CN105804772A - 隧道主、被动结合防水结构 - Google Patents
隧道主、被动结合防水结构 Download PDFInfo
- Publication number
- CN105804772A CN105804772A CN201610291422.8A CN201610291422A CN105804772A CN 105804772 A CN105804772 A CN 105804772A CN 201610291422 A CN201610291422 A CN 201610291422A CN 105804772 A CN105804772 A CN 105804772A
- Authority
- CN
- China
- Prior art keywords
- secondary lining
- tunnel
- waterproof
- active
- passive
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/38—Waterproofing; Heat insulating; Soundproofing; Electric insulating
- E21D11/383—Waterproofing; Heat insulating; Soundproofing; Electric insulating by applying waterproof flexible sheets; Means for fixing the sheets to the tunnel or cavity wall
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F16/00—Drainage
- E21F16/02—Drainage of tunnels
Abstract
本发明涉及一种隧道主、被动结合防水结构。无纺布和防水板隧道全长范围全部设置,投资高且铺设施工难度大,质量非常难保证,常常造成破损,使得防水效果大打折扣,出现问题难以维护,材料耐久性期限到后,无法更换。本发明包括初期支护和二次衬砌,初期支护和二次衬砌之间设置柔性结构受力隔离层,二次衬砌采用防水混凝土结构;柔性结构受力隔离层为无纺布;二次衬砌内侧的漏水部位设置碳纤维布补强。本发明在初期支护与二次衬砌之间设置无纺布的柔性结构受力隔离层,避免两层结构刚性接触,共同受力;全隧道取消设置防水板,二次衬砌采用抗渗性能比较高的防水混凝土,降低无纺布设置规格,节约大量投资。
Description
技术领域
本发明涉及一种隧道衬砌防水结构,具体涉及一种隧道主、被动结合防水结构。
背景技术
目前,隧道初期支护与二次衬砌之间一般要设置无纺布和防水板两层防水结构,规格一般是无纺布350~400g/m2,防水板(EVA)厚1.5~2mm,双线隧道每米数量约35平方米,造价约1500元。
由于是隧道全长范围全部设置,因此需要大量投资;铺设无纺布和防水板施工难度很大,质量非常难保证,常常造成破损,使得防水效果大打折扣;无纺布及防水板如果不密贴,则造成衬砌背后有空洞,不利于结构安全,施工进度慢;为隐蔽工程,出现问题难以维护,材料耐久性期限到后,无法更换。
发明内容
本发明的目的是提供一种隧道主、被动结合防水结构,全隧道取消设置防水板,降低造价并方便后期维护。
本发明所采用的技术方案为:
隧道主、被动结合防水结构,包括初期支护和二次衬砌,其特征在于:
初期支护和二次衬砌之间设置柔性结构受力隔离层,二次衬砌采用防水混凝土结构。
柔性结构受力隔离层为无纺布。
二次衬砌内侧的漏水部位敷设碳纤维布补强。
碳纤维布上设置有条形凹槽,凹槽内设置导排水主管,导排水主管上左右交错布置有分支管。
本发明具有以下优点:
1、本发明在初期支护与二次衬砌之间设置无纺布的柔性结构受力隔离层,避免两层结构刚性接触,共同受力;
2、本发明的结构使得全隧道取消设置防水板,二次衬砌采用抗渗性能比较高的防水混凝土,降低无纺布设置规格,节约大量投资,全国铁路、公路隧道如果都取消防水板,每米隧道就能节省将近1000元,即使发生后期的一些局部补强费用,节约的造价也将是非常可观的。
附图说明
图1为本发明结构图。
图2为碳纤维布上的导排水主管及其分支管的布置图
图中,1-初期支护,2-二次衬砌,3-柔性结构受力隔离层。
具体实施方式
下面结合具体实施方式对本发明进行详细的说明。
本发明涉及一种隧道主、被动结合防水结构,包括初期支护1和二次衬砌2,初期支护1和二次衬砌2之间设置柔性结构受力隔离层3,采用无纺布材料,取消防水板的设置,无纺布的作用在于使初期支护1和二次衬砌2避免刚性接触后共同受力产生开裂。二次衬砌2采用防水混凝土结构,为主动防水结构。
隧道建成运营后,根据现场实际情况,如发现有渗漏水现象,则局部采取防水补强措施,在二次衬砌2混凝土表面粘贴敷设碳纤维布进行防水,并同时对二次衬砌结构起到补强作用,为被动防水和结构补强。碳纤维布上设置有条形凹槽,凹槽内设置导排水主管,导排水主管上左右交错布置有分支管,便于将出水顺混凝土表面引至隧道水沟排出,从而将出水隔离;碳纤维布具有强度高、施工方便、耐久性一系列优点,在天窗时间施工,不影响正常运营。导排水主管及其分支管的敷贴方式采用粘贴方式。
本发明的内容不限于实施例所列举,本领域普通技术人员通过阅读本发明说明书而对本发明技术方案采取的任何等效的变换,均为本发明的权利要求所涵盖。
Claims (4)
1.隧道主、被动结合防水结构,包括初期支护(1)和二次衬砌(2),其特征在于:
初期支护(1)和二次衬砌(2)之间设置柔性结构受力隔离层(3),二次衬砌(2)采用防水混凝土结构。
2.根据权利要求1所述的隧道主、被动结合防水结构,其特征在于:
柔性结构受力隔离层(3)为无纺布。
3.根据权利要求1所述的隧道主、被动结合防水结构,其特征在于:
二次衬砌(2)内侧的漏水部位敷设碳纤维布补强。
4.根据权利要求3所述的隧道主、被动结合防水结构,其特征在于:
碳纤维布上设置有条形凹槽,凹槽内设置导排水主管,导排水主管上左右交错布置有分支管。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610291422.8A CN105804772A (zh) | 2016-05-05 | 2016-05-05 | 隧道主、被动结合防水结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610291422.8A CN105804772A (zh) | 2016-05-05 | 2016-05-05 | 隧道主、被动结合防水结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105804772A true CN105804772A (zh) | 2016-07-27 |
Family
ID=56455266
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610291422.8A Pending CN105804772A (zh) | 2016-05-05 | 2016-05-05 | 隧道主、被动结合防水结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105804772A (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108086998A (zh) * | 2017-12-06 | 2018-05-29 | 广西大学 | 一种基于混凝土布快速凝固材料的巷道复合支护结构的构筑方法 |
CN108756942A (zh) * | 2018-05-28 | 2018-11-06 | 中交城市轨道交通设计研究院有限公司 | 一种设有隔离层结构的双衬砌隧道 |
WO2019237908A1 (zh) * | 2018-06-12 | 2019-12-19 | 济南城建集团有限公司 | 一种隧道二衬施工缝渗漏水堵排结合处治的方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001262987A (ja) * | 2000-01-11 | 2001-09-26 | Ohbayashi Corp | トンネル二次覆工におけるアイソレーションレイヤー工法 |
CN103343690A (zh) * | 2013-07-26 | 2013-10-09 | 中鼎国际工程有限责任公司 | 斜井大断面过含水层井筒防渗漏结构及其施工方法 |
CN203412598U (zh) * | 2013-06-20 | 2014-01-29 | 沈阳电力勘测设计院 | 一种电缆隧道复合衬砌防水结构 |
CN105401955A (zh) * | 2015-11-30 | 2016-03-16 | 武汉大学 | 一种软土压力隧洞防渗承载结构 |
CN205618180U (zh) * | 2016-05-05 | 2016-10-05 | 中铁第一勘察设计院集团有限公司 | 一种隧道主、被动结合防水结构 |
-
2016
- 2016-05-05 CN CN201610291422.8A patent/CN105804772A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001262987A (ja) * | 2000-01-11 | 2001-09-26 | Ohbayashi Corp | トンネル二次覆工におけるアイソレーションレイヤー工法 |
CN203412598U (zh) * | 2013-06-20 | 2014-01-29 | 沈阳电力勘测设计院 | 一种电缆隧道复合衬砌防水结构 |
CN103343690A (zh) * | 2013-07-26 | 2013-10-09 | 中鼎国际工程有限责任公司 | 斜井大断面过含水层井筒防渗漏结构及其施工方法 |
CN105401955A (zh) * | 2015-11-30 | 2016-03-16 | 武汉大学 | 一种软土压力隧洞防渗承载结构 |
CN205618180U (zh) * | 2016-05-05 | 2016-10-05 | 中铁第一勘察设计院集团有限公司 | 一种隧道主、被动结合防水结构 |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108086998A (zh) * | 2017-12-06 | 2018-05-29 | 广西大学 | 一种基于混凝土布快速凝固材料的巷道复合支护结构的构筑方法 |
CN108756942A (zh) * | 2018-05-28 | 2018-11-06 | 中交城市轨道交通设计研究院有限公司 | 一种设有隔离层结构的双衬砌隧道 |
WO2019237908A1 (zh) * | 2018-06-12 | 2019-12-19 | 济南城建集团有限公司 | 一种隧道二衬施工缝渗漏水堵排结合处治的方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105804772A (zh) | 隧道主、被动结合防水结构 | |
CN103205979A (zh) | 高温环境下大型筏基施工方法 | |
CN105570533A (zh) | 一种长距离输水管道连续铺设、节水试压施工方法 | |
CN103410175A (zh) | 一种岩溶富水地质地下结构防水施工渗水控制施工方法 | |
CN207597428U (zh) | 预制管廊与现浇管廊衔接防水结构 | |
CN201738463U (zh) | 主体结构与填充墙体之间的竖向连接结构 | |
CN105350581A (zh) | 一种地下室顶板沉降后浇带提前封闭构造 | |
CN205618180U (zh) | 一种隧道主、被动结合防水结构 | |
CN103147461A (zh) | 一种综合管廊与控制中心连接节点结构 | |
CN201963318U (zh) | 一种隧道施工中的防漏水装置 | |
CN202689047U (zh) | 用于沉管预制管段内施工缝处的防水结构 | |
CN201407056Y (zh) | 承受中等水压力全封闭防水复合式衬砌结构 | |
CN201786364U (zh) | 电缆隧道防水结构层 | |
CN206801577U (zh) | 一种山岭隧道拱顶与中隔墙的防排水结构 | |
CN204402513U (zh) | 一种解决地下洞室衬砌表面渗水漏水的装置 | |
CN103526776A (zh) | 面向沉管隧道用橡胶止水带硬度分层方法及其橡胶止水带 | |
CN203549141U (zh) | 一种新型楼板套管 | |
CN206942247U (zh) | 一种煤仓间转运站下沉式输煤系统 | |
CN102433865A (zh) | 半地下式电站厂房上游侧墙体的建造方法 | |
CN203080482U (zh) | 一种适用严寒环境的碾压混凝土坝结构 | |
CN205078305U (zh) | 一种组合式隧道纵向排水管 | |
CN210341986U (zh) | 一种管廊复合防水结构 | |
CN201943050U (zh) | 钢结构夹层钢板坝的趾板连接结构 | |
CN204328234U (zh) | 一种下水管组件 | |
CN204738322U (zh) | 地下室防渗漏结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |