CN203333143U - Building construction basket - Google Patents

Building construction basket Download PDF

Info

Publication number
CN203333143U
CN203333143U CN2013204089161U CN201320408916U CN203333143U CN 203333143 U CN203333143 U CN 203333143U CN 2013204089161 U CN2013204089161 U CN 2013204089161U CN 201320408916 U CN201320408916 U CN 201320408916U CN 203333143 U CN203333143 U CN 203333143U
Authority
CN
China
Prior art keywords
fence
supporting leg
supporting plate
hanging basket
movable supporting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2013204089161U
Other languages
Chinese (zh)
Inventor
关胜玉
李永刚
穆军军
丁童
薛平
左传信
隋玉朋
周建军
杨爽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
Original Assignee
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 22MCC Group Corp Ltd filed Critical China 22MCC Group Corp Ltd
Priority to CN2013204089161U priority Critical patent/CN203333143U/en
Application granted granted Critical
Publication of CN203333143U publication Critical patent/CN203333143U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to a building construction basket. The building construction basket comprises a movable supporting plate which is provided with a fence. The fence is of a rectangular frame structure. A reinforcing rib is arranged on the side face of the fence, and the top surface and the bottom surface of the fence are hollow. The bottom of the side face of the fence is symmetrically provided with supporting legs extending downwards along the bottom surface of the fence. A hoisting ring is arranged on the top of the side face of the fence. The hoisting ring extends upwards along the top surface of the fence. The movable supporting plate is movably connected with the fence through an inserting bolt and the supporting legs. The building construction basket is easy to manufacture and convenient to operate. The production mode can be standardized, construction operating procedures can be simplified, the labor intensity can be reduced, and the labor efficiency can be improved.

Description

The building operation hanging basket
Technical field
The utility model relates to a kind of Architectural Equipment, specifically, relates to a kind of building operation hanging basket that is mainly used in the building material liftings such as brick, aerated blocks.
Background technology
In prior art, building operation need be transported to each floor by building materialss such as ground brick or aerated blocks, at present most suspension bucket or Lifting baskets of adopting.This hanging basket is simple casher box, and surrounding and bottom are the railing be fixedly linked; The two all needs while using the building materials such as brick or aerated blocks are placed in suspension bucket or hanging basket, starts thereafter the jacking system handling to designated floor, then the material block-by-blocks such as brick or aerated blocks are taken out of to suspension bucket or hanging basket.
Its Shortcomings is: the surrounding of suspension bucket or hanging basket and bottom are the fixed closed structure, need block by block outwards carrying while unloading the building material such as brick, and its labour intensity is large, efficiency is low.
The utility model content
For above-mentioned deficiency of the prior art, the utility model provides a kind of can reduce labour intensity, improves the building operation hanging basket of operating efficiency.
Technical solution adopted in the utility model is:
A kind of building operation hanging basket, comprise movable supporting plate, on movable supporting plate, is provided with fence, the rectangular framed structure of described fence, and the fence side is provided with reinforced rib, and end face and bottom surface are hollow form; The bottom of described fence side is symmetrically arranged with supporting leg, and supporting leg is along the fence bottom surface to downward-extension; The top of described fence side is provided with suspension ring; Suspension ring extend upward along the fence end face; Movable supporting plate is by plug and supporting leg and fence flexible connection.
Described supporting leg is structure as a whole and is connected with fence by welding with suspension ring.
Described movable supporting plate consists of bearing surface and the support beam that is arranged on the bearing surface below.
Described supporting leg and suspension ring are symmetrical arranged up and down along end face and the bottom surface of fence.
The height of described supporting leg is less than the support depth of beam.
The beneficial effect of the relative prior art of the utility model:
The utility model building operation hanging basket, make simple, easy to operate, can the standard mode of production, simplify constructing operation, reduce labour intensity, raise labour efficiency.
The accompanying drawing explanation
Fig. 1 is the utility model building operation hanging basket package assembly schematic diagram;
Fig. 2 is the Fence structure schematic diagram of the utility model building operation hanging basket;
Fig. 3 is the movable support board structure schematic diagram of the utility model building operation hanging basket;
Fig. 4 is the plug structural representation of the utility model building operation hanging basket.
Major part nomenclature in accompanying drawing:
In figure:
1, fence 2, suspension ring
3, movable supporting plate 4, plug
5, reinforced rib 6, hook
7, supporting leg 8, support beam
9, bearing surface 10, grab.
The specific embodiment
Referring to drawings and Examples, the utility model is described in detail:
Accompanying drawing 1-4 is known, and a kind of building operation hanging basket comprises movable supporting plate 3, on movable supporting plate 3, is provided with fence 1, the rectangular framed structure of described fence 1, and fence 1 side is provided with reinforced rib 5, and end face and bottom surface are hollow form; The bottom of described fence 1 side is symmetrically arranged with supporting leg 7, and supporting leg 7 is along the fence bottom surface to downward-extension; The top of described fence 1 side is provided with suspension ring 2; Suspension ring 2 extend upward along fence 1 end face; Movable supporting plate 3 is flexibly connected with fence 1 by plug 4 and supporting leg 7; Described supporting leg 7 is structure as a whole and is connected with fence 1 by welding with suspension ring 2; Described movable supporting plate 3 consists of bearing surface 9 and the support beam 8 that is arranged on bearing surface 9 belows; Described supporting leg 7 and suspension ring 2 are symmetrical arranged up and down along end face and the bottom surface of fence 1; The height of described supporting leg 7 is less than the height of support beam 8.
The concrete using method of the utility model building operation hanging basket:
1, movable supporting plate is lain against on ground, pile up building material on request on movable supporting plate; Pile up and highly be less than the fence height.
2, commander's jacking system accurately is inserted in movable supporting plate and building material in fence.
3, the member plug is inserted in supporting leg, require plug and supporting leg to block mutually.
4, hoist cable and suspension ring are fixed, commander's jacking system is sling fence to assigned address.
5, the member plug is extracted out from supporting leg, and utilized grab to be hung on fence.
6, commander's jacking system lifting, movable supporting plate and building material are stayed assigned address.
7, repeat above-mentioned steps and carry out the building material handling.
The utility model construction hanging basket, a fence need be equipped with 3-4 movable supporting plates, and movable supporting plate can utilize to be hung on fence and have enough to meet the need use.

Claims (5)

1. a building operation hanging basket is characterized in that: comprises movable supporting plate, on movable supporting plate, is provided with fence, and the rectangular framed structure of described fence, the fence side is provided with reinforced rib, and end face and bottom surface are hollow form; The bottom of described fence side is symmetrically arranged with supporting leg, and supporting leg is along the fence bottom surface to downward-extension; The top of described fence side is provided with suspension ring; Suspension ring extend upward along the fence end face; Movable supporting plate is by plug and supporting leg and fence flexible connection.
2. building operation hanging basket according to claim 1, it is characterized in that: described supporting leg is structure as a whole and is connected with fence by welding with suspension ring.
3. building operation hanging basket according to claim 1 is characterized in that: described movable supporting plate consists of bearing surface and the support beam that is arranged on the bearing surface below.
4. building operation hanging basket according to claim 1, it is characterized in that: described supporting leg and suspension ring are symmetrical arranged up and down along end face and the bottom surface of fence.
5. according to the described building operation hanging basket of claim 1 or 2, it is characterized in that: the height of described supporting leg is less than the support depth of beam.
CN2013204089161U 2013-07-10 2013-07-10 Building construction basket Expired - Lifetime CN203333143U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013204089161U CN203333143U (en) 2013-07-10 2013-07-10 Building construction basket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013204089161U CN203333143U (en) 2013-07-10 2013-07-10 Building construction basket

Publications (1)

Publication Number Publication Date
CN203333143U true CN203333143U (en) 2013-12-11

Family

ID=49701834

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013204089161U Expired - Lifetime CN203333143U (en) 2013-07-10 2013-07-10 Building construction basket

Country Status (1)

Country Link
CN (1) CN203333143U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104724596A (en) * 2013-12-23 2015-06-24 王圣君 Hoisting and conveying device
CN105540421A (en) * 2016-01-05 2016-05-04 武汉一冶钢结构有限责任公司 Hoisting auxiliary device and hoisting method for aerated bricks
CN107188023A (en) * 2017-06-21 2017-09-22 五冶集团上海有限公司 Nacelle device
CN108217419A (en) * 2017-12-06 2018-06-29 中国十七冶集团有限公司 A kind of combined type building block hanging apparatus

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104724596A (en) * 2013-12-23 2015-06-24 王圣君 Hoisting and conveying device
CN105540421A (en) * 2016-01-05 2016-05-04 武汉一冶钢结构有限责任公司 Hoisting auxiliary device and hoisting method for aerated bricks
CN107188023A (en) * 2017-06-21 2017-09-22 五冶集团上海有限公司 Nacelle device
CN108217419A (en) * 2017-12-06 2018-06-29 中国十七冶集团有限公司 A kind of combined type building block hanging apparatus

Similar Documents

Publication Publication Date Title
CN203333143U (en) Building construction basket
CN204401395U (en) A kind of subgrade case
CN202481972U (en) Mineshaft material hoisting frame
CN105952129B (en) A kind of elevator combined type entirety lifting operation platform and its construction method
CN202324662U (en) Installation device for foam cement composites
CN102587377B (en) Drop hammer type pile sinking device and pile sinking method thereof
CN202369321U (en) Vibration isolating support hoist
CN105417397A (en) Moving type jacking and lifting transporting equipment and method
CN207312995U (en) One kind self-control bridge-collision-avoidance wall form hanging device
CN106088431B (en) Laminated floor slab and laminated floor slab construction method for hanging
CN108792924A (en) A kind of steel bar positioning frame
CN204357138U (en) Simple steel structure lifting upending frame
CN207142643U (en) Skyscraper indoor equipment hoisting platform
CN202508813U (en) Detachable field distribution transformer transporting vehicle
CN107700854B (en) Steel plate wall sliding installation device and installation method for super high-rise core tube
CN202657862U (en) Wallboard lift-out device
CN204873511U (en) Embedded trolley frame of two roof beam hoists
CN205257821U (en) Movable hoisting equipment
CN104328920A (en) Building material conveying method
CN204356013U (en) Lifting appliance
CN206530049U (en) A kind of high-altitude formwork
CN203959641U (en) A kind of novel building hanging basket
CN102491213A (en) Vibration-insulating support slingcart
CN109384137A (en) Hollow brick cage
CN204198181U (en) Construction elevator is hung under form frame system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20131211

CX01 Expiry of patent term