CN104452805A - Roadbed structure of underpass expressway adjacent to bridge pier - Google Patents

Roadbed structure of underpass expressway adjacent to bridge pier Download PDF

Info

Publication number
CN104452805A
CN104452805A CN201410777828.8A CN201410777828A CN104452805A CN 104452805 A CN104452805 A CN 104452805A CN 201410777828 A CN201410777828 A CN 201410777828A CN 104452805 A CN104452805 A CN 104452805A
Authority
CN
China
Prior art keywords
underpass
anchor pile
bridge pier
bridge
freeways
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410777828.8A
Other languages
Chinese (zh)
Inventor
王祥
周宏元
逯海
金海元
姚成志
谭远发
冯光胜
高山
时凤永
罗和平
李添翼
陈世刚
欧阳旭光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Siyuan Survey and Design Group Co Ltd
Original Assignee
China Railway Siyuan Survey and Design Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Siyuan Survey and Design Group Co Ltd filed Critical China Railway Siyuan Survey and Design Group Co Ltd
Priority to CN201410777828.8A priority Critical patent/CN104452805A/en
Publication of CN104452805A publication Critical patent/CN104452805A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2/00General structure of permanent way
    • E01B2/006Deep foundation of tracks
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/12Consolidating by placing solidifying or pore-filling substances in the soil

Abstract

The invention provides a roadbed structure of an underpass expressway adjacent to a bridge pier. The roadbed structure comprises an expressway bridge pier arranged on a cut slope and a railway bed arranged on a cutting basement, a plurality of anchorage piles are longitudinally arranged along the edge of the cut slope at intervals, inter-pile walls are arranged between the adjacent anchorage piles, and grouting strengthening areas are arranged between the anchorage piles and the bridge pier of the expressway. By the reinforcing structure, safety of the expressway and the railway is effectively guaranteed.

Description

The road structure of underpass of freeways next-door neighbour Bridge Pier
Technical field
The present invention relates to geotechnical engineering field, be specifically related to the road structure of a kind of underpass of freeways next-door neighbour Bridge Pier.
Background technology
Along with the large step of railway construction in China is advanced; the railway network is day by day flourishing; newly built railway often can walk abreast or intersect with existing speedway; particularly during railway underpass of freeways; then need to carry out special construction design, the smooth enforcement of newly built railway could be met, existing speedway is not had a negative impact simultaneously; adopt the railway excavation supporting scheme of reasonable science, railway, highway can be coordinated mutually and sustainable development.The mode situation of intersecting due to railway and highway is a lot, various, again all more complicated, does not have a kind of method can adapt to solve all situations, therefore, all needs to be solved by special construction design, or solved by special construction engineering method, technique.
Summary of the invention
For above-mentioned technical problem, the invention provides the road structure of a kind of underpass of freeways next-door neighbour Bridge Pier, by arranging ruggedized construction effective guarantee speedway and railway security.
The invention provides the road structure of a kind of underpass of freeways next-door neighbour Bridge Pier, comprise and be arranged at bridge on highway pier in cut slope and be arranged at the suprabasil railway bed of cutting, cut slope edge is longitudinally arranged at intervals with multiple anchor pile, be provided with wall between stake between adjacent anchor pile, between anchor pile and bridge on highway pier, be provided with grouting and reinforcing district.
Described anchor pile is arranged at the lateral sulcus edge of railway bed.Grouting and reinforcing district is arranged at bridge on highway pier edge.
The cantilever segment of described anchor pile is positioned on railway bed lateral sulcus absolute altitude, and the anchoring section of anchor pile is positioned under railway bed lateral sulcus absolute altitude.
Between described stake, wall is arranged between the cantilever segment of adjacent anchor pile, and the suspension section both sides of anchor pile are provided with bracket.
Described bottom, grouting and reinforcing district and railway bed lateral sulcus absolute altitude are positioned at same level line, and the lateral extent in grouting and reinforcing district is 3-8m.
The present invention carries out grouting and reinforcing under existing bridge on highway pier around pile foundation, grouting and reinforcing scope is that railway bed lateral sulcus absolute altitude is with upper part, by injecting treatment, the soil body compactness within the scope of Bridge Pier and intensity are increased all to some extent, when railway bed pile plate wall is constructed, avoid the impact on Existing Railway Bridges pier, ensure current highway and bridge safety.Railway bed is to wear existing speedway under cutting form, and cutting adopts pile plate wall supporting and protection structure near existing highway bridge pier side, successfully solves the problem of railway underpass of freeways narrow space.The present invention, by pile plate wall closing slope and pile peripheral earth grouting and reinforcing, defines the ruggedized construction of " solid after front ", has not only ensured existing expressway safety, can also ensure the unimpeded of railway.
Accompanying drawing explanation
Fig. 1 is schematic diagram of the present invention
Wherein, 1-bridge on highway pier, 2-grouting and reinforcing scope, 3-anchor pile, 4-lateral sulcus, 5-railway bed, wall between 6-stake, 7-cantilever segment, 8-anchoring section, 9-cut slope, the substrate of 10-cutting.
Detailed description of the invention
Below in conjunction with Figure of description and specific embodiment, the present invention will be further described:
The invention provides the road structure of a kind of underpass of freeways next-door neighbour Bridge Pier 1, comprise be arranged at bridge on highway pier in cut slope 91 and be arranged in cutting substrate 10 railway bed 5, cut slope 9 edge is longitudinally arranged at intervals with multiple anchor pile 3, be provided with wall 6 between stake between adjacent anchor pile 3, between stake, wall 6 and anchor pile 3 match and form pile plate wall structure.Grouting and reinforcing district 2 is provided with between pile plate wall structure and bridge on highway pier 1, grouting and reinforcing district 2 is arranged at bridge on highway pier 1 edge, by injecting treatment, the soil body compactness in Bridge Pier 1 scope and intensity are increased all to some extent, when railway bed 5 pile plate wall is constructed, avoid the impact on Existing Railway Bridges pier 1, ensure current highway and bridge safety.As shown in Figure 1, railway bed 5 is arranged in cutting substrate 10, and railway bed 5 both sides are provided with the lateral sulcus 4 for draining.Described pile plate wall is arranged at lateral sulcus 4 edge of railway bed 5, without the need to arranging platform between described railway bed 5 and cut slope 9, successfully solves the problem of railway underpass of freeways narrow space.
The cantilever segment 7 of described anchor pile 3 is positioned on railway bed 5 lateral sulcus 4 absolute altitude, and the anchoring section 8 of anchor pile 3 is positioned under railway bed 5 lateral sulcus 4 absolute altitude.The pile foundation of bridge on highway pier 1 and the anchoring section 8 of anchor pile 3 are all arranged in the good ground of cut slope 9.Between described stake, wall 6 is arranged between the cantilever segment 7 of adjacent anchor pile 3, and the suspension section both sides of anchor pile 3 are provided with bracket.Anchoring section 8 and cantilever segment 7 ratio of anchor pile 3 are 2:1, and sufficient stability requirement is covered with in stake.The pile center spacing 4m of anchor pile 3, main body section size 2.5m × 2.5m, cantilever segment 7 front both sides of wall 6 wall between stake arrange 30cm × 40cm bracket, and anchor pile 3 pile body adopts C30 concrete, between stake, wall 6 adopts the baffle plate being of a size of 50cm × 25cm × 130cm, and adopts C30 Prefabricated reinforced concrete part.
Described bottom, grouting and reinforcing district 2 and railway bed 5 lateral sulcus 4 absolute altitude are positioned at same level line, and the lateral extent in grouting and reinforcing district 2 is 3-8m.In the present embodiment grouting and reinforcing district 2 scope be railway bed 5 lateral sulcus 4 absolute altitude with upper part, bridge on highway pier 1 to railway side 5 meters is longitudinally railway and highway cross street.The present invention is main pulping material with Portland cement and water glass, water glass regulates the initial setting time of injection slurry as additive, wherein water/binder ratio is 1 ~ 0.5:1, and cement grout and water glass liquid volume are than being 1:0.08 ~ 0.12, and concentration of slurry from thin to thick.
Obviously, those skilled in the art can carry out various change and modification to the present invention and not depart from the spirit and scope of the present invention.Like this, if these amendments of the present invention and modification belong within the scope of the claims in the present invention and equivalent technologies thereof, then the present invention is also intended to comprise these change and modification.
The content be not described in detail in this manual belongs to the known prior art of professional and technical personnel in the field.

Claims (6)

1. the road structure of a underpass of freeways next-door neighbour Bridge Pier, it is characterized in that comprising the bridge on highway pier (1) be arranged in cut slope (9) and the railway bed (5) be arranged in cutting substrate (10), cut slope (9) edge is longitudinally arranged at intervals with multiple anchor pile (3), be provided with wall between stake (6) between adjacent anchor pile (3), between anchor pile (3) and bridge on highway pier (1), be provided with grouting and reinforcing district (2).
2. the road structure of underpass of freeways next-door neighbour Bridge Pier according to claim 1, is characterized in that anchor pile (3) is arranged at lateral sulcus (4) edge of railway bed (5).
3. the road structure of underpass of freeways next-door neighbour Bridge Pier according to claim 2, is characterized in that grouting and reinforcing district (2) is arranged at bridge on highway pier (1) edge.
4. the road structure of underpass of freeways next-door neighbour Bridge Pier according to claim 2, it is characterized in that the cantilever segment (7) of anchor pile (3) is positioned on railway bed (5) lateral sulcus (4) absolute altitude, the anchoring section (8) of anchor pile (3) is positioned under railway bed (5) lateral sulcus (4) absolute altitude.
5. the road structure of underpass of freeways next-door neighbour Bridge Pier according to claim 3, it is characterized in that between described stake, wall (6) is arranged between the cantilever segment (7) of adjacent anchor pile (3), suspension section (7) both sides of anchor pile (3) are provided with bracket.
6. the road structure of underpass of freeways next-door neighbour Bridge Pier according to claim 4, it is characterized in that lateral sulcus (4) absolute altitude of (2) bottom, grouting and reinforcing district and railway bed (5) is positioned at same level line, the lateral extent of grouting and reinforcing district (2) is 3-8m.
CN201410777828.8A 2014-12-15 2014-12-15 Roadbed structure of underpass expressway adjacent to bridge pier Pending CN104452805A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410777828.8A CN104452805A (en) 2014-12-15 2014-12-15 Roadbed structure of underpass expressway adjacent to bridge pier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410777828.8A CN104452805A (en) 2014-12-15 2014-12-15 Roadbed structure of underpass expressway adjacent to bridge pier

Publications (1)

Publication Number Publication Date
CN104452805A true CN104452805A (en) 2015-03-25

Family

ID=52899505

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410777828.8A Pending CN104452805A (en) 2014-12-15 2014-12-15 Roadbed structure of underpass expressway adjacent to bridge pier

Country Status (1)

Country Link
CN (1) CN104452805A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105155377A (en) * 2015-09-10 2015-12-16 成都聚智工业设计有限公司 Roadbed structure close to expressway pier
CN107761477A (en) * 2017-09-18 2018-03-06 中都工程设计有限公司 A kind of road structure close to bridge pier
CN108914718A (en) * 2018-06-07 2018-11-30 中铁二院工程集团有限责任公司 High-speed railway reinforced earth bulkhead roadbed contact net basic preformed hole construction and its construction method
CN113062173A (en) * 2021-03-22 2021-07-02 武汉一冶建筑安装工程有限责任公司 Construction method for joint of garden path underpass flat plate bridge and conical slope foundation

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20110024476A (en) * 2009-09-02 2011-03-09 (주)컴퍼지트솔루션코리아 Earth anchor, secant pile wall using composite shell pile and construction method thereof
CN103334451A (en) * 2013-07-10 2013-10-02 中铁第四勘察设计院集团有限公司 Underneath-passing channel formed between high-speed rail piers through secant pile walls and method thereof
CN204326098U (en) * 2014-12-15 2015-05-13 中铁第四勘察设计院集团有限公司 The road structure of underpass of freeways next-door neighbour Bridge Pier

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20110024476A (en) * 2009-09-02 2011-03-09 (주)컴퍼지트솔루션코리아 Earth anchor, secant pile wall using composite shell pile and construction method thereof
CN103334451A (en) * 2013-07-10 2013-10-02 中铁第四勘察设计院集团有限公司 Underneath-passing channel formed between high-speed rail piers through secant pile walls and method thereof
CN204326098U (en) * 2014-12-15 2015-05-13 中铁第四勘察设计院集团有限公司 The road structure of underpass of freeways next-door neighbour Bridge Pier

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘晓鹏: "某铁路下穿衡炎高速公路大桥桩板墙设计", 《中国水运》 *
牛高等: "新普路与成雅高速公路交叉工程方案比选", 《公路交通技术》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105155377A (en) * 2015-09-10 2015-12-16 成都聚智工业设计有限公司 Roadbed structure close to expressway pier
CN107761477A (en) * 2017-09-18 2018-03-06 中都工程设计有限公司 A kind of road structure close to bridge pier
CN108914718A (en) * 2018-06-07 2018-11-30 中铁二院工程集团有限责任公司 High-speed railway reinforced earth bulkhead roadbed contact net basic preformed hole construction and its construction method
CN108914718B (en) * 2018-06-07 2023-11-17 中铁二院工程集团有限责任公司 Construction method for foundation preformed hole structure of high-speed railway reinforced earth retaining wall subgrade contact net
CN113062173A (en) * 2021-03-22 2021-07-02 武汉一冶建筑安装工程有限责任公司 Construction method for joint of garden path underpass flat plate bridge and conical slope foundation

Similar Documents

Publication Publication Date Title
CN101775987B (en) Zero spacing construction method for overlapping part of upper main tunnel and lower main tunnel of underground overpass
CN106320120B (en) A kind of peg board formula is without dirt road base construction of the highway technique
CN203729324U (en) Anchor rod lattice type retaining wall structure
CN102359046A (en) High fill subgrade connection method
CN102296507A (en) Treatment method of subgrade cracks
CN106836275A (en) Landscape eco-friendly retaining wall for rapidly protecting tillite slope and implementation method
CN109750571A (en) A kind of road landslide emergency and permanent supporting and retaining system integral structure and construction method
CN106930231A (en) A kind of construction method of the engineering flood bank reinforcing that is applied to pass the flood period
CN104452805A (en) Roadbed structure of underpass expressway adjacent to bridge pier
CN107700299B (en) Overpass lower-layer ground road structure and construction method thereof
CN106049379B (en) Interim electricity-generating method and enrockment self bursting dam during the construction hysteresis of spillway downstream
CN104504991A (en) Simulative roadbed and road surface teaching structure body
CN202450485U (en) Sheet pile-reinforced flood control wall
CN210262555U (en) Light soil road structure
CN102817298B (en) Construction method on permafrost
CN204326098U (en) The road structure of underpass of freeways next-door neighbour Bridge Pier
CN107447731B (en) A kind of mixed dam and its construction method
CN211228180U (en) Culvert structure capable of protecting embankment
CN113215995A (en) Method for constructing bridge road in narrow space
CN105155377A (en) Roadbed structure close to expressway pier
CN205576637U (en) Processing closes on roadbed structure of existing line soft soil foundation
CN208884292U (en) Soft soil roadbed and normal roadbed intersection anti-settling structure
CN103866788B (en) A kind of method of pillar abutment scarp slope barricadeization transformation
CN204940310U (en) A kind of combination retaining structure
CN204551521U (en) The cast-in-place construction structure of board wall between a kind of antislide pile stake

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20150325