CN202466327U - Rail top air duct in subway station - Google Patents
Rail top air duct in subway station Download PDFInfo
- Publication number
- CN202466327U CN202466327U CN2012200612076U CN201220061207U CN202466327U CN 202466327 U CN202466327 U CN 202466327U CN 2012200612076 U CN2012200612076 U CN 2012200612076U CN 201220061207 U CN201220061207 U CN 201220061207U CN 202466327 U CN202466327 U CN 202466327U
- Authority
- CN
- China
- Prior art keywords
- construction
- air duct
- prefabricated
- air channel
- rail top
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model relates to the construction field of subway stations, in particular to a rail top air duct in a subway station, and solves the problems of long construction period, high construction risk, complicated construction technology, much difficulty in controlling the construction quality and the like, which are caused when a conventional subway rail top air duct adopts a sheet iron air pipe and reinforced concrete air duct for construction. The rail top air duct provided by the utility model is formed by assembling a plurality of sections of prefabricated air duct units prefabricated by concrete, the adjacent prefabricated air duct units are connected through bell and spigots, so that the construction of median plates is slightly influenced, the construction precision is easy to control and the construction quality is greatly improved; the phenomena that the rail top air duct construction, the air duct and the like forcibly occupy the effective construction period of a station main structure are avoided, so that the construction period is greatly shortened; the prefabricated rail top air duct can be mounted without the need of suspended aloft work, so that the safety factor is higher; and the process is simple, the prefabricated air duct units adopt combined steel mold industrial operation, the construction quality is controllable, the installation of embedded parts and the formation of prepared holes are simple and the prefabricated air duct has the advantages of high precision, high consistency, high production efficiency and the like.
Description
Technical field
The utility model relates to the metro station construction field, is specially rail air channel, a kind of subway station.
Background technology
Tread air channel, subway station is to get rid of heat that the air conditioner of subway vehicle system distributes, satisfy passenger's constructional device that comfortable institute must setting of riding, and adopts the two kinds of methods in iron sheet airduct and steel concrete air channel usually.Though iron sheet air channel construction is simple, there are shortcomings such as antirust, anticorrosion in it, and there is potential threat in traffic safety; The steel concrete air channel is durable in use, and helps eliminating the noise, and in subway station design at present, adopts more.When construct in the air channel of employing concrete structure form; Conventional way is below middle template die frame system, to build the tread air channel earlier before the middle plate construction; Reserve and middle plate anchor bar; Air channel intensity satisfies after the construction intensity requirement in the air channel formwork and builds middle plate, and construction period is longer, need be with the air channel separately as the operation of a flowing water section.A kind of in addition conventional way is for building middle plate earlier; Reserve the air channel anchor bar in middle plate bottom, middle plate scaffold is removed the back employing and is hung method constructing and overhanging model tread air channel, and this method need be carried out work high above the ground; Construction danger is bigger; And need carry out the internal mold external mold and reinforce, construction technology is complicated, and the quality control on construction difficulty is big.
Summary of the invention
When the utility model adopts iron sheet airduct and steel concrete air channel to construct in order to solve existing tread air channel, subway station; Have long construction period, construction is dangerous big, construction technology is complicated; Problems such as the quality control on construction difficulty is big provide tread air channel, a kind of subway station.
The utility model is to adopt following technical scheme to realize: tread air channel, subway station, said tread air channel is made up of the mutual assembly unit in unit, the prefabricated air channel of the concrete prefabricated plurality of sections that forms.
Unit, described contiguous prefabricated air channel is to connect through bell and spigot, and is simple in structure, connect reliably, uses neoprene latex cement filleting simultaneously, can guarantee the sealing in air channel.
Adopt the structure design of the utility model, as an independent member, adopt concrete to carry out prefabricate tread air channel in the tread air channel; Process unit, the prefabricated air channel of plurality of sections earlier, maintenance is after design strength, in treating at the bottom of timbering to the air channel behind the absolute altitude; Unit, the prefabricated air channel of segmental hoisting reinforces in place; Take template die plate in the installation of full hall scaffold in inside, air channel, adopt the tread air channel of this form of structure to construct, have the following advantages:
1, centering plate construction infection is little, and construction precision is controlled easily, improves construction quality greatly;
2, avoid conversion station effective durations of agent structure such as construction of tread air channel and air channel, shortened construction period greatly;
3, prefabricated tread air channel installation has avoided hanging the mould work high above the ground, and safety factor is higher;
4, technology is simple, and unit, prefabricated air channel adopts the combined steel factory operation, and construction quality is controlled, and built-in fitting installation and reserving hole stay to be established simply, and prefabricated air channel has advantages such as high accuracy, high uniformity, high production rate.
Description of drawings
Fig. 1 is the structural representation of the utility model;
Fig. 2 is the structural representation of unit, the said prefabricated air channel of the utility model;
Fig. 3 is the mounting structure sketch map of the utility model;
Among the figure: unit, the prefabricated air channel of 1-; The 2-bell and spigot; Plate in the 3-station; 4-station side wall; 5-tread air channel.
The specific embodiment
Tread air channel, subway station, said tread air channel is made up of the 1 mutual assembly unit of unit, the prefabricated air channel of the concrete prefabricated plurality of sections that forms, and unit, contiguous prefabricated air channel 1 is to connect through bell and spigot 2.
Prefabricated air channel element length mainly consider to avoid as far as possible built-in fitting installation site and reserving hole the position is set, and the convenience of construction operation, general section length 1.5~2m, and every section numbered.During making; At first require to carry out reinforcing bar binding according to design drawing; Before installing, installation mold, template to confirm the accuracy that quantity and position are set of built-in fitting and reserving hole, after the reinforcing bar binding completion; The topping locator is installed on the master's muscle of air channel, and the control protective layer thickness is in the designing requirement scope.During matched moulds, the medial and lateral template is installed earlier, installs and reserve anchor rib position bamboo offset plate, bolt can carry out concreting after tightening and reinforce completion.Control concreting speed is divided and is built completion three times, vibrates in blanking limit, limit, and the surface is not emitting bubble, bleeding occurs and gets final product.After concreting finishes, receive light to the concrete exposed surface and handle, wipe off with nose bar earlier and remove unnecessary concrete or fill up recess, with trowel rubbing and pressure flat surface repeatedly.
During concrete the construction, can lift the air channel after the full hall of central plate scaffold building is accomplished, lift piecemeal according to the air channel numbering; Every section prefabricated air channel unit weight is 2.7~3.6T, and lifting can be adopted mobile crane or straddle truck, with the neoprene latex cement air channel inwall seam crossing is carried out shutoff behind the hoisted in position of air channel and handles; Realized the prefabricated construction in tread air channel, subway station; Reduce construction period, technology is simple, avoids work high above the ground; Safety factor is high, can guarantee the construction quality in tread air channel simultaneously.Performance analysis sees the following form:
Performance analysis | Cast-in-place method | Hang modulus method | Prefabrication |
Direct economic benefit | 720,000 | 1,240,000 | 740,000 |
Society's (duration) benefit | Each construction section need take 10 days durations, and total duration increases by 60 days | Influence the station secondary structure, dynamo-electric install, decorations 40 days. | Do not influence the construction of structure flowing water section, do not take total duration. |
The safe mass benefit | Template is installed strengthening quality require height, concrete apparent mass control difficulty is big in the construction. | Work high above the ground, security risk is big, and interior external mold strengthening quality control difficulty is big. | Technology is simple, and control construction quality is avoided work high above the ground easily. |
Adopt the prefabricated tread air channel of the utility model to construct, can practice thrift 40 day duration at least than conventional job practices, reduce project operation cost 1,200,000, economic benefit and social benefit effect are remarkable.
Case history:
Project profile
The long 490.8m of No. ten line thes second stage of the project of Beijing Metro Fan Jia village station owner body structure, standard paragraphs width 22.9m, overall floorage are 19740.8m2, underground double-deck three stride island station.The station engineering quantity is big, is the long vehicle station of Beijing Metro No. 10 line.West, station end is designed with the tread air channel of 118m, is arranged in the plate double suspension in bottom.The wide 3.19m in air channel, high 0.93m, inside wall thickness are 240mm, and lateral wall thickness is 150mm, and base plate thickness is 130mm.
Condition of construction
Adopt the prefabricated tread air channel of the utility model to construct; Overcome cast-in-place tread air channel and taken long shortcoming of duration; Also overcome the danger of hanging the operation of mould construction high and medium; Also overcome simultaneously and hung shortcomings such as mould construction technology complicated construction quality control difficulty is big, accomplished the tread air channel construction of 118m smoothly.
Engineering monitoring and evaluation of result
This worker method is adopted at station, Beijing Metro Fan Jia village; Save 40 days durations, guaranteed the plan of binding at station, adopt the prefabricated tread air channel of the utility model to construct; Reliable construction quality; It is difficult to have overcome in the past in the construction reinforcement cover control, and the shortcoming of presentation quality difference has obtained remarkable social benefit and economic benefit.
Claims (2)
1. tread air channel, a subway station is characterized in that said tread air channel is made up of the mutual assembly unit in unit, the prefabricated air channel of the concrete prefabricated plurality of sections that forms (1).
2. tread air channel, subway station according to claim 1 is characterized in that unit, contiguous prefabricated air channel (1) is to connect through bell and spigot (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012200612076U CN202466327U (en) | 2012-02-24 | 2012-02-24 | Rail top air duct in subway station |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012200612076U CN202466327U (en) | 2012-02-24 | 2012-02-24 | Rail top air duct in subway station |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202466327U true CN202466327U (en) | 2012-10-03 |
Family
ID=46914495
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012200612076U Expired - Fee Related CN202466327U (en) | 2012-02-24 | 2012-02-24 | Rail top air duct in subway station |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202466327U (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104612697A (en) * | 2014-12-15 | 2015-05-13 | 中铁建大桥工程局集团第五工程有限公司 | Construction method for subway station track upwind way |
CN104612741A (en) * | 2014-12-24 | 2015-05-13 | 广州机施建设集团有限公司 | Rail top air channel trolley construction method |
CN107100661A (en) * | 2017-04-28 | 2017-08-29 | 上海城建物资有限公司 | A kind of prefabricated assembled ultra-high performance concrete flue sheet structure |
CN108194116A (en) * | 2017-12-06 | 2018-06-22 | 广州地铁设计研究院有限公司 | A kind of integral prefabricated rail in subway station road assembling structure against the wind |
CN109853908A (en) * | 2019-01-11 | 2019-06-07 | 广州地铁设计研究院股份有限公司 | The novel prefabricated rail top air channel structure of one kind and its construction method |
CN110273531A (en) * | 2019-07-17 | 2019-09-24 | 董宏波 | A kind of prefabricated rail in subway station pipeline construction method against the wind |
CN114033469A (en) * | 2021-10-14 | 2022-02-11 | 广州地铁设计研究院股份有限公司 | Subway tunnel cold air cooling environmental control system |
-
2012
- 2012-02-24 CN CN2012200612076U patent/CN202466327U/en not_active Expired - Fee Related
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104612697A (en) * | 2014-12-15 | 2015-05-13 | 中铁建大桥工程局集团第五工程有限公司 | Construction method for subway station track upwind way |
CN104612741A (en) * | 2014-12-24 | 2015-05-13 | 广州机施建设集团有限公司 | Rail top air channel trolley construction method |
CN107100661A (en) * | 2017-04-28 | 2017-08-29 | 上海城建物资有限公司 | A kind of prefabricated assembled ultra-high performance concrete flue sheet structure |
CN108194116A (en) * | 2017-12-06 | 2018-06-22 | 广州地铁设计研究院有限公司 | A kind of integral prefabricated rail in subway station road assembling structure against the wind |
CN109853908A (en) * | 2019-01-11 | 2019-06-07 | 广州地铁设计研究院股份有限公司 | The novel prefabricated rail top air channel structure of one kind and its construction method |
CN110273531A (en) * | 2019-07-17 | 2019-09-24 | 董宏波 | A kind of prefabricated rail in subway station pipeline construction method against the wind |
CN114033469A (en) * | 2021-10-14 | 2022-02-11 | 广州地铁设计研究院股份有限公司 | Subway tunnel cold air cooling environmental control system |
CN114033469B (en) * | 2021-10-14 | 2023-05-19 | 广州地铁设计研究院股份有限公司 | Subway tunnel cold air cooling environmental control system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202466327U (en) | Rail top air duct in subway station | |
CN203403650U (en) | Improved semi-prefabricated subway station rail top wind channel | |
CN101691191B (en) | Self-climbing tower crane | |
CN103161126A (en) | Road bridge variable section hollow high pier slip-form construction method | |
CN106150079A (en) | Make building machine in the air | |
CN203808484U (en) | Integrated cantilevered and attached external scaffolding | |
CN103233424A (en) | Hanging-basket-method support-free anti-collision wall construction method, construction hanging basket and template for construction | |
CN103255717A (en) | Method for constructing hit-preventing wall | |
CN204609154U (en) | The hollow stair system of a kind of prefabricated assembling type reinforced concrete | |
CN102661019B (en) | Heat preservation and decoration integrated construction method for outer wall of building | |
CN204662952U (en) | A kind of self-propelled tool single side formwork formwork system | |
CN208280965U (en) | Coal mine deep well tunnel smooth surface concrete spraying support structure | |
CN203174510U (en) | Movable assembly type hanging basket for bridge anti-collision guardrail construction and formwork for construction | |
CN106808578A (en) | A kind of prefabricated piping lane of two-piece unit formula and method for prefabricating | |
CN102733608B (en) | Construction method for spray head layer of granulation tower | |
CN107386246B (en) | A kind of lock chamber wall Construction Through Form on Traveler method | |
CN109404010A (en) | A kind of aluminum tunnel modular system and its operating method | |
CN102286932B (en) | Construction method for off-site assembling and automatic mounting on bridge of mobile mould bridge abutment | |
CN105401719A (en) | Aluminum alloy stair step template | |
CN105401525B (en) | Cast-in-situ construction method of beam flange plates of acoustic barriers through movable mold base vehicles | |
CN201686953U (en) | Novel wall fence used for road | |
CN207194333U (en) | A kind of hollow stair of marking time of precast concrete | |
CN203878979U (en) | Bolt opposite-pulling type track sliding formwork | |
CN202401753U (en) | Sliding die device | |
CN201865053U (en) | Continuous steel beam template |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20121003 Termination date: 20200224 |