CN203284883U - Ap1000核电穹顶拼装胎架 - Google Patents

Ap1000核电穹顶拼装胎架 Download PDF

Info

Publication number
CN203284883U
CN203284883U CN2013202407314U CN201320240731U CN203284883U CN 203284883 U CN203284883 U CN 203284883U CN 2013202407314 U CN2013202407314 U CN 2013202407314U CN 201320240731 U CN201320240731 U CN 201320240731U CN 203284883 U CN203284883 U CN 203284883U
Authority
CN
China
Prior art keywords
dome
nuclear power
column
stand columns
assembly unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN2013202407314U
Other languages
English (en)
Inventor
伍崇明
邓国平
王晓峰
张芳芳
杨磊
杜佩佩
高飞
李春兰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Nuclear Industry 24 Construction Co Ltd
Original Assignee
China Nuclear Industry 24 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Nuclear Industry 24 Construction Co Ltd filed Critical China Nuclear Industry 24 Construction Co Ltd
Priority to CN2013202407314U priority Critical patent/CN203284883U/zh
Application granted granted Critical
Publication of CN203284883U publication Critical patent/CN203284883U/zh
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本实用新型涉及一种AP1000核电穹顶拼装胎架,包括支撑穹顶环梁的沿整个周向布置的内圈立柱、支撑穹顶径向梁一端的沿整个周向布置的外圈立柱、支撑穹顶径向梁另一端的沿整个周向布置的混凝土基础。内圈立柱与外圈立柱沿轴向由两段组成,在穹顶本体拼装完毕后,将内圈立柱与外圈立柱的上半段拆除,内圈立柱与外圈立柱的下半段通过支撑牛腿连接;支撑牛腿与穹顶模块连接。本实用新型材料用量少,操作简便,结构螺栓连接节点,易拆卸易运输,胎架结构与穹顶下口空间较大,可用于内部模块材料的倒运、安装;可有效的缩短胎具的拼装工期和穹顶的施工周期,提高穹顶的装配精度。

Description

AP1000核电穹顶拼装胎架
技术领域
本实用新型涉及一种AP1000核电穹顶拼装胎架,特别是涉及一种属于核电建筑施工的技术领域,更是一种简易灵活,便于重组、拆卸、重复利用的AP1000穹顶拼装专用胎架。
背景技术
AP1000核电技术是目前全球核电市场中最安全、最先进的商业核电技术,同时也是中国第三代核电自主技术。AP1000钢穹顶形成叠合式结构,需设计特殊胎架来满足整个现场施工的要求。但是传统的胎架多数集预制和拼装于一体,设计结构复杂,占用空间大,且施工时间长。因此亟需提供一种简易灵活,便于重组、拆卸、重复利用的AP1000穹顶拼装专用胎架。
发明内容
本实用新型要解决的技术问题是提供一种提高穹顶的拼装精度、减少空间使用位置,同时缩短施工周期的AP1000核电穹顶拼装胎架。
为解决上述技术问题,本实用新型一种AP1000核电穹顶拼装胎架,包括支撑穹顶环梁的沿整个周向布置的内圈立柱、支撑穹顶径向梁一端的沿整个周向布置的外圈立柱、支撑穹顶径向梁另一端的沿整个周向布置的混凝土基础。
内圈立柱之间通过内圈横梁型钢和斜撑固定。
外圈立柱之间通过外圈横梁型钢和斜撑固定。
内圈立柱与外圈立柱对应位置处通过内外圈横梁和内外圈斜撑固定。
混凝土基础沿周向均匀布置,数量为32个。
内圈立柱与外圈立柱沿轴向由两段组成,在穹顶本体拼装完毕后,将内圈立柱与外圈立柱的上半段拆除,内圈立柱与外圈立柱的下半段通过支撑牛腿连接;支撑牛腿与穹顶模块连接。
本实用新型在满足穹顶单元拼装要求的前提下,胎架材料用量少,操作简便,结构螺栓连接节点,易拆卸易运输,胎架结构与穹顶下口空间较大,可用于内部模块材料的倒运、安装;内部施工空间大,中间不设支撑,避免了因中间支撑太多而导致的施工操作中的局限性,可有效的缩短胎具的拼装工期和穹顶的施工周期,提高穹顶的装配精度。
附图说明
图1为穹顶胎架拼装平面布置图。
图2为穹顶外圈单元展开示意图。
图3为穹顶内圈单元展开部分图。
图4为穹顶径向梁支撑图。
图5为穹顶模块平台支撑图。
图中:1为外圈立柱,2为内圈立柱,3为外圈横梁型钢、4为内圈横梁型钢,5为内外圈横梁,6为支撑牛腿,7为斜撑,8为内外圈斜撑,9为穹顶模块,10为穹顶径向梁,11为穹顶环梁,12为混凝土基础。
具体实施方式
下面结合附图和实施例对本实用新型作进一步详细的说明。
胎架安装流程:胎架基础安装调平—基础上测量放线—立柱单元安装—柱间支撑连接。
外圈单元实施方式:沿整个周向布置的外圈立柱1之间通过螺栓与外圈横梁型钢3、斜撑7连接,形成稳定桁架结构,如图2所示。
内圈单元实施方式:沿整个周向布置的内圈立柱2之间通过螺栓与内圈横梁型钢4、斜撑7连接,形成稳定桁架结构,如图3所示。
内、外圈之间实施方式:外圈立柱1、内圈立柱2对应位置处采用螺栓与内外圈斜撑8、内外圈横梁5连接方式,形成内、外圈立柱间的桁架结构,确保环向框架的平面稳定性。
穹顶与胎架的实施方式:穹顶径向梁10一端支承在混凝土基础12上,另一端支承在外圈立柱1上,与穹顶环梁11焊接形成穹顶本体结构。混凝土基础12沿周向均匀布置,数量为32个。穹顶环梁11由内圈立柱2支撑。基础和钢柱之间不设支撑,为穹顶本体的附属模块提供足够的拼装空间。如图4所示。
外圈立柱1、内圈立柱2沿轴向各由两段组成,两段间采用螺栓连接,在穹顶本体拼装完毕后,将外圈立柱1、内圈立柱2的上半段拆除,外圈立柱1、内圈立柱2的下半段与支撑牛腿6采用螺栓连接。支撑牛腿再通过螺栓与穹顶模块9相连接,起到支撑作用,如图5所示。

Claims (6)

1.AP1000核电穹顶拼装胎架,其特征在于:包括支撑穹顶环梁的沿整个周向布置的内圈立柱、支撑穹顶径向梁一端的沿整个周向布置的外圈立柱、支撑穹顶径向梁另一端的沿整个周向布置的混凝土基础。
2.根据权利要求1所述的一种AP1000核电穹顶拼装胎架,其特征在于:所述内圈立柱之间通过内圈横梁型钢和斜撑固定。
3.根据权利要求1所述的一种AP1000核电穹顶拼装胎架,其特征在于:所述外圈立柱之间通过外圈横梁型钢和斜撑固定。
4.根据权利要求1所述的一种AP1000核电穹顶拼装胎架,其特征在于:所述内圈立柱与外圈立柱对应位置处通过内外圈横梁和内外圈斜撑固定。
5.根据权利要求1所述的一种AP1000核电穹顶拼装胎架,其特征在于:所述混凝土基础沿周向均匀布置,数量为32个。
6.根据权利要求1所述的一种AP1000核电穹顶拼装胎架,其特征在于:所述内圈立柱与外圈立柱沿轴向由两段组成,在穹顶本体拼装完毕后,将内圈立柱与外圈立柱的上半段拆除,内圈立柱与外圈立柱的下半段通过支撑牛腿连接;支撑牛腿与穹顶模块连接。
CN2013202407314U 2013-05-07 2013-05-07 Ap1000核电穹顶拼装胎架 Withdrawn - After Issue CN203284883U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013202407314U CN203284883U (zh) 2013-05-07 2013-05-07 Ap1000核电穹顶拼装胎架

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013202407314U CN203284883U (zh) 2013-05-07 2013-05-07 Ap1000核电穹顶拼装胎架

Publications (1)

Publication Number Publication Date
CN203284883U true CN203284883U (zh) 2013-11-13

Family

ID=49541254

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013202407314U Withdrawn - After Issue CN203284883U (zh) 2013-05-07 2013-05-07 Ap1000核电穹顶拼装胎架

Country Status (1)

Country Link
CN (1) CN203284883U (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104141390A (zh) * 2013-05-07 2014-11-12 中国核工业二四建设有限公司 Ap1000核电穹顶拼装胎架
CN105714935A (zh) * 2014-12-03 2016-06-29 中国核工业二四建设有限公司 Ap1000叠合式穹顶组拼工艺
CN105839780A (zh) * 2016-05-12 2016-08-10 中国工程物理研究院总体工程研究所 一种用于支撑球面排布大口径光学元件的金属框架
CN106836829A (zh) * 2016-12-30 2017-06-13 中国核工业华兴建设有限公司 一种环吊牛腿的安装结构及其安装方法

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104141390A (zh) * 2013-05-07 2014-11-12 中国核工业二四建设有限公司 Ap1000核电穹顶拼装胎架
CN104141390B (zh) * 2013-05-07 2016-11-23 中国核工业二四建设有限公司 Ap1000核电穹顶拼装胎架
CN105714935A (zh) * 2014-12-03 2016-06-29 中国核工业二四建设有限公司 Ap1000叠合式穹顶组拼工艺
CN105714935B (zh) * 2014-12-03 2018-11-27 中国核工业二四建设有限公司 Ap1000叠合式穹顶组拼工艺
CN105839780A (zh) * 2016-05-12 2016-08-10 中国工程物理研究院总体工程研究所 一种用于支撑球面排布大口径光学元件的金属框架
CN105839780B (zh) * 2016-05-12 2017-12-15 中国工程物理研究院总体工程研究所 一种用于支撑球面排布大口径光学元件的金属框架
CN106836829A (zh) * 2016-12-30 2017-06-13 中国核工业华兴建设有限公司 一种环吊牛腿的安装结构及其安装方法
CN106836829B (zh) * 2016-12-30 2019-04-12 中国核工业华兴建设有限公司 一种环吊牛腿的安装结构及其安装方法

Similar Documents

Publication Publication Date Title
CN203284883U (zh) Ap1000核电穹顶拼装胎架
CN104141390B (zh) Ap1000核电穹顶拼装胎架
CN109184189B (zh) 一种大直径筒仓锥壳仓顶结构施工方法
CN210316779U (zh) 水塔倒锥壳体的模板支撑结构
CN102071830B (zh) 一种frp管-混凝土-钢管组合管塔及其分节段建造方法
CN201560398U (zh) 用于斜拉桥塔柱索导管精确定位的钢内模
CN214090973U (zh) 用于浇筑钢筋砼圆筒仓仓顶混凝土的底模板支撑钢架
CN102146492A (zh) 转炉本体设备安装的方法及工装平台
CN211548750U (zh) 圆筒状墙板模架支撑
CN202139255U (zh) 转炉本体设备安装的工装平台
CN204282228U (zh) 一种箱式钢拱梁整体卧式组对专用胎架
CN204386152U (zh) 大直径筒体构筑物的滑模体系
CN201460303U (zh) 快装式多功能台仓
CN103790376A (zh) 用于双曲面建筑物施工的墙体模架及墙体的施工方法
CN202945846U (zh) 大直径无内支撑锥顶罐锥顶结构
CN103306378A (zh) 一种多向穿心钢牛腿、环梁、钢管混凝土柱梁节点施工方法
CN203795932U (zh) 喷雾塔筒体支撑装置
CN102454294A (zh) 钢筋混凝土与钢结构料仓组合框架结构施工方法
CN203320701U (zh) 一种多向穿心钢牛腿、环梁、钢管混凝土柱梁节点
CN203114533U (zh) 风能设备阀基
CN206091252U (zh) 一种用于支撑锥体异形钢结构施工的临时支撑装置
CN204385909U (zh) 一种具有自复位功能的装配式混凝土框架组合节点
CN104652824A (zh) 一种核电站cr10模块外部绑扎钢筋用钢筋支架
CN109295993B (zh) 一种快速周转施工用的管柱基础结构及使用方法
CN219241487U (zh) 钢结构冷却塔

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20131113

Effective date of abandoning: 20170524