CN207582986U - Go out roofing combination formula glass curtain wall hoist and mount construction system - Google Patents

Go out roofing combination formula glass curtain wall hoist and mount construction system Download PDF

Info

Publication number
CN207582986U
CN207582986U CN201721677455.2U CN201721677455U CN207582986U CN 207582986 U CN207582986 U CN 207582986U CN 201721677455 U CN201721677455 U CN 201721677455U CN 207582986 U CN207582986 U CN 207582986U
Authority
CN
China
Prior art keywords
steel
curtain wall
glass curtain
support arm
roofing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721677455.2U
Other languages
Chinese (zh)
Inventor
还向州
沈培
王介炀
张雷
任继军
陈威
葛然
陈建军
谢宏雨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction First Group Corp Ltd
First Construction Co Ltd of China Construction First Group Corp Ltd
Original Assignee
China Construction First Group Corp Ltd
First Construction Co Ltd of China Construction First Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction First Group Corp Ltd, First Construction Co Ltd of China Construction First Group Corp Ltd filed Critical China Construction First Group Corp Ltd
Priority to CN201721677455.2U priority Critical patent/CN207582986U/en
Application granted granted Critical
Publication of CN207582986U publication Critical patent/CN207582986U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Load-Bearing And Curtain Walls (AREA)

Abstract

The utility model discloses a combined glass curtain wall hoisting construction system for a roof, which comprises a steel support, an overhanging support arm, a hanging rail, a walking electric hoist, a hanging basket device and a lifting device; the steel support is a steel support keel of a roof curtain wall steel framework or a newly-added steel support of a roof, the cantilever support arm is horizontally placed and welded on the steel support, the hanger rail is fixed at the arm end of the cantilever support arm, the walking type electric hoist is hung on the hanger rail, and the walking type electric hoist can horizontally slide on the hanger rail; the roof curtain wall steel framework keel comprises a curtain wall pier foundation, steel upright columns, inclined pull columns and transverse steel beams; newly-increased steel support is welded into the lattice column type by the angle steel, and newly-increased steel support passes through chemical crab-bolt with the steel sheet in the bottom and fixes on the roofing. The utility model provides a technical scheme accomplishes the perpendicular transportation of glass curtain wall by electric hoist engine, and electric block accomplishes the horizontal transportation through hanging annular hanger rail, has solved the technical problem that goes out roofing combination formula glass curtain wall hoist and mount difficulty, efficiency of construction is low.

Description

One kind goes out roofing combination type glass curtain wall lifting construction system
Technical field
Go out the lifting of roofing combination type glass curtain wall the utility model is related to construction engineering technical field more particularly to one kind to apply Work system.
Background technology
With the rapid development of construction industry, facade moulding is ever-changing, different style, and unique novel, this is built Build construction, especially curtain wall installing engineering and bring increasing technical barrier, at the same to the selecting of construction method, machinery is set Standby selection brings lot of challenges.
It is modern architecture one big technological highlights of construction and difficulty that high-rise, Super High, which goes out roofing complex combination formula Glass Curtain Wall Construction, Point.
(1)Existing Construction Formwork & Scaffold Technology, which is taken, tears that height-limited, of high cost, security risk is big open;
(2)Existing tower crane transportation technology low construction efficiency, financial cost are high;
(3)Existing hanging basket technology occupies roofing space, and hoisting depth is limited, and can not be moved horizontally, and flexibility is poor.
Therefore, there is an urgent need for design one kind to go out roofing combination type glass curtain wall lifting construction system, solves existing high-rise, Super High Complicated Combined curtain wall construction.
Utility model content
The purpose of this utility model is for above-mentioned technical problem, and the utility model provides one kind and goes out roofing combined type glass Glass curtain wall lifting construction system, it is rational in infrastructure, the vertical transport of glass curtain wall is completed by electrical hoist, electric block passes through The annular hanger rail of suspension completes horizontal transport, solves out roofing combination type glass curtain wall lifting hardly possible, the technology of low construction efficiency is asked Topic.
The technical solution of the utility model
The purpose of this utility model is to provide one kind and goes out roofing combination type glass curtain wall lifting construction system, including steel branch Support overhangs support arm, hanger rail, walking electric block, nacelle device and lifting device;The bracing members are roof curtain wall Steel Structure Keel or roofing increase steel bracket newly, and the overhanging support arm level is shelved and is welded on bracing members, and the hanger rail is fixed on overhanging Support arm arm end, the walking electric block are suspended on hanger rail, and walking electric block horizontal on hanger rail can slide;It is described Roof curtain wall Steel Structure keel include curtain wall pier foundation, steel column, oblique pull column, lateral girder steel;The newly-increased steel bracket is by angle steel Lattice pillar is welded into, newly-increased steel bracket bottom is fixed on by chemical anchor bolts on roofing with steel plate.
Further, the overhanging support arm can add brace and the mode for the bar that baroclines is reinforced, the overhanging support arm Steel wire rope can also be added at arm end and carries out secured drawknot with roofing.
Further, the hanger rail is I-steel, and top flange connect fixation with overhanging support arm, and lower flange need not connect, But it must polish smooth.
Further, the nacelle device includes hanging basket stent transverse arm, stent flagpole, climbs rope component, hanging basket, the hanging basket Stent transverse arm is made of big square steel and small square steel, and big square steel is bolted with small square steel, and big square steel chooses arm, small side before being used as Steel is as postbrachium.The hanging basket stent transverse arm is front and rear to be fixed in a manner of anchor ear on overhanging support arm by stud.
Further, the lifting device is an electrical hoist, sets steel wire rope thereon;The electrical hoist is fixed On roofing, fixed pulley is mounted on overhanging support arm, the steel wire rope on directed traction electrical hoist.
The utility model advantageous effect:
One kind provided by the utility model goes out roofing combination type glass curtain wall lifting construction system, rational in infrastructure, has Following technique effect:
(1)The present invention sets Lift-on/Lift-off System on roofing, to complete out vertical, the horizontal fortune of roofing combination type glass curtain wall Defeated, location and installation recycles hanging basket to complete the installation of curtain wall thin portion, solves out the installation effect of roofing combination type glass curtain wall Rate is low, the problem of constructional difficulties;
(2)The present invention is supporting member using roof curtain wall Steel Structure keel or newly-increased steel bracket, complete by electrical hoist Into the vertical transport of glass curtain wall, walking electric block completes horizontal transport by hanging annular hanger rail.Hanging basket coordinates thin portion Construction, has saved construction cost, has accelerated construction speed, ensure that construction safety.
(3)Hanging basket in the present invention is directly anchored on overhanging support arm, is not take up roofing space, and easy construction is saved Construction cost.
Description of the drawings
By the detailed description made in conjunction with the following drawings, the above-mentioned advantage of the utility model will be apparent and more hold Readily understood, these attached drawings are only schematical, are not intended to limit the utility model, wherein:
Fig. 1 be it is described in the utility model it is a kind of go out roofing combination type glass curtain wall lifting construction system structure diagram;
Fig. 2 is glass curtain wall lifting construction system described in the utility model(Without curtain wall Steel Structure keel)Structural representation Figure;
Fig. 3 is the structure diagram of the electrical hoist lifting of the utility model.
In attached drawing, the component representated by each label is as follows:
1. frame type glass curtain wall;2. unit glass curtain wall;3. hanging part;4. overhang support arm;5. hanger rail;6. walking Electric block;7. newly-increased steel bracket;8. curtain wall pier foundation;9. steel column;10. oblique pull column;11. lateral girder steel;12. steel plate;13. Chemical anchor bolts;14. brace;15. barocline bar;16. steel wire rope;17. stent flagpole;18. climb rope component;19. hanging basket;It is 20. big Square steel;21. small square steel;22. stud;23. electrical hoist;24. fixed pulley;25. glass curtain wall plate.
Specific embodiment
Fig. 1 to Fig. 3 is the accompanying drawings of the application, with reference to specific embodiments and the drawings pair, the utility model one Kind goes out roofing combination type glass curtain wall lifting construction system and is described in detail.
The embodiment recorded herein is the specific specific embodiment of the utility model, for illustrating the utility model Design, is explanatory and illustrative, should not be construed as the limit to the utility model embodiment and the scope of the utility model System.In addition to the embodiment recorded herein, those skilled in the art also are able to public based on the application claims and specification institute The content opened includes doing using the embodiment to recording herein using obvious other technical solutions, these technical solutions Go out the technical solution of any obvious substitutions and modifications.
The attached drawing of this specification is schematic diagram, aids in illustrating the design of the utility model, it is schematically indicated each section Shape and its correlation.Note that for the ease of clearly show the utility model embodiment each component structure, phase With reference marker for representing identical part.
It is a kind of go out roofing combination type glass curtain wall lifting construction system structure diagram, as shown in Figure 1, it is specifically included Bracing members overhang support arm 4, hanger rail 5, walking electric block 6, nacelle device and lifting device;The bracing members are roofing curtain Wall Steel Structure keel or roofing increase steel bracket 7 newly, and overhanging 4 level of support arm is shelved and is welded on bracing members, the hanger rail 5 4 arm end of overhanging support arm is fixed on, the walking electric block 6 is suspended on hanger rail 5, and walking electric block 6 can be in hanger rail 5 Upper horizontal slip;The roof curtain wall Steel Structure keel include curtain wall pier foundation 8, steel column 9, oblique pull column 10, lateral girder steel 11; The newly-increased steel bracket 7 is welded into lattice pillar by angle steel, and newly-increased 7 bottom steel plate 12 of steel bracket is fixed by chemical anchor bolts 13 On roofing, as shown in Figure 2.
The overhanging support arm 4 can add brace 14 and the mode for the bar 15 that baroclines is reinforced, and the overhanging support arm 4 may be used also To add steel wire rope 16 at arm end secured drawknot is carried out with roofing.
The hanger rail 5 is I-steel, and top flange connect fixation with overhanging support arm 4, and lower flange must be beaten without connection Ground smooth.
The nacelle device includes hanging basket stent transverse arm, stent flagpole 17, climbs rope component 18, hanging basket 19, the hanging basket branch Frame transverse arm is made of big square steel 20 and small square steel 21, and big square steel 20 is bolted with small square steel 21, and big square steel is chosen before being used as Arm, small square steel is as postbrachium.The hanging basket stent transverse arm is front and rear to be fixed on overhanging support arm 4 by stud 22 in a manner of anchor ear On.
The lifting device is an electrical hoist 23, sets steel wire rope 16 thereon;The electrical hoist 23 is fixed on On roofing, fixed pulley 24 is mounted on overhanging support arm 4, the steel wire rope on directed traction electrical hoist 23.
In the embodiment shown in fig. 1, the size of the steel column 9 be 250 × 150 × 10mm, the size of oblique pull column 10 For 250 × 150 × 10mm, the size of lateral girder steel 11 is 150 × 150 × 8mm, and overhanging support arm 4 is 22a I-steel, brace 14 size is 100 × 100 × 5mm, 100 × 50 × 5mm of the bar 15 that baroclines.
In the embodiment shown in Figure 2, the size of the big square steel 20 is 80 × 80 × 4mm, and the size of small square steel 21 is 70 × 70 × 4mm, big square steel 20 are bolted with small square steel 21, and big square steel 20 chooses arm before being used as, after small square steel 21 is used as Arm.
In the application, the roofing lower floor for going out roofing combination type glass curtain wall is frame type glass curtain wall 1, and going out roof sections is Unit glass curtain wall 2;Its need by it is described herein go out roofing combination type glass curtain wall lifting construction system, complete glass Horizontal transport, vertical transport and the positioning of glass curtain wall and thin portion installation.
The frame type glass curtain wall 1 constructs complexity, applies man-hour requirement and is installed one by one according to construction technology;The list First formula glass curtain wall 2 is integral unit plate, and when construction, which directly lifts, to be connected on hanging part 3.It is when curtain wall goes out roofing height During 5m, curtain wall Steel Structure keel are equipped in roofing;When curtain wall goes out roofing height for 2m, no Steel Structure keel.
Operating personnel using it is described herein go out roofing combination type glass curtain wall lifting construction system, Specific construction step It is as follows:
Step 1 is equipped with roofing the glass curtain wall of curtain wall Steel Structure keel, construct successively steel column 9, oblique pull column 10 And lateral girder steel 11, steel column 9 and oblique pull column 10 are welded on curtain wall pier foundation 8;There is no curtain wall Steel Structure keel for roofing Glass curtain wall, newly-increased steel bracket 7 is set, and newly-increased steel bracket is welded into lattice pillar by angle steel, increases 7 bottom of steel bracket newly and uses Steel plate 12 is fixed on by chemical anchor bolts 13 on roofing.
Step 2, roofing sets up operating platform and protection outrigger, operating platform use three row's console mode scaffolds, and surrounding is set Guard rail completely spreads bamboo fence board on crosshead, facade hangs up properly safety net and foot guard plate, scaffold and Steel Structure keel or newly-increased steel Stent carries out effective drawknot.
Step 3, the installation overhanging support arm 4 on curtain wall bracing members, overhanging 4 level of support arm are shelved and are welded on bracing members, And consolidation process is carried out to overhanging support arm 4.
Step 4, in the annular hanger rail 5 of 4 outer end of overhanging support arm installation, hanger rail 5 is formed by connecting by I-steel, top flange Bolt installation is carried out with overhanging support arm 4 to fix, it is made to be suspended under overhanging support arm 4 by connecting plate;5 web of hanger rail and lower flange Without connection, but lower flange must polish smooth.
Walking electric block 6, is movably fixed on the lower part of the annular hanger rail 5 of suspension by step 5, and walking is electronic There are certain gaps with the annular hanger rail edge of a wing on the inside of the traveling wheel of cucurbit 6, ensure 6 normal walking of walking electric block.
Step 6 installs hanging basket stent transverse arm on overhanging support arm 4, and hanging basket stent transverse arm is by big square steel 20 and small square steel 21 Composition, big square steel 20 are bolted with small square steel 21, and big square steel 20 chooses arm before being used as, and small square steel 21 is used as postbrachium;Hanging basket Stent transverse arm is front and rear to be fixed on overhanging support arm 4 by stud 22 in a manner of anchor ear, and stud is respectively provided with one about 22 Clamping plate, the square steel position contacted with clamping plate set rubber pad respectively, and 22 both ends of stud are fixed with double nut;Mounting bracket flag again Bar 17 climbs rope component 18, climbs rope and be connected with ground hanging basket 19.
Step 7 installs electrical hoist 23 on roofing, and electrical hoist 23 is fixed on roofing, positions hoist engine steel Cord fixed pulley 24 is weldingly fixed on overhanging support arm 4.
Step 8:Examination lifting is carried out before formal lifting, carries out no-load experiment, static load experiment and dynamic load examination respectively It tests, it is ensured that Lift-on/Lift-off System is safe and reliable.
Step 9:It is formal to carry out glass curtain wall lifting:Roofing element formula glass curtain wall 2 is first installed out, it is rear to install under roofing Layer frame type glass curtain wall 1.
Specifically, when installing out roofing element formula glass curtain wall 2, by electrical hoist steel wire rope 16 and fixed support and glass Glass curtain wall plate 25 connects, and starts roofing electrical hoist 23 and starts to lift, and carries out 25 vertical transport of glass curtain wall plate, such as schemes Shown in 3.Glass curtain wall plate is lifted to 5 position of suspension ring-shaped guide rail, is stopped vertical transport, is carried out changing hook operation.
The walking electric block 6 for being suspended on 5 lower end of guide rail is opened, treats that it is moved to the surface of glass curtain wall plate 25 When, the hook of walking electric block 6 is connected in the fixation support of glass curtain wall plate 25, then slowly decline roofing electric rolling 23 steel wire rope 16 of machine is raised, the removal after electronic 23 machine of the elevator hook relaxation of roofing.
It changes after the completion of hook, adjusting 25 height of glass curtain wall plate makes its 200mm higher than installation position or so, rear control walking Formula electric block 6 makes it be slided along the annular hanger rail 5 of suspension, by 25 horizontal transport of glass curtain wall plate to installation site, Bottle gouard moved by hands is hung on glass curtain wall plate 25 again(Bottle gouard moved by hands upper end is fixed on pole bracket), by adjusting manually Section is accurately positioned, will be manual after 25 pieces of hangers of glass curtain wallboard are hung on adapter 3 and caging bolt etc. installs The hook of cucurbit and electric block unloads.
During installing frame posture glass curtain wall 1, electrical hoist 23 is first passed through by 25 vertical transport of glass curtain wall plate to room In the lower floor of face, hanging basket 19 is risen to roofing lower floor installation site, construction personnel carries out roofing in hanging basket by construction technology Lower floor's frame type glass curtain wall is installed one by one.
Step 10:Formula glass curtain wall to be combined utilizes hanging basket to remove the annular hanger rail 5 of suspension, walking after all installation is complete 6 grade hanging apparatus of formula electric block, ground is drop to by electrical hoist 23;Overhanging support arm 4, nacelle device are removed again, most Dismantling operation platform, protection outrigger and electrical hoist 23 afterwards, ground is transported to by formal elevator.
Compared with prior art, the utility model provides one kind and goes out roofing combination type glass curtain wall lifting construction system, Its is rational in infrastructure, and the vertical transport of glass curtain wall is completed by electrical hoist, and electric block completes water by hanging annular hanger rail Flat transport solves out the technical issues of difficult roofing combination type glass curtain wall lifting, low construction efficiency, has good promotion price Value.
The utility model is not limited to the above embodiment, anyone can obtain other under the enlightenment of the utility model Various forms of products, however, make any variation in its shape or structure, it is every with identical or similar to the present application Technical solution, all fall within the scope of protection of the utility model.

Claims (5)

1. one kind goes out roofing combination type glass curtain wall lifting construction system, which is characterized in that including bracing members, overhangs support arm(4), Hanger rail(5), walking electric block(6), nacelle device and lifting device;The bracing members for roof curtain wall Steel Structure keel or Roofing increases steel bracket newly(7), the overhanging support arm(4)Level is shelved and is welded on bracing members, the hanger rail(5)It is fixed on outstanding Choose support arm(4)Arm end, the walking electric block(6)It is suspended on hanger rail(5)On, walking electric block(6)It can be in hanger rail (5)Upper horizontal slip;The roof curtain wall Steel Structure keel include curtain wall pier foundation(8), steel column(9), oblique pull column(10), it is horizontal To girder steel(11);The newly-increased steel bracket(7)Lattice pillar is welded by angle steel, increases steel bracket newly(7)Bottom steel plate(12) Pass through chemical anchor bolts(13)It is fixed on roofing.
2. glass curtain wall lifting construction system according to claim 1, which is characterized in that the overhanging support arm(4)It can add Brace(14)And the bar that baroclines(15)Mode reinforced, the overhanging support arm(4)Steel wire rope can also be added at arm end (16)Secured drawknot is carried out with roofing.
3. glass curtain wall lifting construction system according to claim 1, which is characterized in that the hanger rail(5)For I-steel, Top flange and overhanging support arm(4)Connection is fixed.
4. glass curtain wall lifting construction system according to claim 1, which is characterized in that the nacelle device includes hanging basket branch Frame transverse arm, stent flagpole(17), climb rope component(18), hanging basket(19), the hanging basket stent transverse arm is by big square steel(20)With small side Steel(21)Composition, big square steel(20)With small square steel(21)It is bolted, the hanging basket stent transverse arm is front and rear to pass through double end spiral shell Bolt(22)Overhanging support arm is fixed in a manner of anchor ear(4)On.
5. glass curtain wall lifting construction system according to claim 1, which is characterized in that the lifting device is an electric rolling Raise machine(23), steel wire rope is set thereon(16);The electrical hoist(23)It is fixed on roofing, fixed pulley(24)Mounted on outstanding Choose support arm(4)On, directed traction electrical hoist(23)On steel wire rope.
CN201721677455.2U 2017-12-06 2017-12-06 Go out roofing combination formula glass curtain wall hoist and mount construction system Active CN207582986U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721677455.2U CN207582986U (en) 2017-12-06 2017-12-06 Go out roofing combination formula glass curtain wall hoist and mount construction system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721677455.2U CN207582986U (en) 2017-12-06 2017-12-06 Go out roofing combination formula glass curtain wall hoist and mount construction system

Publications (1)

Publication Number Publication Date
CN207582986U true CN207582986U (en) 2018-07-06

Family

ID=62735956

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721677455.2U Active CN207582986U (en) 2017-12-06 2017-12-06 Go out roofing combination formula glass curtain wall hoist and mount construction system

Country Status (1)

Country Link
CN (1) CN207582986U (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108675170A (en) * 2018-07-19 2018-10-19 上海建工七建集团有限公司 Roofing monorail crane and its construction method
CN109162466A (en) * 2018-10-24 2019-01-08 何德明 Room level units formula curtain wall installing structure and method
CN109653502A (en) * 2019-02-20 2019-04-19 中国建筑第八工程局有限公司 Staged moves back the big Glass Curtain Wall Construction method of platform
CN110562868A (en) * 2019-08-26 2019-12-13 常州第一建筑集团有限公司 Hoisting construction method for unit type glass curtain wall of super high-rise building
CN111021744A (en) * 2019-12-27 2020-04-17 上海建工五建集团有限公司 Curtain wall installation system and application construction method thereof
CN111305433A (en) * 2020-03-31 2020-06-19 陕西建工集团股份有限公司 Construction structure and construction method of inclined glass curtain wall of roof steel structure platform
CN112814396A (en) * 2020-12-31 2021-05-18 中建八局第二建设有限公司 Curtain wall mounting tool and method for roof steel structure overhanging
CN113914638A (en) * 2021-11-29 2022-01-11 中国建筑一局(集团)有限公司 Overhanging steel beam double-rail curtain wall hoisting system and curtain wall plate hoisting method
CN115874819A (en) * 2022-09-08 2023-03-31 中国十七冶集团有限公司 Construction method of aluminum alloy glass curtain wall of super high-rise building

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108675170A (en) * 2018-07-19 2018-10-19 上海建工七建集团有限公司 Roofing monorail crane and its construction method
CN109162466A (en) * 2018-10-24 2019-01-08 何德明 Room level units formula curtain wall installing structure and method
CN109653502A (en) * 2019-02-20 2019-04-19 中国建筑第八工程局有限公司 Staged moves back the big Glass Curtain Wall Construction method of platform
CN110562868A (en) * 2019-08-26 2019-12-13 常州第一建筑集团有限公司 Hoisting construction method for unit type glass curtain wall of super high-rise building
CN111021744A (en) * 2019-12-27 2020-04-17 上海建工五建集团有限公司 Curtain wall installation system and application construction method thereof
CN111305433A (en) * 2020-03-31 2020-06-19 陕西建工集团股份有限公司 Construction structure and construction method of inclined glass curtain wall of roof steel structure platform
CN111305433B (en) * 2020-03-31 2024-04-16 陕西建工集团股份有限公司 Construction structure and construction method of roof steel structure platform inclined glass curtain wall
CN112814396A (en) * 2020-12-31 2021-05-18 中建八局第二建设有限公司 Curtain wall mounting tool and method for roof steel structure overhanging
CN113914638A (en) * 2021-11-29 2022-01-11 中国建筑一局(集团)有限公司 Overhanging steel beam double-rail curtain wall hoisting system and curtain wall plate hoisting method
CN115874819A (en) * 2022-09-08 2023-03-31 中国十七冶集团有限公司 Construction method of aluminum alloy glass curtain wall of super high-rise building

Similar Documents

Publication Publication Date Title
CN207582986U (en) Go out roofing combination formula glass curtain wall hoist and mount construction system
CN103086279B (en) Vertical transportation construction method for building construction
CN103711301A (en) Construction method and device for two-track movable electric basket and lifting hoist
CN205804190U (en) A kind of travelling bridge for the guardrail construction that builds a bridge
CN106012852B (en) Support integrally falls frame construction method
CN104895337B (en) The installation method of large-size horizontal equipment in concrete frame
CN104310165A (en) Guide rail type adhesion construction lifter and construction method thereof
CN214220561U (en) Building slope facade diversion rail formula hanging flower basket construction platform
CN204644884U (en) High pier over-form construction reinforced bar installs mobile stock
CN212926981U (en) I-steel support of encorbelmenting bears hanging flower basket device
CN106088609A (en) A kind of integral lifting method of large span steel structure vestibule
CN210460016U (en) Integrated form single power lift material platform
CN102444271A (en) Suspended scaffolding with cast-in-place concrete structure
CN105019664A (en) High-altitude sliding installation method for box room type electric room
CN207512610U (en) A kind of assembled bridge pier construction operation platform
CN213836318U (en) Bridge floor wet joint hangs mould structure
CN202481972U (en) Mineshaft material hoisting frame
CN218027231U (en) Simple device for lowering bottom basket of hanging basket
CN215291562U (en) Device for high-rise building construction by adopting cantilever crane
CN109279522A (en) Movable units body glass curtain wall cantilevered hanging device
CN105060124B (en) Intra-frame portal crane system and hoisting use method thereof
CN105253793B (en) Construction method for traction transporting and hoisting of zinc pot in zinc plating workshop
CN108035530A (en) A kind of inner wall of oil tank construction hanging basket
CN210482072U (en) Platform support for controlling pier stud steel bar protection layer
CN207484991U (en) A kind of glass curtain wall monorail hoisting structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant