CN203175055U - Special lifting appliance for installation of concrete structure steel beams - Google Patents

Special lifting appliance for installation of concrete structure steel beams Download PDF

Info

Publication number
CN203175055U
CN203175055U CN 201320147839 CN201320147839U CN203175055U CN 203175055 U CN203175055 U CN 203175055U CN 201320147839 CN201320147839 CN 201320147839 CN 201320147839 U CN201320147839 U CN 201320147839U CN 203175055 U CN203175055 U CN 203175055U
Authority
CN
China
Prior art keywords
lifting
welded
claw
clamping claw
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201320147839
Other languages
Chinese (zh)
Inventor
张永海
张先英
董军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Chemical Engineering Second Construction Corp
Original Assignee
China Chemical Engineering Second Construction Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Chemical Engineering Second Construction Corp filed Critical China Chemical Engineering Second Construction Corp
Priority to CN 201320147839 priority Critical patent/CN203175055U/en
Application granted granted Critical
Publication of CN203175055U publication Critical patent/CN203175055U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

A special lifting appliance for installation of concrete structure steel beams belongs to the building field and is mainly suitable for situations where steel beams are installed on a concrete column on the premise without lifting points. The special lifting appliance is composed of a lifting rod, a chain block and a clamping claw, wherein one end of the lifting rod is welded with a lifting lug, the other end of the lifting rod is welded with the clamping claw, a lifting hook of the chain block is connected with a lifting lug, the lifting rod is formed by two steel channels which are welded at a 90-degree angle and is in an L shape, the clamping claw is formed by three steel channels which are welded and is of a U shape, and a locking pin is arranged on the clamping claw. When steel frames are lifted, holes reversed on concrete floor slabs are well utilized to enable the concrete floor slabs to be lifted, holes punched on floor slabs are reduced, and floor slabs can be conveniently conveyed to each floor. Furthermore, the special lifting appliance can be inserted easily in lifting and can be taken out conveniently after lifting so as to effectively save labor cost and reduce using amount of materials.

Description

The concrete structure girder steel is installed special hanger
Technical field
The utility model belongs to building field, mainly is applicable under the prerequisite that does not have suspension centre girder steel is installed on the concrete column, is specifically related to a kind of concrete structure girder steel special hanger is installed.
Background technology
Eleventh Five-Year Plan period is with fastest developing speed 5 years of Chinese soda industry, also is 5 years that stride forward steadily to soda ash power, and the industry integral level obtains substantive raising.Through the fast development in 5 years, China's soda ash production capacity reached 2,430 ten thousand tons, and soda ash output reached 2,029 ten thousand tons in 2010, had 9 tame enterprise production capacities above 1,000,000 tons; The technology of soda industry and equipment are through constantly innovation, approaching or part has reached international most advanced level, investigating the most of Sodium Carbonate Plant main body of discovery by reality is concrete structure, the support support of pipelines is steel beam structure, the method of lifting also is of all kinds, how to satisfy installation requirements, people are exploring always.The construction of pipeline steelframe is generally installed after the factory building main body construction is finished, and concrete floor does not arrange the hanger position yet, under the condition that can't satisfy lifting, job practices was in the past: method one: in suspension centre methods that arranges commonly used such as floor burrow, shortcoming: burrow use manually often at floor, the quantity that burrows is many, and is big to the quality influence of floor, repairs also relatively difficulty later on; Method two: upright man-like shelf or single-column pole on ground, use jack to install, shortcoming: install for the multilayer steelframe, and man-like shelf or the single-column pole specification used for the big steelframe of specification are also big, fall defeated also inconvenient toward every layer, need the material of usefulness also many, use manually often, influence the construction period.
Summary of the invention
The utility model provides a kind of concrete structure girder steel that special hanger is installed, and its objective is that utilizing on the floor pipeline that preformed hole is installed lifts, and can safety, finish the lifting of the special shaped steel of structure fast, efficiently.
The utility model is combined by suspension rod, jack and claw, the end welding hanger of suspension rod, and the other end welding claw of suspension rod, the suspension hook of jack connects hanger; It is L shaped that suspension rod becomes an angle of 90 degrees to be welded into by two channel-section steels;
Claw is welded into U-shaped by three channel-section steels, and claw is provided with lock pin.
Using method of the present utility model is: jack is hung down from the hole that floor is reserved, the suspension hook of jack hangs up hanger, the suspension rod of an angle of 90 degrees is walked around the corner angle of 90 degree of concrete column, with claw with hung that shaped steel blocks and made claw and shaped steel formation one with lock pin locking.
Stiffener is set on the claw, can manually adjusts the locating piece position, rigging is inserted in the shaped steel, play the effect of producing once and repeatedly utilizing.
Adopting two cover (positive and negative setting) the utility model suspenders to be hung shaped steel lifts by crane simultaneously, by regulating jack, make shaped steel be in balance, well utilize lever principle to install, save time, laborsaving, save material, reduce cost, can conveniently take out suspender after the installation, improve integral installation efficient greatly.
The utility model well utilizes the hole of reserving on the concrete floor to lift when the lifting steelframe, reduces floor and burrows, convenient every layer of transportation, and when lifting, insert easily, the lifting back is convenient takes out, effectively save cost of labor, reduced the expense of material.
Description of drawings
Fig. 1 is structure chart of the present utility model.
Fig. 2 is the upward view of Fig. 1.
Fig. 3 is the front view of claw in the utility model.
Fig. 4 is the right view of Fig. 3.
Fig. 5 is the vertical view of Fig. 3.
Among the figure, 1, concrete column 2, hung girder steel 3, suspension rod 4, stiffener 5, hanger 6, lock pin 7, jack 8, floor 9, floor pipeline preformed hole hole, 10, claw.
The specific embodiment
Fig. 1, Fig. 2, Fig. 3, Fig. 4, shown in Figure 5, the utility model is combined by suspension rod 3, jack 7 and claw, the end welding hanger 5 of suspension rod 3, the other end welding claw 10 of suspension rod 3, the suspension hook of jack 7 connects hanger 5; It is L shaped that suspension rod 3 becomes an angle of 90 degrees to be welded into by two channel-section steels;
Claw 10 is welded into U-shaped by three channel-section steels, and claw 10 is provided with lock pin 6.
In order to guarantee the intensity at when lifting suspension rod lifting surface area, set up stiffener 4 in the both sides of the channel-section steel of claw 10.

Claims (1)

1. a concrete structure girder steel is installed special hanger, it is characterized in that it is combined by suspension rod, jack and claw, the end welding hanger of suspension rod, and the other end welding claw of suspension rod, the suspension hook of jack connects hanger; It is L shaped that suspension rod becomes an angle of 90 degrees to be welded into by two channel-section steels; Claw is welded into U-shaped by three channel-section steels, and claw is provided with lock pin.
CN 201320147839 2013-03-28 2013-03-28 Special lifting appliance for installation of concrete structure steel beams Expired - Lifetime CN203175055U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320147839 CN203175055U (en) 2013-03-28 2013-03-28 Special lifting appliance for installation of concrete structure steel beams

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320147839 CN203175055U (en) 2013-03-28 2013-03-28 Special lifting appliance for installation of concrete structure steel beams

Publications (1)

Publication Number Publication Date
CN203175055U true CN203175055U (en) 2013-09-04

Family

ID=49071779

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320147839 Expired - Lifetime CN203175055U (en) 2013-03-28 2013-03-28 Special lifting appliance for installation of concrete structure steel beams

Country Status (1)

Country Link
CN (1) CN203175055U (en)

Similar Documents

Publication Publication Date Title
CN205151516U (en) Simple and easy hoist and mount of prefabricated wallboard
CN206971404U (en) A kind of out-hung panel and the attachment structure of girder steel lower flange
CN102777037B (en) Simple and practical hoisting construction method of long-span steel girder
CN203333143U (en) Building construction basket
CN201232353Y (en) High pier lifting type turnover formwork platform hanger
CN103061514A (en) Long-span steel structure corridor construction method
CN202882376U (en) Elevator shaft template support platform
CN203175055U (en) Special lifting appliance for installation of concrete structure steel beams
CN209353734U (en) For installing the double-track device of curtain wall
CN207618901U (en) A kind of vertical hanging apparatus of steel column
CN203715136U (en) Tool for hoisting lifting hole cover plate in nuclear power plant
CN204435421U (en) A kind of assembling manhole
CN206232309U (en) A kind of glomeration building concrete hollow block wall piece banding system
CN202850471U (en) Lifting type operation platform for elevator well
CN206438749U (en) Construction operation platform in turnover type elevator
CN206846097U (en) A kind of Men Gangyu frameworks separately-loaded pipeline support structure
CN206256382U (en) It is a kind of to suspend purlin car in midair for the triangle that Wavelike steel webplate is installed
CN204873511U (en) Embedded trolley frame of two roof beam hoists
CN204823757U (en) Downhill path hoist of setting a roof beam in place on stride
CN203612870U (en) Movable and detachable lattice type independent hanging bracket for steel structure
CN204416890U (en) A kind of handling brick cage
CN205677173U (en) Double race oblique line stair
CN205088680U (en) Manual hole digging pile support that is unearthed
CN205116757U (en) Girder steel conveyer that slides
CN204282684U (en) A kind of concrete staircase

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20130904