CN203320425U - 现浇箱梁侧模滑移施工装置 - Google Patents

现浇箱梁侧模滑移施工装置 Download PDF

Info

Publication number
CN203320425U
CN203320425U CN2013203946618U CN201320394661U CN203320425U CN 203320425 U CN203320425 U CN 203320425U CN 2013203946618 U CN2013203946618 U CN 2013203946618U CN 201320394661 U CN201320394661 U CN 201320394661U CN 203320425 U CN203320425 U CN 203320425U
Authority
CN
China
Prior art keywords
side mold
side form
cast
box girder
situ box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2013203946618U
Other languages
English (en)
Inventor
王勇
崔淑斌
黄建平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Construction Bridge Engineering Bureau Electrification Engineering Co Ltd
Original Assignee
China Railway Construction Bridge Engineering Bureau Electrification Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Construction Bridge Engineering Bureau Electrification Engineering Co Ltd filed Critical China Railway Construction Bridge Engineering Bureau Electrification Engineering Co Ltd
Priority to CN2013203946618U priority Critical patent/CN203320425U/zh
Application granted granted Critical
Publication of CN203320425U publication Critical patent/CN203320425U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

本实用新型涉及一种现浇箱梁侧模滑移施工装置,其特征在于:由可移动侧模、滑移轨道及千斤顶构成,可移动侧模由侧模及固装与侧模底部的走行滑轮构成,在支架上固装所述滑移轨道,可移动侧模移动安装在该滑移轨道上,在支架上部与侧模底部之间安装千斤顶。采用本实用新型的滑移施工装置,在施工过程中,有效减少了传统现浇梁施工过程中需要大量吊装设备、运输车辆对侧模进行拆卸、倒运、吊装,经济实用、操作简单,可有效节省经费及缩短工时,具有明显的经济效益和社会效益。

Description

现浇箱梁侧模滑移施工装置
技术领域
本实用新型属于桥梁施工技术领域,特别是一种现浇箱梁侧模滑移施工装置。
背景技术
随国民经济发展,城市立交、高速公路高架桥、高速铁路高架桥的规模越来越大,出现大量的现浇箱梁施工。传统施工方法为:搭设支架→安装侧模→铺装底模→绑扎底、腹板钢筋→安装内模→绑扎顶板钢筋安装预埋件→浇筑混凝土→混凝土养护→拆模。一般情况下浇筑完一孔箱梁后,需拆除侧模后利用吊车和板车倒运至下一孔箱梁,再利用吊车安装侧模。可见,现有的现浇梁施工方法极为复杂,费时费力。
发明内容
本实用新型的目的在于克服现有技术的不足,提供一种现浇箱梁侧模滑移施工装置,其可有效降低施工难度,操作简单,提供施工效率。
本实用新型解决其技术问题是采取以下技术方案实现的:
一种现浇箱梁侧模滑移施工装置,由可移动侧模、滑移轨道及千斤顶构成,可移动侧模由侧模、侧模桁架及固装与侧模桁架底部的走行滑轮构成,在支架上固装所述滑移轨道,可移动侧模移动安装在该滑移轨道上,在支架上部与侧模底部之间安装千斤顶。
而且,在所述侧模桁架底部安装两排走行滑轮。
而且,所述千斤顶设置于靠近滑移轨道的位置。
本实用新型的优点和积极效果是:
1.本现浇箱梁侧模滑移施工装置,在施工过程中,利用现浇梁如下两个特点:连续多孔采用现浇施工方法进行施工,且连续浇筑的箱梁支架方式相同,采用滑移施工方法,有效减少了传统现浇梁施工过程中需要大量吊装设备、运输车辆对侧模进行拆卸、倒运、吊装,经济实用、操作简单。
2.本现浇箱梁侧模滑移施工装置,在施工过程中,可有效节省经费及缩短工时,如在沈丹客专一座连续8孔现浇梁施工中,节约机械费用约16万元,节约工期16天,具有明显的经济效益和社会效益。
附图说明
图1为本实用新型的结构示意图;
图2为图1的A部放大图。
附图标记:
1-侧模、2-侧模桁架、3-走行滑轮、4-千斤顶、5-滑移轨道、6-支架。
具体实施方式
下面结合附图、通过具体实施例对本实用新型作进一步详述。以下实施例只是描述性的,不是限定性的,不能以此限定本实用新型的保护范围。
一种现浇箱梁侧模滑移施工装置,由可移动侧模、滑移轨道5及千斤顶4构成,可移动侧模由侧模1、侧模桁架2及固装与侧模桁架底部的两排走行滑轮3构成,在支架6上固装并排的滑移轨道,可移动侧模移动安装在该滑移轨道上,在支架上部与侧模底部之间对称安装千斤顶。千斤顶位置卡靠近于行走滑轮的位置。上述可移动侧模、滑移轨道是位于箱梁两侧的相同结构。
本现浇箱梁侧模滑移施工装置的施工方法为:
⑴、施工第一孔箱梁时,采用千斤顶将侧模调整至设计标高,并锁死千斤顶。
⑵、浇筑完第一孔箱梁的混凝土,待混凝土达到拆模强度后,将同侧的千斤顶同步、缓慢落下。
⑶、将可移动侧模的走行滑轮落在滑移轨道上;轨道采用工16工字钢。
⑷、安装与第一孔箱梁连续的第二孔箱梁支架,并在支架上安装好滑移轨道,并保证第一、第二孔箱梁支架上的滑移轨道连接平顺。
⑸、利用安装在前端墩顶的卷扬机拖拉侧模,可移动侧模沿着轨道向前移动,移动至设计位置后,停止拖拉,对可移动侧模位置进行微调,并利用千斤顶将侧模顶至设计标高、锁死。
⑹、重复上述步骤,实现现浇梁侧模的滑移施工。
尽管为说明目的公开了本实用新型的实施例和附图,但是本领域的技术人员可以理解:在不脱离本实用新型及所附权利要求的精神和范围内,各种替换、变化和修改都是可能的,因此,本实用新型的范围不局限于实施例和附图所公开的内容。

Claims (3)

1.一种现浇箱梁侧模滑移施工装置,其特征在于:由可移动侧模、滑移轨道及千斤顶构成,可移动侧模由侧模、侧模桁架及固装与侧模桁架底部的走行滑轮构成,在支架上固装所述滑移轨道,可移动侧模移动安装在该滑移轨道上,在支架上部与侧模底部之间安装千斤顶。
2.根据权利要求1所述的现浇箱梁侧模滑移施工装置,其特征在于:在所述侧模桁架底部安装两排走行滑轮。
3.根据权利要求1所述的现浇箱梁侧模滑移施工装置,其特征在于:所述千斤顶设置于靠近滑移轨道的位置。
CN2013203946618U 2013-07-04 2013-07-04 现浇箱梁侧模滑移施工装置 Expired - Fee Related CN203320425U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013203946618U CN203320425U (zh) 2013-07-04 2013-07-04 现浇箱梁侧模滑移施工装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013203946618U CN203320425U (zh) 2013-07-04 2013-07-04 现浇箱梁侧模滑移施工装置

Publications (1)

Publication Number Publication Date
CN203320425U true CN203320425U (zh) 2013-12-04

Family

ID=49659791

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013203946618U Expired - Fee Related CN203320425U (zh) 2013-07-04 2013-07-04 现浇箱梁侧模滑移施工装置

Country Status (1)

Country Link
CN (1) CN203320425U (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103352427A (zh) * 2013-07-04 2013-10-16 中铁十三局集团电务工程有限公司 现浇箱梁侧模滑移施工装置及方法
CN110306432A (zh) * 2019-04-11 2019-10-08 中铁六局集团天津铁路建设有限公司 相邻桥梁施工时的可移动侧向模板支撑体系及施工方法
CN111824191A (zh) * 2020-07-13 2020-10-27 中国水利水电第十二工程局有限公司 一种专用于运输重型预制拱桥拼装箱梁的方法
CN113882279A (zh) * 2021-10-22 2022-01-04 中建三局集团有限公司 能自行走和调节的混凝土连续梁悬臂浇筑施工装备及工艺
CN113914217A (zh) * 2021-09-15 2022-01-11 江苏月生达机械制造有限公司 一种整体式自行外模轨道

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103352427A (zh) * 2013-07-04 2013-10-16 中铁十三局集团电务工程有限公司 现浇箱梁侧模滑移施工装置及方法
CN110306432A (zh) * 2019-04-11 2019-10-08 中铁六局集团天津铁路建设有限公司 相邻桥梁施工时的可移动侧向模板支撑体系及施工方法
CN111824191A (zh) * 2020-07-13 2020-10-27 中国水利水电第十二工程局有限公司 一种专用于运输重型预制拱桥拼装箱梁的方法
CN113914217A (zh) * 2021-09-15 2022-01-11 江苏月生达机械制造有限公司 一种整体式自行外模轨道
CN113882279A (zh) * 2021-10-22 2022-01-04 中建三局集团有限公司 能自行走和调节的混凝土连续梁悬臂浇筑施工装备及工艺
CN113882279B (zh) * 2021-10-22 2024-04-02 中建三局集团有限公司 能自行走和调节的混凝土连续梁悬臂浇筑施工装备及工艺

Similar Documents

Publication Publication Date Title
CN103352427A (zh) 现浇箱梁侧模滑移施工装置及方法
CN203320425U (zh) 现浇箱梁侧模滑移施工装置
CN103334381B (zh) 安装钢箱梁的全支架轨道台车驮移装置及施工方法
CN203866656U (zh) 一种用于轨道施工的道岔铺设机
CN201003145Y (zh) 上行自行式移动模架
CN204662279U (zh) 带防护体系的滚动式砼箱梁桥转体施工合拢吊架装置
CN103669216A (zh) 一种钢箱梁散拼滑移装置及安装方法
CN205223872U (zh) 一种拖吊结合式新型挂篮结构
CN104763446A (zh) 地铁车站施工用多功能台车
CN102134832B (zh) 活动支架辅助不变幅架梁吊机架设钢箱梁方法及活动支架
CN103074871B (zh) 一种弧形坡面混凝土滑升模板
CN205400756U (zh) 可变断面台车
CN103615262B (zh) 一种主体结构可整体通过常规断面的钢模台车及其实现方法
CN106192761B (zh) 一种在桥隧狭短过渡段拆解移动模架的方法
CN206035507U (zh) 一种矩形箱涵及隧道施工用台车
CN201776835U (zh) 高速铁路预制箱梁液压内模销装液压机构
CN203769791U (zh) 一种盾构台车设备小曲率半径转向滑移装置
CN203715086U (zh) 一种起重机车轮组快速更换装置
CN202705913U (zh) 一种铁路现浇简支箱梁侧模滑动小车
CN206359897U (zh) 一种铰接式钢芯模单元
CN204532374U (zh) 地铁车站施工用多功能台车
CN214530206U (zh) 一种便捷式移动模架造桥机
CN104164838A (zh) 轻型组合式移梁台车
CN210031563U (zh) 一种可移动的模块化箱涵快速施工装置
CN203570323U (zh) 一种主体结构可整体通过常规断面的钢模台车

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: CHINA RAILWAY CONSTRUCTION BRIDGE ENGINEERING GROU

Free format text: FORMER NAME: CHINA RAILWAY 13TH BUREAU GROUP ELECTRICAL SERVICE ENGINEERING CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: 300150 Tianjin city Hebei District Zhicheng Daocheng of No. 41

Patentee after: CR13G ELECTRIC ENGINEERING CO., LTD.

Address before: 300150 Tianjin city Hebei District Zhicheng Daocheng of No. 41

Patentee before: CR13G Electric Engineering Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131204

Termination date: 20180704

CF01 Termination of patent right due to non-payment of annual fee