CN101592032A - Wear the preliminary bracing structure of speedway uneven strata large section tunnel under the shallow embedding - Google Patents

Wear the preliminary bracing structure of speedway uneven strata large section tunnel under the shallow embedding Download PDF

Info

Publication number
CN101592032A
CN101592032A CNA2009100598160A CN200910059816A CN101592032A CN 101592032 A CN101592032 A CN 101592032A CN A2009100598160 A CNA2009100598160 A CN A2009100598160A CN 200910059816 A CN200910059816 A CN 200910059816A CN 101592032 A CN101592032 A CN 101592032A
Authority
CN
China
Prior art keywords
preliminary bracing
speedway
bracing structure
sheath
shallow embedding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2009100598160A
Other languages
Chinese (zh)
Inventor
杨建民
喻渝
黄棋
高扬
陈赤坤
陶伟明
赵万强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Eryuan Engineering Group Co Ltd CREEC
Original Assignee
China Railway Eryuan Engineering Group Co Ltd CREEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Eryuan Engineering Group Co Ltd CREEC filed Critical China Railway Eryuan Engineering Group Co Ltd CREEC
Priority to CNA2009100598160A priority Critical patent/CN101592032A/en
Publication of CN101592032A publication Critical patent/CN101592032A/en
Pending legal-status Critical Current

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses and wear speedway uneven strata large section tunnel preliminary bracing structure under a kind of shallow embedding, be intended to control effectively the sedimentation and the ground settlement of constructing tunnel.It comprises advance support structure and preliminary bracing structure, and described advance support structure is outer bassoon canopy (11), the compound formation of being laid by spaced radial of interior bassoon canopy (12); Described preliminary bracing structure is to prop up the compound formation of sheath (22) in sheath (21), the loopful by propping up outside the arch that forms by sprayed mortar, and lays abutment wall system anchor bolt (20) in its abutment wall section.The invention has the beneficial effects as follows, can reduce the influence of excavation deformation effectively to the face of land, it is stressed and strengthen the stability of the soil body to improve preliminary bracing, solved the technical barrier of large-section loess tunnel construction effectively, the sedimentation value and the ground settlement value of constructing tunnel can be controlled in the 30mm, and be guaranteed the safety of constructing tunnel and highway operation.

Description

Wear the preliminary bracing structure of speedway uneven strata large section tunnel under the shallow embedding
Technical field
The present invention relates to the high-speed railway tunnel, particularly wear the speedway arch under the shallow embedding and be the preliminary bracing structure of the large section tunnel of the following uneven strata for the rock stratum of loess, arch.
Background technology
Zhengzhou to Xi'an special line for passenger trains, total track length 458.8km is that China is article one special line for passenger trains of 350km/h in the newly-built overall trip speed in loess area.The tunnel amounts to 38 completely, always is about 77km, and wherein loess tunnel accounts for tunnel length overall 50km.Lay non-fragment orbit in this Line for Passenger Transportation tunnel, require line in tunnel that the ride comfort of height is arranged, settlement after construction requires to be not more than 15mm, relative settlement between the different structure thing should be greater than 5mm, settlement Control standard height, must adopt effective liner structure, avoid because substrate is subjected to produce bigger settlement after construction after the disturbance during the operation.Under the tunnel, wear under the situation of speedway, more will control the sedimentation value and the ground settlement value of constructing tunnel effectively, pass through the safety of speedway to guarantee the tunnel, and construction costs is controlled in the reasonable range by the preliminary bracing structure.
Traditional preliminary bracing structure be with individual layer bassoon canopy (Φ 108mm) as the advance support deck,, establish the loopful profile steel frame in the outer lining and add strong supporting as outer lining (C25 concrete, thick 35cm) with the loopful sprayed mortar, the steelframe spacing is generally 0.5m one Pin.Its weak point is that the sedimentation value of shallow embedding loess tunnel construction is big, the difficult control of ground settlement, and only be applicable in the evenly single tunnel, stratum up and down, to pass through the arch for the tunnel be loess, then specific aim is not strong for the situation of the uneven strata of rock stratum below the arch, it is not strong to show as loess stratum, arch reinforcement measure, and the supporting intensity of tunnel the latter half competent bed is strong partially again.With tunnel, special line for passenger trains Huanglong village, Zhengzhou to Xi'an is example, this tunnel covering layer 11~18m, adopt arc pilot tunnel method excavation, ductule advance support and individual layer steelframe add strong supporting, two longitudinal crack and transverse cracks of front of tunnel heading that are parallel to the tunnel center line appear in the face of land in the work progress, stitch wide 3~20mm, the long 20~25m in crack, surface deformation is bigger, to the safe operation formation influence of highway.
Summary of the invention
Technical problem to be solved by this invention provides the preliminary bracing structure of wearing speedway uneven strata large section tunnel under a kind of shallow embedding, can control the sedimentation and the ground settlement of constructing tunnel effectively, to guarantee the safety of constructing tunnel and highway operation.
The technical solution adopted for the present invention to solve the technical problems is: wear speedway uneven strata large section tunnel preliminary bracing structure under the shallow embedding of the present invention, comprise advance support structure and preliminary bracing structure, it is characterized in that: described advance support structure is the outer bassoon canopy laid by spaced radial, interior bassoon canopy is compound constitutes; Described preliminary bracing structure is that sheath is compound constitutes by propping up outside the arch that forms by sprayed mortar in sheath, the loopful, and lays the abutment wall system anchor bolt in its abutment wall section.
The invention has the beneficial effects as follows, adopt double-deck bassoon canopy advance support can increase pipe canopy rigidity, reduce to manage the canopy spacing, avoid that the soil body peels off between pipe, reduce the influence of excavation deformation effectively the face of land; It is stressed and strengthen the stability of the soil body to improve preliminary bracing by the abutment wall system anchor bolt, props up the compound formation of a sheath tunnel outer lining in sheath, the loopful outside the arch, has strengthened the ability of preliminary bracing rigidity and resistance to deformation; Solved the technical barrier of large-section loess tunnel construction effectively, the sedimentation value and the ground settlement value of constructing tunnel can have been controlled in the 30mm, and be guaranteed the safety of constructing tunnel and highway operation.
Description of drawings
This manual comprises as next width of cloth accompanying drawing:
Fig. 1 is a profile of wearing the preliminary bracing structure of speedway uneven strata large section tunnel under the shallow embedding of the present invention.
Member shown in the figure, toponym and pairing mark: prop up a sheath 22 in sheath 21, lock foot anchoring stock 21a, the loopful outside outer bassoon canopy 11, interior bassoon canopy 12, abutment wall system anchor bolt 20, the arch.
The specific embodiment
The present invention is further described below in conjunction with drawings and Examples.
With reference to Fig. 1, wear the preliminary bracing structure of speedway uneven strata large section tunnel under the shallow embedding of the present invention, comprise advance support structure and preliminary bracing structure.To be that the outer bassoon canopy of being laid by spaced radial 11, interior bassoon canopy 12 are compound constitute described advance support structure, adopt double-deck bassoon canopy advance support can increase pipe canopy rigidity, reduce to manage the canopy spacing, avoid that the soil body peels off between pipe, reduce the influence of excavation deformation effectively the face of land.The interior abutment wall system anchor bolt 20 of laying of the soil body that the abutment wall section of described outer lining is outer, described preliminary bracing structure is that a sheath 22 is compound to be constituted by propping up outside the arch that forms by sprayed mortar in sheath 21, the loopful, to strengthen the ability of preliminary bracing rigidity and resistance to deformation, and lay abutment wall system anchor bolt 20 in its abutment wall section, stressed and strengthen the stability of the soil body to improve preliminary bracing.The present invention can control the sedimentation value and the ground settlement value of constructing tunnel in the 30mm effectively, and guarantees the safety of constructing tunnel and highway operation.
Be the distortion control the loess country rock effectively and the stability that strengthens preliminary bracing, prop up in the sheath 21 longitudinal separations outside the described arch and steelframe is set adds strong supporting that hoop is provided with vertical connecting reinforcement at interval between adjacent two Pin steelframes; Prop up sheath 21 outside the arch at its arch springing portion lateral widening, and lock foot anchoring stock 21a is set steelframe is anchored on the country rock.Because the arch springing portion of widening has increased the arch springing lifting surface area, being provided with of steelframe, lock foot anchoring stock 21a improved the power of carrying that arch springing holds, and therefore can more effectively control the arch preliminary bracing and sink.An interior sheath 22 interior longitudinal separations of described loopful are provided with loopful grid steelframe and add strong supporting, and hoop is provided with vertical connecting reinforcement at interval between adjacent two loopful grid steelframes.
Be that embodiment further specifies the present invention with Line for Passenger Transportation kwan-yin hall tunnel, Zhengzhou to Xi'an below.
Kwan-yin hall tunnel total length 1978m is the Line for Passenger Transportation double track tunnel, wherein DK208+440~DK208+600 wear under the 160m altogether Lianyun Harbour to this speedway kwan-yin hall of Hall fruit to Sanmenxia Gorge section, maximum excavated section 180m 2, maximum excavation span 16.14m, about 27 ° of tunnel and speedway angle, the tunnel overburden cover is 11~13.06m.Under the section of wearing geological condition be that last volt is weak to medium expansion clayey loess, pass through pyroxene andesite burning into sand rock, mud stone, limestone completely decomposed to weak weathering belt, joints development, underground water is grown, rock crushing.
Kwan-yin hall tunnel preliminary bracing structure and concrete parameter are as follows:
1. the arch is provided with the advance support structure that is made of outer bassoon canopy 11, interior bassoon canopy 12, steel pipe caliber Φ 159, wall thickness is 8mm, centering spacing 40cm in the pipe canopy, the outer limb of pipe canopy is controlled in 1 ° of scope, can carry out set of tunneling construction after every endless tube canopy construction is finished.
2. prop up in the sheath 21 longitudinal separations outside the arch and the I25a profile steel frame is set adds strong supporting, steelframe spacing 0.5m one Pin, hoop is provided with Φ 22 vertical connecting reinforcements at interval between adjacent two Pin steelframes, vertical connecting reinforcement circumferential distance 1.0m.The lateral widening 80cm of its arch springing portion, big arch springing place, every Pin steelframe both sides establishes 4 Φ, 22 lock foot anchoring stock 21a steelframe is anchored on the country rock, every long 4.0m of lock foot anchoring stock 21a.Sprayed mortar outer 21 adopts the C25 concretes, and thickness is 35cm, in establish Φ 8 steel mesh reinforcements.
In the loopful in the sheath 22 longitudinal separations loopful grid steelframe be set add strong supporting, grid steelframe spacing 1.0m one Pin, adjacent two loopful grid steelframes connect by connecting reinforcement, connecting reinforcement adopts equilateral triangle to arrange.The second loopful shotcrete layer 22 adopts the C25 concrete, and thickness is 25cm.
4. the abutment wall section is laid abutment wall system anchor bolt 20, adopts grouting rock bolt, and its length is 4mm, and spacing 1.5 * 1.5m is blossom type and lays.
Kwan-yin hall tunnel adopts three step partial excavation methods, connect smoothly on November 10th, 2008, the company of successfully having passed through shallow embedding, heavy traffic is speedway suddenly, safety, quality accident do not take place in the construction, the tunnel sinks (maximum 12mm) and surface subsidence (maximum 8mm) all satisfies the index request that designs maximum 30mm, simultaneously 50 days in advance construction period.Solve the technical barrier of large-section loess tunnel construction effectively, obtained remarkable social benefit and economic benefit, in following similar engineering, had good application prospects.
Wear some principles of the preliminary bracing structure of speedway uneven strata large section tunnel under the above shallow embedding of the present invention that just explains through diagrams, be not be the present invention to be confined to shown in and in described concrete structure and the scope of application, so every the corresponding modify and equivalent that might be utilized, the claim that all belongs to the present invention and applied for.

Claims (7)

1. wear speedway uneven strata large section tunnel preliminary bracing structure under the shallow embedding, comprise advance support structure and preliminary bracing structure, it is characterized in that: described advance support structure is outer bassoon canopy (11), the compound formation of being laid by spaced radial of interior bassoon canopy (12); Described preliminary bracing structure is to prop up the compound formation of sheath (22) in sheath (21), the loopful by propping up outside the arch that forms by sprayed mortar, and lays abutment wall system anchor bolt (20) in its abutment wall section.
2. wear speedway uneven strata large section tunnel preliminary bracing structure under the shallow embedding according to claim 1, it is characterized in that: prop up the interior longitudinal separation of sheath (21) outside the described arch and steelframe is set adds strong supporting, hoop is provided with vertical connecting reinforcement at interval between adjacent two Pin steelframes.
3. as wearing speedway uneven strata large section tunnel preliminary bracing structure under the shallow embedding as described in the claim 2, it is characterized in that: prop up sheath (21) outside the described arch at its arch springing portion lateral widening, and lock foot anchoring stock (21a) is set steelframe is anchored on the country rock.
4. as wearing speedway uneven strata large section tunnel preliminary bracing structure under the shallow embedding as described in claim 2 or 3, it is characterized in that: prop up sheath (21) outside the described arch and adopt the C25 concrete, thickness is 35cm; Described steelframe adopts the I25a profile steel frame.
5. wear speedway uneven strata large section tunnel preliminary bracing structure under the shallow embedding according to claim 1, it is characterized in that: the interior interior longitudinal separation of sheath (22) of described loopful is provided with loopful grid steelframe and adds strong supporting, adjacent two loopful grid steelframes connect by connecting reinforcement, and connecting reinforcement adopts equilateral triangle to arrange.
6. as wearing speedway uneven strata large section tunnel preliminary bracing structure under the shallow embedding as described in the claim 5, it is characterized in that: a sheath (22) adopts the C25 concrete in the described loopful, and thickness is 25cm.
7. wear speedway uneven strata large section tunnel preliminary bracing structure under the shallow embedding according to claim 1, it is characterized in that: described abutment wall system anchor bolt (20) adopts grouting rock bolt, and its length is 4mm, and spacing 1.5 * 1.5m is blossom type and lays.
CNA2009100598160A 2009-06-29 2009-06-29 Wear the preliminary bracing structure of speedway uneven strata large section tunnel under the shallow embedding Pending CN101592032A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2009100598160A CN101592032A (en) 2009-06-29 2009-06-29 Wear the preliminary bracing structure of speedway uneven strata large section tunnel under the shallow embedding

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2009100598160A CN101592032A (en) 2009-06-29 2009-06-29 Wear the preliminary bracing structure of speedway uneven strata large section tunnel under the shallow embedding

Publications (1)

Publication Number Publication Date
CN101592032A true CN101592032A (en) 2009-12-02

Family

ID=41406889

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2009100598160A Pending CN101592032A (en) 2009-06-29 2009-06-29 Wear the preliminary bracing structure of speedway uneven strata large section tunnel under the shallow embedding

Country Status (1)

Country Link
CN (1) CN101592032A (en)

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102226408A (en) * 2011-06-21 2011-10-26 北京交通大学 Loess tunnel anchor bar support device
CN102226399A (en) * 2011-06-02 2011-10-26 中铁二院工程集团有限责任公司 Soft rock four-line large-span tunnel three-bench cable-bracing excavation construction method
CN102518451A (en) * 2011-12-31 2012-06-27 中铁上海工程局有限公司 Construction method of shotcrete support for water contained loess geological tunnel
CN102758642A (en) * 2012-07-16 2012-10-31 中铁隧道集团有限公司 Long-span tunnel overlapping carrying arch structure for upper-soft and lower-hard stratum and construction method thereof
CN103244146A (en) * 2013-05-14 2013-08-14 中铁二十一局集团第四工程有限公司 Construction method for steel frame connection in tunnel anchor-plate retaining
CN104389610A (en) * 2014-09-12 2015-03-04 中铁建大桥工程局集团第二工程有限公司 Construction method of ultrashort steps crossing operational expressway tunnel
CN104405411A (en) * 2014-12-15 2015-03-11 中铁第四勘察设计院集团有限公司 Oversized variable cross section tunnel supporting structure
CN104790971A (en) * 2015-04-03 2015-07-22 核工业井巷建设公司 Large pipe shed advanced pre-reinforcement method for shallow buried small-spacing rock soil tunnel construction
CN105041353A (en) * 2015-08-17 2015-11-11 河南理工大学 Roadway anchor net re-jetting double-folded-shed surrounding rock control technology
CN105134269A (en) * 2015-08-17 2015-12-09 河南理工大学 Control technology for roadway surrounding rock achieving cooperative load bearing by enabling anchor cables to penetrate through sheds
CN105156141A (en) * 2015-08-31 2015-12-16 中国电建集团成都勘测设计研究院有限公司 Support method for controlling overexcavation of consequent steep laminated-structure rock tunnel side wall
CN105840203A (en) * 2016-03-22 2016-08-10 中铁第五勘察设计院集团有限公司 Large section loess tunnel pre-cutting method construction method
CN105952459A (en) * 2016-05-04 2016-09-21 中铁二十四局集团浙江工程有限公司 Splicing-type primary support method for tunnel
CN109057802A (en) * 2018-08-06 2018-12-21 中铁建大桥工程局集团第五工程有限公司 Shallow tunnel with big cross-section underpass of freeways construction method
CN111335903A (en) * 2020-04-26 2020-06-26 粤水电轨道交通建设有限公司 Construction method for penetrating dense building group downwards in stratum of joint zone
CN112195698A (en) * 2020-09-28 2021-01-08 中国一冶集团有限公司 Construction method for road crossing under road section with heavy traffic pressure
CN113404510A (en) * 2021-05-21 2021-09-17 中铁第一勘察设计院集团有限公司 Advanced support structure for underground structure underpass and construction method thereof

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102226399A (en) * 2011-06-02 2011-10-26 中铁二院工程集团有限责任公司 Soft rock four-line large-span tunnel three-bench cable-bracing excavation construction method
CN102226408A (en) * 2011-06-21 2011-10-26 北京交通大学 Loess tunnel anchor bar support device
CN102518451A (en) * 2011-12-31 2012-06-27 中铁上海工程局有限公司 Construction method of shotcrete support for water contained loess geological tunnel
CN102758642A (en) * 2012-07-16 2012-10-31 中铁隧道集团有限公司 Long-span tunnel overlapping carrying arch structure for upper-soft and lower-hard stratum and construction method thereof
CN102758642B (en) * 2012-07-16 2014-04-30 中铁隧道集团有限公司 Long-span tunnel overlapping carrying arch structure for upper-soft and lower-hard stratum and construction method thereof
CN103244146A (en) * 2013-05-14 2013-08-14 中铁二十一局集团第四工程有限公司 Construction method for steel frame connection in tunnel anchor-plate retaining
CN104389610A (en) * 2014-09-12 2015-03-04 中铁建大桥工程局集团第二工程有限公司 Construction method of ultrashort steps crossing operational expressway tunnel
CN104405411A (en) * 2014-12-15 2015-03-11 中铁第四勘察设计院集团有限公司 Oversized variable cross section tunnel supporting structure
CN104790971A (en) * 2015-04-03 2015-07-22 核工业井巷建设公司 Large pipe shed advanced pre-reinforcement method for shallow buried small-spacing rock soil tunnel construction
CN105041353A (en) * 2015-08-17 2015-11-11 河南理工大学 Roadway anchor net re-jetting double-folded-shed surrounding rock control technology
CN105134269A (en) * 2015-08-17 2015-12-09 河南理工大学 Control technology for roadway surrounding rock achieving cooperative load bearing by enabling anchor cables to penetrate through sheds
CN105041353B (en) * 2015-08-17 2017-04-12 河南理工大学 Roadway anchor net re-jetting double-folded-shed surrounding rock control technology
CN105156141A (en) * 2015-08-31 2015-12-16 中国电建集团成都勘测设计研究院有限公司 Support method for controlling overexcavation of consequent steep laminated-structure rock tunnel side wall
CN105840203A (en) * 2016-03-22 2016-08-10 中铁第五勘察设计院集团有限公司 Large section loess tunnel pre-cutting method construction method
CN105952459A (en) * 2016-05-04 2016-09-21 中铁二十四局集团浙江工程有限公司 Splicing-type primary support method for tunnel
CN109057802A (en) * 2018-08-06 2018-12-21 中铁建大桥工程局集团第五工程有限公司 Shallow tunnel with big cross-section underpass of freeways construction method
CN111335903A (en) * 2020-04-26 2020-06-26 粤水电轨道交通建设有限公司 Construction method for penetrating dense building group downwards in stratum of joint zone
CN112195698A (en) * 2020-09-28 2021-01-08 中国一冶集团有限公司 Construction method for road crossing under road section with heavy traffic pressure
CN113404510A (en) * 2021-05-21 2021-09-17 中铁第一勘察设计院集团有限公司 Advanced support structure for underground structure underpass and construction method thereof

Similar Documents

Publication Publication Date Title
CN101592032A (en) Wear the preliminary bracing structure of speedway uneven strata large section tunnel under the shallow embedding
CN102562075B (en) Large cross-section weak surrounding rock tunnel three-step and six-part short-distance construction method
CN106437726B (en) Shallow-depth-excavation tunnel crosses ground fissure crushed zone construction method
CN101852083B (en) Quick supporting method for large-deformation roadway easy to fall, break and loosen and apparatus thereof
CN100501124C (en) Construction method for tunnel contact passage in shield section of underground railway
CN101598026A (en) Wear the preliminary bracing structure of speedway loess stratum large section tunnel under the shallow embedding
CN204532378U (en) Subway tunneling boring rock tunnel development machine engineering method tunnel water handling constructs
CN102213099A (en) Composite liner structure of four-track large-span wall-foundation arched tunnel
CN212296427U (en) Double-lane arrangement working face outer lane narrow coal pillar stable supporting structure
CN102226407A (en) Four-line large-span tunnel cable-arch combined primary support structure
CN106014449B (en) The construction method of two-wire small interval big cross section jointed rock mass subway tunnel
CN101864960A (en) Carst region double-arch road tunnel construction method
CN203961994U (en) Under balancing earth-pressure shielding machine, wear the concealed tunneling structure of having runed shield tunnel
CN106761778A (en) A kind of underground digging in subway station construction technology suitable for upper-soft lower-hard ground
CN105332710A (en) Construction method suitable for up-down overlapped tunnel with small clear space and long distance under weak geological condition
CN206174963U (en) Cross shallow undercut tunnel supporting construction of burying of ground fissure crushed zone
CN209924998U (en) Shallow earthing shield tunnel is worn road reinforcement protection architecture down
CN106869969A (en) A kind of excavation supporting construction method of soft rock large section tunnel
CN104763434A (en) Non-coal-pillar double tunneling method
CN106640096A (en) Construction method for penetrating through tunnel of backfilling soil section and transition section
CN102425155B (en) Method for reinforcing overlying shallow rockmass in mined-out area
CN109555527A (en) A kind of five lines small spacing Shallow tunnel with large cross-section group construction method parallel
CN107237638A (en) Both wired concealed tunneling structure and its construction method are worn under a kind of
CN206219897U (en) Medium-and low-speed maglev two-wire excavation location pile foundation combined type support rail beam transition section structure
CN201486569U (en) Primary support structure of shallow underpass highway non-uniform strata super-large section tunnel

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20091202