy protection structure steel pipes are filled, five Pin shaped steel archs are performed, shaped steel arch is equipped with canopy pipe limiter, with fixed to canopy protection structure steel pipe Position and supporting;Piecemeal erection canopy protection structure steel pipe and shaped steel arch successively;
S3 shaped steel archs make and installation:(a) I-steel arch uses 20b i shaped steels, is welded at every Pin i shaped steel two ends The junction steel plate of 220 × 220 × 10mm is connect, bracing members are all made of two-sided welding, and throat thickness is not less than 5mm, finishing type steel arch The processing of frame;The shaped steel arch processed carries out examination assembly on smooth place, and control plane warpage is less than 20mm, and periphery is spelled Dress tolerance is ± 30mm;Check whether solder joint meets code requirement, if solder skip;It is satisfactory to number, it avoids mixing With;(b) it is tethered and is connect with flange valve snail between steel arch-shelf and shaped steel arch, and the junction of the edges of two sheets of paper welds, longitudinal reinforcing bar using Φ 22mm connects It connects, spacing 60cm, circumferential direction is attached using the dowel of 1m, and welding uses welding by both sides, it is ensured that longitudinally connected to encircle with shaped steel Frame is connected firmly, and constitutes whole;(c) shaped steel arch is bent is bent using forming mill, and shaped steel connection uses 20cm*h thickness 1cm steel Plate ties up a full weld, and h is that shaped steel height subtracts 4cm;First shaped steel butt welding should be expired before tying up item weldering, it is ensured that wait strong ties;Junction steel plate Thickness, size, jewel hole have to comply with requirement, and all throat depths cannot be less than design thickness, and weld seam is full;Bracing members and anchor Head and bar-mat reinforcement welding, with the supporting effect that cements union;
The making and installation of S4 reinforced mesh:(a) it is 5cm × 15cm that reinforced mesh, which uses 6 round steel of Φ, spacing, and bar-mat reinforcement is existing The single installation in field;Reinforced mesh couples securely with steel pipe, is laid with the fluctuating of spray plane;Between bar-mat reinforcement and with sprayed concrete section Bar-mat reinforcement overlap joint is secured, and the lap of splice is not less than 200mm;Bar-mat reinforcement need to be affiliated to securely, and in gunite concrete, bar-mat reinforcement is not It must shake;It (b) will be first by the oil stain of rebar surface, paint dirt, cement mortar and outer skin, the iron that can be peeled off that pounds with a hammer before reinforcement welding Rust is removed clean;Reinforced mesh after completion of processing answers smooth, scar of the rebar surface without weakening steel area;(c) linked network When by the position of drawing calibration hang the reinforced mesh processed, reinforced mesh is laid with the fluctuating of first spray plane, banding fixed in On the pipe boron steel pipe constructed in advance, then reinforced mesh welded together, the lap of splice between reinforced mesh is 1~2 Grid;
S5 fabrication of reinforcing cage and installation:To increase the bending resistance and impact resistance of canopy protection structure, steel reinforcement cage is set in steel pipe Reinforcement is carried out to structure, is made of four Φ 22mm reinforcing bars and fixed ring, with loading machine jacking under hand fit;
S6 slip castings and protective layer construction:(a) face first must spray a layer concrete as wall for grouting, to face by element before slip casting It is closed, it is ensured that slip casting process not spillage;Tube shed grouting mode uses intermittent slip casting, i.e. a machine holes to change hole slip casting;(b) Slip casting is oriented note using orientation filling system, including slurries vectored injection system and purpose monitoring system to canopy protection structure Slurry and monitoring;(c) intermittent time cannot be more than 1.5 hours, and slurries is allowed to have certain setting time, prevent continuous grouting process from starching Liquid is spread without limitation;(d) grouting sequence is first low holes Kong Hougao, and water hole is marked with after first noting no water hole, from two arch springings to vault pair Claim to carry out;(e) slip casting standard is that tunnel structure protective layer thickness meets design requirement, and single-pipe grouting amount reach design value or Grouting pressure reaches final pressure and voltage stabilizing 20 minutes or more, no longer stops slip casting into slurry in hole;(f) it is closed in time after slip casting Grouting stop-valve checks that whether there is or not grout leaking phenomenons for aperture, adjacent hole, the relatively thin position of coating, grout leaking such as occurs, stops immediately during slip casting The hole slip casting blocks grout leaking mouth using intermittent slip casting, is spaced a hole or number hole slip casting, or using the dimity, timber wedge, quick-hardening cement Mortar or Anchor Agent block, and slip casting is further continued for when no longer grout leaking, and pressure such as increases suddenly during slip casting, then may generation Plugging, shutdown inspection;
S7 cycle constructions:With every inside propulsion 30m for a cyclic advance unit, longitudinal two groups of canopy protection structures cycle lap of splice is not Less than 3.0m, until being fully completed end.
CN201810602200.2A 2018-06-12 2018-06-12 A kind of Tunnel Passing cavity canopy protection structure and method for protecting support Pending CN108590713A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810602200.2A CN108590713A (en) 2018-06-12 2018-06-12 A kind of Tunnel Passing cavity canopy protection structure and method for protecting support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810602200.2A CN108590713A (en) 2018-06-12 2018-06-12 A kind of Tunnel Passing cavity canopy protection structure and method for protecting support

Publications (1)

Publication Number Publication Date
CN108590713A true CN108590713A (en) 2018-09-28

Family

ID=63623541

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810602200.2A Pending CN108590713A (en) 2018-06-12 2018-06-12 A kind of Tunnel Passing cavity canopy protection structure and method for protecting support

Country Status (1)

Country Link
CN (1) CN108590713A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110630282A (en) * 2019-09-02 2019-12-31 中铁十八局集团有限公司 Double-track railway tunnel weak surrounding rock advanced reinforcement simple pipe shed room

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20050019580A (en) * 2003-08-20 2005-03-03 주식회사 우지스 The waterproofing air-bubbles grouting method of construction for tunnel hollow filling
CN102182471A (en) * 2011-03-23 2011-09-14 彬县水帘洞煤炭有限责任公司 Advance support method for coal mine tunnel high-risk area
KR101244257B1 (en) * 2012-11-14 2013-03-18 주식회사 성우사면 Method for digging tunnel
CN103993892A (en) * 2014-05-29 2014-08-20 山东大学 Supporting method for soft broken nonuniform stratum tunnel construction
WO2015142017A1 (en) * 2014-03-18 2015-09-24 한국건설기술연구원 Tunnel having steel rib having concrete filled steel tube structure and method for constructing same
CN204920983U (en) * 2015-06-26 2015-12-30 中国建筑材料工业建设西安工程有限公司 Pipe installation suitable for collapsible loess tunnel advance support
CN205117357U (en) * 2015-11-21 2016-03-30 中铁二十局集团第二工程有限公司 Weak surrounding rock tunnel advance support structure based on self -drilling spiral pipe canopy
CN105781582A (en) * 2016-04-11 2016-07-20 长安大学 Novel shallow-buried tunnel support structure applicable to urban sensitive areas and construction method of novel shallow-buried tunnel support structure applicable to urban sensitive areas
CN107675696A (en) * 2017-08-23 2018-02-09 中铁二十二局集团有限公司 A kind of Intelligent deep hole orientation slip casting and monitoring system
KR101834847B1 (en) * 2017-03-17 2018-03-06 (주)하경엔지니어링 Echo-environmental construction method of tunnel portal area using mini pipe-roof
CN107905796A (en) * 2017-10-24 2018-04-13 济南城建集团有限公司 A kind of tunnels in soil Guan Peng operating rooms construction method
CN107965325A (en) * 2017-10-24 2018-04-27 济南城建集团有限公司 Just branch bow member replaces construction method to a kind of small interval shallow tunnel
CN208702428U (en) * 2018-06-12 2019-04-05 北京市政路桥股份有限公司 A kind of Tunnel Passing cavity canopy protection structure

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20050019580A (en) * 2003-08-20 2005-03-03 주식회사 우지스 The waterproofing air-bubbles grouting method of construction for tunnel hollow filling
CN102182471A (en) * 2011-03-23 2011-09-14 彬县水帘洞煤炭有限责任公司 Advance support method for coal mine tunnel high-risk area
KR101244257B1 (en) * 2012-11-14 2013-03-18 주식회사 성우사면 Method for digging tunnel
WO2015142017A1 (en) * 2014-03-18 2015-09-24 한국건설기술연구원 Tunnel having steel rib having concrete filled steel tube structure and method for constructing same
CN103993892A (en) * 2014-05-29 2014-08-20 山东大学 Supporting method for soft broken nonuniform stratum tunnel construction
CN204920983U (en) * 2015-06-26 2015-12-30 中国建筑材料工业建设西安工程有限公司 Pipe installation suitable for collapsible loess tunnel advance support
CN205117357U (en) * 2015-11-21 2016-03-30 中铁二十局集团第二工程有限公司 Weak surrounding rock tunnel advance support structure based on self -drilling spiral pipe canopy
CN105781582A (en) * 2016-04-11 2016-07-20 长安大学 Novel shallow-buried tunnel support structure applicable to urban sensitive areas and construction method of novel shallow-buried tunnel support structure applicable to urban sensitive areas
KR101834847B1 (en) * 2017-03-17 2018-03-06 (주)하경엔지니어링 Echo-environmental construction method of tunnel portal area using mini pipe-roof
CN107675696A (en) * 2017-08-23 2018-02-09 中铁二十二局集团有限公司 A kind of Intelligent deep hole orientation slip casting and monitoring system
CN107905796A (en) * 2017-10-24 2018-04-13 济南城建集团有限公司 A kind of tunnels in soil Guan Peng operating rooms construction method
CN107965325A (en) * 2017-10-24 2018-04-27 济南城建集团有限公司 Just branch bow member replaces construction method to a kind of small interval shallow tunnel
CN208702428U (en) * 2018-06-12 2019-04-05 北京市政路桥股份有限公司 A kind of Tunnel Passing cavity canopy protection structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110630282A (en) * 2019-09-02 2019-12-31 中铁十八局集团有限公司 Double-track railway tunnel weak surrounding rock advanced reinforcement simple pipe shed room
CN110630282B (en) * 2019-09-02 2021-07-06 中铁十八局集团有限公司 Double-track railway tunnel weak surrounding rock advanced reinforcement simple pipe shed room

Similar Documents

Publication Publication Date Title
CN109611102B (en) Construction method for cold excavation underpass overpass
CN102536252B (en) Method for digging backward hole of tunnel with quite small clear distance
CN208702428U (en) A kind of Tunnel Passing cavity canopy protection structure
CN207017275U (en) Recyclable system of deep foundation pit support can be assembled
CN106498950A (en) Anchor head is placed in the Pile-Anchor Supporting for Deep Excavation system and its implementation of pile body
CN208415267U (en) Miniature steel pipe pile prestressed anchor rope combination supporting system
CN105862858B (en) Anchor head structure and its construction method being placed in anchored bolt retaining wall concrete slab
CN110905523A (en) Subway vertical shaft construction method
CN108547644A (en) A kind of Tunnel Passing crushed zone canopy protection structure and method for protecting support
CN210597399U (en) Post-cast strip structure applied to basement outer wall
CN103088830A (en) Construction method for composite outer wall structure of ultra-deep basement
CN111560941A (en) Karst landform cavity treatment method
CN111827260A (en) Defect repairing and leaking stoppage construction method for underground diaphragm wall
CN111119928B (en) Novel tunnel primary support structure and construction method
CN206408630U (en) Anchor head is placed in the Pile-Anchor Supporting for Deep Excavation system of pile body
CN102235007B (en) Method for supporting deep foundation with upper nail-lower pile combination
CN205894734U (en) Outer unilateral mode structure on shear force wall of basement
CN205617390U (en) A softer side of sears layer excavation supporting system for loess area
CN107700490B (en) Gunite concrete makes up constructing structure and its construction method in advance between the stake of sand ovum stratum
CN108999196A (en) In-network processing construction method for supporting between a kind of stake
CN108590713A (en) A kind of Tunnel Passing cavity canopy protection structure and method for protecting support
CN210216467U (en) Seepage-proofing structure without anchoring groove and anchoring platform
CN107905609A (en) Underground people's air defense construction method
CN104675138B (en) A kind of slab balcony reinforcement means for sound insulation and noise reducing transformation
CN115030556B (en) Repairing and reinforcing method for exposed wall old building of brick

Legal Events