CN204823757U - Downhill path hoist of setting a roof beam in place on stride - Google Patents

Downhill path hoist of setting a roof beam in place on stride Download PDF

Info

Publication number
CN204823757U
CN204823757U CN201520471695.1U CN201520471695U CN204823757U CN 204823757 U CN204823757 U CN 204823757U CN 201520471695 U CN201520471695 U CN 201520471695U CN 204823757 U CN204823757 U CN 204823757U
Authority
CN
China
Prior art keywords
roof beam
stride
cylinder
place
downhill
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520471695.1U
Other languages
Chinese (zh)
Inventor
胡国和
胡鹏辉
伍耀军
陈金井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Zhonggong Crane Group Co Ltd
Original Assignee
Henan Zhonggong Crane Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Zhonggong Crane Group Co Ltd filed Critical Henan Zhonggong Crane Group Co Ltd
Priority to CN201520471695.1U priority Critical patent/CN204823757U/en
Application granted granted Critical
Publication of CN204823757U publication Critical patent/CN204823757U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Jib Cranes (AREA)

Abstract

The utility model relates to a downhill path hoist of setting a roof beam in place on stride, it includes the roof beam physically, the upside of the roof beam body be provided with down the roof beam structure, the upside of lower roof beam structure be provided with the roof beam structure, the right part of last roof beam structure be provided with jacking cylinder, fixing device and support, the support upside be provided with and has risen the device, rise to rise the device and be connected with wire rope, the left part of last roof beam structure be provided with stiffener, running gear and stand, the upper end of stand the lower part of support is connected to through fastening rope, the top of stand be connected with luffing cylinder, luffing cylinder be connected with the connecting rod, the downside of connecting rod be provided with the jib, the downside of jib be provided with the tripod, the downside setting of tripod remain to be set a roof beam in place, the utility model has the advantages of rational in infrastructure, convenient to use, security are high.

Description

A kind of stride uphill/downhill erecting crane
Technical field
The utility model belongs to hoisting crane technical field, is specifically related to a kind of erecting crane, particularly a kind of stride uphill/downhill erecting crane.
Background technology
Along with the development of bridge construction, the bridge type of cable-stayed bridge is different, and general bridge formation program is: immediately below section box girder barge transportation by driving to bridge location place, then to be sling by case beam with hoisting crane and be promoted to floor elevation; Then case beam and the beam contraposition that frame is good are spliced, and install drag-line, last erecting crane is walked forward the length of a beam sections, carries out further work; Because some bridge has certain gradient, cause there is certain difficulty during traditional erecting crane walking; Therefore, a kind of stride uphill/downhill erecting crane rational in infrastructure, easy to use, safe is provided to be necessary.
Summary of the invention
The purpose of this utility model is to overcome the deficiencies in the prior art, and provides a kind of stride uphill/downhill erecting crane rational in infrastructure, easy to use, safe.
The purpose of this utility model is achieved in that a kind of stride uphill/downhill erecting crane, it comprises beam body, the upside of described beam body is provided with lower beam frame, the upside of described lower beam frame is provided with roof beam structure, the right part of described upper roof beam structure is provided with jacking cylinder, anchor fitting and bearing, jack up unit is provided with on the upside of described bearing, described jack up unit is connected with steel rope, the left part of described upper roof beam structure is provided with stirrup, running gear and column, the upper end of described column is connected to the bottom of bearing by fastening rope, the top of described column is connected with amplitude oil cylinder, described amplitude oil cylinder is connected with connecting rod, the downside of described connecting rod is provided with suspension rod, the downside of described suspension rod is provided with spider, the downside of described spider arranges and needs to be set a roof beam in place.
Described jacking cylinder is two-way cylinder.
Described stirrup is cylinder stirrup.
Described column is cylinder column.
Described amplitude oil cylinder is two-way cylinder.
The beneficial effects of the utility model: the utility model adopts jacking cylinder, when on set a roof beam in place need to walk forward time, added back rises by jacking cylinder, and running gear to be set a roof beam in place walking on driving, upper set a roof beam in place and under set a roof beam in place between be provided with slideway, after arriving desired location, can use anchor fitting by set a roof beam in place fixing, to set a roof beam in place walking under then driving, both one move one quiet, alternating forward, achieves the walking of hoisting crane stride; The utility model adopts amplitude oil cylinder, can the position of regulating connecting rod and suspension rod easily, thus facilitates docking between the bridge formation process raising middle flask beam beam body good with frame, adopt spider, structural stability is high, and is convenient to angle adjustment, can meet the requirement of pontic needs certain slope; The utility model has advantage rational in infrastructure, easy to use, safe.
Accompanying drawing explanation
Fig. 1 is the structural representation of a kind of stride uphill/downhill of the utility model erecting crane.
In figure: 1, wait to set a roof beam in place 2, upper roof beam structure 3, lower beam frame 4, beam body 5, bearing 6, jacking cylinder 7, anchor fitting 8, jack up unit 9, steel rope 10, stirrup 11, fastening rope 12, running gear 13, column 14, amplitude oil cylinder 15, connecting rod 16, suspension rod 17, spider.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is described further.
Embodiment 1
As shown in Figure 1, a kind of stride uphill/downhill erecting crane, it comprises beam body 4, the upside of described beam body 4 is provided with lower beam frame 3, the upside of described lower beam frame 3 is provided with roof beam structure 2, the right part of described upper roof beam structure 2 is provided with jacking cylinder 6, anchor fitting and 7 bearings 5, jack up unit 8 is provided with on the upside of described bearing 5, described jack up unit 8 is connected with steel rope 9, the left part of described upper roof beam structure 2 is provided with stirrup 10, running gear 12 and column 13, the upper end of described column 13 is connected to the bottom of bearing 5 by fastening rope 11, the top of described column 13 is connected with amplitude oil cylinder 14, described amplitude oil cylinder 14 is connected with connecting rod 15, the downside of described connecting rod 15 is provided with suspension rod 16, the downside of described suspension rod 16 is provided with spider 17, the downside of described spider 17 arranges and needs to be set a roof beam in place 1.
The utility model adopts jacking cylinder, when on set a roof beam in place need to walk forward time, added back rises by jacking cylinder, and running gear to be set a roof beam in place walking on driving, upper set a roof beam in place and under set a roof beam in place between be provided with slideway, after arriving desired location, can use anchor fitting by set a roof beam in place fixing, to set a roof beam in place walking under then driving, both one move one quiet, alternating forward, achieves the walking of hoisting crane stride; The utility model adopts amplitude oil cylinder, can the position of regulating connecting rod and suspension rod easily, thus facilitates docking between the bridge formation process raising middle flask beam beam body good with frame, adopt spider, structural stability is high, and is convenient to angle adjustment, can meet the requirement of pontic needs certain slope; The utility model has advantage rational in infrastructure, easy to use, safe.
Embodiment 2
As shown in Figure 1, a kind of stride uphill/downhill erecting crane, it comprises beam body 4, the upside of described beam body 4 is provided with lower beam frame 3, the upside of described lower beam frame 3 is provided with roof beam structure 2, the right part of described upper roof beam structure 2 is provided with jacking cylinder 6, anchor fitting and 7 bearings 5, jack up unit 8 is provided with on the upside of described bearing 5, described jack up unit 8 is connected with steel rope 9, the left part of described upper roof beam structure 2 is provided with stirrup 10, running gear 12 and column 13, the upper end of described column 13 is connected to the bottom of bearing 5 by fastening rope 11, the top of described column 13 is connected with amplitude oil cylinder 14, described amplitude oil cylinder 14 is connected with connecting rod 15, the downside of described connecting rod 15 is provided with suspension rod 16, the downside of described suspension rod 16 is provided with spider 17, the downside of described spider 17 arranges and needs to be set a roof beam in place 1.
Described jacking cylinder 6 is two-way cylinder.
Described stirrup 10 is cylinder stirrup.
Described column 13 is cylinder column.
Described amplitude oil cylinder 14 is two-way cylinder.
The utility model adopts jacking cylinder, when on set a roof beam in place need to walk forward time, added back rises by jacking cylinder, and running gear to be set a roof beam in place walking on driving, upper set a roof beam in place and under set a roof beam in place between be provided with slideway, after arriving desired location, can use anchor fitting by set a roof beam in place fixing, to set a roof beam in place walking under then driving, both one move one quiet, alternating forward, achieves the walking of hoisting crane stride; The utility model adopts amplitude oil cylinder, can the position of regulating connecting rod and suspension rod easily, thus facilitates docking between the bridge formation process raising middle flask beam beam body good with frame, adopt spider, structural stability is high, and is convenient to angle adjustment, can meet the requirement of pontic needs certain slope; The utility model has advantage rational in infrastructure, easy to use, safe.

Claims (5)

1. a stride uphill/downhill erecting crane, it comprises beam body, it is characterized in that: the upside of described beam body is provided with lower beam frame, the upside of described lower beam frame is provided with roof beam structure, the right part of described upper roof beam structure is provided with jacking cylinder, anchor fitting and bearing, jack up unit is provided with on the upside of described bearing, described jack up unit is connected with steel rope, the left part of described upper roof beam structure is provided with stirrup, running gear and column, the upper end of described column is connected to the bottom of bearing by fastening rope, the top of described column is connected with amplitude oil cylinder, described amplitude oil cylinder is connected with connecting rod, the downside of described connecting rod is provided with suspension rod, the downside of described suspension rod is provided with spider, the downside of described spider arranges and needs to be set a roof beam in place.
2. a kind of stride uphill/downhill erecting crane according to claim 1, is characterized in that: described jacking cylinder is two-way cylinder.
3. a kind of stride uphill/downhill erecting crane according to claim 1, is characterized in that: described stirrup is cylinder stirrup.
4. a kind of stride uphill/downhill erecting crane according to claim 1, is characterized in that: described column is cylinder column.
5. a kind of stride uphill/downhill erecting crane according to claim 1, is characterized in that: described amplitude oil cylinder is two-way cylinder.
CN201520471695.1U 2015-07-03 2015-07-03 Downhill path hoist of setting a roof beam in place on stride Expired - Fee Related CN204823757U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520471695.1U CN204823757U (en) 2015-07-03 2015-07-03 Downhill path hoist of setting a roof beam in place on stride

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520471695.1U CN204823757U (en) 2015-07-03 2015-07-03 Downhill path hoist of setting a roof beam in place on stride

Publications (1)

Publication Number Publication Date
CN204823757U true CN204823757U (en) 2015-12-02

Family

ID=54681380

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520471695.1U Expired - Fee Related CN204823757U (en) 2015-07-03 2015-07-03 Downhill path hoist of setting a roof beam in place on stride

Country Status (1)

Country Link
CN (1) CN204823757U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110526138A (en) * 2019-07-31 2019-12-03 中铁九桥工程有限公司 A kind of amplitude variation type erecting crane

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110526138A (en) * 2019-07-31 2019-12-03 中铁九桥工程有限公司 A kind of amplitude variation type erecting crane

Similar Documents

Publication Publication Date Title
CN202766975U (en) Novel deck erection crane
CN105000482B (en) Tower crane with walking mechanism
CN201077721Y (en) Gantry crane with falling girder
CN101725115B (en) Fixed hoisting bracket device for pushing steel box girder and construction method thereof
CN205387439U (en) Mast hoisting accessory
CN201411900Y (en) Hydraulic die lifter for chimneys
CN101566005B (en) Chimney hydraulic mould lifting device
CN104120659B (en) Descending hanging basket
CN206799021U (en) A kind of full circle swinging traveling derrick crane
CN102777037B (en) Simple and practical hoisting construction method of long-span steel girder
CN205772794U (en) A kind of suspender of revealing all the details of concrete prefabricated element
CN203113793U (en) Large formwork installation system of oblique structure
CN105060135A (en) Tower crane
CN102041779A (en) Erection crane and construction method thereof
CN204823757U (en) Downhill path hoist of setting a roof beam in place on stride
CN204663003U (en) Anchor ear type vestibule truss Steel Structure hoisting hanger
CN206692230U (en) A kind of skyscraper row is hung
CN205709649U (en) A kind of simple suspension crane
CN204059199U (en) A kind of rear fulcrum cast-in-place cantilever hanging basket system for stayed-cable bridge
CN204938802U (en) For the rail supported system of tower crane
CN204823919U (en) Tower crane
CN207293976U (en) A kind of cantilever crane set up for bridge subsection transport
CN202347884U (en) Overhaul platform for water turbine
CN201943006U (en) Main tower zone movable bracket for assisting non-variable amplitude girder erecting crane to erect steel box girders
CN204281029U (en) A kind of stressed clear and definite and adjustable operation platform suspender of suspension centre

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151202

Termination date: 20160703