CN104074346A - Suspended construction support frame - Google Patents

Suspended construction support frame Download PDF

Info

Publication number
CN104074346A
CN104074346A CN201410312823.8A CN201410312823A CN104074346A CN 104074346 A CN104074346 A CN 104074346A CN 201410312823 A CN201410312823 A CN 201410312823A CN 104074346 A CN104074346 A CN 104074346A
Authority
CN
China
Prior art keywords
construction
support
hanging
fixedly connected
platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410312823.8A
Other languages
Chinese (zh)
Inventor
胡建明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wujiang City Minggang Road & Bridge Co Ltd
Original Assignee
Wujiang City Minggang Road & Bridge Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wujiang City Minggang Road & Bridge Co Ltd filed Critical Wujiang City Minggang Road & Bridge Co Ltd
Priority to CN201410312823.8A priority Critical patent/CN104074346A/en
Publication of CN104074346A publication Critical patent/CN104074346A/en
Pending legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a suspended construction support frame, which is erected on a construction object and is positioned under a construction position. The suspended construction support frame comprises a platform and at least one support frame, wherein the platform is used for supporting constructors and appliances; the support frame is used for fixedly connecting the platform and the construction objects and comprises an outer support part and an inner support part; the upper end part of the outer support part is fixedly connected with the relative outer end part of the platform, and the lower end part of the outer support par is fixedly connected with the construction object; and the upper end part of the inner support part is fixedly connected with the relative inner end part of the platform, and the lower end part of the inner support part is fixedly connected with the construction object or the outer support part. The construction support frame according to the embodiment of the invention has the advantages that the erection is simple; the occupied area is small; stability, firmness and durability are realized; the load bearing performance is good; and the suspended construction support frame is very suitable for construction conditions of projects such as bridge building and overhead facility building.

Description

A kind of hanging-type construction support
Technical field
The present invention relates to a kind of hanging-type construction support, this construction bracket is not connected with ground.
Background technology
When building bridge or super highrise building, due to field condition restriction, be often difficult to set up the console mode construction bracket (scaffold) being connected with ground.
Common hanging-type construction support is served high-rise building construction mostly at present, dismounting while increasing for the ease of floor and again setting up, what often emphasize is its mobility and functional diversity, and be short of to some extent aspect load-bearing and steadiness, and it is huge often to set up scope, and be not suitable with the construction demand of bridge, the Large Infrastructure Projects such as overhead.
Summary of the invention
For addressing the above problem, the invention provides the hanging-type construction support that a kind of load-bearing and steadiness are high, the scope of setting up is little.Technical scheme is as follows:
A hanging-type construction support, is erected on construction object and is positioned at the below of construction part.This hanging-type construction support comprises platform for Construction of Supporting person and apparatus, at least one support for described platform and described construction object are fixedly connected.
Further, described support comprises outer support portion and inner support portion, and the upper end of described outer support portion is fixedly connected with the relative outer end of described platform, and bottom and described construction object are fixedly connected; The upper end of described inner support portion is fixedly connected with the relative inner end of described platform, and construct described in bottom object or described outer support portion are fixedly connected.
Further, described outer support portion is hound and forms three-legged structure with described platform and described construction object.
Further, described three-legged structure and horizontal plane are perpendicular.
Further, described construction bracket at least comprises the pair of brackets of the opposite side that is symmetricly set on described construction object.
Further, at described construction object one-sided, be arranged side by side at least two highly identical supports.
Further, described support also comprises level and is fixedly connected on the girt between adjacent two stands.
Further, described construction bracket also comprises the pull bar that runs through that at least one level connects described construction object, and its both ends are fixedly connected with described pair of brackets respectively.
Further, at described flat edge of table, be provided with the protective fence extending upward.
According to construction bracket of the invention process set up simply, occupation of land scope is little, firmly durable, bearing is good, is applicable to very much setting up bridge and builds the execution conditions of the project such as overhead.
Accompanying drawing explanation
Accompanying drawing 1 is the hanging-type construction support front schematic view of embodiment 1;
Accompanying drawing 2 is hanging-type construction support side schematic view of embodiment 1;
Accompanying drawing 3 is the enlarged drawings at A place in Fig. 2.
Shown in figure: 1, construction bracket; 2, construction object; 21, beam section; 3, platform; 4, support; 51, outer support portion; 52, inner support portion; 6, hound; 7, bolt; 8, girt; 9, protective fence; 10, construction part; 11, case beam; 12, run through pull bar.
The specific embodiment
Below in conjunction with accompanying drawing, the present invention is described in detail.
Embodiment 1:
Accompanying drawing 1 is the hanging-type construction support front schematic view of embodiment 1.Construction object 2 is whole beam sections 21, and 10 of construction part are the case beams 11 of beam section 21 upper ends.
Whole construction bracket 1 consists of platform 3 and 4 pack supports 4, and support 4 is fixedly installed on the below of case beam 11, and it makes platform be positioned at the lower edge of case beam 11 highly just, and constructability person constructs to case beam 11.
4 pack supports 4 are divided into two pairs, are separately positioned on the both sides, front and back of beam section 21, and the pair of brackets 4 of homonymy is arranged side by side the equal height in beam section 21, and level has been fixed a girt 8 between the two.
Every pack support 4 all comprises outer support portion 51 and inner support portion 52.In the present embodiment, outer support portion 51 is hounds 6.Accompanying drawing 2 is hanging-type construction support side schematic view of embodiment 1, from accompanying drawing 2, can find out, the upper end of hound 6 is fixedly connected with platform 3, and bottom is fixedly connected with beam section 21 by bolt 7; Inner support portion 52 is directly fixed on the inward flange of platform 3 in beam section 21, thereby makes hound 6, platform 3 and beam section 21 threes form firm gusseted structure.
As shown in Figures 2 and 3, in order further to consolidate the support that is positioned at beam section 21 both sides, front and back, in beam section 21 inner transverse, connect to arrange and run through pull bar 12, its two ends are fixedly connected with the hound 6 and the inner support portion 52 that adhere to both sides separately by bolt 7 respectively, thereby the support 4 of both sides is played to the effect of firm and reinforcement, reduce stressed on the tie point of support 4 and beam section 21.
Platform 3 in the present embodiment is laid around beam section 21, and a circle protective fence 9 has been installed at its edge.In some situation, only need construct for construction the one-sided of object, can be only at one-sided mounting platform 3 and support 4.
According to construction bracket of the invention process set up simply, occupation of land scope is little, firmly durable, bearing is good, is applicable to very much setting up bridge and builds the execution conditions of the project such as overhead.

Claims (9)

1. a hanging-type construction support, be erected at the below of constructing object (2) above and being positioned at construction part (10), it is characterized in that: this hanging-type construction support (1) comprises platform (3), at least one support (4) for described platform (3) and described construction object (2) are fixedly connected for Construction of Supporting person and apparatus.
2. hanging-type construction support according to claim 1, it is characterized in that: described support (4) comprises outer support portion (51) and inner support portion (52), the upper end of described outer support portion (51) is fixedly connected with the relative outer end of described platform (3), and bottom and described construction object (2) are fixedly connected; The upper end of described inner support portion (52) is fixedly connected with the relative inner end of described platform (3), and construct described in bottom object (2) or described outer support portion (51) are fixedly connected.
3. hanging-type construction support according to claim 2, is characterized in that: described outer support portion (51) forms three-legged structure for hound (6) and with described platform (3) and described construction object (2).
4. hanging-type construction support according to claim 3, is characterized in that: described three-legged structure and horizontal plane are perpendicular.
5. according to the hanging-type construction support described in any one in claim 1~4, it is characterized in that: described construction bracket (4) at least comprises the pair of brackets (4) of the opposite side that is symmetricly set on described construction object (2).
6. hanging-type construction support according to claim 5, is characterized in that: at described construction object (2) one-sided, be arranged side by side highly identical at least two described supports (4).
7. hanging-type construction support according to claim 6, is characterized in that: described support (4) also comprises level and is fixedly connected on the girt (8) between adjacent two described supports (4).
8. hanging-type construction support according to claim 5, it is characterized in that: what described construction bracket (4) also comprised that at least one level connect described construction object (2) runs through pull bar (12), and its both ends are fixedly connected with described pair of brackets (4) respectively.
9. hanging-type construction support according to claim 1, is characterized in that: at the edge of described platform (3), be provided with the protective fence (9) extending upward.
CN201410312823.8A 2014-07-02 2014-07-02 Suspended construction support frame Pending CN104074346A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410312823.8A CN104074346A (en) 2014-07-02 2014-07-02 Suspended construction support frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410312823.8A CN104074346A (en) 2014-07-02 2014-07-02 Suspended construction support frame

Publications (1)

Publication Number Publication Date
CN104074346A true CN104074346A (en) 2014-10-01

Family

ID=51595916

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410312823.8A Pending CN104074346A (en) 2014-07-02 2014-07-02 Suspended construction support frame

Country Status (1)

Country Link
CN (1) CN104074346A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2251595Y (en) * 1996-05-23 1997-04-09 余鹏 Outside scaffold for building construction
WO2000077323A1 (en) * 1999-06-11 2000-12-21 Obo Utstyr As Arrangement of a working platform
WO2005001220A1 (en) * 2003-06-30 2005-01-06 Rope Access Building Services Pty Limited Improvements in scaffolding brackets
CN202064620U (en) * 2011-04-26 2011-12-07 北京城建五建设工程有限公司 Load-bearing frame of overhanging structure
CN102953344A (en) * 2012-12-12 2013-03-06 广东省长大公路工程有限公司 Climbing cone type triangular cantilever bracket
CN203393637U (en) * 2013-04-17 2014-01-15 中铁四局集团第五工程有限公司 Bearing bracket
CN103696373A (en) * 2013-11-01 2014-04-02 中铁十七局集团第二工程有限公司 Construction method for adjustable triangular bracket
CN203947753U (en) * 2014-07-02 2014-11-19 吴江市明港道桥工程有限公司 A kind of hanging-type construction support

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2251595Y (en) * 1996-05-23 1997-04-09 余鹏 Outside scaffold for building construction
WO2000077323A1 (en) * 1999-06-11 2000-12-21 Obo Utstyr As Arrangement of a working platform
WO2005001220A1 (en) * 2003-06-30 2005-01-06 Rope Access Building Services Pty Limited Improvements in scaffolding brackets
CN202064620U (en) * 2011-04-26 2011-12-07 北京城建五建设工程有限公司 Load-bearing frame of overhanging structure
CN102953344A (en) * 2012-12-12 2013-03-06 广东省长大公路工程有限公司 Climbing cone type triangular cantilever bracket
CN203393637U (en) * 2013-04-17 2014-01-15 中铁四局集团第五工程有限公司 Bearing bracket
CN103696373A (en) * 2013-11-01 2014-04-02 中铁十七局集团第二工程有限公司 Construction method for adjustable triangular bracket
CN203947753U (en) * 2014-07-02 2014-11-19 吴江市明港道桥工程有限公司 A kind of hanging-type construction support

Similar Documents

Publication Publication Date Title
JP6289046B2 (en) Temporary stand
CN105040591A (en) Positioning device for waveform steel web and positioning method thereof
CN205852606U (en) Three dimensions tubular truss assembly moulding bed
KR101388823B1 (en) Form device
CN103628692B (en) A kind of floor beam mounting bracket and use it to install the method for floor beam
CN203947753U (en) A kind of hanging-type construction support
CN106641461A (en) Bracket provided with three petroleum pipelines capable of being laid thereon
CN204456807U (en) Composite extendible elevator hoistway construction platform
CN103015693A (en) Three-dimensional construction device for super high-rise core tube beam-slab structure
CN104074346A (en) Suspended construction support frame
CN202899639U (en) Concrete column structure
CN205677081U (en) The delay of a kind of Super High steel frame core wall structure semi-girder truss connects equipment
CN204282788U (en) Shaping type scaffold can be assembled
CN203257080U (en) Adjustable overhang supporting device for building construction
CN204212385U (en) Scaffold strengthened by truss
CN202745351U (en) Bailey truss supporting structure
CN203640313U (en) Floor beam installing support
CN203201127U (en) Temporary support system for steel truss
CN206126696U (en) A detachable indoor hoist for buckling restrained brace
CN205742210U (en) Z-shape steel bracket
CN202627312U (en) Integral space steel structure assembly
CN204299011U (en) The supporting construction of high-low bay floor support plate
CN205447177U (en) Equipment for power transmission and distribution rack
CN206191074U (en) Can lay three petroleum pipeline's support
CN205242981U (en) Concrete construction operation platform

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20141001