CN203320417U - Composite beam bridge deck structure with replaceable bridge deck slab - Google Patents

Composite beam bridge deck structure with replaceable bridge deck slab Download PDF

Info

Publication number
CN203320417U
CN203320417U CN2013201690895U CN201320169089U CN203320417U CN 203320417 U CN203320417 U CN 203320417U CN 2013201690895 U CN2013201690895 U CN 2013201690895U CN 201320169089 U CN201320169089 U CN 201320169089U CN 203320417 U CN203320417 U CN 203320417U
Authority
CN
China
Prior art keywords
bridge deck
connector
steel plate
bridge
changeable type
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2013201690895U
Other languages
Chinese (zh)
Inventor
刘玉擎
辛灏辉
张由由
贺君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tongji University
Original Assignee
Tongji University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tongji University filed Critical Tongji University
Priority to CN2013201690895U priority Critical patent/CN203320417U/en
Application granted granted Critical
Publication of CN203320417U publication Critical patent/CN203320417U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a composite beam bridge deck structure with a replaceable bridge deck slab. The composite beam bridge deck structure comprises the bridge deck slab and a replaceable connecting part, wherein the replaceable connecting part is arranged on the upper surface of a main beam of a bridge body; a preset pouring hole corresponding to the replaceable connecting part is formed in the bridge deck slab; the bridge deck slab is laid on the main beam of the bridge body, so that the preset hole is located in a position of the replaceable connecting part; and concrete is poured in the preset pouring hole, so that the bridge deck slab is connected with a main beam of the bridge body, so that a whole is formed. Compared with the prior art, the replaceable bridge deck slab is provided, the construction progress is effectively accelerated, and the service life of the structure is prolonged.

Description

The removable compound beam bridge floor of bridge deck structure
Technical field
The utility model relates to a kind of bridge deck structure, especially relates to the removable compound beam bridge floor of a kind of bridge deck structure.
Background technology
Reinforced concrete bridge deck plate and steel bridge deck are two kinds of bridge deck structures commonly used.Steel bridge deck normally consists of the stiffening rib in length and breadth of steel plate and welding, its fluid concrete not above steel plate, directly black top road surface.With concrete slab, compare, steel bridge deck is lighter, and construction quality easily guarantees, asphalt road surface immediately after bridge deck set up, reduction of erection time.But also there are the shortcomings such as rigidity is lower, flexible pavement easily damages, cost is higher.The Steel concrete combining structure is with its whole stressed economy, and the reasonability of performance bi-material advantage separately and the outstanding advantages of constructability and be widely used have been built a large amount of various forms of composite bridges.Modal composite bridge is the combined steel plate beam bridge, by using connector, plate girder and concrete slab is combined, and bending rigidity can increase substantially, and reduces deck-molding, increase across footpath.
The endurance issues of built bridge more and more causes people's concern, and steel corrosion and concrete cracking are the subject matter that affects durability, and it not only affects the application life of structure, also can cause a large amount of potential safety hazards, even causes the accident.Wherein, bridge deck directly bear vehicular load and environmental load, to be subject to the unfavorable factors such as overload, corrosion and fatigue to affect the most direct member, and traditional concrete slab and steel bridge deck are understood very fast corrosion, ftractureed, peel off under some rugged environments, these bring huge hidden danger and loss to road traffic.Therefore, be necessary to improve bridge deck, improve the service life of bridge.
The utility model content
The purpose of this utility model is exactly to provide the removable compound beam bridge floor of a kind of bridge deck structure in order to overcome the defect that above-mentioned prior art exists.
The purpose of this utility model can be achieved through the following technical solutions:
The removable compound beam bridge floor of a kind of bridge deck structure, comprise bridge deck and changeable type connector, described changeable type connector is arranged at the upper surface of pontic, described bridge deck are provided with the reserved pouring hole corresponding with the changeable type connector, bridge deck are laid on pontic, make the position of reserved pouring hole in the changeable type connector, in described reserved pouring hole, concreting makes bridge deck and pontic be connected to form integral body.
Described changeable type connector comprises bottom steel plate and shear connector, and described bottom steel plate is fixedly connected with the pontic upper surface, and described shear connector is arranged on the steel plate of bottom.
Described shear connector be welded in the bottom steel plate on, or with bottom steel plate one-step casting moulding.
Described bottom steel plate offers bolt hole, by high-strength bolt, with the girder of pontic, is connected.
The shape of described bottom steel plate comprises rectangle or circle.
Described shear connector is weldering nail connector, perforated panel connector and rebar connector.
The shape of described reserved pouring hole comprises rectangle, circle, ellipse or hyperelliptic shape.
Compared with prior art, the utlity model has following advantage:
1, bridge deck structure adopts prefabricated bridge deck, in when construction, by loop wheel machine, lifts to after on pontic, is built connection and gets final product, and has effectively accelerated construction speed.
2, adopt the structure of changeable type, during replacing, can pry open the cast-in-situ concrete of preformed hole place, with loop wheel machine, hang and move bridge deck, after changing connector, again lift bridge deck, improved the service life of bridge.
The accompanying drawing explanation
Fig. 1 is mounting structure schematic diagram of the present utility model;
The schematic diagram that Fig. 2 is bridge deck in the utility model;
The schematic diagram that Fig. 3 is the weldering nail formula changeable type coupling assembling that adopts of the utility model;
The schematic diagram that Fig. 4 is the board-like changeable type coupling assembling of perforate that adopts of the utility model;
The bottom steel plate schematic diagram that Fig. 5 is the utility model changeable type connector.
The specific embodiment
Below in conjunction with the drawings and specific embodiments, the utility model is elaborated.
Embodiment
As shown in Fig. 1~5, the removable compound beam bridge floor of a kind of bridge deck structure, this bridge deck structure is arranged on the pontic consisted of girder 4 and crossbeam 5.Bridge deck structure comprises bridge deck 1 and changeable type connector 2, and the bottom steel plate 6 of changeable type connector 2 is provided with bolt hole, by high-strength bolt 7, changeable type coupling assembling 2 is fixed on the girder 4 of pontic.The quantity of changeable type connector 2 and position can be arranged according to concrete project situation.Changeable type connector 2 has all comprised bottom steel plate 6 and shear connector, welds together between the two or the one-step casting moulding.The shape of bottom steel plate 6 comprises rectangle or circle, adopt rectangle in the present embodiment, shear connector adopts two kinds of forms, can be weldering nail connector 8, as shown in Figure 3, or adopt perforated panel connector 9, as shown in Figure 4, and rebar connector, bridge deck 1 are provided with the reserved pouring hole 3 corresponding with changeable type coupling assembling 2, and its shape can adopt rectangle, circle, ellipse or hyperelliptic shape.In when construction, bridge deck 1 are lifted to after on pontic by loop wheel machine, make the position of reserved pouring hole 3 in changeable type coupling assembling place, then at the interior concreting of reserved pouring hole 3, make bridge deck 1 and pontic be connected to form integral body.During replacing, can pry open the concrete at reserved pouring hole 3 places, with loop wheel machine, hang and move bridge deck 1, lay down high-strength bolt 7, after changing changeable type coupling assembling 2, again lift bridge deck 1.
The utility model can improve effective construction speed of having accelerated, and improves the service life of structure, is applicable to Steel concrete combining structure engineering.
The above-mentioned description to embodiment is can understand and apply the utility model for ease of those skilled in the art.The person skilled in the art obviously can easily make various modifications to these embodiment, and General Principle described herein is applied in other embodiment and needn't passes through performing creative labour.Therefore, the utility model is not limited to the embodiment here, and those skilled in the art are according to announcement of the present utility model, and the improvement of making for the utility model and modification all should be within protection domains of the present utility model.

Claims (7)

1. the removable compound beam bridge floor of a bridge deck structure, it is characterized in that, comprise bridge deck and changeable type connector, described changeable type connector is arranged at the upper surface of pontic girder, described bridge deck are provided with the reserved pouring hole corresponding with the changeable type connector, bridge deck are laid on the pontic girder, make the position of reserved pouring hole in the changeable type connector, and in described reserved pouring hole, concreting makes bridge deck and pontic be connected to form integral body.
2. the removable compound beam bridge floor of a kind of bridge deck according to claim 1 structure, it is characterized in that, described changeable type connector comprises bottom steel plate and shear connector, described bottom steel plate is fixedly connected with pontic girder upper surface, and described shear connector is arranged on the steel plate of bottom.
3. the removable compound beam bridge floor of a kind of bridge deck according to claim 2 structure, is characterized in that, described shear connector be welded in the bottom steel plate on, or with bottom steel plate one-step casting moulding.
4. the removable compound beam bridge floor of a kind of bridge deck according to claim 2 structure, is characterized in that, described bottom steel plate offers bolt hole, by high-strength bolt, with the girder of pontic, is connected.
5. the removable compound beam bridge floor of a kind of bridge deck according to claim 2 structure, is characterized in that, the shape of described bottom steel plate comprises rectangle or circle.
6. the removable compound beam bridge floor of a kind of bridge deck according to claim 2 structure, is characterized in that, described shear connector is weldering nail connector, perforated panel connector or rebar connector.
7. the removable compound beam bridge floor of a kind of bridge deck according to claim 1 structure, is characterized in that, the shape of described reserved pouring hole comprises rectangle, circle, ellipse or hyperelliptic shape.
CN2013201690895U 2013-04-07 2013-04-07 Composite beam bridge deck structure with replaceable bridge deck slab Expired - Fee Related CN203320417U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013201690895U CN203320417U (en) 2013-04-07 2013-04-07 Composite beam bridge deck structure with replaceable bridge deck slab

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013201690895U CN203320417U (en) 2013-04-07 2013-04-07 Composite beam bridge deck structure with replaceable bridge deck slab

Publications (1)

Publication Number Publication Date
CN203320417U true CN203320417U (en) 2013-12-04

Family

ID=49659783

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013201690895U Expired - Fee Related CN203320417U (en) 2013-04-07 2013-04-07 Composite beam bridge deck structure with replaceable bridge deck slab

Country Status (1)

Country Link
CN (1) CN203320417U (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104110002A (en) * 2014-07-10 2014-10-22 中铁大桥局武汉桥梁特种技术有限公司 Method for replacing bridge deck slabs of steel truss girder bridge
CN105113425A (en) * 2015-09-24 2015-12-02 中交第二航务工程局有限公司 Novel construction method for efficient fabricated steel-concrete composite beam
CN106087741A (en) * 2016-08-12 2016-11-09 长安大学 A kind of seam bolt connects precast concrete floorings and method for prefabricating
CN106638260A (en) * 2016-11-17 2017-05-10 西南交通大学 Combined box beam structure and manufacturing method thereof
CN106835951A (en) * 2017-03-28 2017-06-13 宁波金蛟龙重工钢构有限公司 A kind of replaceable prefabricated assembled combined beam structure and manufacturing process
CN108035253A (en) * 2017-12-18 2018-05-15 王燕 A kind of bridge deck structure of arch type bridge engineering
CN108914781A (en) * 2018-08-06 2018-11-30 同济大学 A kind of connection construction technique for welding nail connector combination beam with assembled
CN110080462A (en) * 2019-05-05 2019-08-02 湘潭大学 A kind of detachably prefabricated assembled steel-concrete composite beam and its construction method
CN111395188A (en) * 2020-04-02 2020-07-10 江西省高速公路投资集团有限责任公司 Construction method of steel-concrete composite beam
CN114808661A (en) * 2021-11-20 2022-07-29 重庆大学 Parallel special-shaped PBL (Poly-p-phenylene benzobisoxazole) shear connection system applied to assembled steel-perforated precast concrete slab composite beam

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104110002A (en) * 2014-07-10 2014-10-22 中铁大桥局武汉桥梁特种技术有限公司 Method for replacing bridge deck slabs of steel truss girder bridge
CN104110002B (en) * 2014-07-10 2017-09-19 中铁大桥局武汉桥梁特种技术有限公司 A kind of method for changing steel truss girder bridge floorings
CN105113425A (en) * 2015-09-24 2015-12-02 中交第二航务工程局有限公司 Novel construction method for efficient fabricated steel-concrete composite beam
CN106087741A (en) * 2016-08-12 2016-11-09 长安大学 A kind of seam bolt connects precast concrete floorings and method for prefabricating
CN106638260A (en) * 2016-11-17 2017-05-10 西南交通大学 Combined box beam structure and manufacturing method thereof
CN106835951A (en) * 2017-03-28 2017-06-13 宁波金蛟龙重工钢构有限公司 A kind of replaceable prefabricated assembled combined beam structure and manufacturing process
CN108035253A (en) * 2017-12-18 2018-05-15 王燕 A kind of bridge deck structure of arch type bridge engineering
CN108914781A (en) * 2018-08-06 2018-11-30 同济大学 A kind of connection construction technique for welding nail connector combination beam with assembled
CN110080462A (en) * 2019-05-05 2019-08-02 湘潭大学 A kind of detachably prefabricated assembled steel-concrete composite beam and its construction method
CN111395188A (en) * 2020-04-02 2020-07-10 江西省高速公路投资集团有限责任公司 Construction method of steel-concrete composite beam
CN111395188B (en) * 2020-04-02 2021-05-04 江西省高速公路投资集团有限责任公司 Construction method of steel-concrete composite beam
CN114808661A (en) * 2021-11-20 2022-07-29 重庆大学 Parallel special-shaped PBL (Poly-p-phenylene benzobisoxazole) shear connection system applied to assembled steel-perforated precast concrete slab composite beam

Similar Documents

Publication Publication Date Title
CN203320417U (en) Composite beam bridge deck structure with replaceable bridge deck slab
CN103938546B (en) Simply supported non-uniform construction method
CN105297641B (en) Highway T beam diaphragm plate prestressed reinforcement structure and carry out the engineering method reinforced with it
CN103938533B (en) The construction method of Simply supported non-uniform structure
CN202705895U (en) Truss lattice reinforcing support device for concrete bridge deck slab
CN102767141A (en) Construction method for huge capping beam utilizing reinforced concrete thin wall as permanent formwork
CN103114524A (en) Light type wave-shaped steel and high-strength activity powder concrete composite bridge panel
CN105421632B (en) Prompt about floor system and its construction method
CN103422434A (en) Corrugated sheet steel composite structure bridge deck system
CN106087711B (en) Antinode work beam-steel concrete top plate-external prestressing combines T-shaped simply supported beam
CN203200656U (en) Light corrugated steel-high strength reactive powder concrete combined bridge deck slab
CN207958956U (en) A kind of assembly steel-concrete combination beam
CN203890868U (en) Hollow slab bridge with joints with corresponded grooves
CN205934687U (en) Antinode worker roof beam - steel concrete roof - external prestress combination T type simple beam
CN206722214U (en) Precast beam and the continuous superposed floor of prefabricated PC
CN208933811U (en) A kind of novel steel-concrete combination Continuous Box Girder Bridge of erection without scaffolding
CN204112200U (en) Edge of a wing enhanced waveform steel web plate composite box girder
CN209816686U (en) Wide articulated connection structure is pieced together to new and old bridge
CN103205930A (en) Structure for continuous transformation of existing simply supported hollow slab girder bridge and construction method of structure
CN103911948B (en) Be applied to horizontal purlin formula steel work and the construction method thereof of wide concrete rib plate-girder
CN203393637U (en) Bearing bracket
CN213772939U (en) Assembled anticollision wall
CN206503063U (en) Prefabricated assembled Wavelike steel webplate T beam bridges
CN106012808B (en) A kind of Wavelike steel webplate profiled sheet combination beam and its construction method
CN108487291A (en) The installation method of contact net upright post basic on a kind of railway steel reinforced concrete bondbeam

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131204