CN202481972U - Mineshaft material hoisting frame - Google Patents
Mineshaft material hoisting frame Download PDFInfo
- Publication number
- CN202481972U CN202481972U CN2011205555056U CN201120555505U CN202481972U CN 202481972 U CN202481972 U CN 202481972U CN 2011205555056 U CN2011205555056 U CN 2011205555056U CN 201120555505 U CN201120555505 U CN 201120555505U CN 202481972 U CN202481972 U CN 202481972U
- Authority
- CN
- China
- Prior art keywords
- platform
- bracket
- hoisting
- electric block
- mineshaft
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model relates to a mineshaft material hoisting frame. The mineshaft material hoisting frame comprises a portal frame body, a material box, a platform and a hoisting electric block, wherein the portal frame body consists of an upright post, a portal bracket beam and a bracket; the material box consists of a box body, a steel wire rope, a hoisting ring and a rope clip; the platform consists of a bracket beam, a secondary beam, a boundary beam and a platform bracket; the hoisting electric block is arranged on a transverse beam of the portal frame body; and the hoisting electric block is connected with the steel wire rope of the material box through a hook. The mineshaft material hoisting frame has the beneficial effects of reducing the procedure of hoisting templates through a tower crane and saving the time of turning over materials. The material platform is not provided, so the materials are convenient and flexible to turn over. The portal frame body and the platform are fixed in reserved holes of the wall of the mineshaft through the brackets, so the installation operation is reduced. The electric block type power hoisting mode is adopted, so the mineshaft material hoisting frame is quick in operation and convenience of vertical and horizontal operation is provided. A protective platform is arranged at the bottom, so the safety is improved. The requirement of the construction process of supporting one plate with three brackets in the conventional top plate is met.
Description
Technical field
The utility model relates to the material cycling vertical transport facility of high-building construction, especially a kind of pit shaft material raising legs.
Background technology
At present, more turnover bottom wood planking, flitch and interior supporting steel pipe adopt and earlier above material code are placed on the material platform in the high-building construction, utilize tower crane vertically to lift by crane again, lift the mode to work layer.But this traditional approach some problems of ubiquity in construction of using at present need the multiplex (MUX) to plant use like tower crane, owing to not only will hang reinforcing bar, welding generator, pneumatics pump, also will lift transportation material distributing machine, large form etc.At this moment increased the wait time of lifting wood planking, flitch and interior supporting steel pipe, reduced efficiency, increased the cost expenditure; Also need simultaneously the material platform is installed earlier, bring bigger difficulty, strengthened labor strength, thereby in construction, brought very big potential safety hazard to operating personal to operational administrative.
Summary of the invention
In order to address the above problem, the purpose of the utility model provides a kind of transport operation of simplifying turnover bottom wood planking, flitch and interior supporting steel pipe, raises labour efficiency, and practices thrift the pit shaft material raising legs of cost of labor.
The technical scheme of the utility model is: a kind of pit shaft material raising legs, and this pit shaft material raising legs comprises gantry support body, body feed tank, platform and winding type electric block;
Wherein, said gantry support body is made up of column, gantry bracket beam and bracket, and 2 root posts are welded on forms isoceles triangle type support on the bracket beam of said gantry, and 2 said isoceles triangle type supports are fixed on the two ends of said portal frame crossbeam through nut;
Said body feed tank is made up of casing, steel rope, suspension ring and wire clips, and said suspension ring are fixed on 4 angles, said casing top, and said steel rope is affixed through said wire clips and said suspension ring;
Said platform is made up of bracket beam, secondary beam, side bar peace dummy cow leg, and 2 said bracket beams are welded on the two ends of 2 said side bars, and said secondary beam weldering is welded in the space between said bracket beam and the said side bar, and said platform bracket is installed in the two ends of said bracket beam;
Said winding type electric block is installed in the crossbeam of said gantry support body, and said winding type electric block is connected with the steel rope of said body feed tank through hook.
This practical beneficial effect is: the technical approach with existing turnover material has following characteristics:
1. new-type turnover material method in the building operation.
2. reduce the operation that the tower crane dress hangs template, save the time of turnover material.
3. need not to install the material platform, the turnover material is convenient, flexible.
4. gantry support body peace platform utilizes bracket to be fixed in the hole to be provided of pit shaft body of wall, reduces fitting operation.
5. adopt electric block formula power-lift mode, swift to operate, and the comfort feature that provides vertical and horizontal to operate.
6. the protection platform is installed in the bottom, improves safety.
7. satisfy the construction process requirement that supports three of plates in the existing top board.
Description of drawings
Fig. 1 is the structural representation of the utility model gantry support body.
Fig. 2 is the structural representation of the utility model body feed tank.
Fig. 3 is the utility model thing flat-bed structural representation.
Fig. 4 is the structural representation of the utility model pit shaft material raising legs.
The operational flowchart one of Fig. 5 pit shaft material raising legs.
The operational flowchart two of Fig. 6 pit shaft material raising legs.
The operational flowchart three of Fig. 7 pit shaft material raising legs.
Among the figure:
1. gantry support body, 2. body feed tank, 3. platform, 4. winding type electric block, 5. column, 6. gantry bracket beam, 7. crossbeam, 8. bracket, 9. casing, 10. suspension ring, 11. steel ropes, 12. wire clips, 13. bracket beams, 14. secondary beams, 15. side bars, 16. platform brackets, 17. hooks, 18. bracket holes, 19. pit shafts.
The specific embodiment
further specify below in conjunction with accompanying drawing and the specific embodiment technical scheme to the utility model.
Shown in Fig. 1-4, this practical a kind of pit shaft material raising legs comprises gantry support body 1, body feed tank 2, platform 3 and winding type electric block 4,
Wherein, support body 1 column in gantry is made up of column 5, gantry bracket beam 6 and crossbeam 7,2 root posts 5 and gantry bracket beam 6 welding assembly triangularity supports, then the two ends of crossbeam 7 and triangular supports is connected with nut fixing, gantry bracket beam 6 interior installation brackets 8;
During use; Equidistance is provided with bracket hole 18 on pit shaft 19 walls; Gantry support body 1 is provided with the top of pit shaft 19 through bracket 8; Winding type electric block 4 is installed on the crossbeam 7 of gantry support body 1, winding type electric block 4 through link up with 17 catch on body feed tank 2 steel rope 11 body feed tank 2 is sling, platform 3 is arranged on pit shaft 19 walls of body feed tank 2 lower ends through platform bracket 16.
This device circulation material workflow.
After the n layer form removal of pit shaft; After cement concrete reached intensity, hoisting platform 3 got in the pit shaft, and platform bracket 16 springs in the pre-buried hole; Adjustment bracket beam 13 is even with gap, pit shaft both sides, and winding type electric block 4 is through linking up with 17 lifting object hoppers 2 and being placed on the platform 3; Lifting gantry support body 1 is to the n+2 layer, and bracket 8 springs in the pre-buried hole, and adjustment gantry bracket beam 6 is even with gap, pit shaft both sides.
Get into the circulation material workflow:
Material turnover finishing back gets into the lifting flow process:
At first, body feed tank 2 is connected with platform 3, through linking up with 17 body feed tank 2 and platform 3 is risen to the n+1 layer with winding type electric block 4, platform bracket 16 springs in the hole to be provided, and adjustment bracket beam 13 is even with gap, pit shaft both sides; Untie being connected of body feed tank 2 and platform 3.N+3 layer colligation body of wall reinforcing bar, bury embedded box, pit shaft matched moulds casting concrete, form removal; With tower crane gantry support body 1 is lifted to the n+3 layer, bracket 8 springs in the hole to be provided, and adjustment gantry bracket beam 6 is even with gap, pit shaft both sides.Get into the circulation material workflow again.
Claims (1)
1. a pit shaft material raising legs is characterized in that, this pit shaft material raising legs comprises gantry support body (1), body feed tank (2), platform (3) and winding type electric block (4);
Wherein, Said gantry support body (1) is made up of column (5), gantry bracket beam (6), crossbeam (7), bracket (8); 2 said columns (5) are welded on said gantry bracket beam (6) and go up composition isoceles triangle type support, and the two ends of said crossbeam (7) are through affixed 2 the said isoceles triangle type supports of nut;
Said body feed tank (2) is made up of casing (9), suspension ring (10), steel rope (11) and wire clips (12); Said suspension ring (10) are fixed on 4 angles, said casing (9) top, and said steel rope (11) is affixed through said wire clips (12) and said suspension ring (10);
Said platform (3) is made up of bracket beam (13), secondary beam (14), the peaceful dummy cow leg of side bar (15) (16); 2 said brackets (13) beam is welded on the two ends of 2 said side bars (15); Said secondary beam (14) is welded in the space between said bracket beam (13) and the said side bar (15), and said platform bracket (16) is installed in the said bracket beam (13);
Said winding type electric block (4) is installed on the crossbeam (7) of said gantry support body (1), and said winding type electric block (4) is connected with steel wire (11) rope of said body feed tank (2) through hook (17).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011205555056U CN202481972U (en) | 2011-12-27 | 2011-12-27 | Mineshaft material hoisting frame |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011205555056U CN202481972U (en) | 2011-12-27 | 2011-12-27 | Mineshaft material hoisting frame |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202481972U true CN202481972U (en) | 2012-10-10 |
Family
ID=46956411
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011205555056U Expired - Fee Related CN202481972U (en) | 2011-12-27 | 2011-12-27 | Mineshaft material hoisting frame |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202481972U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102923596A (en) * | 2012-11-13 | 2013-02-13 | 浙江省建设机械集团有限公司 | Detachable automatic-rollover-type material hoister |
CN106041389A (en) * | 2016-05-26 | 2016-10-26 | 中国建筑第八工程局有限公司 | Temporary fixing device for positioning and welding of bracket on steel column and using method of temporary fixing device |
CN107445083A (en) * | 2017-08-15 | 2017-12-08 | 重庆美的通用制冷设备有限公司 | Compressor transporter |
CN108483214A (en) * | 2018-03-27 | 2018-09-04 | 芜湖天梦信息科技有限公司 | A kind of architectural engineering with protective device building materials boom hoisting |
-
2011
- 2011-12-27 CN CN2011205555056U patent/CN202481972U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102923596A (en) * | 2012-11-13 | 2013-02-13 | 浙江省建设机械集团有限公司 | Detachable automatic-rollover-type material hoister |
CN102923596B (en) * | 2012-11-13 | 2015-04-15 | 浙江省建设机械集团有限公司 | Detachable automatic-rollover-type material hoister |
CN106041389A (en) * | 2016-05-26 | 2016-10-26 | 中国建筑第八工程局有限公司 | Temporary fixing device for positioning and welding of bracket on steel column and using method of temporary fixing device |
CN107445083A (en) * | 2017-08-15 | 2017-12-08 | 重庆美的通用制冷设备有限公司 | Compressor transporter |
CN108483214A (en) * | 2018-03-27 | 2018-09-04 | 芜湖天梦信息科技有限公司 | A kind of architectural engineering with protective device building materials boom hoisting |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101619630B (en) | Mounting method of steel chimney and implementary jacking device | |
CN207582986U (en) | One kind goes out roofing combination type glass curtain wall lifting construction system | |
CN202481972U (en) | Mineshaft material hoisting frame | |
CN205772984U (en) | A kind of hanging apparatus of monolithic steel truss | |
CN108979131B (en) | Integral lifting platform device for high-rise building construction steel formwork and operation frame | |
CN200955259Y (en) | Funnel-derrick moving type construction apparatus | |
CN203392766U (en) | Lightweight lifting bracket arranged on roof | |
CN112049236A (en) | Construction method for hanging decoration construction platform under high-altitude large cantilever structure of high-rise building | |
CN104675171A (en) | Construction method for single-piece hoisting of aluminum alloy vault of large vertical storage tank | |
CN206233546U (en) | A kind of elevator hoistways workbench | |
CN201908447U (en) | Lift-type horizontal safety net | |
CN102061810B (en) | Construction method of safe flat net positioned on periphery of building | |
CN203333143U (en) | Building construction basket | |
CN201567160U (en) | Detachable combined high-level crane boom | |
CN202324662U (en) | Installation device for foam cement composites | |
CN209353734U (en) | For installing the double-track device of curtain wall | |
CN202347846U (en) | Simple lifting setting stair steel moulding plate | |
CN102383376B (en) | Ground moulding and integral hoisting method for large-tonnage steel bar bound finished product member | |
CN212477460U (en) | Municipal administration bridge overhauls uses bearing structure | |
CN211257761U (en) | Lifting type elevator shaft operating platform | |
CN204357138U (en) | Simple steel structure lifting upending frame | |
CN103982046A (en) | Lifting and installation method of buckling restrained braces | |
CN203320922U (en) | Supporting device for forming of elevator shaft template | |
CN203905436U (en) | Steel chimney annular installation platform | |
CN210508326U (en) | Liftable well operation platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20121010 Termination date: 20181227 |
|
CF01 | Termination of patent right due to non-payment of annual fee |