CN104612741A - Rail top air channel trolley construction method - Google Patents

Rail top air channel trolley construction method Download PDF

Info

Publication number
CN104612741A
CN104612741A CN201410817759.9A CN201410817759A CN104612741A CN 104612741 A CN104612741 A CN 104612741A CN 201410817759 A CN201410817759 A CN 201410817759A CN 104612741 A CN104612741 A CN 104612741A
Authority
CN
China
Prior art keywords
chassis
air channel
base plate
construction method
template
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410817759.9A
Other languages
Chinese (zh)
Inventor
何炳泉
丁昌银
柯德辉
莫劲
雷雄武
邱师亮
秦建新
蒋明曦
邱建涛
王志
高永辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGZHOU XINQIAO BUILDING LABOUR SERVICE CO Ltd
GUANGZHOU MACHINE FACILITIES CONSTRUCTION GROUP CO Ltd
Original Assignee
GUANGZHOU XINQIAO BUILDING LABOUR SERVICE CO Ltd
GUANGZHOU MACHINE FACILITIES CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGZHOU XINQIAO BUILDING LABOUR SERVICE CO Ltd, GUANGZHOU MACHINE FACILITIES CONSTRUCTION GROUP CO Ltd filed Critical GUANGZHOU XINQIAO BUILDING LABOUR SERVICE CO Ltd
Priority to CN201410817759.9A priority Critical patent/CN104612741A/en
Publication of CN104612741A publication Critical patent/CN104612741A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor

Abstract

The invention relates to a rail top air channel trolley construction method. The rail top air channel trolley construction method comprises the following steps that (S1) a rail is laid in a station body in the extending direction of the station body, a trolley capable of vertically ascending and descending is spliced on the rail, and the trolley is made to be in sliding fit with the rail; (S2) a bottom plate is arranged on the top of the trolley, and the height of the trolley relative to the top of the station body is adjusted in an ascending and descending mode; (S3) reserved steel bars in a rail top air channel of the station body are dug out, later-stage steel bars for the bottom plate and a vertical wall are installed, and the reserved steel bars and the later-stage steel bars are bound; (S4) vertical inner side formworks are perpendicularly and fixedly connected to the bottom plate, and reinforced concrete cushion blocks are arranged at the crossed positions of inner side webs and the bottom plate; (S5) outer side formworks are arranged on the outer sides of the inner side formworks at intervals, and the inner side formworks and the outer side formworks are fixed through split bolts; (S6) concrete is poured between the inner side formworks and the outer side formworks, between the inner side formworks and the bottom plate and between the inner side formworks and the station body at a time. By means of the rail top air channel trolley construction method, the construction speed can be increased, and the manual work labor intensity can be lowered.

Description

Tread air channel chassis construction method
Technical field
The present invention relates to tread air channel chassis construction method.
Background technology
Tread air channel is a sleeve configuration reinforced concrete structure, is made up of the base plate of transverse direction and vertical straight wall.Tread air channel, subway station is divided into prefabricated and cast-in-place two kinds.At present, the construction of cast-in-place method is mostly adopted at home.Cast-in-situ steel reinforced concrete tread air channel be divided into again first water and after water two kinds, under and shield-tunneling construction asynchronous with agent structure drawing by Bidding Invition, station internal construction drawing need to be limited by conditions such as stations, tread air channel can not be built with station agent structure simultaneously, waters method construction after must adopting.
The form that method construction conventional method adopts segmented-erection steel pipe scaffold and wooden form is usually watered behind tread air channel, after support has been set up, mounting base template, colligation base plate and straight wall reinforcing bar, straight wall outboard template is installed, builds base plate and bottom straight wall concrete, after reaching some strength, straight wall inner side template be installed and reinforce, finally building straight wall top concrete again.Construct after reaching form removal requirement, striking and template, be circulated to next section of construction.
Above-mentioned conventional rail against the wind road construction need to install in a large number in agent structure AT STATION, the work of striking template system, high to workman's technical requirements, speed of application is slow, labour's input amount is large, and general employing laminated wood template, the template number of turnover is few, and waste resource, does not meet the theory of environmental protection construction.And because base plate and straight wall are not that one-time-concreting is shaping, operation is more, and can cause producing constuction joint between base plate and straight wall, is unfavorable for the globality of structure.
Summary of the invention
In order to overcome the deficiencies in the prior art, the object of the present invention is to provide tread air channel chassis construction method, can speed of application be improved, reduce manual work labour intensity.
Object of the present invention adopts following technical scheme to realize:
Tread air channel chassis construction method, comprises the following steps:
Lay track along the bearing of trend of station main body in S1, AT STATION main body, on that track assembled can vertical lifting chassis and this chassis is coordinated with non-orbiting scroll;
S2, base plate is positioned over chassis top, lift adjustment chassis is relative to the height of station body top;
S3, the reserved steel bar dug out in main body tread air channel, station, install the later stage reinforcing bar being used for base plate and straight wall, reserved steel bar and later stage reinforcing bar carried out colligation;
S4, vertical inner side template is vertically fixed in base plate, this interior coxostermum and base plate delivery position arrange steel concrete cushion block;
S5, outboard template interval is located at the outside of inner side template, inner side template and outer coxostermum are fixed by split bolt;
S6, between inner side template and outboard template and between inner side template and base plate, station main body one-time-concreting concrete, make the straight wall that formed between inner side template and outboard template and base plate one-time-concreting shaping.
Preferably, further comprising the steps of between step S5 and step S6: the opening mould plate installing the hole for the formation of ventilation on described base plate; Tracking against the wind road adopts section construction, and the concrete interface position between section and section is installed and is used for concrete closing in net described in shutoff.
Preferably, in described step S2, the top of chassis is provided with supporting traverse, chassis bottom be fixed with jack, supporting traverse is connected by support with jack and passes through this support and realizes regulating relative to the height of station body top.
Preferably, described base plate, inner side template and outboard template all adopt aluminium alloy plate.
Compared to existing technology, beneficial effect of the present invention is:
(1) the present invention has abandoned conventional template needs to set up template complex support system, realize construction equipment, by the direct jacking bottom plate of chassis, with inner side template, outboard template, station main body encloses the cavity formed for concreting, pass through layers of concrete simultaneously, in split bolt fixes, outboard template, thus greatly accelerate speed of application, under the guiding of track, chassis can be promoted easily after one section of construction to enter next section and construct, and, base plate and straight wall concrete one-time-concreting shaping, avoid the shortcoming that in conventional method, sidewall hanging beam concrete need be built at twice, simplify working procedure, reduce manual work labour intensity, decrease the generation of constuction joint, be conducive to the resistance to overturning of tread air channel structure,
(2) the present invention utilizes jack to adjust elevation and the plan-position of chassis, base plate, inner side template, the installation of outboard template, dismounting work can be realized easily, which compares Traditional Wood formwork integral good stability, ensure that air channel concreting surfacing is bright and clean;
(3) aluminium alloy plate of the present invention can reach more than 300 times by the number of turnover, and recovery value is high, avoids the wasting of resources.
Detailed description of the invention
Tread air channel chassis construction method, comprises the following steps:
Lay track along the bearing of trend of station main body in S1, AT STATION main body, on that track assembled can vertical lifting chassis and this chassis is coordinated with non-orbiting scroll; Track can adopt steel track, and track bottom rail paving i iron sleeper, to promote the stability of chassis movement;
S2, base plate is positioned over chassis top, lift adjustment chassis is relative to the height of station body top; The spacing distance of this base plate and station body top presets, then carries out lift adjustment to chassis, so that base top is risen to precalculated position;
S3, the reserved steel bar dug out in main body tread air channel, station, install the later stage reinforcing bar being used for base plate and straight wall, reserved steel bar and later stage reinforcing bar carried out colligation; For reinforcing bar and the reinforcing bar reinforced for straight wall of jacking of floor all together with reserved reinforcing bar binding, generally connected by welding manner;
S4, vertical inner side template is vertically fixed in base plate, this interior coxostermum and base plate delivery position arrange steel concrete cushion block; This steel concrete cushion block is used for stable support inner side template, to keep rigidity;
S5, outboard template interval is located at the outside of inner side template, inner side template and outer coxostermum are fixed by split bolt; Inner side template and outboard template composition build the space of straight wall, in conjunction with both inner reinforcing bar, can straight wall be reinforced to make follow-up pouring reinforcement;
S6, between inner side template and outboard template and between inner side template and base plate, station main body one-time-concreting concrete, make the straight wall that formed between inner side template and outboard template and base plate one-time-concreting shaping; Casting process, builds, by one end continuous placing to the other end in the cavity that can surround toward base plate, straight wall and station main body in the preformed hole of main body AT STATION.
By above-mentioned steps, chassis can once mounting shaping, behind one section of tread air channel of having constructed, need not repeat to install, remove chassis support system, only need promote chassis and utilize rail track to march to next section of circulation construction.When form removal is to next section circulation construction, vertical inner side template and vertical outboard template is only had to need manual demolition, the dismounting of base plate makes chassis height decline by adjustment jack, namely base plate departs from the concrete of having built, chassis to next section of construction location, can carry out next construction section reinforcing bar binding after adjusting height by rail forward impelling by jack.Wherein, after inner side template, outboard template are installed, diagonal brace or other water booster system can be set, keep the intensity of inner side template, outboard template, prevent from.
As a preferred embodiment of the present invention, further comprising the steps of between step S5 and step S6: the opening mould plate installing the hole for the formation of ventilation on described base plate, the base plate position in this tread air channel is by design drawing reserved opening, opening mould plate is installed, as the ventilation opening in tread air channel; Tracking against the wind road adopts section construction, concrete interface position between section and section is installed and is used for concrete closing in net described in shutoff, the closing in net installed is guaranteed to connect the concrete roughness in batch position, the leakproofness that the two sections of tread air channels being conducive to successively construction connect.
Particularly, the present invention realizes chassis and to be elevated and the mode driving base plate to be elevated is: in described step S2, the top of chassis is provided with supporting traverse, this supporting traverse is used for support baseboard, chassis bottom be fixed with jack, supporting traverse is connected by support with jack and passes through this support and realizes regulating relative to the height of station body top, carrys out driving arm, and drive supporting traverse lift adjustment by jack.
As the preferred embodiment of the present invention, base plate, inner side template and outboard template all adopt aluminium alloy plate, are beneficial to recovery.
Above-mentioned embodiment is only the preferred embodiment of the present invention; can not limit the scope of protection of the invention with this, change and the replacement of any unsubstantiality that those skilled in the art does on basis of the present invention all belong to the present invention's scope required for protection.

Claims (4)

1. tread air channel chassis construction method, is characterized in that comprising the following steps:
Lay track along the bearing of trend of station main body in S1, AT STATION main body, on that track assembled can vertical lifting chassis and this chassis is coordinated with non-orbiting scroll;
S2, base plate is positioned over chassis top, lift adjustment chassis is relative to the height of station body top;
S3, the reserved steel bar dug out in main body tread air channel, station, install the later stage reinforcing bar being used for base plate and straight wall, reserved steel bar and later stage reinforcing bar carried out colligation;
S4, vertical inner side template is vertically fixed in base plate, this interior coxostermum and base plate delivery position arrange steel concrete cushion block;
S5, outboard template interval is located at the outside of inner side template, inner side template and outer coxostermum are fixed by split bolt;
S6, between inner side template and outboard template and between inner side template and base plate, station main body one-time-concreting concrete, make the straight wall that formed between inner side template and outboard template and base plate one-time-concreting shaping.
2. tread air channel according to claim 1 chassis construction method, is characterized in that: further comprising the steps of between step S5 and step S6: the opening mould plate installing the hole for the formation of ventilation on described base plate; Tracking against the wind road adopts section construction, and the concrete interface position between section and section is installed and is used for concrete closing in net described in shutoff.
3. tread air channel according to claim 1 chassis construction method, it is characterized in that: in described step S2, the top of chassis is provided with supporting traverse, chassis bottom be fixed with jack, supporting traverse is connected by support with jack and passes through this support and realizes regulating relative to the height of station body top.
4. the tread air channel chassis construction method according to any one of claims 1 to 3, is characterized in that: described base plate, inner side template and outboard template all adopt aluminium alloy plate.
CN201410817759.9A 2014-12-24 2014-12-24 Rail top air channel trolley construction method Pending CN104612741A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410817759.9A CN104612741A (en) 2014-12-24 2014-12-24 Rail top air channel trolley construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410817759.9A CN104612741A (en) 2014-12-24 2014-12-24 Rail top air channel trolley construction method

Publications (1)

Publication Number Publication Date
CN104612741A true CN104612741A (en) 2015-05-13

Family

ID=53147366

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410817759.9A Pending CN104612741A (en) 2014-12-24 2014-12-24 Rail top air channel trolley construction method

Country Status (1)

Country Link
CN (1) CN104612741A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105863676A (en) * 2016-04-07 2016-08-17 山东天齐置业集团股份有限公司 Construction method for underground loop on-site concrete air duct
CN106437770A (en) * 2016-11-09 2017-02-22 湖南五新模板有限公司 Hydraulic formwork trolley for rail top air duct post-pouring construction
CN109441484A (en) * 2018-11-26 2019-03-08 中铁隧道集团三处有限公司 A kind of formwork jumbo construction method of underground narrow space air hose passage construction
CN113550761A (en) * 2021-09-03 2021-10-26 中交隧道工程局有限公司 Construction method of support frame body of subway station rail top air duct

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202466327U (en) * 2012-02-24 2012-10-03 中铁十二局集团第二工程有限公司 Rail top air duct in subway station
CN203403650U (en) * 2013-08-28 2014-01-22 中铁十一局集团城市轨道工程有限公司 Improved semi-prefabricated subway station rail top wind channel

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202466327U (en) * 2012-02-24 2012-10-03 中铁十二局集团第二工程有限公司 Rail top air duct in subway station
CN203403650U (en) * 2013-08-28 2014-01-22 中铁十一局集团城市轨道工程有限公司 Improved semi-prefabricated subway station rail top wind channel

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
杜宇: "全预制轨顶风道在成都地铁2号线工程中的设计与应用", 《中华民居》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105863676A (en) * 2016-04-07 2016-08-17 山东天齐置业集团股份有限公司 Construction method for underground loop on-site concrete air duct
CN106437770A (en) * 2016-11-09 2017-02-22 湖南五新模板有限公司 Hydraulic formwork trolley for rail top air duct post-pouring construction
CN106437770B (en) * 2016-11-09 2018-11-09 湖南五新模板有限公司 A kind of hydraulic template trolley for pouring construction after rail against the wind road
CN109441484A (en) * 2018-11-26 2019-03-08 中铁隧道集团三处有限公司 A kind of formwork jumbo construction method of underground narrow space air hose passage construction
CN113550761A (en) * 2021-09-03 2021-10-26 中交隧道工程局有限公司 Construction method of support frame body of subway station rail top air duct

Similar Documents

Publication Publication Date Title
CN102392536B (en) Construction method for long-span hanging vestibule type template support system
CN205676844U (en) A kind of for one-piece casting trench furrow bank with the molding sliding formwork of base plate
CN106013776A (en) Hydraulic climbing type elevator shaft finalization operation platform and construction method
CN104612741A (en) Rail top air channel trolley construction method
CN104005775B (en) Tunnel invert backfill construction integrated template and construction technology thereof
CN110552502A (en) Construction method of C-shaped stock yard intermediate retaining wall overhanging platform
CN105401679A (en) Large-gradient cast-in-place concrete inclined roof construction method
CN111139868B (en) Complete construction method for comprehensive pipe gallery
CN101363224A (en) Movable foundation pit support system and construction method
CN206016835U (en) Tunnel and subway engineering diameter Changeable Model chassis
CN113463683A (en) Double-pipe gallery slip form trolley and double-pipe gallery construction method
CN105887885A (en) Symmetric rock anchor beam concrete pouring trolley
CN206091283U (en) Hydraulic pressure is from climbing formula elevartor shaft regularization operation platform
CN206409242U (en) Tunnel double-lining formwork jumbo
CN110924323A (en) Culvert template trolley
CN103266623A (en) Integral horizontally moving type traveling shuttering construction device for long-strip-shaped uniform section concrete structure
CN204729105U (en) A kind of sliding-mode trolley for the concreting of gateway opening type inclined shaft
CN102787717B (en) Self-supporting combined steel template construction method
CN104500106A (en) Tunnel inverted arch construction die carrier and tunnel inverted arch construction process
CN201343704Y (en) Movable scaffolding system for casting T-shaped beam bridge flange slabs in situ
CN203905969U (en) Integrated formwork for backfill construction of tunnel invert
CN104948206A (en) Slip form trolley for concrete casting of arched inclined shaft
CN203924652U (en) The operation platform of periphery shear wall between a kind of precast stair
CN109372522B (en) Construction method of complex overlapping tunnel for urban rail transit
CN202925471U (en) Hydraulic formwork system for high pier construction

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20150513

RJ01 Rejection of invention patent application after publication