CN202466327U - Rail top air duct in subway station - Google Patents

Rail top air duct in subway station Download PDF

Info

Publication number
CN202466327U
CN202466327U CN2012200612076U CN201220061207U CN202466327U CN 202466327 U CN202466327 U CN 202466327U CN 2012200612076 U CN2012200612076 U CN 2012200612076U CN 201220061207 U CN201220061207 U CN 201220061207U CN 202466327 U CN202466327 U CN 202466327U
Authority
CN
China
Prior art keywords
construction
air duct
prefabricated
air channel
rail top
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012200612076U
Other languages
Chinese (zh)
Inventor
贾捷川
贾大鹏
张丽芳
向前进
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Original Assignee
Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd filed Critical Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Priority to CN2012200612076U priority Critical patent/CN202466327U/en
Application granted granted Critical
Publication of CN202466327U publication Critical patent/CN202466327U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to the construction field of subway stations, in particular to a rail top air duct in a subway station, and solves the problems of long construction period, high construction risk, complicated construction technology, much difficulty in controlling the construction quality and the like, which are caused when a conventional subway rail top air duct adopts a sheet iron air pipe and reinforced concrete air duct for construction. The rail top air duct provided by the utility model is formed by assembling a plurality of sections of prefabricated air duct units prefabricated by concrete, the adjacent prefabricated air duct units are connected through bell and spigots, so that the construction of median plates is slightly influenced, the construction precision is easy to control and the construction quality is greatly improved; the phenomena that the rail top air duct construction, the air duct and the like forcibly occupy the effective construction period of a station main structure are avoided, so that the construction period is greatly shortened; the prefabricated rail top air duct can be mounted without the need of suspended aloft work, so that the safety factor is higher; and the process is simple, the prefabricated air duct units adopt combined steel mold industrial operation, the construction quality is controllable, the installation of embedded parts and the formation of prepared holes are simple and the prefabricated air duct has the advantages of high precision, high consistency, high production efficiency and the like.

Description

Tread air channel, subway station
Technical field
The utility model relates to the metro station construction field, is specially rail air channel, a kind of subway station.
Background technology
Tread air channel, subway station is to get rid of heat that the air conditioner of subway vehicle system distributes, satisfy passenger's constructional device that comfortable institute must setting of riding, and adopts the two kinds of methods in iron sheet airduct and steel concrete air channel usually.Though iron sheet air channel construction is simple, there are shortcomings such as antirust, anticorrosion in it, and there is potential threat in traffic safety; The steel concrete air channel is durable in use, and helps eliminating the noise, and in subway station design at present, adopts more.When construct in the air channel of employing concrete structure form; Conventional way is below middle template die frame system, to build the tread air channel earlier before the middle plate construction; Reserve and middle plate anchor bar; Air channel intensity satisfies after the construction intensity requirement in the air channel formwork and builds middle plate, and construction period is longer, need be with the air channel separately as the operation of a flowing water section.A kind of in addition conventional way is for building middle plate earlier; Reserve the air channel anchor bar in middle plate bottom, middle plate scaffold is removed the back employing and is hung method constructing and overhanging model tread air channel, and this method need be carried out work high above the ground; Construction danger is bigger; And need carry out the internal mold external mold and reinforce, construction technology is complicated, and the quality control on construction difficulty is big.
Summary of the invention
When the utility model adopts iron sheet airduct and steel concrete air channel to construct in order to solve existing tread air channel, subway station; Have long construction period, construction is dangerous big, construction technology is complicated; Problems such as the quality control on construction difficulty is big provide tread air channel, a kind of subway station.
The utility model is to adopt following technical scheme to realize: tread air channel, subway station, said tread air channel is made up of the mutual assembly unit in unit, the prefabricated air channel of the concrete prefabricated plurality of sections that forms.
Unit, described contiguous prefabricated air channel is to connect through bell and spigot, and is simple in structure, connect reliably, uses neoprene latex cement filleting simultaneously, can guarantee the sealing in air channel.
Adopt the structure design of the utility model, as an independent member, adopt concrete to carry out prefabricate tread air channel in the tread air channel; Process unit, the prefabricated air channel of plurality of sections earlier, maintenance is after design strength, in treating at the bottom of timbering to the air channel behind the absolute altitude; Unit, the prefabricated air channel of segmental hoisting reinforces in place; Take template die plate in the installation of full hall scaffold in inside, air channel, adopt the tread air channel of this form of structure to construct, have the following advantages:
1, centering plate construction infection is little, and construction precision is controlled easily, improves construction quality greatly;
2, avoid conversion station effective durations of agent structure such as construction of tread air channel and air channel, shortened construction period greatly;
3, prefabricated tread air channel installation has avoided hanging the mould work high above the ground, and safety factor is higher;
4, technology is simple, and unit, prefabricated air channel adopts the combined steel factory operation, and construction quality is controlled, and built-in fitting installation and reserving hole stay to be established simply, and prefabricated air channel has advantages such as high accuracy, high uniformity, high production rate.
Description of drawings
Fig. 1 is the structural representation of the utility model;
Fig. 2 is the structural representation of unit, the said prefabricated air channel of the utility model;
Fig. 3 is the mounting structure sketch map of the utility model;
Among the figure: unit, the prefabricated air channel of 1-; The 2-bell and spigot; Plate in the 3-station; 4-station side wall; 5-tread air channel.
The specific embodiment
Tread air channel, subway station, said tread air channel is made up of the 1 mutual assembly unit of unit, the prefabricated air channel of the concrete prefabricated plurality of sections that forms, and unit, contiguous prefabricated air channel 1 is to connect through bell and spigot 2.
Prefabricated air channel element length mainly consider to avoid as far as possible built-in fitting installation site and reserving hole the position is set, and the convenience of construction operation, general section length 1.5~2m, and every section numbered.During making; At first require to carry out reinforcing bar binding according to design drawing; Before installing, installation mold, template to confirm the accuracy that quantity and position are set of built-in fitting and reserving hole, after the reinforcing bar binding completion; The topping locator is installed on the master's muscle of air channel, and the control protective layer thickness is in the designing requirement scope.During matched moulds, the medial and lateral template is installed earlier, installs and reserve anchor rib position bamboo offset plate, bolt can carry out concreting after tightening and reinforce completion.Control concreting speed is divided and is built completion three times, vibrates in blanking limit, limit, and the surface is not emitting bubble, bleeding occurs and gets final product.After concreting finishes, receive light to the concrete exposed surface and handle, wipe off with nose bar earlier and remove unnecessary concrete or fill up recess, with trowel rubbing and pressure flat surface repeatedly.
During concrete the construction, can lift the air channel after the full hall of central plate scaffold building is accomplished, lift piecemeal according to the air channel numbering; Every section prefabricated air channel unit weight is 2.7~3.6T, and lifting can be adopted mobile crane or straddle truck, with the neoprene latex cement air channel inwall seam crossing is carried out shutoff behind the hoisted in position of air channel and handles; Realized the prefabricated construction in tread air channel, subway station; Reduce construction period, technology is simple, avoids work high above the ground; Safety factor is high, can guarantee the construction quality in tread air channel simultaneously.Performance analysis sees the following form:
Performance analysis Cast-in-place method Hang modulus method Prefabrication
Direct economic benefit 720,000 1,240,000 740,000
Society's (duration) benefit Each construction section need take 10 days durations, and total duration increases by 60 days Influence the station secondary structure, dynamo-electric install, decorations 40 days. Do not influence the construction of structure flowing water section, do not take total duration.
The safe mass benefit Template is installed strengthening quality require height, concrete apparent mass control difficulty is big in the construction. Work high above the ground, security risk is big, and interior external mold strengthening quality control difficulty is big. Technology is simple, and control construction quality is avoided work high above the ground easily.
Adopt the prefabricated tread air channel of the utility model to construct, can practice thrift 40 day duration at least than conventional job practices, reduce project operation cost 1,200,000, economic benefit and social benefit effect are remarkable.
Case history:
Project profile
The long 490.8m of No. ten line thes second stage of the project of Beijing Metro Fan Jia village station owner body structure, standard paragraphs width 22.9m, overall floorage are 19740.8m2, underground double-deck three stride island station.The station engineering quantity is big, is the long vehicle station of Beijing Metro No. 10 line.West, station end is designed with the tread air channel of 118m, is arranged in the plate double suspension in bottom.The wide 3.19m in air channel, high 0.93m, inside wall thickness are 240mm, and lateral wall thickness is 150mm, and base plate thickness is 130mm.
Condition of construction
Adopt the prefabricated tread air channel of the utility model to construct; Overcome cast-in-place tread air channel and taken long shortcoming of duration; Also overcome the danger of hanging the operation of mould construction high and medium; Also overcome simultaneously and hung shortcomings such as mould construction technology complicated construction quality control difficulty is big, accomplished the tread air channel construction of 118m smoothly.
Engineering monitoring and evaluation of result
This worker method is adopted at station, Beijing Metro Fan Jia village; Save 40 days durations, guaranteed the plan of binding at station, adopt the prefabricated tread air channel of the utility model to construct; Reliable construction quality; It is difficult to have overcome in the past in the construction reinforcement cover control, and the shortcoming of presentation quality difference has obtained remarkable social benefit and economic benefit.

Claims (2)

1. tread air channel, a subway station is characterized in that said tread air channel is made up of the mutual assembly unit in unit, the prefabricated air channel of the concrete prefabricated plurality of sections that forms (1).
2. tread air channel, subway station according to claim 1 is characterized in that unit, contiguous prefabricated air channel (1) is to connect through bell and spigot (2).
CN2012200612076U 2012-02-24 2012-02-24 Rail top air duct in subway station Expired - Fee Related CN202466327U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012200612076U CN202466327U (en) 2012-02-24 2012-02-24 Rail top air duct in subway station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012200612076U CN202466327U (en) 2012-02-24 2012-02-24 Rail top air duct in subway station

Publications (1)

Publication Number Publication Date
CN202466327U true CN202466327U (en) 2012-10-03

Family

ID=46914495

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012200612076U Expired - Fee Related CN202466327U (en) 2012-02-24 2012-02-24 Rail top air duct in subway station

Country Status (1)

Country Link
CN (1) CN202466327U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104612697A (en) * 2014-12-15 2015-05-13 中铁建大桥工程局集团第五工程有限公司 Construction method for subway station track upwind way
CN104612741A (en) * 2014-12-24 2015-05-13 广州机施建设集团有限公司 Rail top air channel trolley construction method
CN107100661A (en) * 2017-04-28 2017-08-29 上海城建物资有限公司 A kind of prefabricated assembled ultra-high performance concrete flue sheet structure
CN108194116A (en) * 2017-12-06 2018-06-22 广州地铁设计研究院有限公司 A kind of integral prefabricated rail in subway station road assembling structure against the wind
CN109853908A (en) * 2019-01-11 2019-06-07 广州地铁设计研究院股份有限公司 The novel prefabricated rail top air channel structure of one kind and its construction method
CN110273531A (en) * 2019-07-17 2019-09-24 董宏波 A kind of prefabricated rail in subway station pipeline construction method against the wind
CN114033469A (en) * 2021-10-14 2022-02-11 广州地铁设计研究院股份有限公司 Subway tunnel cold air cooling environmental control system

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104612697A (en) * 2014-12-15 2015-05-13 中铁建大桥工程局集团第五工程有限公司 Construction method for subway station track upwind way
CN104612741A (en) * 2014-12-24 2015-05-13 广州机施建设集团有限公司 Rail top air channel trolley construction method
CN107100661A (en) * 2017-04-28 2017-08-29 上海城建物资有限公司 A kind of prefabricated assembled ultra-high performance concrete flue sheet structure
CN108194116A (en) * 2017-12-06 2018-06-22 广州地铁设计研究院有限公司 A kind of integral prefabricated rail in subway station road assembling structure against the wind
CN109853908A (en) * 2019-01-11 2019-06-07 广州地铁设计研究院股份有限公司 The novel prefabricated rail top air channel structure of one kind and its construction method
CN110273531A (en) * 2019-07-17 2019-09-24 董宏波 A kind of prefabricated rail in subway station pipeline construction method against the wind
CN114033469A (en) * 2021-10-14 2022-02-11 广州地铁设计研究院股份有限公司 Subway tunnel cold air cooling environmental control system
CN114033469B (en) * 2021-10-14 2023-05-19 广州地铁设计研究院股份有限公司 Subway tunnel cold air cooling environmental control system

Similar Documents

Publication Publication Date Title
CN202466327U (en) Rail top air duct in subway station
CN203403650U (en) Improved semi-prefabricated subway station rail top wind channel
CN101691191B (en) Self-climbing tower crane
CN103161126A (en) Road bridge variable section hollow high pier slip-form construction method
CN106150079A (en) Make building machine in the air
CN203808484U (en) Integrated cantilevered and attached external scaffolding
CN103233424A (en) Hanging-basket-method support-free anti-collision wall construction method, construction hanging basket and template for construction
CN103255717A (en) Method for constructing hit-preventing wall
CN204609154U (en) The hollow stair system of a kind of prefabricated assembling type reinforced concrete
CN102661019B (en) Heat preservation and decoration integrated construction method for outer wall of building
CN204662952U (en) A kind of self-propelled tool single side formwork formwork system
CN208280965U (en) Coal mine deep well tunnel smooth surface concrete spraying support structure
CN203174510U (en) Movable assembly type hanging basket for bridge anti-collision guardrail construction and formwork for construction
CN106808578A (en) A kind of prefabricated piping lane of two-piece unit formula and method for prefabricating
CN102733608B (en) Construction method for spray head layer of granulation tower
CN107386246B (en) A kind of lock chamber wall Construction Through Form on Traveler method
CN109404010A (en) A kind of aluminum tunnel modular system and its operating method
CN102286932B (en) Construction method for off-site assembling and automatic mounting on bridge of mobile mould bridge abutment
CN105401719A (en) Aluminum alloy stair step template
CN105401525B (en) Cast-in-situ construction method of beam flange plates of acoustic barriers through movable mold base vehicles
CN201686953U (en) Novel wall fence used for road
CN207194333U (en) A kind of hollow stair of marking time of precast concrete
CN203878979U (en) Bolt opposite-pulling type track sliding formwork
CN202401753U (en) Sliding die device
CN201865053U (en) Continuous steel beam template

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121003

Termination date: 20200224