CN203403650U - Improved semi-prefabricated subway station rail top wind channel - Google Patents

Improved semi-prefabricated subway station rail top wind channel Download PDF

Info

Publication number
CN203403650U
CN203403650U CN201320527780.6U CN201320527780U CN203403650U CN 203403650 U CN203403650 U CN 203403650U CN 201320527780 U CN201320527780 U CN 201320527780U CN 203403650 U CN203403650 U CN 203403650U
Authority
CN
China
Prior art keywords
air channel
prefabricated
concrete bracket
drop
tread air
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320527780.6U
Other languages
Chinese (zh)
Inventor
张志冰
刘涛
杨祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 11th Bureau Group Co Ltd
China Railway 11th Bureau Group Urban Rail Engineering Co Ltd
Original Assignee
China Railway 11th Bureau Group Co Ltd
China Railway 11th Bureau Group Urban Rail Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 11th Bureau Group Co Ltd, China Railway 11th Bureau Group Urban Rail Engineering Co Ltd filed Critical China Railway 11th Bureau Group Co Ltd
Priority to CN201320527780.6U priority Critical patent/CN203403650U/en
Application granted granted Critical
Publication of CN203403650U publication Critical patent/CN203403650U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model provides an improved semi-prefabricated subway station rail top wind channel. The rail top wind channel is a square channel composed of a subway station top plate, a left concrete bracket lower suspended beam, a right concrete bracket lower suspended beam and a prefabricated rail top wind channel bottom plate. The left concrete bracket lower suspended beam, the right concrete bracket lower suspended beam and the subway station top plate are directly poured into a whole through concrete. Angle steel is pre-buried in the bracket positions of the left concrete bracket lower suspended beam and the right concrete bracket lower suspended beam. The prefabricated rail top wind channel bottom plate is welded to the angle steel on the left concrete bracket lower suspended beam and the right concrete bracket lower suspended beam respectively through steel plates pre-buried in the bottoms of the two ends of the prefabricated rail top wind channel bottom plate. The rail top wind channel is simple in structure and convenient to construct, the construction quality of the rail top wind channel can be easily guaranteed, the construction period of the subway station rail top wind channel is shortened, the problem that secondary entering of a main construction team is solved, and the economic benefit of the project is improved.

Description

Tread air channel, a kind of improved semi-precast underground railway station
Technical field
The utility model relates to tread air channel, subway station, particularly drop in beam and the cast of tread air channel top board one under a kind of improved concrete bracket, the tread air channel, semi-precast underground railway station that prefabricated air channel base plate is installed.
Background technology
Follow China urbanization step to accelerate, increasing population is poured into urban residence life, and existing urban ground traffic system is difficult to meet the trip population demand of explosive growth, builds the necessary choice that subway becomes numerous cities for this reason.Subway can be fast, safety, cosily transport the passenger of large flow, and high efficiency is pollution-free, has good economic results in society.For solving train radiating problem, create safety, comfortable environment, need to set up one good give, exhaust system, and tread air channel (train top air exhaust passage) important composition member of subway station exhaust system just.
At present, concrete tread air channel, subway station adopts the construction of after-pouring method more, its construction technology process is: pre-buried tread air channel side wall reinforcing bar while building tread air channel top board, treat that station construction finishes, construction team's secondary is marched into the arena, and sets up tread air channel construction scaffolding, mounting rail is road bed die version against the wind, colligation air channel base plate and side wall reinforcing bar, the reinforcing bar qualified rear enclosed tread air channel side wall template of applying for checking and examination, utilizes reserved little hole on top board to build tread air channel concrete.After-pouring method construction tread air channel, subway station, narrow and small because of construction space, be not easy to reinforcing bar binding constructing operation, cause the tread air channel construction period elongated, concreting is slow, the concreting leakiness of vibrating, late maintaining difficulty, is not easy to tread air channel end product quality and controls.After-pouring method construction tread air channel needs main body construction troop secondary to march into the arena in addition, and secondary is set up scaffold, has increased secondary construction cost.
Summary of the invention
The utility model, according to the deficiencies in the prior art, provides tread air channel, a kind of improved semi-precast underground railway station, improves the simple convenient operation of tread air channel construction technology, has guaranteed tread air channel quality, has shortened the duration simultaneously and has reduced construction cost.
The technical scheme that the utility model provides: tread air channel, described a kind of improved semi-precast underground railway station, it is characterized in that: Shi You subway station, described tread air channel top board, left, the square duct that under right concrete bracket, drop in beam and prefabricated tread air channel base plate form, a described left side, under right concrete bracket, drop in beam is directly watered and is built up an integral body by concrete and subway station top board, on a left side, under right concrete bracket, the bracket position of drop in beam is embedded with angle steel, the steel plate of prefabricated tread air channel base plate by being embedded in its two side bottom respectively with a left side, angle steel welding under right concrete bracket on drop in beam.
The further technical scheme of the utility model: being provided with the gradient at air channel prefabricated panel end face is 1% mortar sloping layer, and mortar sloping layer is higher near a side absolute altitude of platform plate.
The further technical scheme of the utility model: the two ends of described prefabricated tread air channel base plate respectively and be provided with the cement mortar joint filling preset clearance of 40-60mm under left and right concrete bracket between drop in beam.
The utility model is technical scheme preferably: under described left and right concrete bracket, drop in beam is after the reinforcing bar binding by its inner reinforcing bar and top board inside, station, to form after concreting respectively again.
The utility model is technical scheme preferably: described in be embedded in prefabricated tread air channel base plate bottom steel plate have four, be embedded in respectively the position in four bights of base plate, prefabricated tread air channel.
The utility model is simple in structure, and easy construction had both been easy to guarantee tread air channel construction quality, had shortened again the subway station tread air channel construction period, and the problem of having avoided main body construction troop secondary to march into the arena has improved the economic benefit of engineering.
Accompanying drawing explanation
Fig. 1 is the integral position schematic diagram in tread of the present utility model air channel;
Fig. 2 is structural representation of the present utility model;
Fig. 3 is the structural representation of concrete bracket built-in fitting node of the present utility model;
In figure: the top board of 1-subway station, 2, drop in beam under 4-left and right concrete bracket, 3-prefabricated tread air channel base plate, 5-angle steel, 6-steel plate, 7-cement mortar joint filling preset clearance, 8-mortar sloping layer, 9-train operation tread absolute altitude, 10-platform plate, 11-subway station base plate, 12-station top board longeron, 13-elongated weld seam.
The specific embodiment
Below in conjunction with accompanying drawing, the technical scheme in the utility model is clearly and completely described.In Fig. 2,3, tread air channel, described a kind of improved semi-precast underground railway station, it is characterized in that: the square duct that under Shi You subway station, described tread air channel top board 1, left and right concrete bracket, drop in beam 2,4 and prefabricated tread air channel base plate 3 form, under described left and right concrete bracket, drop in beam 2,4 is directly watered and is built up an integral body by concrete and subway station top board 1, and under described left and right concrete bracket, drop in beam the 2, the 4th, forms respectively after the reinforcing bar binding by its inner reinforcing bar and subway station top board 1 inside after concreting again.Under left and right concrete bracket, the bracket position of drop in beam 2,4 is embedded with angle steel 5, the steel plate 6 of prefabricated tread air channel base plate 3 by being embedded in its two side bottom respectively with left and right concrete bracket under angle steel 5 welding on drop in beam 2,4.The described steel plate 6 that is embedded in base plate 3 bottoms, prefabricated tread air channel has four, is embedded in respectively the position in 3 four bights of base plate, prefabricated tread air channel.
As shown in Figure 2, at air channel prefabricated panel 3 end faces, being provided with the gradient is 1% mortar sloping layer 8.For preventing current direction platform plate 10 shielding reveals on tread air channel prefabricated panel 3, using P42.5 cement mortar to carry out the gradient at air channel prefabricated panel 3 end faces is that 1% mortar looks for domatic to become mortar sloping layer 8, the high side of mortar sloping layer 8 absolute altitudes is near platform plate, at shielding reveal, allow in tread air channel water in that side flow discharge away from platform plate 7 shield doors.
As shown in Figure 3, for convenience of tread air channel prefabricated panel 3, install, respectively and under left and right concrete bracket, between drop in beam 2,4, be provided with the cement mortar joint filling preset clearance 7 of 40-60mm, air channel prefabricated panel 3 is installed and is used P42.5 cement mortar to carry out filleting to 40-60mm cement mortar joint filling preset clearance 7 after welding to tamp processing at the two ends of described prefabricated tread air channel base plate 3.
During the utility model Specific construction: drop in beam 2,4 positions under reserved left and right concrete bracket during station top board 1 template construction at top AT STATION, drop in beam 2 reinforcing bars under colligation concrete bracket, the pre-buried L75mmx75mmx10mm angle steel 5 of the bracket position of drop in beam 2,4 difference under left and right concrete bracket, after reinforced bar engineering inspection of quality is qualified, seal drop in beam 2,4 templates under left and right concrete bracket, top, the station top board 1 one cast at drop in beam 2,4 and place, place, tread air channel under left and right concrete bracket.Specifically building is the concrete of drop in beam under Pouring concrete at the same time bracket in subway station top board 1 and station top board longeron 5 casting process, when concreting, first build the concrete of drop in beam 2,4 under the left and right concrete bracket in air channel, Deng the concrete of station, the lower fast initial setting time placement layer by layer top of drop in beam concrete top board 1, prevent from, because top board 1 concrete pressure in station causes too greatly lower drop in beam 2, the problems such as mould burst-mode occur to run.The maintenance 14 days of sprinkling water after concreting, etc. 2,4 concrete strengths of drop in beam under left and right concrete bracket, reach after design strength, the 10 ton forklift mounting rails that special bracket is equipped with in use are road prefabricated panel 3 against the wind, after prefabricated panel 3 installation sites in tread air channel are adjusted, pre-buried angle steel 5 on drop in beam 2,4 under the pre-buried steel plate 6 in tread air channel prefabricated panel 3 bottoms, two ends and left and right concrete bracket is carried out to elongated weld seam and be welded and fixed.The position at every tread air channel prefabricated panel 3 four angles, bottom is pre-buried block specifications 100mm * 150mm * 10mm steel plate 6 respectively, and the gap of installing between rear two prefabricated panels 3 is 2mm, and weld bead height is 10mm.
Precast plate installation bracket of the present utility model, adopt 180mm*70mm*90mm and two kinds of model channel-section steel welding production growth 1650mm of 100mm*48mm*5.3mm, wide 120mm, the precast plate installation bracket of height 3750mm, bracket props up and drags the platform of precast plate to adopt the inclined-plane setting that becomes 30 degree angles with horizontal plane, is beneficial to prefabricated cover plate jacking and installs.The wire rope that install on bracket top is connected by the pre-buried suspension ring of shackle and precast plate, prevents from, in prefabricated cover plate transportation, falling accident occurs.Utilize fork truck conveniently moving and lifting to lift the feature of function, precast plate installation bracket is arranged on 10T fork truck, every 40 minutes, a prefabricated panel is installed, and installation process safety high speed, has shortened the duration, has reduced construction cost.

Claims (5)

1. tread air channel, an improved semi-precast underground railway station, it is characterized in that: described tread air channel Shi You subway station top board (1), left, under right concrete bracket, drop in beam (2, 4) and a square duct forming of prefabricated tread air channel base plate (3), a described left side, under right concrete bracket, drop in beam (2, 4) directly by concrete and subway station top board (1), water and build up an integral body, on a left side, under right concrete bracket, drop in beam (2, 4) bracket position is embedded with angle steel (5), the steel plate (6) of prefabricated tread air channel base plate (3) by being embedded in its two side bottom respectively with a left side, under right concrete bracket, drop in beam (2, 4) angle steel on (5) welding.
2. tread air channel, a kind of improved semi-precast underground railway station according to claim 1, it is characterized in that: at air channel prefabricated panel (3) end face, being provided with the gradient is 1% mortar sloping layer (8), and mortar sloping layer (8) is higher near a side absolute altitude of platform plate (10).
3. tread air channel, a kind of improved semi-precast underground railway station according to claim 1 and 2, is characterized in that: the two ends of described prefabricated tread air channel base plate (3) respectively and under left and right concrete bracket, between drop in beam (2,4), be provided with the cement mortar joint filling preset clearance (7) of 40-60mm.
4. tread air channel, a kind of improved semi-precast underground railway station according to claim 1 and 2, is characterized in that: drop in beam under described left and right concrete bracket (2,4) is after the reinforcing bar binding by its inner reinforcing bar and station top board (1) inside, to form after concreting respectively again.
5. tread air channel, a kind of improved semi-precast underground railway station according to claim 1 and 2, it is characterized in that: described in be embedded in prefabricated tread air channel base plate (3) bottom steel plate (6) have four, be embedded in respectively the position in (3) four bights of base plate, prefabricated tread air channel.
CN201320527780.6U 2013-08-28 2013-08-28 Improved semi-prefabricated subway station rail top wind channel Expired - Fee Related CN203403650U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320527780.6U CN203403650U (en) 2013-08-28 2013-08-28 Improved semi-prefabricated subway station rail top wind channel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320527780.6U CN203403650U (en) 2013-08-28 2013-08-28 Improved semi-prefabricated subway station rail top wind channel

Publications (1)

Publication Number Publication Date
CN203403650U true CN203403650U (en) 2014-01-22

Family

ID=49939589

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320527780.6U Expired - Fee Related CN203403650U (en) 2013-08-28 2013-08-28 Improved semi-prefabricated subway station rail top wind channel

Country Status (1)

Country Link
CN (1) CN203403650U (en)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104612697A (en) * 2014-12-15 2015-05-13 中铁建大桥工程局集团第五工程有限公司 Construction method for subway station track upwind way
CN104612741A (en) * 2014-12-24 2015-05-13 广州机施建设集团有限公司 Rail top air channel trolley construction method
CN104847090A (en) * 2015-04-29 2015-08-19 中国建筑第二工程局有限公司 Construction method of small-section-size ventilating duct
CN105863676A (en) * 2016-04-07 2016-08-17 山东天齐置业集团股份有限公司 Construction method for underground loop on-site concrete air duct
CN106761824A (en) * 2016-12-19 2017-05-31 中铁建大桥工程局集团第二工程有限公司 For the subway station rail chassis that road is poured against the wind
CN106836286A (en) * 2017-04-18 2017-06-13 郑州市市政工程总公司 Underground engineering assembly concrete air channel and its construction method
CN107100661A (en) * 2017-04-28 2017-08-29 上海城建物资有限公司 A kind of prefabricated assembled ultra-high performance concrete flue sheet structure
CN108194116A (en) * 2017-12-06 2018-06-22 广州地铁设计研究院有限公司 A kind of integral prefabricated rail in subway station road assembling structure against the wind
CN108331605A (en) * 2017-12-26 2018-07-27 上海市政工程设计研究总院(集团)有限公司 A kind of tunnel exhausting duct precast assembly method
CN110206274A (en) * 2019-06-04 2019-09-06 中国铁路设计集团有限公司 A kind of full precast assembly rail of rail traffic road against the wind
CN110230381A (en) * 2019-07-01 2019-09-13 中铁七局集团有限公司 A kind of precast underground railway station rail top air channel structure and its construction method
CN110344844A (en) * 2019-07-08 2019-10-18 中国铁建大桥工程局集团有限公司 A kind of track engineering section of track well construction method
CN111535361A (en) * 2020-04-26 2020-08-14 中铁第一勘察设计院集团有限公司 Assembled rail top air duct structure of underground station and construction method thereof
CN112343640A (en) * 2020-10-10 2021-02-09 中铁第四勘察设计院集团有限公司 Assembly type installation structure of subway station rail top air duct and construction method thereof
CN113153349A (en) * 2021-03-24 2021-07-23 中铁第六勘察设计院集团有限公司 Landing platform separated type side platform shielding door installation vertical beam structure and construction method
CN115853570A (en) * 2023-02-24 2023-03-28 中建六局(天津)绿色建筑科技有限公司 Prefabricated rail top air duct assembly type structure based on foamed ceramics and construction method

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104612697A (en) * 2014-12-15 2015-05-13 中铁建大桥工程局集团第五工程有限公司 Construction method for subway station track upwind way
CN104612741A (en) * 2014-12-24 2015-05-13 广州机施建设集团有限公司 Rail top air channel trolley construction method
CN104847090A (en) * 2015-04-29 2015-08-19 中国建筑第二工程局有限公司 Construction method of small-section-size ventilating duct
CN104847090B (en) * 2015-04-29 2016-12-07 中国建筑第二工程局有限公司 Construction method of small-section-size ventilating duct
CN105863676A (en) * 2016-04-07 2016-08-17 山东天齐置业集团股份有限公司 Construction method for underground loop on-site concrete air duct
CN106761824B (en) * 2016-12-19 2019-01-01 中铁建大桥工程局集团第二工程有限公司 For the subway station rail trolley that road pours against the wind
CN106761824A (en) * 2016-12-19 2017-05-31 中铁建大桥工程局集团第二工程有限公司 For the subway station rail chassis that road is poured against the wind
CN106836286A (en) * 2017-04-18 2017-06-13 郑州市市政工程总公司 Underground engineering assembly concrete air channel and its construction method
CN107100661A (en) * 2017-04-28 2017-08-29 上海城建物资有限公司 A kind of prefabricated assembled ultra-high performance concrete flue sheet structure
CN108194116A (en) * 2017-12-06 2018-06-22 广州地铁设计研究院有限公司 A kind of integral prefabricated rail in subway station road assembling structure against the wind
CN108194116B (en) * 2017-12-06 2024-05-14 广州地铁设计研究院股份有限公司 Whole prefabricated rail top wind channel assembly structure of subway station
CN108331605B (en) * 2017-12-26 2024-01-19 上海市政工程设计研究总院(集团)有限公司 Prefabricated assembly method for tunnel exhaust duct
CN108331605A (en) * 2017-12-26 2018-07-27 上海市政工程设计研究总院(集团)有限公司 A kind of tunnel exhausting duct precast assembly method
CN110206274A (en) * 2019-06-04 2019-09-06 中国铁路设计集团有限公司 A kind of full precast assembly rail of rail traffic road against the wind
CN110230381A (en) * 2019-07-01 2019-09-13 中铁七局集团有限公司 A kind of precast underground railway station rail top air channel structure and its construction method
CN110344844A (en) * 2019-07-08 2019-10-18 中国铁建大桥工程局集团有限公司 A kind of track engineering section of track well construction method
CN111535361A (en) * 2020-04-26 2020-08-14 中铁第一勘察设计院集团有限公司 Assembled rail top air duct structure of underground station and construction method thereof
CN112343640A (en) * 2020-10-10 2021-02-09 中铁第四勘察设计院集团有限公司 Assembly type installation structure of subway station rail top air duct and construction method thereof
CN113153349A (en) * 2021-03-24 2021-07-23 中铁第六勘察设计院集团有限公司 Landing platform separated type side platform shielding door installation vertical beam structure and construction method
CN115853570A (en) * 2023-02-24 2023-03-28 中建六局(天津)绿色建筑科技有限公司 Prefabricated rail top air duct assembly type structure based on foamed ceramics and construction method

Similar Documents

Publication Publication Date Title
CN203403650U (en) Improved semi-prefabricated subway station rail top wind channel
CN105386778B (en) Tunnel excavation lining construction chassis and tunnel excavation lining construction method
CN101761092B (en) Construction method of movable side wall of large overall template of large-span deep foundation pit
CN104695337B (en) Self-lifting sliding and turnover construction system and construction method
CN102392536B (en) Construction method for long-span hanging vestibule type template support system
CN101914897A (en) Construction method of single main cable inclined suspender ground anchor type suspension bridge
CN208280965U (en) Coal mine deep well tunnel smooth surface concrete spraying support structure
CN205025086U (en) Strength nature skeleton concrete beam construction suspend template in midair
CN109972655B (en) Prefabricated pipe gallery mechanical and hydraulic combined type integrally-installed and disassembled steel template and installation method
CN103032078A (en) Parallel construction method for shield arrival tunnel portal ring beam and shield crossing station
CN104594204B (en) Urban light rail viaduct mountain type U beam Construction Supporting System and construction method
CN206591862U (en) A kind of subway overhead station construction protecting platform car
CN104532754B (en) A kind of prestressed concrete box girder end-blocking template construction method
CN103255717A (en) Method for constructing hit-preventing wall
CN202466327U (en) Rail top air duct in subway station
CN213806710U (en) Laminated structure for plugging reserved hole of subway station
CN103485574B (en) A kind of granulation tower tower top structure of reinforced concrete method
CN104005775A (en) Integrated formwork for tunnel inverted arch backfill construction, and constructing process of integrated formwork
CN204266132U (en) Adopt the railway Frame Pier crossbeam of D type beam
CN202900288U (en) Steel section skeleton combined structure of tunnel minor radius section lining pouring
CN204475184U (en) Urban light rail viaduct mountain type U beam Construction Supporting System
CN103967332B (en) The construction method of a kind of building site enclosing
CN204267046U (en) A kind of tunnel lining concrete grouting device
CN203603928U (en) Rubber-tyred walking full-hydraulic lining trolley
CN106948267B (en) A kind of memorial archway bar formula bridge cable tower king-post method for synchronously constructing

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140122