CN204825969U - Inspection shaft subsides prevents and treats structure - Google Patents

Inspection shaft subsides prevents and treats structure Download PDF

Info

Publication number
CN204825969U
CN204825969U CN201520500490.1U CN201520500490U CN204825969U CN 204825969 U CN204825969 U CN 204825969U CN 201520500490 U CN201520500490 U CN 201520500490U CN 204825969 U CN204825969 U CN 204825969U
Authority
CN
China
Prior art keywords
well base
inspection shaft
walling crib
concrete
subsides
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520500490.1U
Other languages
Chinese (zh)
Inventor
张永军
张怀斌
郭瑞
邵启磊
张晶晶
郝志
杨巧玉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
He'nan Lujia Road & Bridge Co Ltd
Original Assignee
He'nan Lujia Road & Bridge Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by He'nan Lujia Road & Bridge Co Ltd filed Critical He'nan Lujia Road & Bridge Co Ltd
Priority to CN201520500490.1U priority Critical patent/CN204825969U/en
Application granted granted Critical
Publication of CN204825969U publication Critical patent/CN204825969U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

Inspection shaft subsides prevents and treats structure, its well base for there is reservation step form at original well base top opening part that digs, the walling crib arrange in original well base to fill between walling crib and well base and pack, the well base of step form in lay steel reinforcement cage and concrete -filled. The utility model discloses have a very strong practicality in that urban road is under construction, it not only adds on cement concrete pavement and bituminous paving and the new road bed of constructing and is suitable for when spreading asphalt concrete, and the inspection shaft of other pipeline facilities of installation adds and can be suitable for equally when spreading the asphalt concrete road surface on urban road moreover, adopt this structure can effectually prevent that the inspection shaft from taking place to subside at the in -process that uses.

Description

Manhole prevention and cure of settlement structure
Technical field
The utility model belongs to the infrastructure in municipal highway, the manhole depression control structure specifically for preventing manhole from depression in use occurring.
Background technology
In recent years, city size constantly expanded, and infrastructure construction reach quality control is tight and due to reasons such as vehicle flowrate increasings, there is a large amount of manhole depressions and all road surface breakages of well in urban road, affect road occupation effect, smooth degree and difference attractive in appearance, especially affect ride comfort.
Existing manhole construction is after road foundation or basic unit are shaped substantially, in the oppositely rear installation of excavation, then backfill, because excavation caused disturbance to original closely knit roadbed and basic unit, in addition during backfill, work plane is narrow, backfill quality control is not tight, especially original design standard, and walling crib is often less than the scope of excavation disturbance, and be plain concrete substantially, cause the depression of whole manhole, pavement destruction, and then develop into the destruction of manhole and pipeline.
Summary of the invention
The utility model is for the manhole depression control structure of tackling manhole depression situation in urban road., its structure is simple, the basis of original walling crib is set up a circle coagulation pedosphere, prevents depression respond well.
The utility model realizes above-mentioned purpose by the following technical solutions:
Manhole prevention and cure of settlement structure, it is have reserved step-like well base at original well Ji Shangfangkaikouchu dug, and described walling crib is placed in original well base, and fills filler between walling crib and well base; Reinforcing cage is laid and fill concrete in described step-like well base.
Preferably, described reinforcing cage and the top of walling crib link together, and better can ensure the connectivity of concrete outer ring and walling crib in the process of concreting.
The utility model adopts technique scheme to have following beneficial effect:
Although the utility model technical difficulty is little, but there is very strong practicality in urban road construction, it is not only suitable for during Paving Bituminous Concrete on cement concrete pavement and flexible pavement and the roadbed newly built, and can be suitable for equally when installing the manhole Paving Bituminous Concrete road surface of other pipeline facility on urban road; This structure is adopted can effectively to prevent manhole from the process used, sedimentation occurring.
Accompanying drawing explanation
Fig. 1 is schematic diagram of the present utility model.
Fig. 2 is the schematic diagram of another embodiment.
Detailed description of the invention
Below in conjunction with drawings and Examples, the utility model is described further.
Embodiment 1
As shown in Figure 1 be a kind of embodiment of the present utility model.
Manhole prevention and cure of settlement structure, it is have reserved the second step-like well base 12 at original the first well base 11 upper opening place dug; Walling crib 2 is positioned in the first well base 11, and fills filler 3 between walling crib 2 and the first well base 11.
Reinforcing cage 4 is located in the second well base 12, is skeleton concreting 5 with reinforcing cage 4.
Embodiment 2
Another embodiment of the present utility model as shown in Figure 2.
Manhole prevention and cure of settlement structure, it is have reserved the second step-like well base 12 at original the first well base 11 upper opening place dug; Walling crib 2 is positioned in the first well base 11, and fills filler 3 between walling crib 2 and the first well base 11.
Reinforcing cage 4 is connected to the top of walling crib 2, and when walling crib 2 puts into the first well base 11, reinforcing cage 4 matches with the second well base 12, is skeleton concreting 5 with reinforcing cage 4.

Claims (1)

1. manhole prevention and cure of settlement structure, it is have reserved the second step-like well base (12) at original the first well base (11) upper opening place dug; Walling crib (2) is positioned in the first well base (11), and filler (3) is filled between walling crib (2) and the first well base (11), reinforcing cage (4) is located in the second well base (12), it is characterized in that: described reinforcing cage (4) is connected to the top of walling crib (2), when walling crib (2) puts into first well base (11), reinforcing cage (4) matches with the second well base (12), with reinforcing cage (4) for skeleton concreting (5).
CN201520500490.1U 2015-07-06 2015-07-06 Inspection shaft subsides prevents and treats structure Active CN204825969U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520500490.1U CN204825969U (en) 2015-07-06 2015-07-06 Inspection shaft subsides prevents and treats structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520500490.1U CN204825969U (en) 2015-07-06 2015-07-06 Inspection shaft subsides prevents and treats structure

Publications (1)

Publication Number Publication Date
CN204825969U true CN204825969U (en) 2015-12-02

Family

ID=54683585

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520500490.1U Active CN204825969U (en) 2015-07-06 2015-07-06 Inspection shaft subsides prevents and treats structure

Country Status (1)

Country Link
CN (1) CN204825969U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106567410A (en) * 2016-11-07 2017-04-19 温州市兴业市政建设有限公司 New construction method of municipal road inspection well
CN110295628A (en) * 2019-07-02 2019-10-01 广东源基建设工程有限公司 A kind of pavement construction method with inspection shaft
CN111321793A (en) * 2020-02-26 2020-06-23 中铁二院工程集团有限责任公司 Construction method of ballastless track railway roadbed water collecting well

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106567410A (en) * 2016-11-07 2017-04-19 温州市兴业市政建设有限公司 New construction method of municipal road inspection well
CN110295628A (en) * 2019-07-02 2019-10-01 广东源基建设工程有限公司 A kind of pavement construction method with inspection shaft
CN111321793A (en) * 2020-02-26 2020-06-23 中铁二院工程集团有限责任公司 Construction method of ballastless track railway roadbed water collecting well

Similar Documents

Publication Publication Date Title
CN101368383B (en) Method for treating soft soil roadbed by artificial composite crust layer
CN102433876B (en) Multi-compartment casing composite pile and construction method thereof
CN106759496B (en) Anti-settling inspection shaft changes the outfit technique
CN205443840U (en) Car lane permeable pavement structure
CN105714759B (en) The row that liquefaction collapse is taken precautions against in urban dregs blends reinforcement means
CN203393530U (en) Anti-floating lightweight high-fill embankment structure
CN204825969U (en) Inspection shaft subsides prevents and treats structure
CN103147614A (en) Pool with multi-layer structure and building method thereof
CN106049379B (en) Interim electricity-generating method and enrockment self bursting dam during the construction hysteresis of spillway downstream
CN105926393A (en) Method for filling embankments by using bubble mixed light soil
CN105421571A (en) Sewer well and rainwater well construction process
CN102817298B (en) Construction method on permafrost
CN104652495A (en) Waterproof construction process for joint of inner support upright post of foundation pit and bottom plate
CN202830673U (en) Existing embankment heightening structure for limited using land area
CN208884292U (en) Soft soil roadbed and normal roadbed intersection anti-settling structure
CN204491320U (en) Existing railway station roadbed light supporting structure on filled ground
CN207469190U (en) A kind of infitration galleries structure of efficient draining
CN215758302U (en) High liquid limit soil roadbed structure
CN204940330U (en) A kind of pipeline foundation
CN204385575U (en) Fill Reinforced With Geogrids clay bound edge CHARACTERISTICS OF TAILINGS SAND roadbed
CN205000290U (en) Bottom of reservior pitch thoughtlessly congeals panel and storehouse slope concrete panel connection structure
CN107642109A (en) A kind of town road heavy well cover walling crib ruggedized construction and its construction method
CN207228166U (en) A kind of town road heavy well cover walling crib ruggedized construction
CN210049276U (en) Soil slope retaining wall system structure
CN106277687A (en) The installation method of stem pressing glass reinforced plastics anaerobic tank

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant