CN104328920A - Building material conveying method - Google Patents

Building material conveying method Download PDF

Info

Publication number
CN104328920A
CN104328920A CN201410510071.6A CN201410510071A CN104328920A CN 104328920 A CN104328920 A CN 104328920A CN 201410510071 A CN201410510071 A CN 201410510071A CN 104328920 A CN104328920 A CN 104328920A
Authority
CN
China
Prior art keywords
hoist engine
level
building
supporting seat
elevator shaft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410510071.6A
Other languages
Chinese (zh)
Other versions
CN104328920B (en
Inventor
王成武
王健
单宏伟
陈耀毅
龚家军
赵祺
谢良兵
吴云飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fifth Engineering Bureau Co Ltd
China Construction Fifth Engineering Bureau Co Ltd Dongguan Branch
Original Assignee
China Construction Fifth Engineering Bureau Co Ltd
China Construction Fifth Engineering Bureau Co Ltd Dongguan Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fifth Engineering Bureau Co Ltd, China Construction Fifth Engineering Bureau Co Ltd Dongguan Branch filed Critical China Construction Fifth Engineering Bureau Co Ltd
Priority to CN201410510071.6A priority Critical patent/CN104328920B/en
Publication of CN104328920A publication Critical patent/CN104328920A/en
Application granted granted Critical
Publication of CN104328920B publication Critical patent/CN104328920B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention relates to a building material conveying method, which comprises the following steps that A, hoisting equipment is erected, and the erecting comprises the following work procedures regardless of sequences: 1, a hoisting support frame is erected; 2, an electric block for hoisting a cross beam is arranged at the top of a building; 3, a windlass used for hoisting materials is arranged on the cross beam; 4, a horizontal transfer rail and a translation trolley are erected at a material conveying target ground floor; B, materials are hoisted on the windlass, and the materials are hoisted above the horizontal transfer rail by the windlass; C, the materials are unfastened from the windlass and are placed on the translation trolley; D, the materials are transferred by the translation trolley; E, the electric block is used for lifting the hoisting support frame, the horizontal transfer rail and the translation trolley are transferred to an upper floor, and the steps from B to D are repeated. The building material conveying method has the advantages that the material conveying efficiency can be effectively improved, and the building construction safety can be improved.

Description

Constructional materials carrying method
Technical field
The present invention relates to technical field of building construction, be specifically related to a kind of carrying method of constructional materials.
Background technology
At present, when building for highrise building, normally successively build, constructional materials used needs carrying out successively to carry, and existing constructional materials normally adopts the tower crane of great cantilever to lift.
In architectural process, safety is matter of utmost importance, when utilizing tower crane to lift building material at present, because material is suspended from building outside, there is the risk of larger falling from high altitude; In addition, in hoisting process, first utilize tower crane to lift material, then tower crane swings to corresponding position, and arrive materials station by traversing for material afterwards, the whole process used time is longer, and the efficiency of conveying is relatively low, affects the duration.
Summary of the invention
For the deficiencies in the prior art, object of the present invention is intended to provide a kind of constructional materials carrying method, and it has higher safety, and can improve the efficiency of mass transport.
For achieving the above object, the present invention adopts following technical scheme:
Constructional materials carrying method, comprises the steps:
Steps A, hanging device are built, and it comprises the following operation of order in no particular order:
Operation one, in two opposed inner walls of building elevator shaft respectively pre-buried supporting seat, supporting seat is hinged with fall arrest support member; In elevator shaft, hoisting bracket is set, this hoisting bracket comprises crossbeam and two vertical beams be oppositely arranged, two vertical beams are individually fixed in above the two ends of crossbeam, and the arranged outside of vertical beam has the multiple teeth groove along highly arrangement, the fall arrest support member of the supporting seat in elevator shaft two opposed inner walls is embedded in the teeth groove of two vertical beams respectively;
Operation two, top of building arrange the electric block being used for lifting cross beam;
Operation three, hoist engine for lifting material is set on crossbeam;
Operation four, mass transport destination floor set up level transhipment track, this level transhipment track extend to elevator shaft inside, level transhipment track on translating trolleys is set;
Step B, material is lifted on hoist engine, utilizes hoist engine by above material lifting to level transhipment track;
Below step C, mobile translating trolleys to material, material is untied from hoist engine and makes material be placed on translating trolleys;
Step D, by translating trolleys level transport material;
Step e, utilize electric block to promote hoisting bracket, level is transported the floor that track and translating trolleys are transferred to top, repeat above-mentioned steps B to step D.
Hoisting bracket comprises two crossbeams parallel to each other, and the body cross-over connection of hoist engine is fixed on the centre position of two crossbeam length directions.
Level transhipment track comprises straightway and bend section.
Supporting seat is also provided with the stopper slot limiting vertical beam and move up and down.
Beneficial effect of the present invention is:
Compared to prior art, the present invention is owing to adopting the mode of vertical lifting material, effectively can improve the efficiency of mass transport, thus shorten the building operations duration, and whole material conveying process completes in the elevator shaft watering building inside, there is not outdoor work, improve the safety of building operations.
Accompanying drawing explanation
Fig. 1 is the structural representation of hanging device of the present invention;
Fig. 2 is the sectional view of hanging device of the present invention;
Fig. 3 is the zoomed-in view at A place in Fig. 2;
Wherein: 10, elevator shaft; 20, hoisting bracket; 21, crossbeam; 22, vertical beam; 30, hoist engine; 40, level transhipment track; 50, translating trolleys; 60, supporting seat; 61, fall arrest support member.
Detailed description of the invention
Below, by reference to the accompanying drawings and detailed description of the invention, the present invention is described further:
Building material carrying method, it comprises the steps:
Build hanging device shown in steps A, foundation Fig. 1,2,3, this step specifically comprises the following operation of order in no particular order:
Operation one, in the opposed inner walls of the elevator shaft 10 of building respectively pre-buried supporting seat 60, supporting seat 60 upper hinge is connected with fall arrest support member 61, can be at the inner pre-embedding metal part of the cement components of elevator shaft 10 when building elevator shaft 10, then supporting seat 60 being welded on pre-buried metalwork, in elevator shaft 10 inside, hoisting bracket 20 is set, this hoisting bracket 20 comprises crossbeam 21, and two vertical beams be oppositely arranged 22, two vertical beams 22 are individually fixed in above the two ends of crossbeam 21, and the arranged outside of vertical beam 22 has the multiple teeth groove along short transverse arrangement, by in two the vertical beams 22 respectively stopper slot of cross-under on supporting seat 60, the fall arrest support member 61 be oppositely arranged is made to be plugged in the teeth groove of two vertical beams 22 respectively, thus utilize fall arrest support member 61 to support hoisting bracket 20, and when hoisting bracket 20 moves upward, fall arrest support member 61 rotates towards the direction of supporting seat 60, stop moving up hoisting bracket 20, fall arrest support member 61 supports vertical beam 22 again.In order to ensure stability, prevent vertical beam 22 beat, stopper slot on above-mentioned supporting seat 60 is consistent with the width of vertical beam 22, for limiting moving up and down of vertical beam 22, also can be for each is with the adaptive two or more supporting seat 60 of vertical beam 22, moving up and down of vertical beam 22 can either be limited further, the gravity of hoisting bracket 20 and the material on it can be disperseed simultaneously.
Operation two, to arrange at top of building and be used for the electric block of lifting cross beam 21;
Operation three, hoist engine 30 for lifting material is set on crossbeam 21; Above-mentioned hoisting bracket 20 can be comprise two crossbeams 21, and the body part of hoist engine 30 is connected across the centre position of two crossbeam 21 length directions;
Operation four, set up level transhipment track 40 at mass transport destination floor, it is inner that this level transhipment track 40 extends to elevator shaft 10, and level transhipment track 40 arranges translating trolleys 50;
Step B, material to be lifted on hoist engine 30, to utilize hoist engine 30 by above material lifting to level transhipment track 40;
Below step C, mobile translating trolleys 50 to material, material is untied from hoist engine 30 and makes material be placed on translating trolleys 50;
Step D, by translating trolleys 50 level transport material;
Step e, utilize electric block to promote hoisting bracket 20, level is transported the floor that track 40 and translating trolleys 50 shift top, repeat above-mentioned steps B to step D.
In said method of the present invention, owing to adopting the mode of vertical lifting material, effectively can improve the efficiency of mass transport, thus shorten the building operations duration, and whole material conveying process completes in the elevator shaft 10 watering building inside, there is not outdoor work, improve the safety of building operations.
To one skilled in the art, according to technical scheme described above and design, other various corresponding change and deformation can be made, and all these change and deformation all should belong within the protection domain of the claims in the present invention.

Claims (4)

1. constructional materials carrying method, is characterized in that, comprises the steps:
Steps A, hanging device are built, and it comprises the following operation of order in no particular order:
Operation one, in two opposed inner walls of building elevator shaft respectively pre-buried supporting seat, supporting seat is hinged with fall arrest support member; In elevator shaft, hoisting bracket is set, this hoisting bracket comprises crossbeam and two vertical beams be oppositely arranged, two vertical beams are individually fixed in above the two ends of crossbeam, and the arranged outside of vertical beam has the multiple teeth groove along highly arrangement, the fall arrest support member of the supporting seat in elevator shaft two opposed inner walls is embedded in the teeth groove of two vertical beams respectively;
Operation two, top of building arrange the electric block being used for lifting cross beam;
Operation three, hoist engine for lifting material is set on crossbeam;
Operation four, mass transport destination floor set up level transhipment track, this level transhipment track extend to elevator shaft inside, level transhipment track on translating trolleys is set;
Step B, material is lifted on hoist engine, utilizes hoist engine by above material lifting to level transhipment track;
Below step C, mobile translating trolleys to material, material is untied from hoist engine and makes material be placed on translating trolleys;
Step D, by translating trolleys level transport material;
Step e, utilize electric block to promote hoisting bracket, level is transported the floor that track and translating trolleys are transferred to top, repeat above-mentioned steps B to step D.
2. constructional materials carrying method as claimed in claim 1, it is characterized in that, hoisting bracket comprises two crossbeams parallel to each other, and the body cross-over connection of hoist engine is fixed on the centre position of two crossbeam length directions.
3. constructional materials carrying method as claimed in claim 1, is characterized in that, level transhipment track comprises straightway and bend section.
4. constructional materials carrying method as claimed in claim 1, is characterized in that, supporting seat is also provided with the stopper slot limiting vertical beam and move up and down.
CN201410510071.6A 2014-09-28 2014-09-28 Construction material carrying method Expired - Fee Related CN104328920B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410510071.6A CN104328920B (en) 2014-09-28 2014-09-28 Construction material carrying method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410510071.6A CN104328920B (en) 2014-09-28 2014-09-28 Construction material carrying method

Publications (2)

Publication Number Publication Date
CN104328920A true CN104328920A (en) 2015-02-04
CN104328920B CN104328920B (en) 2016-09-28

Family

ID=52403720

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410510071.6A Expired - Fee Related CN104328920B (en) 2014-09-28 2014-09-28 Construction material carrying method

Country Status (1)

Country Link
CN (1) CN104328920B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105565178A (en) * 2015-12-30 2016-05-11 华北冶建工程建设有限公司 Elevator shaft material hoisting device
CN112408288A (en) * 2020-09-21 2021-02-26 上海宝冶冶金工程有限公司 Jacking sliding equipment special for blast furnace

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2236477Y (en) * 1995-05-08 1996-10-02 大连第二建筑工程公司 High bulk material lifting apparatus
CN2703832Y (en) * 2004-05-10 2005-06-08 唐裕新 Elevator well creeping formwork hoisting frame
WO2005084185A2 (en) * 2004-02-20 2005-09-15 Otis Elevator Company A device for moving a platform along elevator guide rails
CN1982193A (en) * 2005-12-16 2007-06-20 王�忠 Installation of high-building construction vertical transferring apparatus by elevator well
CN102341336A (en) * 2009-03-06 2012-02-01 通力股份公司 Elevator arrangement and method
CN102459053A (en) * 2009-04-06 2012-05-16 通力股份公司 Method and elevator arrangement

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2236477Y (en) * 1995-05-08 1996-10-02 大连第二建筑工程公司 High bulk material lifting apparatus
WO2005084185A2 (en) * 2004-02-20 2005-09-15 Otis Elevator Company A device for moving a platform along elevator guide rails
CN2703832Y (en) * 2004-05-10 2005-06-08 唐裕新 Elevator well creeping formwork hoisting frame
CN1982193A (en) * 2005-12-16 2007-06-20 王�忠 Installation of high-building construction vertical transferring apparatus by elevator well
CN102341336A (en) * 2009-03-06 2012-02-01 通力股份公司 Elevator arrangement and method
CN102459053A (en) * 2009-04-06 2012-05-16 通力股份公司 Method and elevator arrangement

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105565178A (en) * 2015-12-30 2016-05-11 华北冶建工程建设有限公司 Elevator shaft material hoisting device
CN112408288A (en) * 2020-09-21 2021-02-26 上海宝冶冶金工程有限公司 Jacking sliding equipment special for blast furnace

Also Published As

Publication number Publication date
CN104328920B (en) 2016-09-28

Similar Documents

Publication Publication Date Title
CN103711301A (en) Construction method and device for two-track movable electric basket and lifting hoist
CN103774857A (en) Hoisting construction method for fixed hydraulic lifting large-sized equipment in frame
GB201209006D0 (en) High rise building elevation concept
CN202751338U (en) Rail type suspension basket
CN204000830U (en) Merogenesis take-over type sand drain machine
CN204185120U (en) Mobile unit dolly in place
CN104895336A (en) Method for installing stiff mixed-structure steel girders in place
CN104120701B (en) A kind of construction method of vertical ship lift great good lifting and device
CN104328920A (en) Building material conveying method
CN204626998U (en) A kind of attached lift scaffold discharging platform
CN104291222A (en) Rigid protection and crane integration system inside super high-rise building core tube
CN104016260A (en) Compartment funnel slipping mounting method and slipping mounting mechanism
RU140819U1 (en) Gantry crane
CN103654610A (en) Rail type hanging basket
CN203783105U (en) Fast construction operating platform used for section steel column interior pouring concrete
CN203333143U (en) Building construction basket
CN106276602B (en) A kind of across high ferro Business Line beam body hangs method
CN202810176U (en) Mobile operation platform
CN209353734U (en) For installing the double-track device of curtain wall
CN204001751U (en) Super high steel structure construction overhanging unloading platform
RU2016111128A (en) Tower structure
CN204151685U (en) Rear feeding beam formula steel girder segment cantilever Bridge Erector
CN202337945U (en) Outer side in-place beam body lifting device
CN201128882Y (en) Lifting and supporting brackets integrated construction device for bridge arch rib
CN103849709A (en) Installation method for tilting system of steelmaking converter

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160928

Termination date: 20170928

CF01 Termination of patent right due to non-payment of annual fee