CN105417397A - Moving type jacking and lifting transporting equipment and method - Google Patents

Moving type jacking and lifting transporting equipment and method Download PDF

Info

Publication number
CN105417397A
CN105417397A CN201510929956.4A CN201510929956A CN105417397A CN 105417397 A CN105417397 A CN 105417397A CN 201510929956 A CN201510929956 A CN 201510929956A CN 105417397 A CN105417397 A CN 105417397A
Authority
CN
China
Prior art keywords
pole
fixed
pulley
jack
hoisting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510929956.4A
Other languages
Chinese (zh)
Other versions
CN105417397B (en
Inventor
陆海英
生振杰
孙爱华
罗旭东
王安鑫
隗合新
安洋
阎奇
王欢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Construction Co ltd Of China Construction Sixth Engineering Bureau
China Construction Sixth Engineering Division Co Ltd
Original Assignee
China Construction Sixth Engineering Division Co Ltd
China Construction Sixth Installation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Sixth Engineering Division Co Ltd, China Construction Sixth Installation Engineering Co Ltd filed Critical China Construction Sixth Engineering Division Co Ltd
Priority to CN201510929956.4A priority Critical patent/CN105417397B/en
Publication of CN105417397A publication Critical patent/CN105417397A/en
Application granted granted Critical
Publication of CN105417397B publication Critical patent/CN105417397B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C19/00Cranes comprising trolleys or crabs running on fixed or movable bridges or gantries
    • B66C19/02Cranes comprising trolleys or crabs running on fixed or movable bridges or gantries collapsible

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

本发明公开了一种移动式起重吊装运输设备及方法,包括两个结构相同的立柱、设置于两个立柱之间的横梁,所述横梁上设置有水平移动的第一起重器;所述两个立柱下部均设置有移动式墩基础,所述两个立柱的其中一个上下两端分别套设有抱杆上滑轮和抱杆下滑轮,所述立柱上端固定设置有用于支撑抱杆上滑轮的固定夹板,所述抱杆上滑轮固定有第一定滑轮,所述抱杆下滑轮固定设置有倾斜的顶部固定有第二定滑轮的抱杆,所述抱杆的顶端设置有第二起重器,所述第二起重器的钢丝绳绕过第一定滑轮和第二定滑轮。本发明制作成本低、适用性强,适用于不同空间大小内物品的起吊运输。

The invention discloses a mobile hoisting, hoisting and transportation equipment and method, comprising two uprights with the same structure and a crossbeam arranged between the two uprights, the crossbeam is provided with a first jack that moves horizontally; The lower parts of the two columns are equipped with movable pier foundations, and the upper and lower ends of one of the two columns are respectively provided with an upper pulley and a lower pulley for the pole, and the upper end of the column is fixedly provided with a pulley for supporting the upper pole. The fixed splint, the upper pulley of the pole is fixed with the first fixed pulley, the lower pulley of the pole is fixed with the pole with the inclined top fixed with the second fixed pulley, and the top of the pole is provided with the second fixed pulley. weight, the steel wire rope of the second jack goes around the first fixed pulley and the second fixed pulley. The invention has low production cost and strong applicability, and is suitable for hoisting and transporting articles in different space sizes.

Description

一种移动式起重吊装运输设备及方法Mobile hoisting and transporting equipment and method

技术领域technical field

本发明涉及一种吊装及运输设备及方法,更具体的说,是涉及一种移动式起重吊装运输设备及方法。The present invention relates to a hoisting and transportation equipment and method, more specifically, relates to a mobile hoisting, hoisting and transportation equipment and method.

背景技术Background technique

目前,用于狭小空间内设备和材料的吊装运输大都采用机械吊车或者叉车,采用机械吊车及叉车的不足之处为:①成本高;②吊装过程对地面要求高;③吊装过程对空间条件要求高。At present, mechanical cranes or forklifts are mostly used for hoisting and transportation of equipment and materials in small spaces. The disadvantages of using mechanical cranes and forklifts are: ① high cost; ② high requirements for the ground during the hoisting process; ③ requirements for space conditions during the hoisting process high.

发明内容Contents of the invention

本发明的目的是为了克服现有技术中的不足,提供了一种制作成本低、适用性强的移动式起重吊装运输设备及方法。The object of the present invention is to overcome the deficiencies in the prior art, and provide a mobile lifting, hoisting and transporting device and method with low manufacturing cost and strong applicability.

本发明的目的是通过以下技术方案实现的。The purpose of the present invention is achieved through the following technical solutions.

本发明的移动式起重吊装运输设备,包括两个结构相同的立柱、设置于两个立柱之间的横梁,所述横梁上设置有水平移动的第一起重器;所述两个立柱下部均设置有移动式墩基础,所述两个立柱的其中一个上下两端分别套设有抱杆上滑轮和抱杆下滑轮,所述立柱上端固定设置有用于支撑抱杆上滑轮的固定夹板,所述抱杆上滑轮固定有第一定滑轮,所述抱杆下滑轮固定设置有倾斜的顶部固定有第二定滑轮的抱杆,所述抱杆的顶端设置有第二起重器,所述第二起重器的钢丝绳绕过第一定滑轮和第二定滑轮。The mobile hoisting and transporting equipment of the present invention comprises two uprights with the same structure and a crossbeam arranged between the two uprights, the crossbeam is provided with a first jack that moves horizontally; the lower parts of the two uprights are A mobile pier foundation is provided, one of the two columns is equipped with upper and lower pulleys on the pole and a lower pulley on the pole, and the upper end of the column is fixedly provided with a fixed splint for supporting the upper pulley on the pole. The upper pulley of the holding pole is fixed with a first fixed pulley, the lower pulley of the holding pole is fixed with a holding pole with a second fixed pulley fixed on the inclined top, and the top of the holding pole is provided with a second jack. The wire rope of the second jack goes around the first fixed pulley and the second fixed pulley.

本发明的目的还可通过以下技术方案实现。The purpose of the present invention can also be achieved through the following technical solutions.

本发明的移动式起重吊装运输设备,包括两个结构相同的立柱、设置于两个立柱之间的横梁,其特征在于,所述横梁设置有水平移动的第一起重器;所述两个立柱下部均设置有移动式墩基础,所述两个立柱上端均套设有抱杆上滑轮,所述两个立柱下端均套设有抱杆下滑轮,所述两个立柱均固定有用于支撑抱杆上滑轮的固定夹板,所述抱杆上滑轮均固定有第一定滑轮,所述抱杆下滑轮均固定设置有倾斜的顶部固定有第二定滑轮的抱杆,所述抱杆的顶端均设置有第二起重器,所述第二起重器的钢丝绳均绕过各自一侧的第一定滑轮和第二定滑轮。The mobile hoisting and transporting equipment of the present invention comprises two uprights with the same structure and a crossbeam arranged between the two uprights, characterized in that the crossbeam is provided with a first jack that moves horizontally; the two The lower part of the column is equipped with a movable pier foundation, the upper ends of the two columns are equipped with upper pulleys for holding poles, the lower ends of the two columns are equipped with lower pulleys for holding poles, and the two columns are fixed with pulleys for supporting The fixed splint of the pulley on the pole, the upper pulley of the pole is fixed with the first fixed pulley, the lower pulley of the pole is fixed with the pole with the second fixed pulley fixed on the top of the pole, the pole of the pole The top ends are all provided with second jacks, and the steel wire ropes of the second jacks all go around the first fixed pulley and the second fixed pulley on their respective sides.

所述移动式墩基础包括墩座,所述墩座上表面设置有一体构成的用于与立柱套接的锚头,所述墩座的侧面和底面设置有起支撑作用的固定杆,所述固定杆和墩座底部设置有滑轮。The mobile pier foundation includes a pier seat, the upper surface of the pier seat is provided with an anchor head integrally formed for socketing with the column, and the side and bottom surface of the pier seat are provided with supporting fixing rods. Pulleys are arranged at the bottom of the fixed rod and the plinth.

所述横梁由伸缩杆构成。The beam is made of telescopic rods.

所述立柱上端侧面设置有支撑横梁的牛腿。A corbel supporting the beam is arranged on the side of the upper end of the column.

所述第一起重器由移动式电葫芦构成,所述第二起重器由电葫芦构成。The first lifting device is composed of a mobile electric hoist, and the second lifting device is composed of an electric hoist.

上述移动式起重吊装运输设备的使用方法,包括以下步骤:The method for using the above-mentioned mobile lifting and transporting equipment includes the following steps:

(1)根据作业空间大小调节横梁,将本发明移至被运/吊物处;(1) Adjust the crossbeam according to the size of the working space, and move the present invention to the transported/hanging place;

(2)使第一起重器或第二起重器的吊钩挂住被运/吊物,通过横梁上的第一起重器实现被运/吊物垂直方向变化,并利用第一起重器在横梁上的水平移动实现被运/吊物水平方向位移变动;通过第二起重器可实现垂直方向变化,外力推动抱杆,带动抱杆上滑轮和抱杆下滑轮环向转动,进而实现被运/吊物环向位移变动;(2) Make the hook of the first lifter or the second lifter hang the object being transported/hanging, realize the vertical direction change of the object being transported/hanging through the first lifter on the beam, and use the first lifter to The horizontal movement on the beam realizes the horizontal displacement change of the transported/hanging object; the vertical direction change can be realized through the second jack, and the external force pushes the pole to drive the upper pulley of the pole and the lower pulley of the pole to rotate circularly, thereby realizing the Circumferential displacement changes of transported/hanging objects;

(3)通过外力利用底部的滑轮实现本发明和被运/吊物的整体移动,使被运/吊物到达指定位置。(3) The pulley at the bottom is used to realize the overall movement of the present invention and the transported/hanging object by external force, so that the transported/hanging object reaches the designated position.

与现有技术相比,本发明的技术方案所带来的有益效果是:Compared with the prior art, the beneficial effects brought by the technical solution of the present invention are:

(1)本发明中,两个立杆之间设置有可伸缩的横梁,可根据吊物的大小进行伸缩调节,节省空间,适用性强;立柱上端侧面设置有支撑横梁的牛腿,使用时可将横梁置放于牛腿上部,便于拆卸、组装;(1) In the present invention, a telescopic beam is arranged between the two poles, which can be telescopically adjusted according to the size of the hanging object, saving space and having strong applicability; the upper side of the column is provided with a corbel supporting the beam. The beam can be placed on the upper part of the corbel for easy disassembly and assembly;

(2)本发明中,横梁上设置有水平移动的第一起重器,可实现物体竖直方向的起吊和水平方向的移动;(2) In the present invention, the first jack that moves horizontally is arranged on the beam, which can realize the lifting of the object in the vertical direction and the movement in the horizontal direction;

(3)本发明中,立柱上端套置有被固定夹板支撑的固定有第一定滑轮的抱杆上滑轮,立杆下端套设有抱杆下滑轮,抱杆下滑轮固定有倾斜的顶部设置有第二定滑轮的抱杆,所述抱杆顶部设置有第二起重器,第二起重器的钢丝绳穿过第一定滑轮和第二定滑轮,将本发明移动到吊物附近,第二起重器可实现吊物竖直方向的起吊,抱杆上滑轮、抱杆下滑轮和抱杆可实现吊物沿圆周起吊,在空间受限的条件下,能够实现并完成不同重量、不同长度的吊物在三维空间下的起重、运输就位;(3) In the present invention, the upper end of the upright column is set with the upper pulley on the pole which is supported by the fixed splint and is fixed with the first fixed pulley. There is a pole with a second fixed pulley, the top of the pole is provided with a second jack, the wire rope of the second jack passes through the first fixed pulley and the second fixed pulley, and the invention is moved to the vicinity of the hanging object, The second hoist can realize the vertical lifting of the hanging object. The upper pulley of the holding pole, the lower pulley of the holding pole and the holding pole can realize the hoisting of the hanging object along the circumference. Under the condition of limited space, it can realize and complete different weights, Lifting and transportation of hanging objects of different lengths in three-dimensional space;

(4)本发明中,两个立柱下部分别设置有包含滑轮的移动式墩基础,在实现移动功能的同时,配合可伸缩的横梁,可以根据吊物尺寸和作业空间调整本发明的体积;本发明对运输地面和运输空间要求较低,适用性强;(4) In the present invention, the lower parts of the two uprights are respectively provided with movable pier foundations containing pulleys. While realizing the moving function, the volume of the present invention can be adjusted according to the size of the hanging object and the working space by cooperating with the telescopic beam; The invention has low requirements on the transportation ground and transportation space, and has strong applicability;

(5)本发明结构简单、易于制作,制作时机械设备及人力投入较少,制作所用材料二次回收率高,因此还具有成本低的优点。(5) The present invention has a simple structure, is easy to manufacture, has less mechanical equipment and manpower input during manufacture, and has a high secondary recovery rate of materials used in manufacture, so it also has the advantage of low cost.

附图说明Description of drawings

图1是本发明的结构示意图。Fig. 1 is a structural schematic diagram of the present invention.

图2是本发明中移动式墩基础的结构示意图。Fig. 2 is a structural schematic diagram of the mobile pier foundation in the present invention.

图3是图1的侧视图。FIG. 3 is a side view of FIG. 1 .

图4是本发明另一实施例的结构示意图。Fig. 4 is a schematic structural diagram of another embodiment of the present invention.

附图标记:1墩座2锚头3固定杆4滑轮5立柱6横梁7牛腿8第一起重器9抱杆上滑轮10抱杆下滑轮11固定夹板12抱杆13第一定滑轮14第二起重器15第二定滑轮16钢丝绳Reference signs: 1 pier seat 2 anchor head 3 fixed rod 4 pulley 5 upright column 6 beam 7 corbel 8 first jack 9 pole-holding upper pulley 10 pole-holding lower pulley 11 fixed splint 12 pole-holding 13 first fixed pulley 14th Two jacks 15 the second fixed pulley 16 wire rope

具体实施方式detailed description

下面结合附图对本发明作进一步的描述。The present invention will be further described below in conjunction with the accompanying drawings.

如图1至图3所示,本发明的移动式起重吊装运输设备,包括两个左右平行设置的结构相同的立柱5、设置于两个立柱5之间的横梁6,所述横梁6可由伸缩杆构成,根据作业空间和吊物的尺寸进行伸缩调整。所述立柱5上端侧面可设置有支撑横梁6的牛腿7。所述横梁6上设置有水平移动的第一起重器8,所述第一起重器8可由移动式电葫芦等构成,所述移动式电葫芦的电动按钮可固定在立柱5上,便于操作。所述两个立柱5下部均设置有移动式墩基础,所述两个立柱5中任意一个立柱5的上下两端分别套设有抱杆上滑轮9和抱杆下滑轮10,所述立柱5上端固定设置有用于支撑抱杆上滑轮9的固定夹板11,所述固定夹板11可与立柱5焊接固定。所述抱杆上滑轮9固定设置有第一定滑轮13,所述抱杆下滑轮10固定设置有倾斜的顶部固定有第二定滑轮15的抱杆12,所述抱杆12可与抱杆下滑轮10焊接固定,所述抱杆12的顶端设置有第二起重器14,所述第二起重器14的钢丝绳16绕过第一定滑轮13和第二定滑轮15,所述第二起重器14可由电葫芦构成,电葫芦的电动按钮可固定在立柱5上。As shown in Figures 1 to 3, the mobile lifting, lifting and transporting equipment of the present invention includes two uprights 5 with the same structure arranged parallel to the left and right, and a crossbeam 6 arranged between the two uprights 5, and the crossbeam 6 can be formed by It is composed of telescopic rods, which can be telescopically adjusted according to the working space and the size of the hanging objects. The upper side of the column 5 may be provided with a corbel 7 supporting the beam 6 . The first jack 8 that moves horizontally is arranged on the beam 6, and the first jack 8 can be made of a mobile electric hoist, etc., and the electric button of the mobile electric hoist can be fixed on the column 5 for easy operation. The lower parts of the two columns 5 are provided with movable pier foundations, and the upper and lower ends of any one of the columns 5 in the two columns 5 are respectively provided with upper pulleys 9 and lower pulleys 10 for the poles. The upper end is fixedly provided with a fixed splint 11 for supporting the pulley 9 on the pole, and the fixed splint 11 can be welded and fixed with the column 5 . The upper pulley 9 of the pole is fixedly provided with the first fixed pulley 13, and the lower pulley 10 of the pole is fixedly provided with the pole 12 with the second fixed pulley 15 fixed on the top of the pole, and the pole 12 can be connected with the pole The lower pulley 10 is welded and fixed, and the top of the pole 12 is provided with a second jack 14, and the steel wire rope 16 of the second jack 14 walks around the first fixed pulley 13 and the second fixed pulley 15. Two jacks 14 can be made of electric hoist, and the electric button of electric hoist can be fixed on the column 5.

所述移动式墩基础包括墩座1,所述墩座1上表面设置有一体构成的用于与立柱5套接的锚头2,所述墩座1的侧面和底面设置有起支撑作用的固定杆3,所述固定杆3和墩座1底部设置有滑轮4。The mobile pier foundation includes a pier 1, the upper surface of the pier 1 is provided with an anchor head 2 integrally formed for socketing with the column 5, and the side and bottom of the pier 1 are provided with supporting The fixed rod 3 is provided with a pulley 4 at the bottom of the fixed rod 3 and the podium 1 .

如图4所示,本发明的另一种结构,本发明设置为左右对称的结构,即在两个立柱5的上端都套设有抱杆上滑轮9,下端都套设有抱杆下滑轮10,所述两个立柱5均固定有用于支撑抱杆上滑轮9的固定夹板11,所述抱杆上滑轮9均固定有第一定滑轮13,所述抱杆下滑轮10均固定设置有倾斜的顶部固定有第二定滑轮15的抱杆12,所述抱杆12的顶端均设置有第二起重器14,所述第二起重器14的钢丝绳16均绕过各自一侧的第一定滑轮13和第二定滑轮15。As shown in Figure 4, another structure of the present invention, the present invention is set as a left-right symmetrical structure, that is, the upper ends of the two columns 5 are provided with upper pulleys 9, and the lower ends are provided with lower pulleys. 10. The two columns 5 are fixed with fixed splints 11 for supporting the upper pulley 9 of the pole, the upper pulley 9 of the pole is fixed with a first fixed pulley 13, and the lower pulley 10 of the pole is fixed with a The top of the inclination is fixed with the holding bar 12 of the second fixed pulley 15, and the top of the holding bar 12 is provided with a second jack 14, and the steel wire rope 16 of the second jack 14 is all bypassed on each side. The first fixed pulley 13 and the second fixed pulley 15.

本发明的使用方法:首先,根据作业空间的大小调节横梁6,改变本发明的体积,将本发明移至被运/吊物处,使被运/吊物处于第一起重器8下方或置于抱杆12侧方。然后,使第一起重器8或第二起重器14的吊钩挂住被运/吊物,通过横梁6上的第一起重器8实现被运/吊物垂直方向变化,并利用第一起重器8在横梁6上的水平移动实现被运/吊物水平方向位移变动;通过第二起重器14可实现垂直方向变化,外力推动抱杆12,带动抱杆上滑轮9和抱杆下滑轮10环向转动,进而实现被运/吊物环向位移变动。最后,通过外力利用底部的滑轮4实现本发明和被运/吊物的整体移动,使被运/吊物到达指定位置。The use method of the present invention: first, adjust the beam 6 according to the size of the working space, change the volume of the present invention, move the present invention to the place where the object is transported/hanging, so that the object to be transported/hanging is placed under the first jack 8 or placed On the side of the pole 12. Then, the hook of the first jack 8 or the second jack 14 is hooked to the transported/hanging object, and the vertical direction of the transported/hanging object is realized by the first jack 8 on the beam 6, and the first lifting The horizontal movement of the weight 8 on the crossbeam 6 realizes the horizontal displacement change of the transported/hanging object; the vertical direction change can be realized through the second jack 14, and the external force pushes the pole 12, driving the pulley 9 on the pole and the pole to slide down The wheel 10 rotates in the circumferential direction, thereby realizing the change in the circumferential displacement of the transported/hanging object. Finally, the pulley 4 at the bottom is used to realize the overall movement of the present invention and the transported/hanging object by external force, so that the transported/hanging object reaches the designated position.

尽管上面结合附图对本发明的功能及工作过程进行了描述,但本发明并不局限于上述的具体功能和工作过程,上述的具体实施方式仅仅是示意性的,而不是限制性的,本领域的普通技术人员在本发明的启示下,在不脱离本发明宗旨和权利要求所保护的范围情况下,还可以做出很多形式,这些均属于本发明的保护之内。Although the function and working process of the present invention have been described above in conjunction with the accompanying drawings, the present invention is not limited to the above-mentioned specific functions and working process, and the above-mentioned specific implementation is only illustrative, rather than limiting. Under the enlightenment of the present invention, those skilled in the art can also make many forms without departing from the spirit of the present invention and the scope protected by the claims, and these all belong to the protection of the present invention.

Claims (7)

1. a Mobile hoisting hoisting transportation equipment, comprises the identical column of two structures, is arranged at crossbeam between two columns, it is characterized in that, described crossbeam is provided with the first treasure of parallel motion; Described two column bottoms are provided with portable pier foundation, one of them upper and lower two ends of described two columns are arranged with pole top sheave and pole lower sheave respectively, described column is fixedly installed the strap for supporting holding pole top sheave, described pole top sheave is fixed with the first fixed pulley, the top that described pole lower sheave is fixedly installed inclination is fixed with the pole of the second fixed pulley, the top of described pole is provided with the second Jack, and the steel rope of described second Jack walks around the first fixed pulley and the second fixed pulley.
2. a Mobile hoisting hoisting transportation equipment, comprise the identical column of two structures, be arranged at crossbeam between two columns, it is characterized in that, described crossbeam is provided with the first treasure of parallel motion, described two column bottoms are provided with portable pier foundation, described two column upper ends are all arranged with pole top sheave, described two column lower ends are all arranged with pole lower sheave, described two columns are all fixed with the strap for supporting holding pole top sheave, described pole top sheave is all fixed with the first fixed pulley, the top that described pole lower sheave is all fixedly installed inclination is fixed with the pole of the second fixed pulley, the top of described pole is provided with the second Jack, the steel rope of described second Jack all walks around the first fixed pulley and second fixed pulley of respective side.
3. Mobile hoisting hoisting transportation equipment according to claim 1 and 2, it is characterized in that, described portable pier foundation comprises pier base, described pier base upper surface is provided with the anchor head for being socketed with column that one is formed, the side of described pier base and bottom surface are provided with passive fixed link, are provided with pulley bottom described fixed link and pier base.
4. Mobile hoisting hoisting transportation equipment according to claim 1 and 2, it is characterized in that, described crossbeam is made up of expansion link.
5. Mobile hoisting hoisting transportation equipment according to claim 1 and 2, it is characterized in that, described column upper side is provided with the bracket of supporting traverse.
6. Mobile hoisting hoisting transportation equipment according to claim 1 and 2, is characterized in that, described the first treasure is made up of runaway hoist, and described second Jack is made up of hoist ceiling crane.
7. a using method for Mobile hoisting hoisting transportation equipment, is characterized in that, comprises the following steps:
(1) according to working space size adjustment crossbeam, the present invention is moved to and is transported/hang thing place;
(2) make the suspension hook of the first treasure or the second Jack tangle and transported/hang thing, realize being transported/hang thing vertical direction by the first treasure on crossbeam to change, and utilize the parallel motion of the first treasure on crossbeam to realize being transported/hang the displacement of thing horizontal direction to change; Can realize vertical direction change by the second Jack, external force promotes pole, drives pole top sheave and pole lower sheave hoop to rotate, and then realizes being transported/hang the displacement of thing hoop and change;
(3) utilize the pulley of bottom realize the present invention and transported/hang moving integrally of thing by external force, make to be transported/hang thing and arrive assigned address.
CN201510929956.4A 2015-12-14 2015-12-14 A kind of Mobile hoisting hoisting transportation device and method Expired - Fee Related CN105417397B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510929956.4A CN105417397B (en) 2015-12-14 2015-12-14 A kind of Mobile hoisting hoisting transportation device and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510929956.4A CN105417397B (en) 2015-12-14 2015-12-14 A kind of Mobile hoisting hoisting transportation device and method

Publications (2)

Publication Number Publication Date
CN105417397A true CN105417397A (en) 2016-03-23
CN105417397B CN105417397B (en) 2017-07-25

Family

ID=55496022

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510929956.4A Expired - Fee Related CN105417397B (en) 2015-12-14 2015-12-14 A kind of Mobile hoisting hoisting transportation device and method

Country Status (1)

Country Link
CN (1) CN105417397B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106672565A (en) * 2016-12-12 2017-05-17 西可林控制系统(上海)有限公司 Large-span beam-free rail conveyer
CN107866551A (en) * 2017-11-27 2018-04-03 重庆市志乾铸造厂 A kind of device for casting upset
CN110436368A (en) * 2019-07-22 2019-11-12 天津天安机电设备安装工程有限公司 A kind of Mobile hoisting hoisting transportation equipment and hanging method
CN111792509A (en) * 2020-06-30 2020-10-20 广州中石科技有限公司 A mobile gantry and method of using the same

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3805967A (en) * 1972-09-05 1974-04-23 Renner Mfg Co Dual hook hoist apparatus
CN201154873Y (en) * 2007-11-14 2008-11-26 青铜峡铝业集团有限公司 Mobile crane for automobile maintenance
CN202643142U (en) * 2012-04-13 2013-01-02 领新(南通)重工有限公司 Double-beam portal crane turnover structure
CN205312917U (en) * 2015-12-14 2016-06-15 中建六局安装工程有限公司 Portable jack -up hoist and mount transportation equipment

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3805967A (en) * 1972-09-05 1974-04-23 Renner Mfg Co Dual hook hoist apparatus
CN201154873Y (en) * 2007-11-14 2008-11-26 青铜峡铝业集团有限公司 Mobile crane for automobile maintenance
CN202643142U (en) * 2012-04-13 2013-01-02 领新(南通)重工有限公司 Double-beam portal crane turnover structure
CN205312917U (en) * 2015-12-14 2016-06-15 中建六局安装工程有限公司 Portable jack -up hoist and mount transportation equipment

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106672565A (en) * 2016-12-12 2017-05-17 西可林控制系统(上海)有限公司 Large-span beam-free rail conveyer
CN106672565B (en) * 2016-12-12 2019-08-23 西可林控制系统(上海)有限公司 A kind of large span is without beam orbit transporter and its control system
CN107866551A (en) * 2017-11-27 2018-04-03 重庆市志乾铸造厂 A kind of device for casting upset
CN110436368A (en) * 2019-07-22 2019-11-12 天津天安机电设备安装工程有限公司 A kind of Mobile hoisting hoisting transportation equipment and hanging method
CN110436368B (en) * 2019-07-22 2020-09-25 天津天安机电设备安装工程有限公司 Movable hoisting and transporting equipment and hoisting method
CN111792509A (en) * 2020-06-30 2020-10-20 广州中石科技有限公司 A mobile gantry and method of using the same

Also Published As

Publication number Publication date
CN105417397B (en) 2017-07-25

Similar Documents

Publication Publication Date Title
CN202988612U (en) Flat jib tower crane
CN217297045U (en) High-adaptability mobile cantilever crane
CN104860211A (en) Vertical transport device for construction material between building block layers
CN105417397B (en) A kind of Mobile hoisting hoisting transportation device and method
CN104495632A (en) Expanded type suspension rope lifting and hoisting system
CN204675673U (en) To construct between a kind of building block layer material vertical transferring apparatus
CN103863938B (en) For carrying the safty hoisting device of wind tunnel experiment car
CN104150353A (en) Liftable and detachable bridge crane
JP5291964B2 (en) Cargo handling equipment
CN203833540U (en) Movable heavy object hoisting device
CN210620052U (en) Assembled building hoisting accessory
JP2016142097A (en) Portable hoist unit and horizontal member dismantling method
CN201786010U (en) Elevating platform for construction use
CN205312917U (en) Portable jack -up hoist and mount transportation equipment
JP5958764B2 (en) Lifting device, lifting method and building demolition method
CN110407096A (en) Gantry crane is used in a kind of carrying of cargo
CN103743581B (en) Test platform device and test method for internal climbing tower crane
CN103771271B (en) Setting machine 4 balancing lift
JP5948828B2 (en) Lifting device used for assembling cargo lift for building demolition work, cargo lift for building demolition work, and assembling method thereof
CN207434895U (en) A kind of harbour container loop wheel machine
CN105186387A (en) A device for laying a large cross-section cable tunnel
CN203997408U (en) Gantry suspension hook storage rack of lifting steel scrap
CN107344698A (en) A special high-altitude crane
JP5959701B1 (en) Traveling heavy lifting device
CN204714390U (en) A kind of suspender installed for annex in tower cylinder

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 710075 room 11001, 10th floor, building 3, Fengxi new town headquarters economic Park project, Xixian New District, Xi'an, Shaanxi Province

Patentee after: China Construction Sixth Engineering Bureau Northwest Construction Co.,Ltd.

Patentee after: CHINA CONSTRUCTION SIXTH ENGINEERING DIVISION Corp.,Ltd.

Address before: 300451 no.4919, Tanggu new North Road, Binhai New Area, Tianjin

Patentee before: CHINA CONSTRUCTION SIXTH ENGINEERING BUREAU INSTALLATION ENGINEERING Co.,Ltd.

Patentee before: CHINA CONSTRUCTION SIXTH ENGINEERING DIVISION Corp.,Ltd.

CP03 Change of name, title or address
CP01 Change in the name or title of a patent holder

Address after: 710075 room 11001, 10th floor, building 3, Fengxi new town headquarters economic Park project, Xixian New District, Xi'an, Shaanxi Province

Patentee after: The First Construction Co.,Ltd. of China Construction Sixth Engineering Bureau

Patentee after: CHINA CONSTRUCTION SIXTH ENGINEERING DIVISION Corp.,Ltd.

Address before: 710075 room 11001, 10th floor, building 3, Fengxi new town headquarters economic Park project, Xixian New District, Xi'an, Shaanxi Province

Patentee before: China Construction Sixth Engineering Bureau Northwest Construction Co.,Ltd.

Patentee before: CHINA CONSTRUCTION SIXTH ENGINEERING DIVISION Corp.,Ltd.

CP01 Change in the name or title of a patent holder
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170725

CF01 Termination of patent right due to non-payment of annual fee