CN208884292U - Soft soil roadbed and normal roadbed intersection anti-settling structure - Google Patents

Soft soil roadbed and normal roadbed intersection anti-settling structure Download PDF

Info

Publication number
CN208884292U
CN208884292U CN201821297276.0U CN201821297276U CN208884292U CN 208884292 U CN208884292 U CN 208884292U CN 201821297276 U CN201821297276 U CN 201821297276U CN 208884292 U CN208884292 U CN 208884292U
Authority
CN
China
Prior art keywords
roadbed
dimensional geogrid
normal
dimensional
geogrid
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821297276.0U
Other languages
Chinese (zh)
Inventor
唐震
赵乾文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wisdri Engineering and Research Incorporation Ltd
Wisdri Urban Construction Engineering Technology Co Ltd
Original Assignee
Wisdri Engineering and Research Incorporation Ltd
Wisdri Urban Construction Engineering Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wisdri Engineering and Research Incorporation Ltd, Wisdri Urban Construction Engineering Technology Co Ltd filed Critical Wisdri Engineering and Research Incorporation Ltd
Priority to CN201821297276.0U priority Critical patent/CN208884292U/en
Application granted granted Critical
Publication of CN208884292U publication Critical patent/CN208884292U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of soft soil roadbed and normal roadbed intersection anti-settling structures, it is placed on treatment of soft foundation section and normal roadbed section intersection comprising sand, rubble drainage blanket, the first three-dimensional geogrid, roadbed, the second three-dimensional geogrid, lower roadbed, third three-dimensional geogrid, the upper roadbed, road surface structare layer set gradually from the bottom up.The utility model can prevent soft soil roadbed and normal roadbed section intersection differential settlement, to improve road surface stability.

Description

Soft soil roadbed and normal roadbed intersection anti-settling structure
Technical field
The utility model relates to roadbed subsidence prevention and control fields, and in particular to a kind of soft soil roadbed anti-with normal roadbed intersection Settle structure.
Background technique
In highway engineering, the changeover portion between soft soil roadbed and normal roadbed section is the weak link of roadbed, for a long time by Under the action of the load of road surface, it is possible that the vertically and horizontally cracking of roadbed, makes road surface differential settlement occur, entire roadbed is influenced Use.Therefore, we are there is an urgent need to a kind of structure that can prevent soft soil roadbed and normal roadbed section intersection differential settlement, To improve the stability on entire road surface.
Utility model content
The purpose of this utility model is to provide a kind of soft soil roadbed and normal roadbed intersection anti-settling structure, the structures Soft soil roadbed and normal roadbed section intersection differential settlement can be prevented, to improve road surface stability.
The technical scheme adopted by the utility model is
A kind of soft soil roadbed and normal roadbed intersection anti-settling structure, is placed in treatment of soft foundation section and normal roadbed section On intersection comprising sand, rubble drainage blanket, the first three-dimensional geogrid, the roadbed, the two or three set gradually from the bottom up To TGXG, lower roadbed, third three-dimensional geogrid, upper roadbed, road surface structare layer.
According to the above scheme, the laying depth of sand, rubble drainage blanket is not less than 50cm;The two sides of sand, rubble drainage blanket Roadbed 0.8-1.5m, preferably 1m are stretched out respectively, so that structure is more stable, to realize the purpose for reducing sedimentation.
According to the above scheme, the first three-dimensional geogrid, the second three-dimensional geogrid, third three-dimensional geogrid are on weak soil road Base segment and the laying length of normal roadbed section are not less than 15m, the first three-dimensional geogrid, the second three-dimensional geogrid, third Roadbed 1-1.5m is stretched out in the two sides of three-dimensional geogrid respectively, so that structure is more stable, to realize the purpose for reducing sedimentation.
According to the above scheme, the first three-dimensional geogrid, the second three-dimensional geogrid, the two sides of third three-dimensional geogrid are logical U-shaped nail anchoring is crossed, so that structure is more stable.
According to the above scheme, sand, rubble drainage blanket, the first three-dimensional geogrid, roadbed, the second three-dimensional geogrid, under Roadbed, third three-dimensional geogrid, upper roadbed, pavement structure are arranged in parallel.
The utility model has the beneficial effects that:
Using three layers of three-dimensional geogrid, it can increase subgrade stability, reduce settlement of subgrade, and easy construction, Construction quality is easy to get control;
By being laid with sand, rubble drainage blanket, the first three-dimensional on treatment of soft foundation section and normal roadbed section intersection TGXG, roadbed, the second three-dimensional geogrid, lower roadbed, third three-dimensional geogrid, upper roadbed, road surface structare layer, thus Highway soft soil roadbed and normal basement transition stage are reinforced, changeover portion roadbed overall stability can be effectively promoted, reduce A section settlement of subgrade is crossed, the quality of soft soil roadbed and normal this road weak link of basement transition stage, Jin Erti are improved The stability of high entire road, extends Road Service Life;
Simple and reasonable for structure, economically feasible, anti-differential settlement effect are ideal.
Detailed description of the invention
Below in conjunction with accompanying drawings and embodiments, the utility model is described in further detail, in attached drawing:
Fig. 1 is the structural schematic diagram of the utility model embodiment;
Fig. 2 is the structural schematic diagram of three-dimensional geogrid;
Fig. 3 is the structural schematic diagram of U-shaped nail;
Wherein, 1, treatment of soft foundation section, 2, normal roadbed section, 3, sand, rubble drainage blanket, 4, first three-dimensional geotechnique's lattice Grid, 5, roadbed, the 6, second three-dimensional geogrid, 7, lower roadbed, 8, third three-dimensional geogrid, 9, upper roadbed, 10, pavement structure Layer, 11, U-shaped nail, 12, changeover portion process range.
Specific embodiment
In order to make the purpose of the utility model, technical solutions and advantages more clearly understood, below in conjunction with attached drawing and implementation Example, the present invention will be further described in detail.It should be appreciated that specific embodiment described herein is only to explain this Utility model is not used to limit the utility model.
Referring to figures 1-3, a kind of soft soil roadbed and normal roadbed intersection anti-settling structure, is placed in treatment of soft foundation section 1 On normal 2 intersection of roadbed section comprising sand, the rubble drainage blanket 3, the first three-dimensional geotechnique set gradually from the bottom up Grid 4, roadbed 5, the second three-dimensional geogrid 6, lower roadbed 7, third three-dimensional geogrid 8, upper roadbed 9, road surface structare layer 10. Sand, rubble drainage blanket 3 laying depth be 50cm, and roadbed 1m is stretched out in the two sides of sand, rubble drainage blanket 3 respectively.First Three-dimensional geogrid 4, the second three-dimensional geogrid 6, third three-dimensional geogrid 8 Soft Ground and normal roadbed section paving If length is not less than 15m, the two sides of the first three-dimensional geogrid 4, the second three-dimensional geogrid 6, third three-dimensional geogrid 8 Roadbed 1.5m is stretched out respectively, and its two sides passes through U-shaped 11 anchoring of nail.
Construction procedure are as follows:
1, changeover portion process range 12 is determined;
2, in changeover portion process range 12, it is thick that 50cm is laid on treatment of soft foundation section 1 and normal 2 intersection of roadbed section Sand, rubble drainage blanket 3;
3, after the completion of sand, rubble drainage blanket 3 are laid with, it is laid with the first three-dimensional geogrid 4, the first three-dimensional geotechnique on it Roadbed 1.5m is stretched out in 4 two sides of grid respectively;And first three-dimensional geogrid 4 it is long in the laying of Soft Ground and normal roadbed section Degree is not less than 15m, and 4 two sides of the first three-dimensional geogrid (both ends along the longitudinal direction) are anchored at sand with U-shaped nail 11, rubble drains On bed course 3;After the completion of first three-dimensional geogrid 4 is laid with, covering influences reinforced action to avoid solarization aging in time;
4, it backfilled roadbed supported 5 on the first three-dimensional geogrid 4, and is compacted;
5, the second three-dimensional geogrid 6, the second three-dimensional geogrid 6 and the first three-dimensional geogrid 4 are laid on roadbed 5 In parallel;Roadbed (lower roadbed 7) 1.5m is stretched out in second three-dimensional geogrid, 6 two sides respectively;And second three-dimensional geogrid 6 in weak soil The laying length of roadbed section and normal roadbed section is not less than 15m, 6 two sides of the second three-dimensional geogrid (both ends along the longitudinal direction) It is anchored on roadbed 5 with U-shaped nail 11;After the completion of second three-dimensional geogrid 6 is laid with, covering is in time to avoid solarization aging, shadow Ring reinforced action;
6, roadbed 7 is set on 6 upper berth of the second three-dimensional geogrid, and is compacted;
7, third three-dimensional geogrid 8, third three-dimensional geogrid 8 and first three-dimensional geotechnique's lattice are laid on lower roadbed 7 Grid 4 are parallel;Roadbed (lower roadbed 7) 1.5m is stretched out in 8 two sides of third three-dimensional geogrid respectively;And third three-dimensional geogrid 8 exists Soft Ground and the laying length of normal roadbed section are not less than 15m, and 8 two sides of third three-dimensional geogrid are (along the longitudinal direction Both ends) it is anchored on lower roadbed 7 with U-shaped nail 11;After the completion of third three-dimensional geogrid 8 is laid with, covering is in time to avoid solarization Aging influences reinforced action;
8, it is laid with upper roadbed 9 on third three-dimensional geogrid 8, and is compacted;
9, after upper 9 making of roadbed compacting, 10 making of road surface structare layer is carried out.
It should be understood that for those of ordinary skills, it can be modified or changed according to the above description, And all these modifications and variations all should belong to the protection scope of the appended claims for the utility model.

Claims (5)

1. a kind of soft soil roadbed and normal roadbed intersection anti-settling structure is placed in treatment of soft foundation section and normal roadbed section and hands over On at boundary, it is characterised in that: including the sand, rubble drainage blanket, the first three-dimensional geogrid, road set gradually from the bottom up Base, the second three-dimensional geogrid, lower roadbed, third three-dimensional geogrid, upper roadbed, road surface structare layer.
2. according to claim 1 soft soil roadbed with normal roadbed intersection anti-settling structure, it is characterised in that: sand, broken The laying depth of stone drainage blanket be not less than 50 cm, sand, rubble drainage blanket two sides stretch out roadbed 0.8-1.5m respectively.
3. according to claim 1 soft soil roadbed and normal roadbed intersection anti-settling structure, it is characterised in that: the one or three It is long in the laying of Soft Ground and normal roadbed section to TGXG, the second three-dimensional geogrid, third three-dimensional geogrid Degree be not less than 15m, the first three-dimensional geogrid, the second three-dimensional geogrid, third three-dimensional geogrid two sides stretch respectively Roadbed 1-1.5m out.
4. according to claim 1 or 3 soft soil roadbed and normal roadbed intersection anti-settling structure, it is characterised in that: the One three-dimensional geogrid, the second three-dimensional geogrid, third three-dimensional geogrid two sides pass through U-shaped nail anchor.
5. according to claim 1 soft soil roadbed and normal roadbed intersection anti-settling structure, it is characterised in that: the one or three To TGXG, the second three-dimensional geogrid, third three-dimensional geogrid parallel laid.
CN201821297276.0U 2018-08-13 2018-08-13 Soft soil roadbed and normal roadbed intersection anti-settling structure Active CN208884292U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821297276.0U CN208884292U (en) 2018-08-13 2018-08-13 Soft soil roadbed and normal roadbed intersection anti-settling structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821297276.0U CN208884292U (en) 2018-08-13 2018-08-13 Soft soil roadbed and normal roadbed intersection anti-settling structure

Publications (1)

Publication Number Publication Date
CN208884292U true CN208884292U (en) 2019-05-21

Family

ID=66508787

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821297276.0U Active CN208884292U (en) 2018-08-13 2018-08-13 Soft soil roadbed and normal roadbed intersection anti-settling structure

Country Status (1)

Country Link
CN (1) CN208884292U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111549600A (en) * 2020-05-06 2020-08-18 东南大学 Road widening junction roadbed processing structure on deep and soft foundation
CN112813759A (en) * 2021-01-25 2021-05-18 罗志球 Soft soil roadbed and normal roadbed juncture prevent subsiding structure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111549600A (en) * 2020-05-06 2020-08-18 东南大学 Road widening junction roadbed processing structure on deep and soft foundation
CN112813759A (en) * 2021-01-25 2021-05-18 罗志球 Soft soil roadbed and normal roadbed juncture prevent subsiding structure
CN112813759B (en) * 2021-01-25 2022-05-17 中铁二十三局集团第一工程有限公司 Soft soil roadbed and normal roadbed juncture prevent subsiding structure

Similar Documents

Publication Publication Date Title
CN109914173B (en) Foam light soil pouring table back structure in expressway reconstruction and extension project and construction method thereof
CN107938480A (en) A kind of microorganism cures the desert highway embankment and its construction method of joint TGXG
CN105908588A (en) Permeable pavement system for weakly-permeable soil regions
CN208884292U (en) Soft soil roadbed and normal roadbed intersection anti-settling structure
CN107700299B (en) Overpass lower-layer ground road structure and construction method thereof
CN103046446A (en) Treatment structure at joint part of reconstruction and extension project of highway
CN106836034B (en) High-fill cover plate culvert flexible load shedding system and construction method
CN202830673U (en) Existing embankment heightening structure for limited using land area
CN203034328U (en) Joint part treatment structure of reconstruction and extension project of expressway
CN107268373A (en) A kind of water permeability asphalt concrete road and its construction method
CN104452805A (en) Roadbed structure of underpass expressway adjacent to bridge pier
CN204825969U (en) Inspection shaft subsides prevents and treats structure
CN204676593U (en) A kind of superelevation overall steel-plastic Geogrid Reinforced Soil abutment wall-retaining structure
CN207452609U (en) A kind of hassock layer Foam lightweight soil road structure in deep soft foundation section
CN203096697U (en) Ballast field structure at earth and rockfill dam toe
CN214737081U (en) Firm town road soft or hard is plugged into and is prevented novel structure that subsides
CN207176431U (en) A kind of permeable pavement structure based on sponge the idea of the city
CN210658236U (en) Slag stacking structure
CN107642109A (en) A kind of town road heavy well cover walling crib ruggedized construction and its construction method
CN208949663U (en) The roadbed anti-sedimentation pad lid structure that highway construction is laid with
CN204326098U (en) The road structure of underpass of freeways next-door neighbour Bridge Pier
CN210507006U (en) High-strength steel wire mesh reinforced material filling structure of road embankment
CN207228166U (en) A kind of town road heavy well cover walling crib ruggedized construction
CN203625740U (en) Temporary service road in desert
CN208167703U (en) A kind of Soft Ground structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant