Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420324904.5U
Other languages
Chinese (zh)
Inventor
余波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201420324904.5U priority Critical patent/CN203905969U/en
Application granted granted Critical
Publication of CN203905969U publication Critical patent/CN203905969U/en
Anticipated expiration legal-status Critical
Active legal-status Critical Current

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses an integrated formwork for backfill construction of a tunnel invert. In the integrated formwork, a side wall formwork body and a turn-over formwork body are symmetrically arranged on the two sides of an end beam, the side wall formwork body is in rigid connection with the end beam, the side wall formwork body is hinged to the turn-over formwork body, and a formwork through beam is in rigid connection with the turn-over formwork body; a supporting walking mechanism is arranged at one end of the side wall formwork body and used for being in lapped connection with the interior of a side ditch which is already formed in a lining mode, a horizontal supporting adjusting mechanism is arranged at the other end of the side wall formwork body, and a vertical supporting adjusting mechanism is arranged below the end beam; the turn-over formwork body is further connected with a turn-over formwork supporting adjusting mechanism, one end of the turn-over formwork supporting adjusting mechanism is connected with the formwork through beam, and the other end of the turn-over formwork supporting adjusting mechanism is connected with the side wall formwork body; the side wall formwork body is provided with a limiting mechanism, and a turn-over mechanism is used for collecting the turn-over formwork and fixing the turn-over formwork to the limiting mechanism. During moving and being in place, the side ditch which is already formed in the lining mode serves as a guide rail and a positioning reference, so that moving is convenient, and being in place is quick.

Description

Tunnel invert backfill construction integrated template
Technical field
The utility model relates to a kind of constructing tunnel template, relates in particular to a kind of tunnel invert backfill construction integrated template.
Background technology
Modern tunnel structure complexity, the duration is short, quality is high, and the innovation of construction technology has been proposed to higher requirement.Constructing tunnel mainly by: excavation, lining cutting, finishing three process form.The principal element that affects tunnel application life and tunnel construction cycle is by excavating and lining cutting two procedures determines.This two procedures is carried out in tunnel narrow space simultaneously, when requiring construction quality, can not interfere with each other, and this has proposed high requirement to construction method and execution control.
Current construction method is: first excavate operation in front, tunnel; Then carry out in the wings lining cutting operation.Excavation operation is selected digging mode and coordinates corresponding lining cutting mode by country rock situation.Each construction operation is alternate, sequentially carries out.The job requirements of each link guarantee plan time that will strictly closely cooperate, controls not excess budget of construction investment.
Tunnel invert and secondary lining concrete form a sealing force structure after excavation completes by tunnel, bear pressure from surrounding rock, prevent tunnel collapse, and its quality has determined the application life in tunnel.Inverted arch fill concrete plays cushioning effect, and its quality influence is to safety and the comfortableness of Vehicle Driving Cycle; Can the attached structure such as ditch and cable channel quality influence tunnel normally use.Thereby quality, the working procedure time, most important to tunnel construction of the attached structures such as inverted arch, inverted arch filling and ditch are also difficult point and the emphasis of current constructing tunnel.
In the modal bench excavation mode of current constructing tunnel as example, in constructing tunnel, inverted arch and inverted arch are filled construction process and are: waterproofing course → reinforcing bar binding is laid in the base treatment → preliminary bracing of preparation of construction → inverted arch excavation, the installation invert form → inverted arch filling concrete → inverted arch demoulding → Central drain is measured setting-out → Central drain formwork erection → inverted arch fill concrete perfusion → maintenance to intensity and met machine-walking → end.The wide approximately 6 meters of scope internal cause gradients in inverted arch middle part are less, available Manual mode, and both sides adopt form concrete.When both sides invert forms be installed installed on steel mesh reinforcement welded reinforcement support bar, less punching block is welded to invert form is installed on support bar; After inverted arch pouring concrete is complete, pull down invert form after cutting off solder joint with burning torch again when the demoulding.Above operation is complete, and with manually carrying out, workload is large, and template installation quality is restive, and every linear meter(lin.m.) need consume 40-50 kilogram of bearing bar, causes larger waste.
For solving an above-mentioned difficult problem, prior art is explored and has been tested and permitted several different methods, but all has so far various defects, is difficult to promote.For example 201310315424.2 disclosed a kind of convertible tunnel overhead arch mould plate trolley and construction methods thereof of hanging, open day is 2013.10.16, it adopts two groups independently on symmetrical travelling car, to install turnover invert form additional, carries out inverted arch and filling operation.On travelling car, be equiped with road wheel, when mobile, is just propping up on concrete surface one end, and the other end is walked on inverted arch filling face.When the demoulding, the rotation of hinge that invert form arranges on dolly, fills construction after departing from lining and exceeding filling face.From said structure and mode of occupation: 1,, because having increased dolly outside template, construction weight is larger.2, dolly template in both sides is absolute construction, when walking, walk respectively, and easy sideslip, thereby all difficulties mobile and in place, if set up guide rail, increase again workload, and dismounting inconvenience, cost is high.3, have one end road wheel to be positioned at and just prop up on concrete surface, after must moving into place before inverted arch steel mesh reinforcement is installed, personnel carry out steel mesh reinforcement installation exercise below invert form, and installing space is narrow and small and dangerous.4, soakaway trench reserved opening is easily stopped up, and inconvenience cleaning.Therefore existing invert form, owing to there are these defects, makes it be difficult to promote.
Summary of the invention
The purpose of this utility model is to overcome the problems referred to above of constructing tunnel integrated template and construction technology existence thereof, and a kind of tunnel invert backfill construction integrated template is provided.The utility model is in mobile and in place, serve as guide rail and positioning datum with the gutter that lining cutting forms, thereby conveniently moving, in place rapid, solve the prior art easy sideslip of walking on a first concrete surface, increase again the problem of workload and construction cost if set up guide rail.
For achieving the above object, the technical solution adopted in the utility model is as follows:
A kind of tunnel invert backfill construction integrated template, it is characterized in that: comprise two groups of sidewall templates, a butt beam, two groups of turn-over forms, the two logical beams of template, cross binding governor motion, vertical supporting governor motion and switching mechanisms, sidewall template and turn-over form are symmetricly set on end carriage both sides, sidewall template and end carriage are rigidly connected, sidewall template and turn-over form are hinged, and the logical beam of template and turn-over form are rigidly connected; Sidewall template one end is provided with the support walking mechanism in the gutter for being overlapped on the formation of lining cutting, and the other end arranges cross binding governor motion, and vertical supporting governor motion is arranged on end carriage below; On turn-over form, be also connected with turn-over form support adjustment mechanism, turn-over form support adjustment mechanism one end is connected with the logical beam of template, and the other end is connected with sidewall template; On sidewall template, be provided with position-limit mechanism, switching mechanism is fixed to position-limit mechanism for turn-over form is received to mould.
When described integrated template is during in inverted arch concrete construction state, sidewall template one end is overlapped on by supporting walking mechanism on the gutter of the formation of lining cutting, the other end is supported in tunnel by cross binding governor motion and just props up on sidewall, vertical supporting governor motion is supported in tunnel and just props up on base plate, adjusts turn-over form to needs angle by turn-over form support adjustment mechanism.
When described integrated template is in the time receiving mould state, switching mechanism one end is connected with sidewall template, and the other end is connected with the logical beam of template, drives turn-over form to turn on position-limit mechanism.
When described integrated template is during in walking states, support walking mechanism and be arranged in the gutter that lining cutting forms, gutter forms guide rail.
Described support walking mechanism comprises two groups of roller structures, and every group of roller structure comprises three rollers, and roller is connected with sidewall template by telescopic screw rod, and three rollers form and the support walking structure of the gutter shape adaptation that lining cutting forms.
Described position-limit mechanism is limiting bracket, and limiting bracket is four groups, and every group of sidewall template middle part arranges two groups of limiting brackets.
Described cross binding governor motion comprises that two cross binding are very heavy, two very heavy being symmetricly set on sidewall template of cross binding.
Two vertical supportings of described vertical supporting governor motion are very heavy, two very heavy end carriage belows that are arranged on of vertical supporting, and end carriage top is provided with suspension hook, and end carriage both sides are provided with the connection seat connecting with sidewall template.
Described switching mechanism comprises four upset cucurbits, and when in the time receiving mould state, upset cucurbit one end is articulated on the gourd hook of sidewall template setting, and the other end is articulated on the hinge ear of the logical beam of template.
It is very heavy that described turn-over form support adjustment mechanism comprises that four turn-over forms support, and every group of turn-over form correspondence arranges two turn-over forms and support very heavyly, and turn-over form supports very heavy one end and leads to beam with template and be connected, and the other end is connected with the hinge ear on position-limit mechanism.
Employing the utility model has the advantage of:
One, the utility model is made up of two groups of sidewall templates, a butt beam, two groups of turn-over forms, the two logical beams of template, cross binding governor motion, vertical supporting governor motion and switching mechanisms, from forming, obviously simple than prior art, save equipment cost; Sidewall template and turn-over form are symmetricly set on end carriage both sides, and sidewall template and end carriage are rigidly connected, and sidewall template and turn-over form are hinged, and the logical beam of template and turn-over form are rigidly connected; Sidewall template one end is provided with the support walking mechanism in the gutter for being overlapped on the formation of lining cutting, and the other end arranges cross binding governor motion, and vertical supporting governor motion is arranged on end carriage below; On turn-over form, be also connected with turn-over form support adjustment mechanism, turn-over form support adjustment mechanism one end is connected with the logical beam of template, and the other end is connected with sidewall template; On sidewall template, be provided with position-limit mechanism, switching mechanism is fixed to position-limit mechanism for turn-over form is received to mould, adopt this structure, in mobile and in place, serve as guide rail and positioning datum with the gutter that lining cutting forms, thereby conveniently moving, in place rapid, solve the prior art easy sideslip of walking on a first concrete surface, increase again the problem of workload and construction cost if set up guide rail.
Two, in the utility model, when described integrated template is during in inverted arch concrete construction state, sidewall template one end is overlapped on by supporting walking mechanism on the gutter of the formation of lining cutting, the other end is supported in tunnel by cross binding governor motion and just props up on sidewall, vertical supporting governor motion is supported in tunnel and just props up on base plate, adjust turn-over form to needs angle by turn-over form support adjustment mechanism, adopt this structure, there are three braced structuress, excellent stability, and the angle of turn-over form can realize the adjustment that becomes more meticulous, construction precision is obviously better than prior art.
Three, in the utility model, when described integrated template is in the time receiving mould state, switching mechanism one end is connected with sidewall template, the other end is connected with the logical beam of template, drive turn-over form to turn on position-limit mechanism, when turn-over form upset, be easy to drive, and can reliably fix after upset, keep receiving mould state.
Four, in the utility model, when described integrated template is during in walking states, support walking mechanism and be arranged in the gutter that lining cutting forms, gutter forms guide rail, and gutter serves as guide rail and positioning datum in construction always, there will not be the situation of sideslip.
Five, in the utility model, described support walking mechanism comprises two groups of roller structures, every group of roller structure comprises three rollers, roller is connected with sidewall template by telescopic screw rod, and three rollers form the support walking structure with the gutter shape adaptation that lining cutting forms, roller structure forms three-point fix in gutter, has ensured the reliability of walking.
Six, in the utility model, described position-limit mechanism is limiting bracket, and limiting bracket is four groups, and every group of sidewall template middle part arranges two groups of limiting brackets, adopts the mode of limiting bracket, can mate with turn-over form, effectively fixing to turn-over form.
Seven, in the utility model, described cross binding governor motion comprises that two cross binding are very heavy, two very heavy being symmetricly set on sidewall template of cross binding, and cross binding governor motion is simple in structure, and reliability is high, can realize becomes more meticulous regulates center line and high-rise position.
Eight, in the utility model, two vertical supportings of described vertical supporting governor motion are very heavy, two very heavy end carriage belows that are arranged on of vertical supporting, end carriage top is provided with suspension hook, end carriage both sides are provided with the connection seat connecting with sidewall template, vertical supporting governor motion is simple in structure, and reliability is high, and can realize becomes more meticulous regulates center line and high-rise position.
Nine, in the utility model, described switching mechanism comprises four upset cucurbits, when in the time receiving mould state, upset cucurbit one end is articulated on the gourd hook of sidewall template setting, the other end is articulated on the hinge ear of the logical beam of template, and switching mechanism relatively and prior art, simpler in result, easy to operate, reliability is high.
Ten, in the utility model, it is very heavy that described turn-over form support adjustment mechanism comprises that four turn-over forms support, every group of turn-over form correspondence arranges two turn-over forms and supports very heavy, turn-over form supports very heavy one end and is connected with the logical beam of template, the other end is connected with the hinge ear on position-limit mechanism, turn-over form support adjustment mechanism is simple in structure, and not only has the support function to turn-over form, and can also realize becomes more meticulous regulates turn-over form angle.
11, adopt the utility model, in mobile and in place, integrated template serves as guide rail and positioning datum with gutter, not only conveniently moving, in place rapid, and adopt after this construction technology completion, change soakaway trench reserved opening into horizontal positioned, be difficult for stopping up, be easy to cleaning; The gutter that serves as guide rail effect not only can serve as interim ditch, improve operating environment in tunnel, also provide support a little for follow-up ditch, both sides and cable channel construction and installation template, the concrete after the construction of ditch, both sides and cable channel in gutter has formed inverted arch carving head and can prevent that ditch cable trench dislocation and cracking from seeping water between filling with inverted arch.
To sum up, the utility model not only structurally, on working procedure unlike the prior art, and also there is larger difference with prior art in inverted arch and backfill construction completion situation, solved the problem that prior art is described in background technology.
Brief description of the drawings
Fig. 1 be in the time of inverted arch concrete construction the utility model left side A to the right B to structural representation
Fig. 2 be in the time that fill concrete is constructed the utility model left side A to the right B to structural representation
Fig. 3 is the A portion structure for amplifying schematic diagram in Fig. 1
Fig. 4 is the B portion structure for amplifying schematic diagram in Fig. 2
Fig. 5 is the utility model plan structure schematic diagram
Fig. 6 is the utility model inverted arch and backfill completion situation schematic diagram
Fig. 7 is prior art inverted arch and backfill completion situation schematic diagram
In figure, be labeled as: 1, sidewall template, 2, end carriage, 3, turn-over form, 4, the logical beam of template, 5, gutter, 6, roller, 7, limiting bracket, 8, cross binding is very heavy, and 9, vertical supporting is very heavy, 10, suspension hook, 11, upset cucurbit, 12, gourd hook, 13, turn-over form supports very heavy, 14, soakaway trench, 15, template rotating shaft, 16, inverted arch, 17, inverted arch is filled, and 18, locking plug template, 19, centre drain; 20, inverted arch backfill layer; 21, abutment wall.
Detailed description of the invention
Embodiment 1
As shown in Fig. 1-4, a kind of tunnel invert backfill construction integrated template, comprise two groups of sidewall templates 1,, a butt beam 2, two groups of turn-over forms 3, the two logical beams 4 of template, cross binding governor motion, vertical supporting governor motion and switching mechanisms, sidewall template 1 and turn-over form 3 are symmetricly set on end carriage 2 both sides, sidewall template 1 is rigidly connected with end carriage 2, sidewall template 1 is hinged with turn-over form 3, can be hinged by template rotating shaft 15, and the logical beam 4 of template is rigidly connected with turn-over form 3; Sidewall template 1 one end is provided with the support walking mechanism in the gutter 5 for being overlapped on the formation of lining cutting, and the other end arranges cross binding governor motion, and vertical supporting governor motion is arranged on end carriage 2 belows; On turn-over form 3, be also connected with turn-over form support adjustment mechanism, turn-over form support adjustment mechanism one end is connected with the logical beam 4 of template, and the other end is connected with sidewall template 1; On sidewall template 1, be provided with position-limit mechanism, switching mechanism is fixed to position-limit mechanism for turn-over form 3 is received to mould.
When described integrated template is during in inverted arch concrete construction state, sidewall template 1 one end is overlapped on by supporting walking mechanism on the gutter 5 of the formation of lining cutting, the other end is supported in tunnel by cross binding governor motion and just props up on sidewall, vertical supporting governor motion is supported in tunnel and just props up on base plate, adjusts turn-over form 3 to needs angle by turn-over form support adjustment mechanism.
When described integrated template is in the time receiving mould state, switching mechanism one end is connected with sidewall template 1, and the other end is connected with the logical beam 4 of template, drives turn-over form 3 to turn on position-limit mechanism.
When described integrated template is during in walking states, support walking mechanism and be arranged in the gutter 5 that lining cutting forms, gutter 5 forms guide rail.
In the utility model, described support walking mechanism comprises two groups of roller structures, every group of roller structure comprises three rollers, and roller 6 is connected with sidewall template 1 by telescopic screw rod, and three rollers form and the support walking structure of the gutter 5 shape adaptations that lining cutting forms.
In the utility model, described position-limit mechanism is limiting bracket 7, and limiting bracket 7 is four groups, and every group of sidewall template 1 middle part arranges two groups of limiting brackets 7.
In the utility model, described cross binding governor motion comprises that two very heavy 8, two cross binding very heavy 8 of cross binding are symmetricly set on sidewall template 1.
In the utility model, very heavy 9, two vertical supportings very heavy 9 of two vertical supportings of described vertical supporting governor motion are arranged on end carriage 2 belows, and end carriage 2 tops are provided with suspension hook 10, and end carriage 2 both sides are provided with the connection seat connecting with sidewall template 1.
In the utility model, described switching mechanism comprises four upset cucurbits 11, and when in the time receiving mould state, upset cucurbit 11 one end are articulated on the gourd hook 12 that sidewall template 1 arranges, and the other end is articulated on the hinge ear of the logical beam 4 of template.
In the utility model, described turn-over form support adjustment mechanism comprises that four turn-over forms support very heavy 13, every group of turn-over form 3 correspondence arrange two turn-over forms and support very heavyly 13, and turn-over form supports very heavy 13 one end and is connected with the logical beam 4 of template, and the other end is connected with the hinge ear on position-limit mechanism.
Adopt working procedure of the present utility model as follows:
A, inverted arch concrete construction: sidewall template one end is overlapped on the gutter of the formation of lining cutting, the other end is supported in tunnel by cross binding governor motion and just props up on sidewall, vertical supporting governor motion is supported in tunnel and just props up on base plate fixing, install after locking plug template 18, carry out inverted arch concrete construction;
B, fill concrete construction: inverted arch reaches after demoulding requirement, remove turn-over form support adjustment mechanism, switching mechanism one end is articulated on sidewall template, the other end is articulated on the logical beam of template, pack up turn-over form to limiting bracket, pack up vertical supporting governor motion, ditch template, soakaway trench, bulkhead are installed, start to carry out fill concrete construction; As shown in Figure 2 and Figure 4, the correlation of inverted arch 16, inverted arch filling 17 and integrated template;
C, run to next station: after fill concrete reaches driving and requires, now next circulation reinforcing bar installs, packs up cross binding governor motion, then sidewall template one end is departed to the concrete of having poured into a mould; Utilize walking machine by mentioning end carriage, also mentioned the sidewall template and the turn-over form that are connected with end carriage, put down the steel mesh reinforcement top that runs to next circulation simultaneously;
D, repeat above step, can carry out inverted arch and filling operation.
In described a operation, regulate center line and high-rise position by cross binding governor motion and vertical supporting governor motion, adjust turn-over form to needs angle by turn-over form support adjustment mechanism.
Embodiment 2
The utility model is very heavy by two groups of symmetrical sidewall templates, sidewall template end carriage, two groups of turn-over forms, eight supports, two template Tong Liang, four 3t upset cucurbits form.
Sidewall template middle part is provided with four groups of limiting brackets and four gourd hooks; On limiting bracket, there is very heavy hinge ear; Be provided with three rollers in sidewall template one end, roller can stretch by screw mandrel; The connection seat that the other end is provided with two cross binding and connects with end carriage; Sidewall template below is also provided with the hinge ear hinged with turn-over form.
End carriage both sides are provided with the connection seat connecting with sidewall template, and it is very heavy that below is provided with two vertical supportings.Top is provided with suspension hook.
Turn-over form top is provided with the hinge ear hinged with sidewall template; Below is provided with the connection seat connecting with the logical beam of template.
Template Tong Liang side is provided with and very heavy hinged hinge ear; Below is provided with the connection seat connecting with turn-over form.
Sidewall template symmetrical each one group respectively with end carriage bolt rigid connection, sidewall template below is hinged with turn-over form; The logical beam of turn-over form and template is by bolt rigid connection.
Sidewall template one side is overlapped on the gutter of the formation of lining cutting, the other end just props up on sidewall by the very heavy tunnel that is supported in of cross binding, end carriage vertical supporting is very heavy be supported in tunnel just prop up on base plate fixing, and can be by cross binding very heavy and the very heavy adjusting center line of vertical supporting and high-rise position.Support very heavy adjustment turn-over form to needs angle by turn-over form.Install after locking plug template, start to carry out inverted arch concrete construction.
Reach after demoulding requirement Deng inverted arch, remove turn-over form and support very heavyly, hang over sidewall template gourd hook with upset cucurbit one end, the other end hangs over the logical beam of template and cuts with scissors on ear, packs up turn-over form to limiting bracket, packs up end carriage vertical supporting very heavy.Ditch template, soakaway trench, bulkhead are installed, are started to carry out fill concrete construction.
Reach after driving requirement Deng fill concrete, now next circulation reinforcing bar installs.Pack up end carriage cross binding very heavy, the very heavy concrete of having poured into a mould that sidewall template one end is departed from of swing roller spiral.Other lifting walking machines on the simple and easy trestle that utilizes automatic trestle or set up, as digging machine etc., mention end carriage by suspension hook, also mention the sidewall template and the turn-over form that are connected with end carriage simultaneously.Put down the steel mesh reinforcement top that runs to next circulation.
Repeat above step, can carry out inverted arch and filling operation.
Embodiment 3
As shown in Figure 5, left side A is to illustrate centre drain 19, inverted arch backfill layer 20, gutter 5, abutment wall 21 for inverted arch and backfill completion part, and right side B is to for adopting the utility model to be in Construction State.
As shown in Figure 6, the utility model changes soakaway trench 14 reserved opening into horizontal positioned, is difficult for stopping up, and is easy to cleaning, and inverted arch and backfill completion situation exists the gutter for making guide rail and positioning datum all the time.
As shown in Figure 7, prior art inverted arch and backfill completion situation soakaway trench 14 reserved opening have a kink, and soakaway trench reserved opening is easily stopped up, inconvenience cleaning, and there is no gutter.
Obviously; those of ordinary skill in the art is according to grasped technological know-how and customary means; according to above said content; can also make the various ways that does not depart from the utility model fundamental technics thought; the change of for example support adjustment mechanism, these pro forma conversion are all within protection domain of the present utility model.

Claims (10)

1. a tunnel invert backfill construction integrated template, it is characterized in that: comprise two groups of sidewall templates (1), a butt beam (2), two groups of turn-over forms (3), the two logical beams (4) of template, cross binding governor motion, vertical supporting governor motion and switching mechanisms, sidewall template (1) and turn-over form (3) are symmetricly set on end carriage (2) both sides, sidewall template (1) is rigidly connected with end carriage (2), sidewall template (1) is hinged with turn-over form (3), and template is led to beam (4) and is rigidly connected with turn-over form (3); Sidewall template (1) one end is provided with the interior support walking mechanism of gutter (5) forming for being overlapped on lining cutting, and the other end arranges cross binding governor motion, and vertical supporting governor motion is arranged on end carriage (2) below; Turn-over form is also connected with turn-over form support adjustment mechanism on (3), and turn-over form support adjustment mechanism one end is connected with the logical beam (4) of template, and the other end is connected with sidewall template (1); Sidewall template is provided with position-limit mechanism on (1), and switching mechanism is fixed to position-limit mechanism for turn-over form (3) is received to mould.
2. tunnel invert backfill construction integrated template according to claim 1, it is characterized in that: when described integrated template is during in inverted arch concrete construction state, sidewall template (1) one end is overlapped on by supporting walking mechanism on the gutter (5) of the formation of lining cutting, the other end is supported in tunnel by cross binding governor motion and just props up on sidewall, vertical supporting governor motion is supported in tunnel and just props up on base plate, adjusts turn-over form (3) to needs angle by turn-over form support adjustment mechanism.
3. tunnel invert backfill construction integrated template according to claim 1 and 2, it is characterized in that: when described integrated template is in the time receiving mould state, switching mechanism one end is connected with sidewall template (1), the other end is connected with the logical beam (4) of template, drives turn-over form (3) to turn on position-limit mechanism.
4. tunnel invert backfill construction integrated template according to claim 3, is characterized in that: when described integrated template is during in walking states, support walking mechanism and be arranged in the gutter (5) that lining cutting forms, gutter (5) forms guide rail.
5. according to the tunnel invert backfill construction integrated template described in claim 1,2 or 4, it is characterized in that: described support walking mechanism comprises two groups of roller structures, every group of roller structure comprises three rollers (6), roller (6) is connected with sidewall template (1) by telescopic screw rod, and three rollers form and the support walking structure of gutter (5) the shape adaptation that lining cutting forms.
6. tunnel invert backfill construction integrated template according to claim 5, is characterized in that: described position-limit mechanism is limiting bracket (7), and limiting bracket (7) is four groups, and every group of sidewall template (1) middle part arranges two groups of limiting brackets (7).
7. according to the tunnel invert backfill construction integrated template described in claim 1,2,4 or 6, it is characterized in that: described cross binding governor motion comprises two cross binding very heavy (8), two cross binding very heavy (8) are symmetricly set on sidewall template (1).
8. tunnel invert backfill construction integrated template according to claim 7, it is characterized in that: two vertical supportings of described vertical supporting governor motion very heavy (9), two vertical supportings very heavy (9) are arranged on end carriage (2) below, end carriage (2) top is provided with suspension hook (10), and end carriage (2) both sides are provided with the connection seat connecting with sidewall template (1).
9. according to the tunnel invert backfill construction integrated template described in claim 1,2,4,6 or 8, it is characterized in that: described switching mechanism comprises four upset cucurbits (11), when in the time receiving mould state, upset cucurbit (11) one end is articulated on the gourd hook (12) of sidewall template (1) setting, and the other end is articulated on the hinge ear of the logical beam (4) of template.
10. tunnel invert backfill construction integrated template according to claim 9, it is characterized in that: described turn-over form support adjustment mechanism comprises that four turn-over forms support very heavy (13), every group of turn-over form (3) correspondence arranges two turn-over forms and supports very heavy (13), turn-over form supports very heavy (13) one end and is connected with the logical beam (4) of template, and the other end is connected with the hinge ear on position-limit mechanism.
CN201420324904.5U 2014-06-18 2014-06-18 Integrated formwork for backfill construction of tunnel invert Active CN203905969U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420324904.5U CN203905969U (en) 2014-06-18 2014-06-18 Integrated formwork for backfill construction of tunnel invert

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420324904.5U CN203905969U (en) 2014-06-18 2014-06-18 Integrated formwork for backfill construction of tunnel invert

Publications (1)

Publication Number Publication Date
CN203905969U true CN203905969U (en) 2014-10-29

Family

ID=51780257

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420324904.5U Active CN203905969U (en) 2014-06-18 2014-06-18 Integrated formwork for backfill construction of tunnel invert

Country Status (1)

Country Link
CN (1) CN203905969U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104005775A (en) * 2014-06-18 2014-08-27 余波 Integrated formwork for tunnel inverted arch backfill construction, and constructing process of integrated formwork
CN107120140A (en) * 2017-07-06 2017-09-01 中国铁路设计集团有限公司 Central trench step is incubated under tunnel inverted arch and checks well construction

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104005775A (en) * 2014-06-18 2014-08-27 余波 Integrated formwork for tunnel inverted arch backfill construction, and constructing process of integrated formwork
CN104005775B (en) * 2014-06-18 2016-02-03 余波 Tunnel invert backfill construction integrated template and construction technology thereof
CN107120140A (en) * 2017-07-06 2017-09-01 中国铁路设计集团有限公司 Central trench step is incubated under tunnel inverted arch and checks well construction

Similar Documents

Publication Publication Date Title
CN104005775B (en) Tunnel invert backfill construction integrated template and construction technology thereof
CN101929341B (en) Construction method for TBM synchronization lining
CN109505630B (en) Full-hydraulic crawler-type self-propelled trestle and construction method
CN102146796B (en) Construction technology for inverted arch of two-track tunnel of high-speed railway
CN102146799B (en) Construction equipment for inverted arch of two-track tunnel of high-speed railway
CN203403650U (en) Improved semi-prefabricated subway station rail top wind channel
CN103967050A (en) Construction system of subway station
CN103470272B (en) A kind of chassis for the multiple section concrete construction of Mining Method and construction method thereof
CN201196094Y (en) Hydraulic template trolley for rail tunnel liner concrete
CN203066990U (en) Fully-hydraulic and self-walking inverted arch formworking trolley for tunnel
CN109538238A (en) A kind of tunnel arch prefabricated pipe section constructing device and control method
CN105952482A (en) Self-propelled tunnel invert lining trolley
CN102022123B (en) Integral lining method for tunnel with altered diameter by model board trolley
CN102704949A (en) No-pull rod side wall construction method for underground tunnel and formwork trolley for construction
CN201943045U (en) Automatic-moving hydraulic cantilever gantry concrete placement device for wave wall
CN103541744A (en) Tire walking full-hydraulic lining trolley
CN104564102B (en) A kind of tunnel lining concrete grouting device
CN202596743U (en) Formwork trolley for underground tunnel pull-rod-free side wall construction
CN103352710A (en) Suspension overturn type tunnel inverted arch formwork trolley and construction method thereof
CN103982200B (en) Slide rail Mobile steel mould trolley in tunneling boring
CN202659247U (en) Back templates and combined steel die for tunnel inverted arch construction
CN105736012B (en) A kind of tunnel lining concrete grouting device
CN203499697U (en) Trolley used for concrete construction of various cross sections through mining method
CN203905969U (en) Integrated formwork for backfill construction of tunnel invert
CN104110002A (en) Method for replacing bridge deck slabs of steel truss girder bridge

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant