CN108331605A - A kind of tunnel exhausting duct precast assembly method - Google Patents

A kind of tunnel exhausting duct precast assembly method Download PDF

Info

Publication number
CN108331605A
CN108331605A CN201711433049.6A CN201711433049A CN108331605A CN 108331605 A CN108331605 A CN 108331605A CN 201711433049 A CN201711433049 A CN 201711433049A CN 108331605 A CN108331605 A CN 108331605A
Authority
CN
China
Prior art keywords
channel base
air channel
base plate
prefabricated
hold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711433049.6A
Other languages
Chinese (zh)
Other versions
CN108331605B (en
Inventor
薛勇
张晓�
高振波
李永治
高峰
沈艳峰
王淼
殷建国
马永
刘艳芳
贺兰军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Original Assignee
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Municipal Engineering Design Insitute Group Co Ltd filed Critical Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority to CN201711433049.6A priority Critical patent/CN108331605B/en
Publication of CN108331605A publication Critical patent/CN108331605A/en
Application granted granted Critical
Publication of CN108331605B publication Critical patent/CN108331605B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F1/00Ventilation of mines or tunnels; Distribution of ventilating currents
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F1/00Ventilation of mines or tunnels; Distribution of ventilating currents
    • E21F1/04Air ducts
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F1/00Ventilation of mines or tunnels; Distribution of ventilating currents
    • E21F1/04Air ducts
    • E21F1/06Duct connections

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)
  • Duct Arrangements (AREA)

Abstract

The invention discloses a kind of tunnel exhausting duct precast assembly methods, prefabricated air channel base plate piecemeal is erected on the bracket of cast-in-place air duct side wall, and the operations such as notch filling pea gravel concreten, hold-down bolt between cast-in-place side wall bracket and prefabricated air channel base plate, bottom plate set up with prefabricated air channel base plate piecemeal and implement, working strength and difficulty so are can obviously reduce, saves human cost.Advantages of the present invention is:Exempt and tear template operation in long and narrow air duct open, hence it is evident that reduces operation intensity and difficulty, save human cost;Meet " green " construction requirement;Use hold-down bolt, connection bolt can effectively prevent vehicle traveling generate vibration and tunnel internal such as top plate and air channel base plate to be installation fire-proof plate cause between prefabricated air duct plate gap to expand to leak out and lead to influence exhaust effect using drilling setting anchor bolt operation vibration;The air channel base plate being damaged such as in the accidents such as tunnel fire hazard is easily changed.

Description

A kind of tunnel exhausting duct precast assembly method
Technical field
The present invention is suitable for tunnel or the tunnel exhausting duct of longitudinal long range underground structure top plate setting rectangular duct is pre- Assembling method processed.
Background technology
Being built in business district underground loop generally uses loop top plate setting rectangle exhausting duct in underground to be used for loop air draft, commonly uses Rectangle exhausting duct height it is smaller, template inside air duct need to be removed using monolithic reinforced concrete structure, due to net in exhausting duct Outage degree is small, and form removal personnel can only be over long distances(The length of deformation joint spacing, typically no less than 25m)Crawling operations, work Environment is poor, and working strength is larger, and thus installation prefabricated to air duct proposes demand.
Invention content
The purpose of the present invention is to provide a kind of tunnel exhausting duct precast assembly method, the work that can obviously reduce installation is strong Degree and difficulty, save human cost.
To achieve the goals above, technical scheme is as follows:A kind of tunnel exhausting duct precast assembly method, it is special Sign is:The prefabricated installation method of tunnel exhausting duct includes the following steps:
A, prefabricated air channel base plate is made, air duct is divided into the prefabricated air channel base plate of several unit lengths along its length;
B, cast-in-place tunnel roof and air duct side wall, the air duct side wall bracket positioned at air duct lower sidewall, before casting and compacting of concrete Hold-down bolt built-in pipe is installed and is located in air duct side wall bracket position;
C, prefabricated air channel base plate rubber spacer is pasted on the side wall bracket of air duct after concrete reaches intensity;
D, by prefabricated air channel base plate, both ends are erected on the side wall bracket of air duct in the width direction, prefabricated air channel base plate both ends and air duct There are cast-in-place notches between side wall;Both sides upper end to the middle part of the prefabricated air channel base plate along its length is equipped with a connection and lacks Mouthful, lower end sets hand hole notch, and connector reinforcing bar is reserved at connection breach, and hand hole indentation, there sets built-in fitting, adjacent two pieces of prefabricated wind The connection breach of road bottom plate cooperatively form a connection pouring area, and the hand hole notch of adjacent two pieces of prefabricated air channel base plates cooperatively forms hand Hole, the built-in fitting of adjacent two pieces of prefabricated air channel base plates is equipped with matched link bolt hole in hand hole, described;
E, hold-down bolt is inserted in hold-down bolt built-in pipe, connection bolt is put into the link bolt hole of pre-embedded steel slab in hand hole Interior and coordination is gradually tightened;
F, it is built into prefabricated air channel base plate in the connection pouring area and connects longitudinal reinforcement;
G, between air duct side wall and prefabricated air channel base plate pouring area is connected between cast-in-place notch and adjacent two pieces of prefabricated air channel base plates Pea gravel concreten is inside filled respectively, can mix swelling agent;
H, it after after the tunnel air duct of certain length section, installation is complete, is stitched between cast-in-place air duct side wall bracket and prefabricated air channel base plate Gap uses clay pointing between gap and adjacent two pieces of prefabricated air channel base plates.
Further, in step E, hold-down bolt elbow is arranged in the hold-down bolt upper end, and hold-down bolt inner side of elbow is set There is hold-down bolt screens bar, with hold-down bolt elbow at 90 degree of positioning weldings, hold-down bolt hypomere is inserted into hold-down bolt screens bar In hold-down bolt built-in pipe, epimere is located in cast-in-place notch, and after tightening, hold-down bolt screens bar is located in cast-in-place notch, compresses Bolt elbow exposes outside cast-in-place notch.Hold-down bolt screens bar forms 90 degree of right angles with hold-down bolt elbow, can be easy to compress spiral shell Bolt elbow effectively push down prefabricated air channel base plate and meanwhile tightened on the outside of air duct nut due to hold-down bolt screens bar screens yes Screw rod can not possibly be rotated with tightening nut.
Further, the root of the reserved connector reinforcing bar at the connection breach is embedded in prefabricated air channel base plate, end Portion extends into connection breach, and extends to beyond being bent obliquely upward after pre-buried air channel base plate range, adjacent two pieces of prefabricated wind The reserved connector reinforcing bar bending part of road bottom plate is interlaced, formation U-shaped structure, in step F, prefabricated air channel base plate is connected vertical To steel-bar arrangement in U-shaped structure.
Further, cast-in-place air duct side wall bracket is arranged the lower section of cast-in-place air duct side wall, and towards cast-in-place air duct side wall Inside extends, and the upper surface of extension forms the low inclined-plane in the high inside in outside, and prefabricated air channel base plate rubber spacer is pasted described The inside on inclined-plane, the setting of both ends bottom and the matched inclined-plane in the inclined-plane of the prefabricated air channel base plate.
Further, the hand hole indentation, there sets built-in fitting as pre-embedded steel slab, and connection bolt is equipped in the pre-embedded steel slab Hole and embedded bar in prefabricated air channel base plate is stretched into, the pre-embedded steel slab of adjacent two pieces of prefabricated air channel base plates passes through prefabricated air duct Bottom plate connector rubber pad connects, and is connected with connection between the respective bolt holes of the pre-embedded steel slab of adjacent two pieces of prefabricated air channel base plates Bolt.
Exhausting duct method for prefabricating in tunnel of the present invention is not required to creep form removal and by prefabricated air channel base plate piecemeal(Piecemeal length Generally no greater than 2m)It is erected on the bracket of cast-in-place air duct side wall, and between cast-in-place side wall bracket and prefabricated air channel base plate, bottom plate Notch filling pea gravel concreten, the operations such as hold-down bolt set up and implement with prefabricated air channel base plate piecemeal, so can obviously reduce Working strength and difficulty save human cost, while also complying with " green " construction requirement.
Advantages of the present invention is as described below:
1. exempting in long and narrow air duct and tearing template operation open, hence it is evident that reduce operation intensity and difficulty, save human cost;
2. meeting " green " construction requirement;
3. vehicle traveling can be effectively prevent to generate vibration and tunnel internal such as top plate and air duct using hold-down bolt, connection bolt Gap, which expands to leak out, between bottom plate uses the vibrations such as setting anchor bolt operation that drill to cause prefabricated air duct plate for installation fire-proof plate leads It causes to influence exhaust effect;
4. being easily changed for the air channel base plate being damaged such as in the accidents such as tunnel fire hazard.
Description of the drawings
Fig. 1 is tunnel cross section figure.
Fig. 2 is prefabricated air channel base plate mounting plane figure.
Fig. 3 is that cross-sectional view is installed in air duct processed.
Fig. 4 is cast-in-place air duct sidewall profile figure.
Fig. 5 is air channel base plate and cast-in-place side wall detail drawing of installation(Detail drawing).
Fig. 6 is hold-down bolt detail drawing.
Fig. 7 is prefabricated air channel base plate longitudinal seam detail drawing(1-1 sectional views).
Fig. 8 is prefabricated air channel base plate built-in fitting detail drawing(Detail drawing).
Each unit number indicates as follows in figure:
Cast-in-place air duct side wall;
The cast-in-place air duct side wall brackets of 1-1;
2. prefabricated air channel base plate;
The prefabricated air channel base plate side-struts of 2-1, the prefabricated air channel base plate connector notches of 2-2,2-3 reserve connector reinforcing bar, 2-4 bolts peace Fill hand hole, the prefabricated air channel base plate built-in fittings of 2-5;The filling of 2-6 clay, 2-7 connections bolt, the prefabricated air channel base plate connector rubber of 2-8 The prefabricated air channel base plate connector pea gravel concreten filling of pad, 2-9, the prefabricated air channel base plates of 2-10 connect longitudinal reinforcement;
3. air channel top board;
4. clay is filled;
5. prefabricated air channel base plate rubber spacer;
6. hold-down bolt;
6-1 hold-down bolt screens bar, 6-2 hold-down bolt elbows;
7. hold-down bolt built-in pipe;
8. air duct side wall is filled with prefabricated panel connector pea gravel concreten;
9. prefabricated steel;
9-1 embedded part bolts hole, 9-2 built-in fitting anchor bars;
10. air duct.
Specific implementation mode
The invention will be further described below in conjunction with the accompanying drawings:
A kind of tunnel exhausting duct precast assembly structure as shown in the figure, including cast-in-place air duct side wall 1, it is characterised in that the tunnel Exhausting duct precast assembly structure further includes
Cast-in-place air duct side wall bracket 1-1, the cast-in-place air duct side wall bracket 1-1 are arranged on the inside of the lower section of cast-in-place air duct side wall 1;
The prefabricated air channel base plate 2 of several unit lengths, both ends are erected at several described prefabricated air channel base plates 2 in the width direction On cast-in-place air duct side wall bracket 1-1, there are cast-in-place notches between 2 both ends of prefabricated air channel base plate and cast-in-place air duct side wall 1;If described Dry prefabricated air channel base plate 2 is spliced successively along its length;
Hold-down bolt built-in pipe 7, hold-down bolt built-in pipe 7 is arranged in cast-in-place air duct side wall bracket 1-1, and the hold-down bolt Built-in pipe 7 should be located at the position below cast-in-place notch close to inside;
Hold-down bolt 6,6 hypomere of the hold-down bolt are inserted into hold-down bolt built-in pipe 7, and epimere is located in cast-in-place notch, described Hold-down bolt elbow 6-2 is arranged in 6 upper end of hold-down bolt, and hold-down bolt screens bar 6-1, pressure are equipped on the inside of hold-down bolt elbow 6-2 Tight bolt screens bar 6-1 and hold-down bolt elbow 6-2 is at 90 degree of positioning weldings;
Cast-in-place interconnecting piece, the cast-in-place interconnecting piece are to be filled between prefabricated air channel base plate both ends and air duct side wall in cast-in-place notch Pea gravel concreten, the epimere and hold-down bolt screens bar of the hold-down bolt be respectively positioned in cast-in-place interconnecting piece, and hold-down bolt is curved Head is located at outside cast-in-place interconnecting piece.
Further, both sides upper end to the middle part of the prefabricated air channel base plate 2 along its length is equipped with a connection breach, under End sets hand hole notch, and connector reinforcing bar 2-3 is reserved at connection breach, and hand hole indentation, there sets prefabricated air channel base plate built-in fitting 2-5, phase The connection breach of adjacent two pieces of prefabricated air channel base plates 2 cooperatively form a connection pouring area, the hand hole of adjacent two pieces of prefabricated air channel base plates 2 Notch cooperatively forms hand hole, and adjacent two pieces of prefabricated air channel base plate built-in fitting 2-5 are equipped with matched link bolt hole, institute in hand hole It states and is connected with connection bolt 2-7 between matched link bolt hole.
Further, the root of the reserved connector reinforcing bar 2-3 at the connection breach is embedded in prefabricated air channel base plate, End extends into connection breach, and extends to beyond being bent obliquely upward after 2 range of pre-buried air channel base plate, and adjacent two pieces prefabricated The reserved connector reinforcing bar 2-3 bending parts of air channel base plate 2 are interlaced, form U-shaped structure, the prefabricated longitudinal steel of air channel base plate connection Muscle is set in U-shaped structure.
Further, cast-in-place air duct side wall bracket 1-1 is arranged the lower section of cast-in-place air duct side wall 1, and towards cast-in-place air duct side The inside of wall 1 extends, and the upper surface of extension forms the low inclined-plane in the high inside in outside, and prefabricated air channel base plate rubber spacer 5 is pasted Inside on the inclined-plane.
Further, the hand hole indentation, there sets prefabricated air channel base plate built-in fitting 2-5, specific implementation according to the present invention Example, the prefabricated air channel base plate built-in fitting are pre-embedded steel slab 9, and link bolt hole is equipped in the pre-embedded steel slab 9 and is stretched into pre- The pre-embedded steel slab of embedded bar in air channel base plate processed, adjacent two pieces of prefabricated air channel base plates passes through prefabricated air channel base plate connector rubber Pad connection, and it is connected with connection bolt between the respective bolt holes of the pre-embedded steel slab of adjacent two pieces of prefabricated air channel base plates.
A kind of tunnel exhausting duct precast assembly method of the present invention, steps are as follows for implementation:
A, prefabricated air channel base plate is made, air duct is divided into the prefabricated air channel base plate of several unit lengths along its length;
B, cast-in-place tunnel roof and air duct side wall, the air duct side wall bracket positioned at air duct lower sidewall, before casting and compacting of concrete Hold-down bolt built-in pipe is installed and is located in air duct side wall bracket position;
C, prefabricated air channel base plate rubber spacer is pasted on the side wall bracket of air duct after concrete reaches intensity;
D, by prefabricated air channel base plate, both ends are erected on the side wall bracket of air duct in the width direction, prefabricated air channel base plate both ends and air duct There are cast-in-place notches between side wall;Both sides upper end to the middle part of the prefabricated air channel base plate along its length is equipped with a connection and lacks Mouthful, lower end sets hand hole notch, and connector reinforcing bar is reserved at connection breach, and hand hole indentation, there sets built-in fitting, adjacent two pieces of prefabricated wind The connection breach of road bottom plate cooperatively form a connection pouring area, and the hand hole notch of adjacent two pieces of prefabricated air channel base plates cooperatively forms hand Hole, the built-in fitting of adjacent two pieces of prefabricated air channel base plates is equipped with matched link bolt hole in hand hole, described;
E, hold-down bolt is inserted in hold-down bolt built-in pipe, connection bolt is put into the link bolt hole of pre-embedded steel slab in hand hole Interior and coordination is gradually tightened;
F, it is built into prefabricated air channel base plate in the connection pouring area and connects longitudinal reinforcement;
G, between air duct side wall and prefabricated air channel base plate pouring area is connected between cast-in-place notch and adjacent two pieces of prefabricated air channel base plates Pea gravel concreten is inside filled respectively, can mix swelling agent;
H, it after after the tunnel air duct of certain length section, installation is complete, is stitched between cast-in-place air duct side wall bracket and prefabricated air channel base plate Gap uses clay pointing between gap and adjacent two pieces of prefabricated air channel base plates.
Further, in step E, hold-down bolt elbow is arranged in the hold-down bolt upper end, and hold-down bolt inner side of elbow is set There is hold-down bolt screens bar, with hold-down bolt elbow at 90 degree of positioning weldings, hold-down bolt hypomere is inserted into hold-down bolt screens bar In hold-down bolt built-in pipe, epimere is located in cast-in-place notch, and after tightening, hold-down bolt screens bar is located in cast-in-place notch, compresses Bolt elbow exposes outside cast-in-place notch.Hold-down bolt screens bar forms 90 degree of right angles with hold-down bolt elbow, can be easy to compress spiral shell Bolt elbow effectively push down prefabricated air channel base plate and meanwhile tightened on the outside of air duct nut due to hold-down bolt screens bar screens yes Screw rod can not possibly be rotated with tightening nut.
Further, the root of the reserved connector reinforcing bar 2-3 at the connection breach is embedded in prefabricated air channel base plate, End extends into connection breach, and extends to beyond being bent obliquely upward after 2 range of pre-buried air channel base plate, and adjacent two pieces prefabricated The reserved connector reinforcing bar 2-3 bending parts of air channel base plate 2 are interlaced, form U-shaped structure, the prefabricated longitudinal steel of air channel base plate connection Muscle is set in U-shaped structure.
Further, cast-in-place air duct side wall bracket 1-1 is arranged the lower section of cast-in-place air duct side wall 1, and towards cast-in-place air duct side The inside of wall 1 extends, and the upper surface of extension forms the low inclined-plane in the high inside in outside, and prefabricated air channel base plate rubber spacer 5 is pasted Inside on the inclined-plane.
In the description of the present invention, it is to be understood that, term "upper", "lower", "front", "rear", "left", "right", " perpendicular To ", " transverse direction ", "top", "bottom", "inner", the instructions such as "outside" orientation or positional relationship be orientation based on ... shown in the drawings or position Relationship is set, is merely for convenience of description of the present invention and simplification of the description, device is not indicated or implied the indicated or element is necessary With specific orientation, with specific azimuth configuration and operation, therefore be not considered as limiting the invention.
Although specific embodiments of the present invention have been described above, it will be appreciated by those of skill in the art that this is only For example, protection scope of the present invention is to be defined by the appended claims.Those skilled in the art without departing substantially from Under the premise of the principle and substance of the present invention, many changes and modifications may be made, but these change and Modification each falls within protection scope of the present invention.

Claims (5)

1. a kind of tunnel exhausting duct precast assembly method, it is characterised in that:The prefabricated installation method of tunnel exhausting duct includes Following steps:
A, prefabricated air channel base plate is made, air duct is divided into the prefabricated air channel base plate of several unit lengths along its length;
B, cast-in-place tunnel roof and air duct side wall, the air duct side wall bracket positioned at air duct lower sidewall, before casting and compacting of concrete Hold-down bolt built-in pipe is installed and is located in air duct side wall bracket position;
C, prefabricated air channel base plate rubber spacer is pasted on the side wall bracket of air duct after concrete reaches intensity;
D, by prefabricated air channel base plate, both ends are erected on the side wall bracket of air duct in the width direction, prefabricated air channel base plate both ends and air duct There are cast-in-place notches between side wall;Both sides upper end to the middle part of the prefabricated air channel base plate along its length is equipped with a connection and lacks Mouthful, lower end sets hand hole notch, and connector reinforcing bar is reserved at connection breach, and hand hole indentation, there sets built-in fitting, adjacent two pieces of prefabricated wind The connection breach of road bottom plate cooperatively form a connection pouring area, and the hand hole notch of adjacent two pieces of prefabricated air channel base plates cooperatively forms hand Hole, the built-in fitting of adjacent two pieces of prefabricated air channel base plates is equipped with matched link bolt hole in hand hole, described;
E, hold-down bolt is inserted in hold-down bolt built-in pipe, connection bolt is put into the link bolt hole of pre-embedded steel slab in hand hole Interior and coordination is gradually tightened;
F, it is built into prefabricated air channel base plate in the connection pouring area and connects longitudinal reinforcement;
G, between air duct side wall and prefabricated air channel base plate pouring area is connected between cast-in-place notch and adjacent two pieces of prefabricated air channel base plates Pea gravel concreten is inside filled respectively, can mix swelling agent;
H, it after after the tunnel air duct of certain length section, installation is complete, is stitched between cast-in-place air duct side wall bracket and prefabricated air channel base plate Gap uses clay pointing between gap and adjacent two pieces of prefabricated air channel base plates.
2. exhausting duct precast assembly method in tunnel as described in claim 1, it is characterised in that in step E, the hold-down bolt Hold-down bolt elbow is arranged in upper end, and hold-down bolt inner side of elbow is equipped with hold-down bolt screens bar, hold-down bolt screens bar and compression Bolt elbow is inserted at 90 degree of positioning weldings, hold-down bolt hypomere in hold-down bolt built-in pipe, and epimere is located in cast-in-place notch, is twisted Next, hold-down bolt screens bar is located in cast-in-place notch, and hold-down bolt elbow exposes outside cast-in-place notch;
Hold-down bolt screens bar forms 90 degree of right angles with hold-down bolt elbow, can be easy to hold-down bolt elbow and effectively pushes down prefabricated wind Road bottom plate tightens screw rod that nut is due to the screens of hold-down bolt screens bar on the outside of air duct simultaneously can not possibly be with screwing spiral shell It is female and rotate.
3. exhausting duct precast assembly method in tunnel as described in claim 1, it is characterised in that reserved at the connection breach The root of connector reinforcing bar is embedded in prefabricated air channel base plate, and end extends into connection breach, and is extended to beyond pre-buried wind It being bent obliquely upward after road bottom plate range, the reserved connector reinforcing bar bending part of adjacent two pieces of prefabricated air channel base plates is interlaced, U-shaped structure is formed, in step F, prefabricated air channel base plate connection longitudinal reinforcement is set in U-shaped structure.
4. exhausting duct precast assembly method in tunnel as described in claim 1, it is characterised in that cast-in-place air duct side wall bracket setting The lower section of cast-in-place air duct side wall, and extend towards the inside of cast-in-place air duct side wall, the upper surface of extension forms the high inside in outside Low inclined-plane, prefabricated air channel base plate rubber spacer are pasted in the inside on the inclined-plane, the both ends bottom of the prefabricated air channel base plate Setting and the matched inclined-plane in the inclined-plane.
5. exhausting duct precast assembly method in tunnel as described in claim 1, it is characterised in that the hand hole indentation, there sets pre-buried Part is pre-embedded steel slab, and link bolt hole is equipped in the pre-embedded steel slab and stretches into the embedded bar in prefabricated air channel base plate, phase The pre-embedded steel slab of adjacent two pieces of prefabricated air channel base plates is connected by prefabricated air channel base plate connector rubber pad, and adjacent two pieces of prefabricated air ducts Connection bolt is connected between the respective bolt holes of the pre-embedded steel slab of bottom plate.
CN201711433049.6A 2017-12-26 2017-12-26 Prefabricated assembly method for tunnel exhaust duct Active CN108331605B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711433049.6A CN108331605B (en) 2017-12-26 2017-12-26 Prefabricated assembly method for tunnel exhaust duct

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711433049.6A CN108331605B (en) 2017-12-26 2017-12-26 Prefabricated assembly method for tunnel exhaust duct

Publications (2)

Publication Number Publication Date
CN108331605A true CN108331605A (en) 2018-07-27
CN108331605B CN108331605B (en) 2024-01-19

Family

ID=62923746

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711433049.6A Active CN108331605B (en) 2017-12-26 2017-12-26 Prefabricated assembly method for tunnel exhaust duct

Country Status (1)

Country Link
CN (1) CN108331605B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110230381A (en) * 2019-07-01 2019-09-13 中铁七局集团有限公司 A kind of precast underground railway station rail top air channel structure and its construction method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203403650U (en) * 2013-08-28 2014-01-22 中铁十一局集团城市轨道工程有限公司 Improved semi-prefabricated subway station rail top wind channel
CN205242729U (en) * 2015-12-17 2016-05-18 上海宝岳住宅工业有限公司 Fast assembly's precast concrete coincide wallboard
CN205369525U (en) * 2016-01-21 2016-07-06 东南大学 Local prestressing force assembled power consumption beam column node
CN106049704A (en) * 2016-07-28 2016-10-26 杭州江润科技有限公司 Prefabricated, cast-in-situ, combined type bare concrete exterior wall structure and construction method
CN106436758A (en) * 2016-09-06 2017-02-22 沈阳建筑大学 Precast fabricated concrete subway substation
CN207960659U (en) * 2017-12-26 2018-10-12 上海市政工程设计研究总院(集团)有限公司 A kind of tunnel exhausting duct precast assembly structure

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203403650U (en) * 2013-08-28 2014-01-22 中铁十一局集团城市轨道工程有限公司 Improved semi-prefabricated subway station rail top wind channel
CN205242729U (en) * 2015-12-17 2016-05-18 上海宝岳住宅工业有限公司 Fast assembly's precast concrete coincide wallboard
CN205369525U (en) * 2016-01-21 2016-07-06 东南大学 Local prestressing force assembled power consumption beam column node
CN106049704A (en) * 2016-07-28 2016-10-26 杭州江润科技有限公司 Prefabricated, cast-in-situ, combined type bare concrete exterior wall structure and construction method
CN106436758A (en) * 2016-09-06 2017-02-22 沈阳建筑大学 Precast fabricated concrete subway substation
CN207960659U (en) * 2017-12-26 2018-10-12 上海市政工程设计研究总院(集团)有限公司 A kind of tunnel exhausting duct precast assembly structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110230381A (en) * 2019-07-01 2019-09-13 中铁七局集团有限公司 A kind of precast underground railway station rail top air channel structure and its construction method

Also Published As

Publication number Publication date
CN108331605B (en) 2024-01-19

Similar Documents

Publication Publication Date Title
CN106168057B (en) A kind of assembled steel lath band combined concrete shear wall and its production construction method
CN100572705C (en) Rubber water stop U anchor construction method
CN104878948B (en) A kind of reinforcement means of rc-frame-beam hogging moment area
CN208934197U (en) The plug-in filling wall construction system of steel frame and assembled filled-in panel
CN206428853U (en) Energy-dissipation and shock-absorption oblique prestressed shear wall structure system suitable for prefabricated assembly
CN207863150U (en) Overlap wall and horizontal member connecting node
CN108119177A (en) A kind of tunnel exhausting duct precast assembly structure
CN107700676A (en) A kind of dry method connecting plate type structural system and its construction method
CN108000689A (en) Concrete component gang form and its casting method and concrete component with window frame
CN207960659U (en) A kind of tunnel exhausting duct precast assembly structure
CN108331605A (en) A kind of tunnel exhausting duct precast assembly method
CN206070792U (en) A kind of assembled steel lath band combined concrete shear wall
CN208534081U (en) A kind of reconstruction structure of old building constructional column
CN106065676B (en) Novel external wallboard joint and construction method
CN105821908A (en) Multiple water stop belt, waterproof structure and construction method of waterproof structure
RU2296833C2 (en) Method for culvert laying under road embankment
CN209260960U (en) It is a kind of to facilitate the wall for installing interim bearing diagonal
CN111156036A (en) Novel plate anchor structure
CN216109128U (en) Hollow internal mold steel mesh assembled wall
CN214531318U (en) Cast-in-place partition wall template structure
CN215253661U (en) Old wall structure with heat preservation layer
CN205714225U (en) A kind of railway culvert, tunnel defect wavy metal culvert pipe liner bracing means
CN110552443B (en) Residential system of steel pipe concrete close-packed column steel plate energy-consuming shear wall structure
CN107916727A (en) A kind of prefabricated composite wallboard in underground and the waterproofing node structure of cast in place frame column seam crossing
CN110284618B (en) Construction method of heat insulation wall

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant