CN107642109A - A kind of town road heavy well cover walling crib ruggedized construction and its construction method - Google Patents

A kind of town road heavy well cover walling crib ruggedized construction and its construction method Download PDF

Info

Publication number
CN107642109A
CN107642109A CN201710846639.5A CN201710846639A CN107642109A CN 107642109 A CN107642109 A CN 107642109A CN 201710846639 A CN201710846639 A CN 201710846639A CN 107642109 A CN107642109 A CN 107642109A
Authority
CN
China
Prior art keywords
walling crib
prefabricated
well
road
ruggedized construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710846639.5A
Other languages
Chinese (zh)
Inventor
兰春辉
王连明
季超
鞠青娟
刘步芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING WANXING BUILDING GROUP CO LTD
Original Assignee
BEIJING WANXING BUILDING GROUP CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING WANXING BUILDING GROUP CO LTD filed Critical BEIJING WANXING BUILDING GROUP CO LTD
Priority to CN201710846639.5A priority Critical patent/CN107642109A/en
Publication of CN107642109A publication Critical patent/CN107642109A/en
Pending legal-status Critical Current

Links

Abstract

The present invention discloses a kind of town road heavy well cover walling crib ruggedized construction, prefabricated walling crib, cystosepiment and pit shaft including setting gradually direction earthwork grille from top to bottom, the bottom face external circumferential of prefabricated walling crib is provided with prefabricated well cycle basis seat, cystosepiment is arranged between prefabricated walling crib and pit shaft, and concrete has been poured between prefabricated well cycle basis seat and road structure layer;Well lid is placed on prefabricated walling crib top by support frame.Ruggedized construction in the present invention, coordinate low density polyethylene (LDPE) closed-cell foam plate shape into the semirigid structure body of rigid flexible system using the prefabricated walling crib with pedestal, the intensity of sub-surface around walling crib is improved, increased car dynamic load lifting surface area, has disperseed well week roadbase load;The semirigid structure body of rigid flexible system, reduce the quality problems such as well week pavement cracking, breakage and well lid sinking, ensure surface evenness so that road-ability and security are greatly improved, while also reduce road maintenance, maintenance costs.

Description

A kind of town road heavy well cover walling crib ruggedized construction and its construction method
Technical field
The present invention relates to Municipal Road Engineering technical field of construction, more particularly to a kind of town road heavy well cover walling crib Ruggedized construction and its construction method.
Background technology
Major part urban road in China's is steady using lime stabilized soil, lime-fly-ash stabilization soil, lime fly ash at present Determine rubble and cement stabilized macadam to belong to semi-rigid plate body as road deck structure as base layer structure, bituminous concrete and hold Carry structure design.Based on inspection shaft uses armored concrete in road, concrete segment or brick setting are well bore, are used in well week 2:8 dirt or graded sand and stone backfill, armored concrete is prefabricated or preliminary shaft is built in building block (brick) by laying bricks or stones, spheroidal graphite cast-iron walling crib (lid) with 30~ The C30 concrete parcel that 50cm is wide, 25cm is thick, reserved 4cm thickness perform asphalt concrete pavement structure, belong to rigid structure and set Meter.Overlapped between road and inspection shaft both structure types using bituminous concrete, once multibody system sedimentation is uneven, dynamic Bituminous concrete lap-joint is easily sheared destruction under load action, or well week backfill (surface layer) roll it is unreal, pour it is not whole, The reasons such as mortar strength is inadequate, well lid installation is undesirable cause superficial layer cracking herein.If repaired not in time, rainwater enters Enter roadbase, damage face will progressively expand.
The content of the invention
It is an object of the invention to provide a kind of town road heavy well cover walling crib ruggedized construction, effectively solve it is current I The inspection shafts such as rainwater, sewage, reclaimed water, upper water, combustion gas and telecommunications in the range of state's urban road occur well lid periphery (10~ 35cm) the quality problems such as pavement cracking, breakage and well lid sinking, ensure municipal road pavement flatness so that road-ability It is greatly improved with safety, while reduces road maintenance, maintenance costs.
To achieve the above object, the invention provides following scheme:The present invention provides a kind of town road heavy well cover well Ruggedized construction is enclosed, including prefabricated walling crib, cystosepiment and the pit shaft set gradually from top to bottom, the bottom of the prefabricated walling crib have The prefabricated well cycle basis seat of integrally connected, the cystosepiment are arranged between the prefabricated walling crib and the pit shaft, the prefabricated well Concrete is poured between circle and road structure layer, the upper surface of the concrete is concordant with the upper surface of the prefabricated walling crib; Well lid is used for by fixed placement on the prefabricated walling crib top.
Optionally, the prefabricated well cycle basis seat it is wide go out the walling crib the value of top external diameter be more than or equal to 750mm, it is and described The upper surface of prefabricated well cycle basis seat is inclined-plane.
Optionally, the prefabricated walling crib is prefabricated reinforced concrete walling crib, and the epithelium of the prefabricated walling crib is using at dabbing Reason.
Optionally, the lateral surface of the prefabricated well cycle basis seat is placed adjacent with the inwall of going to a grassroots level of road structure layer.
Optionally, it is equipped with one layer pair on the surface of the concrete and the upper basic unit of the road structure layer first poured To GSZ, the top of the direction earthwork grille is roadway base surfaces layer.
Optionally, a screed-coat has been poured between the bottom of the prefabricated well cycle basis seat and the underlayment of road structure layer.
Optionally, the cystosepiment is low density polyethylene (LDPE) closed-cell foam plate, and the low density polyethylene (LDPE) closed-cell foam The thickness of plate is 100mm.
Optionally, the outside of the pit shaft and be roadbed positioned at the bottom of the road structure layer, the roadbed passes through well All backfilling materials be filled and it is counter after the completion of filling dig, the well week backfilling material is graded sand and stone backfilling material.
The town road heavy type well curb well lid carried out using above-mentioned town road heavy type well curb well lid ruggedized construction reinforces knot The construction method of structure, Specific construction step are:
Roadway base surfaces layer and upper roadbed shared by anti-digging inspection shaft and its surrounding etc.;
The roadbed of pit shaft surrounding is complete by the backfilling material backfill of well week according to specification, then lay one layer of pitch coagulation Soil;
The underlayment of laying road structure sheaf, and lay one layer of bituminous concrete on the surface of underlayment;
Low density polyethylene (LDPE) closed-cell foam plate is fixed on the top of pit shaft, and on the top of the underlayment and described low The periphery of density polyethylene closed-cell foam plate pours screed-coat by ready-mixed concrete;
Laid on the top of the screed-coat and low density polyethylene (LDPE) closed-cell foam plate prefabricated with prefabricated well cycle basis seat Walling crib;
The casting concrete between the top surface and road structure layer of prefabricated well cycle basis seat, the upper surface of concrete with it is prefabricated Walling crib is concordant, 14 days curing periods, road bituminous layers is done after reaching 2/3 intensity;
One layer of direction earthwork grille is laid on the surface of the concrete poured and the road structure layer first poured;
Finally lay and shakeout road surface, periodically conserved.
The present invention achieves following technique effect relative to prior art:
Well lid walling crib ruggedized construction in the present invention, between road deck and basic unit place one layer of direction earthwork grille and Using with prefabricated well cycle basis seat prefabricated reinforced concrete walling crib coordinate 100mm thickness low density polyethylene (LDPE) closed-cell foam plate shape into The semirigid structure body of rigid flexible system, the cast-in-place concrete of this structure and prefabricated well cycle basis seat improve road surface base around walling crib The intensity of layer, increased car dynamic load lifting surface area, and had disperseed well week roadbase load;Direction earthwork grille, can effectively it hinder Only and delayed reflex crack generation, rapidly absorb and spread as the stress caused by gravity, the life-span is used in extension;Low-density is gathered Ethene closed-cell foam plate has that return rate is strong, and no water imbibition, impact resistance and against weather are strong, absorbs superstructure load and base Holder structure counter-force, serve the effect of elastic structure.One layer of direction earthwork grille and just is placed between road deck and basic unit The semirigid structure body of soft combination, reduce the quality problems such as well week pavement cracking, breakage and well lid sinking, ensure town road Surface evenness so that road-ability and security are greatly improved, while also reduce road maintenance, upkeep charges With.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to institute in embodiment The accompanying drawing needed to use is briefly described, it should be apparent that, drawings in the following description are only some implementations of the present invention Example, for those of ordinary skill in the art, without having to pay creative labor, can also be according to these accompanying drawings Obtain other accompanying drawings.
Fig. 1 is the overall structure diagram of town road heavy well cover walling crib ruggedized construction of the present invention;
Wherein, 1 direction earthwork grille;Basic unit on 2;3 go to a grassroots level;4 underlayments;5 roadbeds;6 first anti-digging interfaces;7 coagulations Soil;8 prefabricated well cycle basis seats;9 screed-coats;10 well week backfilling material;11 prefabricated walling cribs;12 low density polyethylene (LDPE) closed-cell foam plates; 13 pit shafts;14 second anti-digging interfaces;15 well lids.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, rather than whole embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art are obtained every other under the premise of creative work is not made Embodiment, belong to the scope of protection of the invention.
It is an object of the invention to provide a kind of town road heavy well cover walling crib ruggedized construction, effectively solve it is current I The inspection shafts such as rainwater, sewage, reclaimed water, upper water, combustion gas and telecommunications in the range of state's urban road occur well lid periphery (10~ 35cm) the quality problems such as pavement cracking, breakage and well lid sinking, ensure municipal road pavement flatness so that road-ability It is greatly improved with safety, while reduces road maintenance, maintenance costs.
Town road heavy well cover walling crib ruggedized construction provided by the invention, including two-way geotechnique is set gradually from top to bottom Prefabricated walling crib, cystosepiment and the pit shaft of grid, the bottom of prefabricated walling crib have the prefabricated well cycle basis seat of integrally connected, and cystosepiment is set Be placed between prefabricated walling crib and pit shaft, poured concrete between prefabricated walling crib and road structure layer, the upper surface of concrete with The upper surface of prefabricated walling crib is concordant;Well lid is used for by fixed placement on prefabricated walling crib top.
The well lid walling crib ruggedized construction, place one layer of direction earthwork grille between road deck and basic unit and use carries The prefabricated walling crib of prefabricated well cycle basis seat coordinates the semirigid structure body of cystosepiment formation rigid flexible system, the cast-in-place coagulation of this structure Native and prefabricated walling crib improves the intensity of sub-surface around walling crib, increased car dynamic load lifting surface area, it is thoughtful to have disperseed well Base course load;Low density polyethylene (LDPE) closed-cell foam plate has that return rate is strong, and no water imbibition, impact resistance and against weather are strong, Superstructure load and base construction counter-force are absorbed, serves the effect of elastic structure.
In order to facilitate the understanding of the purposes, features and advantages of the present invention, it is below in conjunction with the accompanying drawings and specific real Applying mode, the present invention is further detailed explanation.
Fig. 1 is refer to, wherein, Fig. 1 is that the overall structure of town road heavy well cover walling crib ruggedized construction of the present invention is illustrated Figure.
As shown in figure 1, the present invention provides a kind of town road heavy well cover walling crib ruggedized construction, including from top to bottom successively Prefabricated walling crib 11, cystosepiment and the pit shaft 13 set, the bottom of prefabricated walling crib 11 have the prefabricated well cycle basis seat 8 of integrally connected, Cystosepiment is arranged between prefabricated walling crib 11 and pit shaft 13, and C15 concrete has been poured between prefabricated walling crib 11 and road structure layer 7, the upper surface of concrete seven is concordant with the upper surface of prefabricated walling crib 11;Well lid 15 is used for by fixed placement in prefabricated walling crib 11 Top.
For walling crib using prefabricated, the walling crib pedestal being wholely set with walling crib is pedestal foot, prefabricated well cycle basis seat 8 it is wide go out walling crib 13 The value of top external diameter be more than or equal to 750mm, the thickness of prefabricated well cycle basis seat 8 is not less than 100mm, and intensity is not less than C30, the north Area, which needs to use, is not less than label D200 frost-resistant concretes, and the upper surface of prefabricated well cycle basis seat 8 is inclined-plane.Prefabricated walling crib 11 For prefabricated reinforced concrete walling crib, reinforcing bar uses HRB400 reinforcing bars, and protective layer 20mm, the epithelium of prefabricated walling crib 11 is using at dabbing Reason, the lateral surface of prefabricated well cycle basis seat 8 are close to 3 inwalls of going to a grassroots level of road structure layer.
One layer of two-way geotechnological lattice are equipped with concrete seven and the surface of the upper basic unit 2 of the road structure layer first poured Grid 1, ensure walling crib and surface layer roadbase collective effect, the top of direction earthwork grille 1 by laying direction earthwork grille 1 For roadbase.
A screed-coat 9 is poured between the bottom of prefabricated well cycle basis seat 8 and the underlayment 4 of road structure layer, screed-coat 9 is The C15 ready-mixed concrete screed-coats poured, horizontal placement basis is provided prefabricated well cycle basis seat 8.
Cystosepiment is low density polyethylene (LDPE) closed-cell foam plate 12, and low density polyethylene (LDPE) closed-cell foam plate 12 has return rate By force, no water imbibition, impact resistance and against weather are strong, absorb superstructure load and base construction counter-force, serve elastic knot The effect of structure body, the thickness of low density polyethylene (LDPE) closed-cell foam plate 12 is 100mm.
The outside of pit shaft 13 and be roadbed 5 positioned at the bottom of road structure layer, roadbed 5 is carried out by well week backfilling material 10 Filling, well week backfilling material 10 be graded sand and stone backfilling material.The material of each road structure layer is stablized broken for cement, flyash Stone, emulsified asphalt, bituminous concrete etc..
The town road heavy type well curb well lid carried out using above-mentioned town road heavy type well curb well lid ruggedized construction reinforces knot The construction method of structure, Specific construction step are:
It is anti-to dig inspection shaft, first it is anti-dig that interface 6 is counter to be dug, while to roadway base surfaces Ceng Heshang roads shared around Base etc. is counter to be dug;
The roadbed 5 of the surrounding of pit shaft 13 is backfilled completely according to specification by well week backfilling material 10, then lays one layer of drip Blue or green concrete, in order to ensure the compactness of inspection shaft surrounding and the bearing capacity of roadbed 5, inspection shaft surrounding is using graded sand and stone backfill point Layer compacting, width are not less than 400mm, and compactness is not less than 0.94, and the compactness of roadbase should meet《Highway bed construction skill Art specification》Requirement;
The underlayment 4 of laying road structure sheaf, and lay one layer of bituminous concrete on the surface of underlayment 4;
Fix low density polyethylene (LDPE) closed-cell foam plate 12 on the top of pit shaft 13, and on the top of the underlayment 4 and The periphery of the low density polyethylene (LDPE) closed-cell foam plate 12 pours screed-coat by ready-mixed concrete;
Laid on the top of the screed-coat 9 and low density polyethylene (LDPE) closed-cell foam plate 12 with prefabricated well cycle basis seat 8 Prefabricated walling crib 11;
The casting concrete 7 between the top surface and road structure layer of prefabricated well cycle basis seat 8, the upper surface of concrete seven with Prefabricated walling crib 11 is concordant;
One layer of direction earthwork grille 1 is laid on the surface of the concrete seven poured and the road structure layer first poured;
Finally lay and shakeout road surface, periodically conserved.
In work progress, prefabricated well cycle basis seat 8, which is instead dug, to be carried out after the completion of the laying of roadway base surfaces layer, in the second anti-digging Interface 14 (basic unit is counter to dig interface) is carried out, and when walling crib bottom is road structure layer, the primer thickness of roadbed 5 is not less than 17cm;After the completion of anti-digging, the upper surface of underlayment 4 is cleared up, pours C15 ready-mixed concrete screed-coats in time, pacified on the top of pit shaft 13 Put 100mm thickness low density polyethylene (LDPE) closed-cell foams plate 12;Then walling crib is laid, the placement in whole work progress is required to gently take Put down gently, forbid to get rid of and touch, pay attention to finished product protection;Walling crib epithelium needs dabbing to handle, and after the completion for the treatment of that walling crib is laid, it is pre- to pour C15 in time Mixed concrete, upper surface is concordant with walling crib upper surface, 14 days curing periods, road bituminous layers is done again after reaching 2/3 intensity.
The edge bituminous concrete of inspection shaft should use artificial hammer ram, hot iron supplement compacting, and compactness should reach 0.97 More than.
It should be noted that the town road heavy well cover walling crib ruggedized construction in the present invention, the above-mentioned limit on numerical value It is fixed only for the purpose of illustration, it is not limited to only to be used using above-mentioned numerical value, according to practice of construction and service condition Appropriate adjustment can be carried out, within the scope of the present invention;The selection of concrete strength etc. can also enter according to actual conditions Row adjustment;Low density polyethylene (LDPE) closed-cell foam plate in the present invention is also replaced by the sheet material of other materials for meeting to require, Within the scope of the present invention.
Specific case is applied in the present invention to be set forth the principle and embodiment of the present invention, above example Illustrate to be only intended to help the method and its core concept for understanding the present invention;Meanwhile for those of ordinary skill in the art, according to According to the thought of the present invention, in specific embodiments and applications there will be changes.In summary, this specification content It should not be construed as limiting the invention.

Claims (9)

  1. A kind of 1. town road heavy well cover walling crib ruggedized construction, it is characterised in that:It is prefabricated including what is set gradually from top to bottom Walling crib, cystosepiment and pit shaft, the bottom of the prefabricated walling crib have the prefabricated well cycle basis seat of integrally connected, and the cystosepiment is set Between the prefabricated walling crib and the pit shaft, concrete has been poured between the prefabricated walling crib and road structure layer, it is described mixed The upper surface for coagulating soil is concordant with the upper surface of the prefabricated walling crib;Well lid is used for by fixed placement on the prefabricated walling crib top End.
  2. A kind of 2. town road heavy well cover walling crib ruggedized construction according to claim 1, it is characterised in that:It is described prefabricated Walling crib pedestal it is wide go out the walling crib the value of top external diameter be more than or equal to 750mm, and the upper surface of the prefabricated well cycle basis seat is Inclined-plane.
  3. A kind of 3. town road heavy well cover walling crib ruggedized construction according to claim 1, it is characterised in that:It is described prefabricated Walling crib is prefabricated reinforced concrete walling crib, and the epithelium of the prefabricated walling crib is handled using dabbing.
  4. A kind of 4. town road heavy well cover walling crib ruggedized construction according to claim 1, it is characterised in that:It is described prefabricated The inwall of going to a grassroots level of the lateral surface of walling crib pedestal and road structure layer is placed adjacent.
  5. A kind of 5. town road heavy well cover walling crib ruggedized construction according to claim 1, it is characterised in that:Described mixed Solidifying soil and the surface of the upper basic unit of the road structure layer first poured are equipped with one layer of direction earthwork grille, the two-way geotechnique The top of grid is roadway base surfaces layer.
  6. A kind of 6. town road heavy well cover walling crib ruggedized construction according to claim 1, it is characterised in that:It is described prefabricated A screed-coat has been poured between the bottom of walling crib pedestal and the underlayment of road structure layer.
  7. A kind of 7. town road heavy well cover walling crib ruggedized construction according to claim 1, it is characterised in that:The foam Plate is low density polyethylene (LDPE) closed-cell foam plate, and the thickness of the low density polyethylene (LDPE) closed-cell foam plate is 100mm.
  8. A kind of 8. town road heavy well cover walling crib ruggedized construction according to claim 1, it is characterised in that:The pit shaft Outside and be roadbed positioned at the bottom of the road structure layer, the roadbed is filled by well week backfilling material, and Spread it is anti-when walling crib is reinforced after roadway base surfaces layer dig, the well week backfilling material is graded sand and stone backfilling material.
  9. 9. a kind of construction method of town road heavy type well curb well lid ruggedized construction, including any one of claim 1-8 Town road heavy type well curb well lid ruggedized construction, it is characterised in that:
    Specific construction step is:
    Roadway base surfaces layer and upper roadbed shared by anti-digging inspection shaft and its surrounding etc.;
    The roadbed of pit shaft surrounding is complete by the backfilling material backfill of well week according to specification, then lay one layer of bituminous concrete;
    The underlayment of laying road structure sheaf, and lay one layer of bituminous concrete on the surface of underlayment;
    Low density polyethylene (LDPE) closed-cell foam plate is fixed on the top of pit shaft, and on the top of the underlayment and the low-density The periphery of ethylene closed cell cystosepiment pours screed-coat by ready-mixed concrete;
    The prefabricated walling crib with prefabricated well cycle basis seat is laid on the top of the screed-coat and low density polyethylene (LDPE) closed-cell foam plate;
    The casting concrete between the top surface and road structure layer of prefabricated well cycle basis seat, the upper surface of concrete and prefabricated walling crib Concordantly, curing period 14 days, road bituminous layers are done after reaching 2/3 intensity;
    One layer of direction earthwork grille is laid on the surface of the concrete poured and the road structure layer first poured;
    Finally lay and shakeout road surface, periodically conserved.
CN201710846639.5A 2017-09-19 2017-09-19 A kind of town road heavy well cover walling crib ruggedized construction and its construction method Pending CN107642109A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710846639.5A CN107642109A (en) 2017-09-19 2017-09-19 A kind of town road heavy well cover walling crib ruggedized construction and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710846639.5A CN107642109A (en) 2017-09-19 2017-09-19 A kind of town road heavy well cover walling crib ruggedized construction and its construction method

Publications (1)

Publication Number Publication Date
CN107642109A true CN107642109A (en) 2018-01-30

Family

ID=61111791

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710846639.5A Pending CN107642109A (en) 2017-09-19 2017-09-19 A kind of town road heavy well cover walling crib ruggedized construction and its construction method

Country Status (1)

Country Link
CN (1) CN107642109A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109440821A (en) * 2018-12-18 2019-03-08 温州金德市政建设有限公司 Pipe well road and municipal well lid integral structure
CN110284525A (en) * 2019-04-02 2019-09-27 贵州磷镁材料有限公司 A kind of anti-settling manhole cover construction and the maintenance of impaired well lid or replacing options

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006112075A (en) * 2004-10-13 2006-04-27 Shinichi Tsubakimori Manhole and installation method of manhole cover supporting frame
KR100665210B1 (en) * 2005-09-13 2007-01-09 조용우 Concrete mold for manhole manufacture
CN103806470A (en) * 2014-03-14 2014-05-21 江苏华光双顺机械制造有限公司 Production and installation method for reinforced concrete inspection well
CN103835217A (en) * 2013-12-02 2014-06-04 天津炬实科技发展有限公司 Method for prevention and treatment on damage and depression of pavement around inspection well

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006112075A (en) * 2004-10-13 2006-04-27 Shinichi Tsubakimori Manhole and installation method of manhole cover supporting frame
KR100665210B1 (en) * 2005-09-13 2007-01-09 조용우 Concrete mold for manhole manufacture
CN103835217A (en) * 2013-12-02 2014-06-04 天津炬实科技发展有限公司 Method for prevention and treatment on damage and depression of pavement around inspection well
CN103806470A (en) * 2014-03-14 2014-05-21 江苏华光双顺机械制造有限公司 Production and installation method for reinforced concrete inspection well

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
张迎辉: "检查井周围路面沉陷碎裂的防治技术", 《市政技术》 *
王水华等: "一种随路基沉降式检查井井盖及支座安装方法介绍", 《特种结构》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109440821A (en) * 2018-12-18 2019-03-08 温州金德市政建设有限公司 Pipe well road and municipal well lid integral structure
CN110284525A (en) * 2019-04-02 2019-09-27 贵州磷镁材料有限公司 A kind of anti-settling manhole cover construction and the maintenance of impaired well lid or replacing options

Similar Documents

Publication Publication Date Title
CN207987964U (en) A kind of reinforcing inspection shaft
CN110578290B (en) Bridge abutment back backfill structure and construction method thereof
CN202787044U (en) Longitudinal crack treatment structure for bituminous concrete pavement
CN104452510B (en) Immediate construction method of rural road
CN106567410A (en) New construction method of municipal road inspection well
CN109914173A (en) Foam lightweight soil pours platform back structure and its construction method in Expressway Extension Project
CN108316089A (en) It is a kind of that road surface method is repaired using plain concrete and reinforced concrete
CN107460890A (en) A kind of city bituminous concrete pavement inspection shaft construction method
CN206625096U (en) A kind of reinforced rubble frame structure subgrade strengthening system
CN106676993A (en) Roadbed reinforcing system of reinforced gravel framework structure and reinforcing method of roadbed reinforcing system
CN107700299B (en) Overpass lower-layer ground road structure and construction method thereof
CN210262555U (en) Light soil road structure
CN202849895U (en) Structure for repairing urban asphalt pavements
CN107642109A (en) A kind of town road heavy well cover walling crib ruggedized construction and its construction method
CN207714057U (en) A kind of anti-settling road structure
CN207211362U (en) A kind of basement bottom board fish tail and waterproof layer
CN106836034B (en) High-fill cover plate culvert flexible load shedding system and construction method
CN207228166U (en) A kind of town road heavy well cover walling crib ruggedized construction
CN210529400U (en) Solidified building residue soil road structure
CN104499397A (en) Asphalt pavement structure based on coordination of deformation of subgrade and pavement
CN108951383A (en) A kind of construction technology that the regeneration of cement stabilized macadam base presplitting formula is reinforced
CN210797245U (en) Structure is backfilled to bridgehead abutment back of body
CN211079810U (en) Avoid pitch highway of ponding
CN210657841U (en) Rigid and flexible seamless pavement base layer structure
CN207597177U (en) A kind of elevated bridge lower floor road structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180130