CN106088431B - Laminated floor slab and laminated floor slab construction method for hanging - Google Patents

Laminated floor slab and laminated floor slab construction method for hanging Download PDF

Info

Publication number
CN106088431B
CN106088431B CN201610633724.9A CN201610633724A CN106088431B CN 106088431 B CN106088431 B CN 106088431B CN 201610633724 A CN201610633724 A CN 201610633724A CN 106088431 B CN106088431 B CN 106088431B
Authority
CN
China
Prior art keywords
floor slab
laminated floor
piece
suspension ring
hoist cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610633724.9A
Other languages
Chinese (zh)
Other versions
CN106088431A (en
Inventor
苑庆民
李永刚
聂全军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tangshan Caofeidian 22 Mcc Engineering Technology Co Ltd
Original Assignee
Tangshan Caofeidian 22 Mcc Engineering Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tangshan Caofeidian 22 Mcc Engineering Technology Co Ltd filed Critical Tangshan Caofeidian 22 Mcc Engineering Technology Co Ltd
Priority to CN201610633724.9A priority Critical patent/CN106088431B/en
Publication of CN106088431A publication Critical patent/CN106088431A/en
Application granted granted Critical
Publication of CN106088431B publication Critical patent/CN106088431B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/02Load-carrying floor structures formed substantially of prefabricated units
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements

Abstract

The present invention relates to a kind of laminated floor slab and laminated floor slab construction method for hanging, including laminated floor slab body, laminated floor slab body upper surface is provided with girder rib, suspension ring connector is provided with laminated floor slab body, laminated floor slab body lower surface is connected with suspension ring, the end of suspension ring connector is stretched out from laminated floor slab body lower surface, and the suspension ring top is connected with the end of suspension ring connector.Laminated floor slab lifting construction comprises the following steps:The upper hook of main hoist cable is connected with crane hook;Connection ring of the lower hook of main hoist cable respectively with first piece of laminated floor slab upper surface girder rib is connected;The upper hook of bottom hoist cable is connected with the suspension ring of first piece of laminated floor slab lower surface;The lower hook of bottom hoist cable is connected with the connection ring on second piece of laminated floor slab upper surface girder rib.Laminated floor slab and laminated floor slab construction method for hanging of the present invention, it is safe and efficient, construction cost is reduced, improves efficiency of construction.

Description

Laminated floor slab and laminated floor slab construction method for hanging
Technical field
The present invention relates to a kind of construction techniques, is to be related to a kind of laminated floor slab and laminated floor slab lifting specifically Construction method.
Background technology
At present, civil construction building industrialization in China's is mostly using prefabricated components prefabrication, the construction work of on-site consolidation Skill, prefabricated components use vertical transport instrument(Tower crane, truck crane etc.)Assembly is carried out one by one, and efficiency is low.
The content of the invention
For above-mentioned deficiency of the prior art, the present invention provides a kind of reduction construction cost, improves the folded of efficiency of construction Close floor and laminated floor slab construction method for hanging.
The technical solution used in the present invention is:
A kind of laminated floor slab, including laminated floor slab body, laminated floor slab body upper surface are provided with girder rib, laminated floor slab It is provided with suspension ring connector in body, laminated floor slab body lower surface is connected with suspension ring, and the end of suspension ring connector is from overlapping building Plate body lower surface is stretched out, and the suspension ring top is connected with the end of suspension ring connector.
The quantity of the suspension ring is at least four, and longitudinal axis and axis of pitch of the suspension ring along laminated floor slab are symmetrical arranged.
The vertical direction position corresponding with suspension ring is provided with company on the girder rib of the laminated floor slab body upper surface Connect ring.
A kind of construction method for hanging of laminated floor slab, comprises the following steps:
The upper hook of main hoist cable is connected with crane hook;
Connection ring of the lower hook of main hoist cable respectively with first piece of laminated floor slab upper surface girder rib is connected;
Crane is sling first piece of laminated floor slab by main hoist cable;
First piece of laminated floor slab lower surface is lifted at 1.8 meters -2.0 meters of ground;
The upper hook of bottom hoist cable is connected with the suspension ring of first piece of laminated floor slab lower surface;
The lower hook of bottom hoist cable is connected with the connection ring on second piece of laminated floor slab upper surface girder rib;
Crane is lifted, and first piece of laminated floor slab and second piece of laminated floor slab are sling to the top of design attitude;
Crane declines, and second piece of laminated floor slab is placed on into design attitude;
Crane continues to decline 0.1-0.2 rice, by the connection ring of the lower hook of bottom hoist cable and second piece of laminated floor slab Annexation releases;The annexation of the upper hook of bottom hoist cable and the suspension ring of first piece of laminated floor slab is released;
First piece of laminated floor slab is placed on design attitude by crane;
The annexation of the lower hook of main hoist cable and the connection ring of first piece of laminated floor slab is released.
The beneficial effect of the present invention compared with the prior art:
Laminated floor slab and laminated floor slab construction method for hanging of the present invention, it is safe and efficient, construction cost is reduced, improves construction effect Rate.
Brief description of the drawings
The structural representation of Fig. 1 laminated floor slabs of the present invention and laminated floor slab construction method for hanging;
Fig. 2 is Fig. 1 A partial enlargement structural representation.
Critical piece symbol description in accompanying drawing:
In figure:
1-laminated floor slab body, 2-bottom hoist cable, 3-the second piece of 6-purlin of laminated floor slab 4-suspension ring, 5-connection ring Frame muscle 7-suspension ring connector
Lower hook 9-main hoist cable of 8-main hoist cable
The upper hook of 10-the first piece of laminated floor slab, 11-bottom hoist cable
The lower hook of 12-bottom hoist cable.
Embodiment
Referring to the drawings and embodiment the present invention will be described in detail:
Accompanying drawing 1-2 understands that a kind of laminated floor slab, including laminated floor slab body 1, the upper surface of laminated floor slab body 1 are provided with Girder rib 6, suspension ring connector 7 is provided with laminated floor slab body 1, the lower surface of laminated floor slab body 1 is connected with suspension ring 4, suspension ring The end of connector 7 is stretched out from laminated floor slab body lower surface, and the top of suspension ring 4 is connected with the end of suspension ring connector 7.
The quantity of the suspension ring 4 is at least four, is symmetrical arranged along the longitudinal axis and axis of pitch of laminated floor slab.
The vertical direction position corresponding with suspension ring is provided with company on the girder rib 6 of the laminated floor slab body upper surface Ring 5 is connect, suspension ring are with connection ring on same plumb line.
A kind of construction method for hanging of laminated floor slab, comprises the following steps:
The upper hook of main hoist cable is connected with crane hook;
Connection ring 5 of the lower hook 8 of main hoist cable respectively with first piece of laminated floor slab upper surface girder rib is connected;
Crane is sling first piece of laminated floor slab 10 by main hoist cable 9;
First piece of lower surface of laminated floor slab 10 is lifted at 1.8 meters -2.0 meters of ground;
The upper hook 11 of bottom hoist cable is connected with the suspension ring 4 of first piece of lower surface of laminated floor slab 10;
The lower hook 12 of bottom hoist cable is connected with the connection ring 5 on second piece of upper surface girder rib of laminated floor slab 13 Connect;
Crane is lifted, and first piece of laminated floor slab 10 and second piece of laminated floor slab 13 are sling to the top of design attitude;
Crane declines, and second piece of laminated floor slab 13 is placed on into design attitude;
Crane continues to decline 0.1-0.2 rice, by the connection ring 5 of the lower hook 12 of bottom hoist cable and second piece of laminated floor slab Annexation release;The annexation of the upper hook 11 of bottom hoist cable and the suspension ring 4 of first piece of laminated floor slab 10 is released;
First piece of laminated floor slab 10 is placed on design attitude by crane;
The annexation of the lower hook 8 of main hoist cable and the connection ring 5 of first piece of laminated floor slab 10 is released.
According to the lifting tonnage of crane in hoisting process, 3 pieces or more polylith laminated floor slab are once lifted.
The above described is only a preferred embodiment of the present invention, not the structure of the present invention is made any formal Limitation.Any simple modification, equivalent change and modification that every technical spirit according to the present invention is made to above example, Belong in the range of technical scheme.

Claims (1)

1. a kind of construction method for hanging of laminated floor slab,
Including laminated floor slab body, laminated floor slab body upper surface is provided with girder rib, and suspension ring are provided with laminated floor slab body Connector, laminated floor slab body lower surface are connected with suspension ring, and the end of suspension ring connector is stretched out from laminated floor slab body lower surface, The suspension ring top is connected with the end of suspension ring connector;
The quantity of the suspension ring is at least four, and longitudinal axis and axis of pitch of the suspension ring along laminated floor slab are symmetrical arranged;
The vertical direction position corresponding with suspension ring is provided with connection ring on the girder rib of the laminated floor slab body upper surface;
It is characterized in that:Comprise the following steps:
The upper hook of main hoist cable is connected with crane hook;
Connection ring of the lower hook of main hoist cable respectively with first piece of laminated floor slab upper surface girder rib is connected;
Crane is sling first piece of laminated floor slab by main hoist cable;
First piece of laminated floor slab lower surface is lifted at 1.8 meters -2.0 meters of ground;
The upper hook of bottom hoist cable is connected with the suspension ring of first piece of laminated floor slab lower surface;
The lower hook of bottom hoist cable is connected with the connection ring on second piece of laminated floor slab upper surface girder rib;
Crane is lifted, and first piece of laminated floor slab and second piece of laminated floor slab are sling to the top of design attitude;
Crane declines, and second piece of laminated floor slab is placed on into design attitude;
Crane continues to decline 0.1-0.2 rice, by the connection of the lower hook of bottom hoist cable and the connection ring of second piece of laminated floor slab Relation broken;
The annexation of the upper hook of bottom hoist cable and the suspension ring of first piece of laminated floor slab is released;
First piece of laminated floor slab is placed on design attitude by crane;
The annexation of the lower hook of main hoist cable and the connection ring of first piece of laminated floor slab is released.
CN201610633724.9A 2016-08-05 2016-08-05 Laminated floor slab and laminated floor slab construction method for hanging Active CN106088431B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610633724.9A CN106088431B (en) 2016-08-05 2016-08-05 Laminated floor slab and laminated floor slab construction method for hanging

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610633724.9A CN106088431B (en) 2016-08-05 2016-08-05 Laminated floor slab and laminated floor slab construction method for hanging

Publications (2)

Publication Number Publication Date
CN106088431A CN106088431A (en) 2016-11-09
CN106088431B true CN106088431B (en) 2018-03-06

Family

ID=57455137

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610633724.9A Active CN106088431B (en) 2016-08-05 2016-08-05 Laminated floor slab and laminated floor slab construction method for hanging

Country Status (1)

Country Link
CN (1) CN106088431B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105883580B (en) * 2016-06-20 2019-05-10 南通振华重型装备制造有限公司 A kind of track crane girder web plate hoisting
CN109853805A (en) * 2019-01-18 2019-06-07 盈创新材料(苏州)有限公司 The production method of 3D printing laminated floor slab, floor and floor

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0748847A (en) * 1993-08-10 1995-02-21 Kajima Corp Steel frame column base section structure for building with underground floor and underground skeleton construction method
CN202194291U (en) * 2011-07-18 2012-04-18 从卫民 Prefabricated thin plate hoisting and connecting device for superposing floor
CN102359180B (en) * 2011-07-19 2013-10-30 筑巢(北京)科技有限公司 Truss combined beam and upper and layer connected light steel structure and construction method thereof
CN202717497U (en) * 2012-06-06 2013-02-06 中国十七冶集团有限公司 Lifting device of prefabricated composite floor slab
CN103821276B (en) * 2014-03-05 2016-09-07 沈阳诺思达智能设备有限公司 A kind of assembled, modular architectural system
CN105035562A (en) * 2015-07-13 2015-11-11 张跃 Main plate container

Also Published As

Publication number Publication date
CN106088431A (en) 2016-11-09

Similar Documents

Publication Publication Date Title
CN202400723U (en) Lifting tool type hanger frame for prefabricated parts
CN205045698U (en) Reinforcement cage hoisting utensil
CN106088431B (en) Laminated floor slab and laminated floor slab construction method for hanging
CN102852095B (en) Prefabricated bridge abutment multifunctional lifting system and construction procedure thereof
CN106948604A (en) The irregular alien invasion glass curtain wall positioning apparatus of high-rise building and construction method
CN108425503A (en) A kind of large-span steel girder mounting slip with promote coupling apparatus and its construction method
CN103899093A (en) Step-by-step hoisting construction method of mega-frame steel truss beam
CN205637622U (en) Perpendicular unit glass curtain wall hoist and mount system
CN204057659U (en) The prefabricated superimposed panel lifting appliance of super large
CN203333143U (en) Building construction basket
CN206693641U (en) The irregular alien invasion glass curtain wall positioning apparatus of high-rise building
CN208294101U (en) A kind of large-span steel girder mounting slip and promote coupling apparatus
CN204778496U (en) Platform sling structure of tower crane
CN201128882Y (en) Lifting and supporting brackets integrated construction device for bridge arch rib
CN207209830U (en) For the hoisting tooling at Bridge Beam bottom and pier stud small space
CN204825655U (en) Arc case roof beam lifts by crane focus off -centre and installation leveling system that takes one's place
CN204297905U (en) A kind of lifting device of precast concrete
CN203345968U (en) Tower crane
CN203612810U (en) Offshore platform skid hoisting structure
CN103015323B (en) Beam body hoisting device
CN207142643U (en) Skyscraper indoor equipment hoisting platform
CN202358822U (en) Hoisting structure for oil field skid block
CN205023729U (en) Gallows frame
CN203065000U (en) Net-beam floor hoisting tool
CN107618999A (en) For the hoisting tooling and handling method at Bridge Beam bottom and pier stud small space

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant