CN203412598U - 一种电缆隧道复合衬砌防水结构 - Google Patents

一种电缆隧道复合衬砌防水结构 Download PDF

Info

Publication number
CN203412598U
CN203412598U CN201320358060.1U CN201320358060U CN203412598U CN 203412598 U CN203412598 U CN 203412598U CN 201320358060 U CN201320358060 U CN 201320358060U CN 203412598 U CN203412598 U CN 203412598U
Authority
CN
China
Prior art keywords
tunnel
cable
splash guard
waterproof
composite lining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201320358060.1U
Other languages
English (en)
Inventor
李朝顺
戴承文
潘玉成
毕岩
隋军
陈曦
刘明岳
宁善武
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaoning Electric Power Construction Supervision Co ltd
Shenyang Electric Power Survey & Design Institute Co ltd
STATE GRID LIAONING ECONOMIC TECHNIQUE INSTITUTE
State Grid Corp of China SGCC
Original Assignee
Shenyang electric power survey design institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang electric power survey design institute filed Critical Shenyang electric power survey design institute
Priority to CN201320358060.1U priority Critical patent/CN203412598U/zh
Application granted granted Critical
Publication of CN203412598U publication Critical patent/CN203412598U/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

本实用新型涉及电缆隧道结构自防水设施,尤其为一种用于电缆隧道中具有好的防水效果和造价低廉的电缆隧道复合衬砌防水结构,从隧道外部向内依次设置有网喷钢筋混凝土层、PVC防水板以及模筑防水混凝土层,PVC防水板为无钉和双焊缝铺设结构,采用此结构造价低,容易施工,很大程度上提高了隧道结构本体自防水能力。

Description

一种电缆隧道复合衬砌防水结构
技术领域
本实用新型涉及电缆隧道结构自防水设施,尤其为一种用于电缆隧道中具有好的防水效果和造价低廉的复合衬砌防水结构。
背景技术
近年来,随着城区建设变电站逐步增多,高中压架空线路被电缆线路取代,因此电缆隧道的建设越来越多。我公司城区电缆隧道绝大多数采用浅埋暗挖施工工艺,然而由于城区地质条件差,大部分地区为回填土,地下水丰富且水位埋深浅,因此,对电缆隧道工程建设技术,特别是塌方和防水的设计和施工就提出了更高的要求。隧道沿线地质条件恶劣,地下水埋藏浅且水量丰富的特点,在这样的水文地质条件下建设电缆隧道,设计与施工的技术不当将影响工程的正常使用,降低使用寿命,甚至危及工程安全。
发明内容
针对现有技术中存在的不足之处,本实用新型要解决的技术问题在于提供一种用于电缆隧道中具有好的防水效果和造价低廉的复合衬砌防水结构。
本实用新型采用如下的技术方案:
一种电缆隧道复合衬砌防水结构,从隧道外部向内依次包括网喷钢筋混凝土层、PVC防水板以及模筑防水混凝土层,其中PVC防水板为无钉和双焊缝铺设结构。
进一步地,所述PVC防水板的上下面分别设置有无纺布缓冲层。
进一步地,PVC防水板与模筑防水混凝土层之间设置有细石混凝土保护层,所述细石混凝土保护层内置有钢筋网。
进一步地,网喷钢筋混凝土层面向PVC防水板的一侧表面为光滑平整的结构。
本实用新型具有如下的优点及有益效果:
1、本实用新型解决隧道结构本体自防水性能,其初支结构是钢拱架加连接筋和网片的喷射混凝土结构。从喷射混凝土的施工特点和工艺来看远不能达到自防水的要求,欲提高自防水性能,必须适时地对初支结构进行回填注浆,以解决隧道上部和周边土体的流动和沉降,并可以从隧道的迎水面解决大部分的初支结构的渗漏水问题。这在过去的工程实践中得以证明。初支基面找平层施作前必须检查渗漏关,根据不同情况进行注浆堵漏或防水材料堵漏,无渗漏时再施作,但若采用复合衬砌防水层后则很大程度上提高了隧道结构本体自防水能力。
2、避免浅埋暗挖法施工造成路面塌方,提高结构本体自防水能力,解决隧道上部和周边土体的流动和沉降,并可以从隧道的迎水面解决大部分的初支结构的渗漏水问题。可根据不同情况进行注浆堵漏或防水材料堵漏,无渗漏时再施作,以免窜水造成后遗症,这样一旦某个区域发生防水板破坏而漏水,不会窜水而影响其它区域。对防水板与二衬之间的间隙进行注浆修补,效果好,修补费用低,综合造价低,是合理的防水结构,且保证外防水层的全封闭和提高结构本身防水性能,达到自身防水效果。
附图说明
图1为本实用新型隧道带复合衬砌防水层断面图;
图2为图1的局部断面放大图。
图中,1为模筑防水混凝土层;2为PVC防水板;3为网喷钢筋混凝土层;4为电缆固定托架;5为电缆托架立柱;6为排水坡;21为无纺布缓冲层;22为细石混凝土保护层。
具体实施方式
下面结合附图以及实施例对本实用新型进行详细地说明。
如图1所示,本实用新型用于提高电缆隧道结构本体的自防水能力,具体地在隧道的模筑防水混凝土层1与网喷钢筋混凝土层3之间设置有PVC防水板2,为了将PVC防水板2加入至两层之间,在PVC防水板2的两侧设置了无纺布缓冲层21。为了保护PVC防水板2,保持网喷钢筋混凝土层3面向PVC防水板2的一侧表面为光滑平整的结构。
实施例
如图2所示,对于拱形电缆隧道,隧道内部侧面设置有电缆托架立柱5,电缆托架立柱5上固定有电缆固定托架4,用于安置电缆,隧道的底层设置有斜面的排水坡6。
从隧道外部向内依次设置有网喷钢筋混凝土层3、PVC防水板2以及模筑防水混凝土层1,其中PVC防水板2采用无钉和双焊缝铺设结构。PVC防水板的上下面分别设置有无纺布缓冲层。PVC防水板与模筑防水混凝土层之间设置有细石混凝土保护层22,细石混凝土保护层22内置有钢筋网。
本实用新型在两层之间安装PVC防水板,在安装之前为了保持网喷钢筋混凝土层表面的光滑,在网喷钢筋混凝土层表面,抹一层20mm厚找平砂浆,以保证初期支护面平整。若有渗水点应处理,确保PVC防水板施工时无水作业。
在本实施例中,PVC防水板在施工:首先测量标出纵向中线,沿中线向两边用电钻钻孔,下塑料胶管,再用木螺丝紧固塑料垫圈。塑料垫圈固定点以梅花状排列,纵横向间距,拱部500mm,边墙1000mm,底板1500mm。然后,铺设防水板,根据实际长度并考虑搭接预留长度500mm剪裁卷材,铺设时由中线向两边铺设,用压焊器将PVC防水板热合在塑料垫圈上,整个PVC防水板铺好并检查确实固定后,再用塑料热合机焊接搭接处。PVC防水板采用双焊缝焊接,搭接长度不小于150mm,每条焊缝宽为10mm,两条缝间留30mm宽空腹,作为检查焊缝密封性用。
PVC防水板铺设好后,在其上铺一层50mm厚的细石混凝土保护层,保护层凝固后,再进行其它作业。侧墙和拱顶无保护层处,焊接钢筋时必须用隔板遮挡隔离,以免溅出火花烧坏防水板,二次衬砌灌注混凝土时,振捣棒不得接触PVC防水板,以免其受损伤。同时,加强施工人员教育管理,避免人为损坏防水板,若有损坏,要及时修复。

Claims (5)

1.一种电缆隧道复合衬砌防水结构,其特征在于,从隧道外部向内依次包括网喷钢筋混凝土层、PVC防水板以及模筑防水混凝土层,其中PVC防水板为无钉和双焊缝铺设结构。
2.按照权利要求1所述的电缆隧道复合衬砌防水结构,其特征在于,所述PVC防水板的上下面分别设置有无纺布缓冲层。
3.按照权利要求1所述的电缆隧道复合衬砌防水结构,其特征在于,PVC防水板与模筑防水混凝土层之间设置有细石混凝土保护层,所述细石混凝土保护层内置有钢筋网。
4.按照权利要求1所述的电缆隧道复合衬砌防水结构,其特征在于,网喷钢筋混凝土层面向PVC防水板的一侧表面为光滑平整的结构。
5.按照权利要求1所述的电缆隧道复合衬砌防水结构,其特征在于,PVC防水板双焊缝铺设结构为搭接长度不小于150mm,每条焊缝宽为10mm,两条缝间具有30mm宽空腹。
CN201320358060.1U 2013-06-20 2013-06-20 一种电缆隧道复合衬砌防水结构 Expired - Lifetime CN203412598U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320358060.1U CN203412598U (zh) 2013-06-20 2013-06-20 一种电缆隧道复合衬砌防水结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320358060.1U CN203412598U (zh) 2013-06-20 2013-06-20 一种电缆隧道复合衬砌防水结构

Publications (1)

Publication Number Publication Date
CN203412598U true CN203412598U (zh) 2014-01-29

Family

ID=49975493

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320358060.1U Expired - Lifetime CN203412598U (zh) 2013-06-20 2013-06-20 一种电缆隧道复合衬砌防水结构

Country Status (1)

Country Link
CN (1) CN203412598U (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104018717A (zh) * 2014-04-28 2014-09-03 中国大唐集团新能源股份有限公司 一种压气储能洞室的施工方法
CN105804772A (zh) * 2016-05-05 2016-07-27 中铁第勘察设计院集团有限公司 隧道主、被动结合防水结构
CN106337688A (zh) * 2015-07-13 2017-01-18 中铁第六勘察设计院集团有限公司 一种电缆隧道带电运行套设内衬加固结构及其施工方法
CN108035770A (zh) * 2017-12-10 2018-05-15 成都隶盈科技有限公司 一种电力隧道施工方法

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104018717A (zh) * 2014-04-28 2014-09-03 中国大唐集团新能源股份有限公司 一种压气储能洞室的施工方法
CN104018717B (zh) * 2014-04-28 2016-10-05 中国大唐集团新能源股份有限公司 一种压气储能洞室的施工方法
CN106337688A (zh) * 2015-07-13 2017-01-18 中铁第六勘察设计院集团有限公司 一种电缆隧道带电运行套设内衬加固结构及其施工方法
CN105804772A (zh) * 2016-05-05 2016-07-27 中铁第勘察设计院集团有限公司 隧道主、被动结合防水结构
CN108035770A (zh) * 2017-12-10 2018-05-15 成都隶盈科技有限公司 一种电力隧道施工方法

Similar Documents

Publication Publication Date Title
CN202788022U (zh) 一种墙体裂缝复合式修复结构
CN204343312U (zh) 基坑内降水井的一种封堵装置
CN203429601U (zh) 库岸防渗面板与混凝土重力坝横缝相交部位止水结构
CN105019919B (zh) 用于传输流体的隧洞及其施工方法
CN203412598U (zh) 一种电缆隧道复合衬砌防水结构
CN103225318B (zh) 一种地下连续墙槽段接缝处防渗堵漏装置以及施工方法
CN111828056B (zh) 一种浅埋暗挖法隧道防水施工方法
CN206916753U (zh) 一种地下连续墙及其接缝处的止水结构
CN203821311U (zh) 一种心墙堆石坝坝内廊道结构缝止水结构
CN202039387U (zh) 环氧树脂桩头防水封堵及二次注浆堵漏结构
CN102758637B (zh) 由压型钢板和混凝土组合成的隧道二次衬砌结构
CN105862928A (zh) 一种后浇带外墙超前止水处理结构及其施工工艺
CN106988440A (zh) 一种用于地铁车站主体与附属接口处的防水结构及其施工方法
CN103603368A (zh) 连续墙遇地下管线逆做的施工方法
CN202851009U (zh) 隧道缓冲多层防排水结构
CN203145029U (zh) 深基坑降水井封堵结构
CN210163948U (zh) 一种用于地下室顶板后浇带浇筑的施工体系
CN102852530A (zh) 隧道缓冲多层防排水结构与施工方法
CN202706060U (zh) 50mm宽底板变形缝防水结构
CN103205986A (zh) 混凝土筏基施工缝处注浆装置及方法
CN109667607A (zh) 一种隧道分区防水施工工艺
CN203768925U (zh) 一种基坑内降水井的封堵装置
CN206616711U (zh) 一种用于地铁车站主体与附属接口处的防水结构
CN204827469U (zh) 用于传输流体的隧洞
CN210238573U (zh) 一种用于明挖车站主体与附属连接处的防水结构

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 110003, No. 81, eleven weft Road, Heping District, Liaoning, Shenyang

Patentee after: SHENYANG ELECTRIC POWER SURVEY & DESIGN INSTITUTE CO.,LTD.

Address before: 110003, No. 81, eleven weft Road, Heping District, Liaoning, Shenyang

Patentee before: Shenyang Electric Power Survey Design Institute

CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Lu Tianqi

Inventor after: Li Dongxue

Inventor after: Xiao Xue

Inventor after: Gu Zheng

Inventor after: Pan Xiao

Inventor after: Nanzhe

Inventor after: Zhu Heyan

Inventor after: Chen Youhui

Inventor after: Li Meijun

Inventor after: Li Chaoshun

Inventor after: Zhu Shenning

Inventor after: Li Jian

Inventor after: Li Zhensheng

Inventor after: Dai Chengwen

Inventor after: Pan Yucheng

Inventor after: Bi Yan

Inventor after: Sui Army

Inventor after: Chen Xi

Inventor after: Liu Mingyue

Inventor after: Ning Shanwu

Inventor after: Zheng Xiaochun

Inventor after: Wang Chunsheng

Inventor after: Yang Jiye

Inventor after: Xiao Mojun

Inventor after: Gao Xun

Inventor after: Li Xianglin

Inventor after: Liu Tao

Inventor after: Ma Qiang

Inventor before: Li Chaoshun

Inventor before: Dai Chengwen

Inventor before: Pan Yucheng

Inventor before: Bi Yan

Inventor before: Sui Army

Inventor before: Chen Xi

Inventor before: Liu Mingyue

Inventor before: Ning Shanwu

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180116

Address after: Shenhe Wencui Road District of Shenyang City, Liaoning Province, No. 110016 183-1

Co-patentee after: State Grid Corporation of China

Patentee after: STATE GRID LIAONING ECONOMIC TECHNIQUE INSTITUTE

Co-patentee after: SHENYANG ELECTRIC POWER SURVEY & DESIGN INSTITUTE CO.,LTD.

Co-patentee after: LIAONING ELECTRIC POWER CONSTRUCTION SUPERVISION Co.,Ltd.

Address before: 110003, No. 81, eleven weft Road, Heping District, Liaoning, Shenyang

Patentee before: SHENYANG ELECTRIC POWER SURVEY & DESIGN INSTITUTE CO.,LTD.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20140129