CN105421571A - Sewer well and rainwater well construction process - Google Patents
Sewer well and rainwater well construction process Download PDFInfo
- Publication number
- CN105421571A CN105421571A CN201510930060.8A CN201510930060A CN105421571A CN 105421571 A CN105421571 A CN 105421571A CN 201510930060 A CN201510930060 A CN 201510930060A CN 105421571 A CN105421571 A CN 105421571A
- Authority
- CN
- China
- Prior art keywords
- well
- catch
- construction
- basin
- sewer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F5/00—Sewerage structures
- E03F5/04—Gullies inlets, road sinks, floor drains with or without odour seals or sediment traps
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F5/00—Sewerage structures
- E03F5/04—Gullies inlets, road sinks, floor drains with or without odour seals or sediment traps
- E03F5/0401—Gullies for use in roads or pavements
Landscapes
- Health & Medical Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Hydrology & Water Resources (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- Road Paving Structures (AREA)
Abstract
The invention discloses a sewer well and rainwater well construction process for municipal administration. The construction process comprises the following steps: 1) construction layout; 2) foundation pit excavation; 3) well body construction; 4) well wall plastering; 5) backfilling; 6) well frame installation; 7) well ring and well cover installation; 8) concrete laying; 9) backfilling around well wall; and 10) well periphery compaction. The construction process disclosed by the invention has the beneficial effects that a well body is good in construction quality, the mouth of the well is smooth with a pavement and the occurrence of traffic accidents due to serious subsidence of a sewer well; and in addition, the sewer well is smoothly and well connected to the pavement, strong in load-resistance capacity and long in service life, so that the evenness of the pavement and driving comfort are improved, the walking comfort and safety of pedestrians are enhanced and urban roads are beautified.
Description
Technical field
The invention belongs to civilian infrastructure field, particularly relate to lower well and catch-basin construction technology.
Background technology
In existing civilian infrastructure, the lower well of municipal administration and catch-basin are often arranged in urban road, have material impact to urban road construction.And the construction quality of lower well and catch-basin, be directly connected to urban road by property and travel safety, sometimes even have influence on the walking safety of pedestrian.Sinking or installing irregular phenomenon appears in lower well and catch-basin, thus affects the outward appearance of entire road, more have impact on the comfortableness of driving.And various lower well (comprising sink hole) is the weak link of road construction, lower well and road surface badly buried much hidden danger to roads engineering quality along connecing, light then cause the damage of road, heavy then manhole significantly depression, causes the generation of traffic accident., along connecing irregularity and causing jumping car and pavement roughness, also make troubles to pedestrian and motor vehicle, even occur accident in lower well and catch-basin and road surface.Also do not have a set of effectively perfectly construction method opinion to solve the problem of lower well and catch-basin construction and sedimentation prevention in Practical Project at present, be badly in need of the construction method of a set of theory contact engineering reality, this is also those skilled in the art's problems faced.
Summary of the invention
For above-mentioned existing problems, the present invention proposes the lower well of one municipal administration and catch-basin construction method, and lower well and catch-basin can be avoided to occur sinking or installing irregular phenomenon, makes well head and road surface well along connecing, improve surface evenness, to solve the deficiencies in the prior art.
The technical solution used in the present invention is:
Lower well and catch-basin construction technology, comprise following methods step:
1). construction lofting;
2). excavation pit;
3). build well body by laying bricks or stones;
4). the borehole wall is wiped one's face;
5). backfill;
6). crib is installed
7). walling crib and well lid are installed;
8). concrete making
9). backfill around the borehole wall
10). the compacting of well week
Beneficial effect of the present invention is: well body construction quality is good, well head and road surface smooth-going, lower well can be avoided to occur significantly depression and cause the generation of traffic accident, and lower well and road surface are along connecing well, load resistant power is strong, and long service life, improves the comfortableness of surface evenness and driving, add comfortableness and the safety of pedestrian's walking, fine urban road.
Accompanying drawing explanation
Fig. 1 is process chart of the present invention.
Detailed description of the invention
Below in conjunction with drawings and Examples, technical scheme of the present invention is described further.
Lower well and catch-basin construction technology, comprise following methods step:
1). construction lofting;
2). excavation pit;
3). build well body by laying bricks or stones;
4). the borehole wall is wiped one's face;
5). backfill;
6). crib is installed
7). walling crib and well lid are installed;
8). concrete making
9). backfill around the borehole wall
10). the compacting of well week
Below described in detail.
For step 1), in newly-built road, if construction lofting is not careful, lower well, catch basin cover collimation mark can be caused high higher or on the low side, be connected uneven with road surface.At present, in the construction line-putting, be after having puzzled curb mostly, the absolute altitude with reference to the absolute altitude lateral stay determination well small cup of curb is this, and method is simple, but there is any discrepancy easily to make actual elevation and design elevation.
For step 2), the lower well foundation ditch planar dimension of excavation can be bigger than normal and need rule, to avoid the refill spaces around lower well too little, causes compacting facility to operate.In addition, strictly should construct by the construction organization requirement of construction technology code and establishment, artificially can not reduce the excavated section of foundation ditch, in order to avoid compacting facility cannot operate, cause the unreal or void of backfill to be filled out and cause sedimentation around well catch-basin under road.
For step 3), 4), when lower well wall is built by laying bricks or stones, should ensure that the quality of masonry mortar reaches design grade, mix and stir and want evenly, workability will be got well.When building by laying bricks or stones, mortar is full, and jointing wants tight, and Brick for building, material will meet requirement of strength.What also will ensure crib and its structure in construction builds reality, prevents from rolling or deforming under other External Force Acting.Should avoiding when coordinating the road construction lifting borehole wall, building coarse and mortar by laying bricks or stones and not reaching intensity and just stand load extruding, in order to avoid borehole wall surrounding brick wall becomes to loosen state, causing lower well to go wrong.
In addition, needed again to build by laying bricks or stones with high strength strength mortar morning by the brick walling perturbed to well head place.Should clean before wiping one's face and moistening brick surface.When wiping one's face, timely press polish receives slurry and maintenance.When meeting underground water, wipe one's face and jointing should complete in time with building by laying bricks or stones, can not backfill after carry out again in wipe one's face or interior jointing.Strengthen manhole well body is connected part masonry strength with road surface.Block strength is not less than m10 or changes cast-in-situ concrete within the scope of the borehole wall topmost 500mm.Mortar strength is not less than m10, and concrete strength is not less than c25.
For step 5), around lower well, catch-basin during backfill, suitably process done by reply filler, backfills, instead of backfill according to the undisturbed soil after roadway excavation groove according to soil property in plan; Meanwhile, should packing quality be ensured, guarantee the compactness of backfilling material, can not for saving cost and gathering materials on the spot, avoid causing lower well, catch-basin periphery to sink because of packing quality problem etc.
When carrying out backfill construction, answer the optimum moisture content of attentional manipulation backfill, bigger than normal or the less than normal and backfill building waste degree of compaction that all will compacting be made not reach requirement of the water content of soil, causes manhole surrounding soil to sink.If do not reach optimum moisture content in order to work to tight deadlines in backfill just to backfill, very easily form the sudden change of spring soil or sedimentation.
For step 6), the connected mode of crib and well body need be improved.Tusk can be increased at the bottom of crib, or make it be embedded in body of wall or concrete to increase stability at the base of crib punching pre-embedded bolt, or to take boring pre-embedded bolt to run through the concrete connected mode of the borehole wall to fix in the side of crib, strict with job specfication operation, improve construction technology.When crib is installed, should by highness change within 5mm.
For step 7), 8), after crib installs and be errorless on inspection, walling crib and well lid could be installed, then can carry out the making of bituminous concrete.For the ease of paver work, ensure road evenness, should before asphalt concrete pavement pave, by walling crib Pass line adjustment to lower than design road surface elevation 10-20mm, after asphalt paving has rolled, horse back adjust walling crib, makes the smooth-going joint on itself and road surface.
Consider impact in winter, the setting height(from bottom) of lower well should be advisable lower than road surface 0 ~ 5mm.When laying walling crib, the stuffing box packing that intensity is higher must be selected, and timely mortar plugs the gap, walling crib is laid firmly.Grouting material should be selected has early strong, high-strength, easy flowing and micro-swollen non-shrinking material, and its design strength should at more than c30, and placing highly should not be less than 6cm.
For step 9), want back-filling in layers when lower well periphery backfill, every layer of backfill THICKNESS CONTROL at 250-300mm, and is tamped, until the height of foundation on road surface with vibratory plate compactor.Lower well periphery backfill can not use brickbat, tile fragment, dregs rubbish etc., in order to avoid cause depression.Backfill as when not drying rainy season, then all adopts rendzinas or sand backfill, can ensure the sudden change of its compactness and sedimentation like this.If work to tight deadlines, then filler answers that selection intensity is high, compacting fast, the material of good water permeability is as boulder and cobble, rubble, medium coarse sand etc.
For step 10), when well, catch-basin occur sinking instantly, should adjust in time, adjust again when can not by the time sink fairly obvious, so just be guaranteed that driving is comfortable and the appearance of the city is attractive in appearance.When maintenance lower well, catch-basin, first should detect the ground after excavation, as bearing capacity of foundation soil existing problems, multiple rammer can be adopted or change and fill out dirt, the good material of gravel equivalent-load power tamping.
Claims (5)
1. descend well and catch-basin construction technology, it is characterized in that: comprise following methods step:
1). construction lofting;
2). excavation pit;
3). build well body by laying bricks or stones;
4). the borehole wall is wiped one's face;
5). backfill;
6). crib is installed
7). walling crib and well lid are installed;
8). concrete making
9). backfill around the borehole wall
10). the compacting of well week.
2. lower well according to claim 1 and catch-basin construction technology, is characterized in that: block strength and mortar strength are all not less than M10.
3. lower well according to claim 1 and catch-basin construction technology, is characterized in that: concrete strength is not less than C25.
4. lower well according to claim 1 and catch-basin construction technology, is characterized in that: adopt cast-in-situ concrete within the scope of the 500mm of borehole wall the top.
5. lower well according to claim 1 and catch-basin construction technology, is characterized in that: grouting material is selected has early strong, high-strength, easy flowing and micro-swollen non-shrinking material, and its intensity is more than C30, and its placing is highly not less than 60mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510930060.8A CN105421571A (en) | 2015-12-15 | 2015-12-15 | Sewer well and rainwater well construction process |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510930060.8A CN105421571A (en) | 2015-12-15 | 2015-12-15 | Sewer well and rainwater well construction process |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105421571A true CN105421571A (en) | 2016-03-23 |
Family
ID=55500078
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510930060.8A Pending CN105421571A (en) | 2015-12-15 | 2015-12-15 | Sewer well and rainwater well construction process |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105421571A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106545071A (en) * | 2016-12-09 | 2017-03-29 | 济南市市政工程有限公司 | Inspection shaft, roof drain and cement concrete pavement one-time cast-forming construction method |
CN106638696A (en) * | 2016-11-01 | 2017-05-10 | 济南汇通联合市政工程有限责任公司 | Installation and construction method for anti-settling manhole cover |
CN106759496A (en) * | 2016-09-28 | 2017-05-31 | 山西太水市政工程有限公司 | Anti-settling inspection shaft changes the outfit technique |
CN110130460A (en) * | 2019-05-21 | 2019-08-16 | 杭州悦为科技有限公司 | The catch-basin construction method of the cast-in-place catch-basin erecting device of drawing and pulling type |
CN111335445A (en) * | 2020-03-18 | 2020-06-26 | 中国十七冶集团有限公司 | Construction method of concrete catch basin by using steel pipe as inner mold |
CN113250306A (en) * | 2021-06-10 | 2021-08-13 | 广东天濠建设工程有限公司 | Construction method of inspection well of domestic sewage pipeline |
-
2015
- 2015-12-15 CN CN201510930060.8A patent/CN105421571A/en active Pending
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106759496A (en) * | 2016-09-28 | 2017-05-31 | 山西太水市政工程有限公司 | Anti-settling inspection shaft changes the outfit technique |
CN106759496B (en) * | 2016-09-28 | 2019-03-22 | 山西太水市政工程有限公司 | Anti-settling inspection shaft changes the outfit technique |
CN106638696A (en) * | 2016-11-01 | 2017-05-10 | 济南汇通联合市政工程有限责任公司 | Installation and construction method for anti-settling manhole cover |
CN106638696B (en) * | 2016-11-01 | 2018-09-11 | 山东汇通建设集团有限公司 | The construction method of installation of anti-settling manhole cover |
CN106545071A (en) * | 2016-12-09 | 2017-03-29 | 济南市市政工程有限公司 | Inspection shaft, roof drain and cement concrete pavement one-time cast-forming construction method |
CN110130460A (en) * | 2019-05-21 | 2019-08-16 | 杭州悦为科技有限公司 | The catch-basin construction method of the cast-in-place catch-basin erecting device of drawing and pulling type |
CN111335445A (en) * | 2020-03-18 | 2020-06-26 | 中国十七冶集团有限公司 | Construction method of concrete catch basin by using steel pipe as inner mold |
CN111335445B (en) * | 2020-03-18 | 2021-11-02 | 中国十七冶集团有限公司 | Construction method of concrete catch basin by using steel pipe as inner mold |
CN113250306A (en) * | 2021-06-10 | 2021-08-13 | 广东天濠建设工程有限公司 | Construction method of inspection well of domestic sewage pipeline |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105421571A (en) | Sewer well and rainwater well construction process | |
CN109972659B (en) | Novel municipal inspection well structure and construction method | |
CN102644295A (en) | Construction method for preventing peripheral and local sedimentation of road surface inspection well | |
CN106192646A (en) | Vcehicular tunnel car-driving shock-absorbing denoising structure and construction method thereof | |
CN106567410A (en) | New construction method of municipal road inspection well | |
CN201296895Y (en) | Vertical cracking pavement repair structure | |
CN110295628A (en) | A kind of pavement construction method with inspection shaft | |
CN111648408A (en) | Inspection well lifting construction method | |
CN108532406A (en) | Can rapid construction high-bearing capacity pervious surface and laying method | |
CN107700299B (en) | Overpass lower-layer ground road structure and construction method thereof | |
CN110670436B (en) | Structure for preventing urban road subgrade from being unevenly settled and construction method thereof | |
CN108252176A (en) | A kind of pavement engineering construction method equipped with inspection shaft | |
CN214271530U (en) | Soft basic district road structure based on building rubbish is laid | |
CN210163943U (en) | Reinforcing and upgrading structure for inspection well of white-to-black municipal administration road | |
CN210529400U (en) | Solidified building residue soil road structure | |
CN208748462U (en) | Can rapid construction high-bearing capacity pervious surface | |
CN110983907A (en) | Assembled self-draining sidewalk | |
CN114411921B (en) | Road reconstruction and extension roadbed drainage ditch masonry method and structure | |
CN214497785U (en) | Hollow block rainwater infiltration inspection shaft | |
CN105155387A (en) | Garden road structure | |
CN206127789U (en) | Structure of making an uproar falls in highway tunnel driving damping | |
CN214656089U (en) | Be applied to assembled road surface structure in sinking area of underground coal mine | |
CN212128696U (en) | Road bridge links up mixed light dirt road bed structure of section bubble | |
CN211142682U (en) | Structure for preventing urban road subgrade from non-uniform settlement | |
CN212000419U (en) | Road structure in hilly areas |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20160323 |