CN205677081U - The delay of a kind of Super High steel frame core wall structure semi-girder truss connects equipment - Google Patents

The delay of a kind of Super High steel frame core wall structure semi-girder truss connects equipment Download PDF

Info

Publication number
CN205677081U
CN205677081U CN201620479827.XU CN201620479827U CN205677081U CN 205677081 U CN205677081 U CN 205677081U CN 201620479827 U CN201620479827 U CN 201620479827U CN 205677081 U CN205677081 U CN 205677081U
Authority
CN
China
Prior art keywords
linking arm
chord member
box
delay
strength bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620479827.XU
Other languages
Chinese (zh)
Inventor
张风亮
朱武卫
陆建勇
田鹏刚
边兆伟
员作义
史继创
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHAANXI ACADEMY OF ARCHITECTONICS
Original Assignee
SHAANXI ACADEMY OF ARCHITECTONICS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHAANXI ACADEMY OF ARCHITECTONICS filed Critical SHAANXI ACADEMY OF ARCHITECTONICS
Priority to CN201620479827.XU priority Critical patent/CN205677081U/en
Application granted granted Critical
Publication of CN205677081U publication Critical patent/CN205677081U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Rod-Shaped Construction Members (AREA)

Abstract

The delay that the utility model discloses a kind of Super High steel frame core wall structure semi-girder truss connects equipment, including connector and fixed frame, described fixed frame be internally provided with box-shaped chord member, described box-shaped chord member be provided above fixing linking arm, described expansion link be arranged above the second Telescopic Fixed nut, described second Telescopic Fixed nut be arranged above the first Telescopic Fixed nut, the left side of described box-shaped chord member is provided with the firm post of housing, the right side of described box-shaped chord member is provided with high-strength bolt temporary connecting device, the upper and lower of described high-strength bolt temporary connecting device is provided with pad.This utility model is provided with eight stress detection points, each link position on device can be carried out stress judgement, thus be adjusted device according to stressing conditions.

Description

The delay of a kind of Super High steel frame-concrete wall structure semi-girder truss connects equipment
Technical field
This utility model relates to postponing to connect equipment technical field, is specially a kind of Super High steel frame-concrete wall structure The delay of semi-girder truss connects equipment.
Background technology
Frame structure refers to be connect to be connected with steel by beam and column form, and constitutes the structure of bearing system, i.e. by beam and column group Framework is become jointly to resist the horizontal loading and vertical load occurred during use.The house wall not load-bearing of frame structure, only Play and go along with sb. to guard him and compartmentation, typically with prefabricated air entrained concrete, expanded perlite, hollow brick or porous brick, Pumex, trematodiasis The light weight board such as stone, haydite is built by laying bricks or stones or is assembled.
The appearance of Super High steel frame substantially increases stability and the service life of building, but the current stage is super There is many weak points in Tall Frameworks, such as, it is impossible to counter stress accurately judges, it is impossible to carries out junction point quickly The most fixing, it is impossible to control its stability.
Utility model content
The purpose of this utility model is that the delay providing a kind of Super High steel frame-concrete wall structure semi-girder truss connects Equipment, with solve in above-mentioned background technology propose cannot accurately judge by counter stress, it is impossible to junction point is carried out quick from Dynamic fixing, it is impossible to the problem controlling its stability.
For achieving the above object, the following technical equipment of this utility model offer: a kind of Super High steel frame-concrete wall structure The delay of semi-girder truss connects equipment, including connector and fixed frame, described fixed frame be internally provided with box-shaped chord member, It is provided with fixing linking arm on described box-shaped chord member, described fixing linking arm is provided with support bar, described fixing linking arm The left and right sides be provided with diagonal web member, and diagonal web member is connected by high-strength bolt with fixing linking arm, and described connector is arranged on Between diagonal web member and fixing linking arm, the internally installed of described high-strength bolt has hydraulic means, and the top of described hydraulic means sets Be equipped with expansion link, described expansion link be arranged above the second Telescopic Fixed nut, the top of described second Telescopic Fixed nut Being provided with the first Telescopic Fixed nut, the left side of described box-shaped chord member is provided with the firm post of housing, the right side peace of described box-shaped chord member Equipped with high-strength bolt temporary connecting device, the upper and lower of described high-strength bolt temporary connecting device is provided with pad.
Preferably, described diagonal web member is cylindrical structural.
Preferably, described stress trajectory point is provided with eight altogether, and eight stress trajectory points be separately mounted to box-shaped chord member, On fixing linking arm and diagonal web member.
Preferably, described high-strength bolt is provided with four altogether, and four high-strength bolts are separately mounted to the left and right of diagonal web member Both sides.
Compared with prior art, the beneficial effects of the utility model are: this one Super High steel frame-concrete wall structure is stretched It is provided with eight stress detection points on the delay connection equipment of arm truss, each link position on device can be carried out stress Judge, thus according to stressing conditions, device be adjusted, the high-strength bolt of device be internally provided with hydraulic means, can control System first nut and second that stretches stretches the flexible of nut, thus quickly connector is carried out installing/dismounting by it, facilitates Fast, the upper and lower chord member at semi-girder truss two ends, diagonal web member, close to Core Walls Structure and the position of outside framework, arrange that deformation and stress are visited Measuring point measuring point, controls exterior frame column and Core Walls Structure vertical deformation and the stability of stress by deformation and internal force.
Accompanying drawing explanation
Fig. 1 is the diagonal web member postponing connection equipment of this practical a kind of Super High steel frame-concrete wall structure semi-girder truss Structural representation with the delay connected mode of chord member;
Fig. 2 is the housing steel postponing connection equipment of this practical a kind of Super High steel frame-concrete wall structure semi-girder truss The structural representation of the delay connected mode of post and chord member;
Fig. 3 is the high-strength spiral shell postponing connection equipment of this practical a kind of Super High steel frame-concrete wall structure semi-girder truss The internal structure schematic diagram of bolt.
In figure: 1-diagonal web member;2-stress trajectory point;3-high-strength bolt;4-connector;5-fixes linking arm;6-fixed frame Frame;7-box-shaped chord member;8-support bar;The firm post of 9-housing;10-pad;11-high-strength bolt temporary connecting device;12-first stretches The fixing nut of contracting;The Telescopic Fixed nut of 13-second;14-expansion link;15-hydraulic means.
Detailed description of the invention
Below in conjunction with the accompanying drawing in this utility model embodiment, the technical equipment in this utility model embodiment is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of this utility model rather than whole Embodiment.Based on the embodiment in this utility model, those of ordinary skill in the art are not under making creative work premise The every other embodiment obtained, broadly falls into the scope of this utility model protection.
Refer to Fig. 1-3, a kind of embodiment that this utility model provides: a kind of Super High steel frame-concrete wall structure is stretched The delay of arm truss connects equipment, including connector 4 and fixed frame 6, fixed frame 6 be internally provided with box-shaped chord member 7, case It is provided with fixing linking arm 5 on shape chord member 7, fixing linking arm 5 is provided with support bar 8, the left and right sides of fixing linking arm 5 Be provided with diagonal web member 1, and diagonal web member 1 be connected by high-strength bolt 3 with fixing linking arm 5, connector 4 be arranged on diagonal web member 1 with Between fixing linking arm 5, the internally installed of high-strength bolt 3 has hydraulic means 15, hydraulic means 15 be provided above expansion link 14, expansion link 14 be arranged above the second Telescopic Fixed nut 13, the second Telescopic Fixed nut 13 be arranged above first Telescopic Fixed nut 12, the left side of box-shaped chord member 7 is provided with the firm post of housing 9, and the right side of box-shaped chord member 7 is provided with high-strength bolt and faces Time attachment means 11, the upper and lower of high-strength bolt temporary connecting device 11 is provided with pad 10, and diagonal web member 1 is cylindrical knot Structure, stress trajectory point 2 is provided with eight altogether, and eight stress trajectory points 2 are separately mounted to box-shaped chord member 7, fixing linking arm 5 and On diagonal web member 1, high-strength bolt 3 is provided with four altogether, and four high-strength bolts 3 are separately mounted to the left and right sides of diagonal web member 1.
Operation principle;This equipment in use, controls expansion link 14 by the hydraulic means 15 in high-strength bolt 3 and stretches, Thus control the second Telescopic Fixed nut 13 and the first Telescopic Fixed nut 12 stretches, thus control fixing linking arm 5 and oblique abdomen Bar 1 connects, and is detected the stress in device by stress trajectory point 2, is faced temporary fixing rack by pad 10 Time welding, and fixed by high-strength bolt temporary connecting device 11.
It is obvious to a person skilled in the art that this utility model is not limited to the details of above-mentioned one exemplary embodiment, and And in the case of without departing substantially from spirit or essential attributes of the present utility model, it is possible to realize this practicality in other specific forms new Type.Therefore, no matter from the point of view of which point, all should regard embodiment as exemplary, and be nonrestrictive, this practicality is new The scope of type is limited by claims rather than described above, it is intended that by the containing of equivalency in claim that fall All changes in justice and scope are included in this utility model.Should not be considered as any reference in claim limiting Involved claim.

Claims (4)

1. the delay of Super High steel frame-concrete wall structure semi-girder truss connects an equipment, including connector (4) and fixed frame Frame (6), it is characterised in that: described fixed frame (6) be internally provided with box-shaped chord member (7), described box-shaped chord member (7) sets It is equipped with fixing linking arm (5), described fixing linking arm (5) is provided with support bar (8), the left and right of described fixing linking arm (5) Both sides are provided with diagonal web member (1), and diagonal web member (1) is connected by high-strength bolt (3) with fixing linking arm (5), described connector (4) being arranged between diagonal web member (1) and fixing linking arm (5), the internally installed of described high-strength bolt (3) has hydraulic means (15), described hydraulic means (15) be provided above expansion link (14), being arranged above of described expansion link (14) second is stretched The fixing nut (13) of contracting, described second Telescopic Fixed nut (13) be arranged above the first Telescopic Fixed nut (12), described The left side of box-shaped chord member (7) is provided with the firm post of housing (9), and the right side of described box-shaped chord member (7) is provided with high-strength bolt and connects temporarily Connection device (11), the upper and lower of described high-strength bolt temporary connecting device (11) is provided with pad (10).
The delay of a kind of Super High steel frame-concrete wall structure semi-girder truss the most according to claim 1 connects equipment, its It is characterised by: described diagonal web member (1) is cylindrical structural.
The delay of a kind of Super High steel frame-concrete wall structure semi-girder truss the most according to claim 1 connects equipment, its It is characterised by: also include that stress trajectory point (2), described stress trajectory point (2) are provided with eight altogether, and eight stress trajectory points (2) it is separately mounted on box-shaped chord member (7), fixing linking arm (5) and diagonal web member (1).
The delay of a kind of Super High steel frame-concrete wall structure semi-girder truss the most according to claim 1 connects equipment, its It is characterised by: described high-strength bolt (3) is provided with four altogether, and four high-strength bolts (3) are separately mounted to a left side for diagonal web member (1) Right both sides.
CN201620479827.XU 2016-05-24 2016-05-24 The delay of a kind of Super High steel frame core wall structure semi-girder truss connects equipment Expired - Fee Related CN205677081U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620479827.XU CN205677081U (en) 2016-05-24 2016-05-24 The delay of a kind of Super High steel frame core wall structure semi-girder truss connects equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620479827.XU CN205677081U (en) 2016-05-24 2016-05-24 The delay of a kind of Super High steel frame core wall structure semi-girder truss connects equipment

Publications (1)

Publication Number Publication Date
CN205677081U true CN205677081U (en) 2016-11-09

Family

ID=57435741

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620479827.XU Expired - Fee Related CN205677081U (en) 2016-05-24 2016-05-24 The delay of a kind of Super High steel frame core wall structure semi-girder truss connects equipment

Country Status (1)

Country Link
CN (1) CN205677081U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112081243A (en) * 2020-08-05 2020-12-15 上海建工集团股份有限公司 Outrigger truss structure
CN112081244A (en) * 2020-08-05 2020-12-15 上海建工集团股份有限公司 Construction method of outrigger truss structure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112081243A (en) * 2020-08-05 2020-12-15 上海建工集团股份有限公司 Outrigger truss structure
CN112081244A (en) * 2020-08-05 2020-12-15 上海建工集团股份有限公司 Construction method of outrigger truss structure
CN112081244B (en) * 2020-08-05 2021-12-28 上海建工集团股份有限公司 Construction method of outrigger truss structure

Similar Documents

Publication Publication Date Title
CN103104092B (en) Support composite structure of beam and slab
CN106759893B (en) Assembled steel structure
CN206219086U (en) A kind of attachment structure of tower crane and attached wall
CN107476581B (en) Hoisting and mounting method for steel structure double-layer overhanging structure
CN102828560B (en) Flange joint structure of hinge pin for assembled cold forming sectional steel structural connection
CN107576569A (en) A kind of loading device for testing and test method that edge constraint is realized to board member
CN104831939A (en) Bolt ball welding ball mixed node large span cantilever grid structure construction method
CN105544398A (en) Horizontal force self-balancing type splayed heavy type upper air support system and installation method thereof
CN205677081U (en) The delay of a kind of Super High steel frame core wall structure semi-girder truss connects equipment
CN109184061A (en) It cornices outside space structure ceiling system structure and construction method
CN102444270A (en) Sleeve joint oblique key type support bracket
CN103628692B (en) A kind of floor beam mounting bracket and use it to install the method for floor beam
CN204080843U (en) Movable plank house foundation structure
CN104818675B (en) The spelling method of reinforcing bar sections
CN204059208U (en) Tool-type assembling steel pipe post structure
CN207829261U (en) A kind of large span arc aluminum veneer close joint suspended ceiling device
CN104018586A (en) Connecting device for steel structure column and steel structure column
CN203640313U (en) Floor beam installing support
CN207633791U (en) A kind of free-standing temporary support for curved tube component
JP6931567B2 (en) Truss beam expansion structure
CN206581578U (en) Double-layer basket constructing device for overhanging scaffold
CN206846097U (en) A kind of Men Gangyu frameworks separately-loaded pipeline support structure
CN205777420U (en) Skyscraper skybridge construction bracket
CN106065713B (en) The template frame without scaffold cast-in-place concrete can be achieved
CN110629683A (en) Composite assembling type bridge cantilever construction bracket

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161109

Termination date: 20170524

CF01 Termination of patent right due to non-payment of annual fee