CN203393637U - Bearing bracket - Google Patents
Bearing bracket Download PDFInfo
- Publication number
- CN203393637U CN203393637U CN201320193364.7U CN201320193364U CN203393637U CN 203393637 U CN203393637 U CN 203393637U CN 201320193364 U CN201320193364 U CN 201320193364U CN 203393637 U CN203393637 U CN 203393637U
- Authority
- CN
- China
- Prior art keywords
- free bearing
- hinge seat
- bearing bracket
- bearing
- steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model relates to a bearing bracket. The bearing bracket comprises forming truss platforms which are symmetrically arranged, wherein one side of the upper end of each forming truss platform is connected with an upper hinge seat by a connection steel pin; one side of the lower end of the forming truss platform is connected with a lower hinge seat by a connection steel pin; and the upper hinge seat and the lower hinge seat are connected with the upper hinge seat and the lower hinge seat which are symmetrically arranged by connection shafts and JM anchorage devices, thus solving the construction technical problems of a bearing bracket at the top of a suspended-casting continuous beam pier during bridge project construction. The bearing bracket has the characteristics of being simple in the stress of a bracket structure, safe and reliable, convenient to install and detach, and capable of being repeatedly used for many times. The bearing bracket can be widely applied to construction processes for various concrete piers.
Description
Technical field
The utility model relates to a kind of bearing support, particularly a kind of cantilever method continuous beam pier top load bearing bracket.
Background technology
Cantilever method continuous beam is common method for designing in Longspan Bridge design.Cantilever method continuous beam pier top 0# piece generally adopts the construction of welded type cast-in-site of bracket method, mostly set up in the following way bracket: be close to pier shaft sidewall template and bury pre-embedded steel slab underground, steel truss is being specified to processing place welding fabrication on request simultaneously, after pier shaft form removal, the steel truss of moulding is welded on and on pre-embedded steel slab, forms bracket.Utilize bracket formwork erection, reinforcing bar be installed, cast pier top 0# block concrete, assistance platform that also can be using this bracket as assembling construction Hanging Basket.Bracket is removed the general gas cutting that adopts and is cut off.The weak point of its existence is, causes that material recycling rate of waterused is low, waste is large.In addition with pre-embedded steel slab, to be welded and fixed be mainly vertical position welding and overhead welding to welded type bracket, and owing to adopting, the bridge pier of bracket job practices is generally higher, and the operating space that workman is fixed welding to steel truss is little, and welding quality is difficult for guaranteeing.
Utility model content
Its object of the utility model is just to provide a kind of bearing support, has carrier structure stressed simple, safe and reliable, and mounting or dismounting are convenient, the feature that can be repeatedly used.
The technical scheme that realizes above-mentioned purpose and take, comprise the moulding truss platform being arranged symmetrically with, described moulding truss platform upper end one side connects upper free bearing through connecting steel pin, moulding truss platform lower end one side connects lower free bearing through connecting steel pin, and described upper free bearing and lower free bearing are through upper free bearing and the lower free bearing of connecting axle and JM ground tackle connected symmetrical dendrimer layout.
Compared with prior art this device has the following advantages.
1, owing to having adopted free bearing to connect the structure design of moulding truss platform, thereby it is stressed simple, safe and reliable to have carrier structure, simple load and unload feature.
2, owing to having adopted free bearing to connect the structure design of moulding truss platform, thereby there is dismountable feature, can be repeatedly used.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the invention will be further described.
Fig. 1 is this apparatus structure schematic diagram.
Fig. 2 is the upper free bearing X lateral view of this device.
Fig. 3 is the upper free bearing X front view of this device.
Fig. 4 is the lower free bearing Y lateral view of this device.
Fig. 5 is the lower free bearing Y front view of this device.
The specific embodiment
Embodiment
This device comprises the moulding truss platform 3 being arranged symmetrically with, as shown in Figure 1, described moulding truss platform 3 upper end one sides connect upper free bearing X through connecting steel pin 5, moulding truss platform 3 lower end one sides connect lower free bearing Y through connecting steel pin 5, and described upper free bearing X and lower free bearing Y are through upper free bearing X and the lower free bearing Y of connecting axle and JM ground tackle 2 connected symmetrical dendrimers layouts.
Described upper free bearing X and lower free bearing Y bottom surface are provided with pressure-resistant rubber pad 4, as shown in Figures 3 and 5.Described connecting axle is high-strength fining twisted steel 1.
At least 2 of described connecting axles.
This device embodiment is comprised of high-strength fining twisted steel 1, JM ground tackle 2, moulding truss platform 3, upper free bearing X, lower free bearing Y, pressure-resistant rubber pad 4, connection steel pin 5.By stretch-draw fining twisted steel 1, free bearing X, Y are anchored on pier shaft sidewall, then moulding truss platform 3 are passed through to connect steel pin 5 pin joints on free bearing X, Y, the upper load that utilizes free bearing to conduct oneself with dignity and bear with the frictional force between pier wall and support reaction balance bracket.Pressure-resistant rubber pad 4 between free bearing and pier wall is for increase free bearing with frictional force between pier wall, avoid free bearing steel plate to cause damage to pier shaft concrete simultaneously.
During construction pier shaft, in specific bit, install preformed hole, pier shaft concrete reaches after design strength by the high-strength fining twisted steel 1 of stretch-draw, free bearing X, Y are anchored on pier shaft sidewall, subsequently the shaped steel moulding truss platform 3 of machine-shaping is linked on free bearing X, Y by steel pin, finally the same side steel truss is formed to integral bracket by welded connection part and jointly bear top working load.When bracket is removed, first connecting piece between steel truss is dismantled, the coupling pin 5 of then dismantling between steel truss 1 and free bearing X, Y is removed steel truss, finally by putting, opens dismantle free bearing X, Y and high-strength fining twisted steel 1, JM ground tackle 2.
Cantilever method bridge pier top 0# piece construction bracket system is comprised of high-strength fining twisted steel 1, JM ground tackle 2, moulding truss platform 3, upper free bearing X, lower free bearing Y, pressure-resistant rubber pad 4, coupling pin 5.During construction pier shaft, in specific bit, install preformed hole, after pier shaft form removal, can in pier shaft preformed hole, wear high-strength fining twisted steel 1, the upper free bearing X and the lower free bearing Y that on backing plate, post pressure-resistant rubber pad 4 are installed, the supporting JM ground tackle 2 of same fining twisted steel 1 is screwed on simultaneously.Until pier shaft concrete strength, reach after design strength, can use punching top by calculated value stretch-draw fining twisted steel 1, tighten JM ground tackle 2 free bearing X or Y are anchored on pier shaft sidewall.Subsequently the shaped steel moulding truss platform of machine-shaping 3 is passed through to coupling pin 5 pin joints on free bearing, finally the same side steel truss is formed to integral bracket by welded connection part and jointly bear top working load.When bracket is removed, first connecting piece between steel truss is dismantled, the coupling pin 5 of then dismantling between steel truss 1 and free bearing X, Y is removed steel truss 1, finally by putting dismounting free bearing X, a Y and high-strength fining twisted steel 1, JM ground tackle 2.
Claims (4)
1. a bearing support, comprise the moulding truss platform (3) being arranged symmetrically with, it is characterized in that, described moulding truss platform (3) upper end one side is through connecting free bearing (X) in steel pin (5) connection, moulding truss platform (3) lower end one side connects lower free bearing (Y) through connecting steel pin (5), and described upper free bearing (X) and lower free bearing (Y) are through upper free bearing (X) and the lower free bearing (Y) of connecting axle (1) and JM ground tackle (2) connected symmetrical dendrimer layout.
2. a kind of bearing support according to claim 1, is characterized in that, described upper free bearing (X) and lower free bearing (Y) bottom surface are provided with pressure-resistant rubber pad (4).
3. a kind of bearing support according to claim 1, is characterized in that, described connecting axle (1) is high-strength fining twisted steel.
4. according to a kind of bearing support described in claim 1 or 3, it is characterized in that at least 2 of described connecting axles.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320193364.7U CN203393637U (en) | 2013-04-17 | 2013-04-17 | Bearing bracket |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320193364.7U CN203393637U (en) | 2013-04-17 | 2013-04-17 | Bearing bracket |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203393637U true CN203393637U (en) | 2014-01-15 |
Family
ID=49905180
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320193364.7U Expired - Fee Related CN203393637U (en) | 2013-04-17 | 2013-04-17 | Bearing bracket |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203393637U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104074346A (en) * | 2014-07-02 | 2014-10-01 | 吴江市明港道桥工程有限公司 | Suspended construction support frame |
CN104314012A (en) * | 2014-09-25 | 2015-01-28 | 安徽省新路建设工程集团有限责任公司 | Fastener connecting structure for cantilever box beam triangle brackets |
CN104328737A (en) * | 2014-09-25 | 2015-02-04 | 安徽省新路建设工程集团有限责任公司 | Connecting construction method of suspended-cast box girder triangular bracket fastener connecting construction method |
-
2013
- 2013-04-17 CN CN201320193364.7U patent/CN203393637U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104074346A (en) * | 2014-07-02 | 2014-10-01 | 吴江市明港道桥工程有限公司 | Suspended construction support frame |
CN104314012A (en) * | 2014-09-25 | 2015-01-28 | 安徽省新路建设工程集团有限责任公司 | Fastener connecting structure for cantilever box beam triangle brackets |
CN104328737A (en) * | 2014-09-25 | 2015-02-04 | 安徽省新路建设工程集团有限责任公司 | Connecting construction method of suspended-cast box girder triangular bracket fastener connecting construction method |
CN104314012B (en) * | 2014-09-25 | 2016-08-24 | 安徽省新路建设工程集团有限责任公司 | A kind of cantilever box beam shelf bracket fastener attachment structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203320417U (en) | Composite beam bridge deck structure with replaceable bridge deck slab | |
CN103452053A (en) | Anti-overturning reinforcing device of single-column-pier bridge | |
CN102926504B (en) | Construction method of steel and concrete overlapped beam combined part | |
CN105586833B (en) | Stiff skeleton steel reinforcement cage global formation large-scale cast-in-place tall pier and thin wall construction method | |
CN204589822U (en) | The two cantilever bent cap anchor ear Construction Support system of a kind of solely post | |
CN203393637U (en) | Bearing bracket | |
CN103866693A (en) | Installing method of reinforced concrete bowstring rod arch bridge arch ribs and hanging auxiliary bridge | |
CN101368372A (en) | Bearing support | |
CN107165056B (en) | Anti-overturning steel bar bracket for cantilever bent cap concrete pouring and mounting method thereof | |
CN102277836B (en) | Construction method of tilting concrete tower base | |
CN103552911B (en) | A kind of movable boom hoisting and the construction installation method of use thereof | |
CN104499706B (en) | Hoistway formwork platform and construction method thereof | |
CN202482772U (en) | Collapse-proof stop block mounting system for railway bridge | |
CN203393641U (en) | Anchoring profile steel concrete beam | |
CN205296821U (en) | Oblique roofing formwork system of heavy grade cast in situ concrete | |
CN212771960U (en) | Whole device of demolising of 0# piece bracket of continuous rigid frame bridge | |
CN207209786U (en) | The cast-in-place boom support monoblock type automatic disassembling device of falsework | |
CN102877414A (en) | Universal triangular basket and bracket mounting structure and construction method thereof | |
CN202954577U (en) | Reinforced structure for bearing beam of wall-attached embedded part of large-tonnage self-climbing tower crane | |
CN204715362U (en) | A kind of deep foundation ditch embedded column base bracing frame | |
CN202644407U (en) | Demoulding device for bottom plate bracket of capping beam constructed by hoop method | |
CN209194318U (en) | A kind of spreading connection structure of steel truss | |
CN203613461U (en) | Slip form construction lifting system | |
CN206667082U (en) | A kind of steel box-girder splice plate more changing device | |
CN105113426A (en) | Cable connector and steel truss arch bridge cable connecting method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140115 Termination date: 20190417 |
|