CN203612870U - Movable and detachable lattice type independent hanging bracket for steel structure - Google Patents

Movable and detachable lattice type independent hanging bracket for steel structure Download PDF

Info

Publication number
CN203612870U
CN203612870U CN201320761205.2U CN201320761205U CN203612870U CN 203612870 U CN203612870 U CN 203612870U CN 201320761205 U CN201320761205 U CN 201320761205U CN 203612870 U CN203612870 U CN 203612870U
Authority
CN
China
Prior art keywords
isosceles trapezoid
steel structure
guide rail
platform structure
trapezoid platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201320761205.2U
Other languages
Chinese (zh)
Inventor
金钱华
陈学方
张伟
刘振之
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Greenland Construction Group Co Ltd
Original Assignee
Shanghai Greenland Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Greenland Construction Group Co Ltd filed Critical Shanghai Greenland Construction Group Co Ltd
Priority to CN201320761205.2U priority Critical patent/CN203612870U/en
Application granted granted Critical
Publication of CN203612870U publication Critical patent/CN203612870U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides a movable and detachable lattice type independent hanging bracket for a steel structure. The hanging bracket comprises an isosceles trapezoid table structure composed of cross beams and branch sides. A guide rail is arranged on the top surface of the isosceles trapezoid table structure, a pulley with a hanging hook is arranged on the guide rail in a sliding mode, and a pull rod is arranged on the upper portion of the guide rail. Lacing bars are arranged on the front surface and the rear surface of the isosceles trapezoid table structure in an intersecting mode, and movable tires are arranged on the bottom of the isosceles trapezoid table structure. The hanging bracket overcomes the shortcomings in the prior art, is convenient to use, assemble and disassemble, light in weight, movable, is an unconventional lifting machine which is simple, practical and high in safety performance and cost performance, and is worth popularizing on the occasions when conventional lifting machines can not finish lifting tasks.

Description

A kind of removable detachable latticed steel structure independence suspension bracket
Technical field
The utility model relates to the interim suspension bracket of a kind of steel structure, is mainly used in the on-site hoisting of steel structure member, belongs to steel structure hoisting technical field.
Background technology
The parameter that construction site will be considered and many factors, in the time of design and layout tower crane, when on-the-spot tower crane has been constructed complete, after cannot having adjusted the layout of tower crane or model, also can there are once in a while unavoidably some careless omissions, as part steel structure member be positioned at tower crane lifting radius beyond, cause this part steel structure cannot use on-the-spot tower crane lifting.
For example, New World famous-object city project is positioned at intown Nanjing Road, Shanghai City, crossing, Henan, and architectural plane is of a size of long 132 meters, and wide 90.8 meters, building structure is reinforced concrete composite structure.Whole camp site is provided with the tower flat boom crane of two 6015 altogether, 55 meters of brachiums, and the maximum hoisting weight in end is 2.15 tons; 45 meters of another brachiums, the maximum hoisting weight in end is 3.1 tons, two tower cranes lay respectively at the thing both sides of whole building.
Because overall budget is not linked up with steel structure professional construction unit in the time designing and arrange tower crane, do not take into full account the lifting demand of steel structure yet, on-the-spot tower crane of while has also been constructed complete, cannot adjust the layout of tower crane or model.Thereby the lifting of steel structure is caused to following several situation:
1) part steel structure member be positioned at tower crane lifting radius beyond, cause this part steel structure cannot use on-the-spot tower crane lifting.
2) because 6015 tower cranes of configuration belong to small-sized tower crane, the hoisting weight of its end is too little, can not meet the requirement of far-end steel member hoisting weight.
Because tower crane cannot be adjusted, whether design engineer proposes to adopt wheel crane to carry out the lifting of steel member.Fully making an on-the-spot survey behind camp site, finding that whole building is close to the bustliniest Nanjing Road, business zone, Shanghai and surrounding commercial establishment is stood in great numbers, do not having the stand of loop wheel machine and lifting to use place at all, this method is also declared infeasible.
Because the lifting of construction steel structure is general all take tower crane and wheel crane as main lifting device, these two kinds of methods are all adopting for above-mentioned reasons.The dead end street that this enters the steel structure hoisting of this building, thereby have only and look for another way, the steel structure that designs a kind of novel this building of lifting device guarantee has lifted smoothly.
Utility model content
The technical problems to be solved in the utility model is to provide a kind of four limbs lattice, removable, the interim suspension bracket of detouchable steel structure.
In order to solve the problems of the technologies described above, the technical solution of the utility model is to provide a kind of removable detachable latticed steel structure independence suspension bracket, it is characterized in that: comprise the isosceles trapezoid platform structure being formed by crossbeam and point limb, the end face of isosceles trapezoid platform structure is provided with guide rail, the pulley that suspension hook is housed is located on guide rail slidably, and guide rail top is provided with pull bar; On former and later two faces of isosceles trapezoid platform structure, intersect and be furnished with lacing, the bottom of isosceles trapezoid platform structure is provided with mobile tyre.
Preferably, end face and the bottom surface of described isosceles trapezoid platform structure form by described crossbeam, and four angles of the end face of described isosceles trapezoid platform structure and bottom surface are connected by described point of limb is corresponding respectively.
Preferably, the height of described isosceles trapezoid platform structure is 9.5 meters, and the bottom surface of described isosceles trapezoid platform structure is of a size of 5 meters × 5 meters, and the end face of described isosceles trapezoid platform structure is of a size of 5 meters × 2 meters.
Preferably, the bottom surface of described isosceles trapezoid platform structure and the angle of described point of limb are 80 °.
The step of the Hoisting Program of the removable detachable latticed steel structure independence suspension bracket that the utility model provides is as follows:
1) after the framework of suspension bracket is completed by factory's oneself making, be transported to scene.Winching to flooring by tower crane carries out assembled, then in place to Hoisting Position by manually drawing.After in place, unload mobile tyre, make suspension bracket directly be located in flooring.
2) due to approximately 3.8 tons of the maximum lift heavys of the steel member that adopts this suspension bracket to lift, first must the allocation and transportation of steel member extremely be needed by tower crane to the flooring of lifting, then steel member is hauled by this suspension bracket by Hydraulic trolley, adopt again 5t chain block that steel member is sling, finally by pulley, in place member slippage, whereabouts, correction etc. are completed to installation.
3) after having lifted, with jack, lifting framework jack-up is set up to mobile tyre, move to next Hoisting Position, complete the lifting of next member by above-mentioned lifting operation.
4) complete after the lifting component of a flooring, lifting framework is taken apart, winch to region, the middle Room, treat that last layer flooring structure construction is complete, with tower crane, framework is hung on to flooring assembled, prepare the lifting component of next flooring.
The device that the utility model provides has overcome the deficiencies in the prior art, easy to use, easy installation and removal, lightweight, and can move, be a kind of simple and easy, practical, safety and the unconventional elevator machinery that has cost performance, particularly in the time that conventional hoisting crane cannot be born lifting task, be worth promoting.
Accompanying drawing explanation
The removable detachable latticed steel structure independence suspension bracket front view that Fig. 1 provides for the utility model;
The removable detachable latticed steel structure independence suspension bracket lateral plan that Fig. 2 provides for the utility model;
The removable detachable latticed steel structure independence suspension bracket top view that Fig. 3 provides for the utility model;
Fig. 4 is that suspension bracket is in place and lift by crane schematic diagram;
Fig. 5 is steel member slippage schematic diagram;
Fig. 6 is the lateral plan of Fig. 5;
Fig. 7 is steel member schematic diagram in place.
The specific embodiment
For the utility model is become apparent, hereby with a preferred embodiment, and coordinate accompanying drawing to be described in detail below.
Fig. 1~Fig. 3 is respectively removable detachable latticed steel structure independence suspension bracket front view, lateral plan and then the top view that the utility model provides, and described removable detachable latticed steel structure independence suspension bracket has seven part compositions: point limb 1, crossbeam 2, lacing 3, guide rail 4, the pulley 5 that suspension hook is housed, pull bar 6 and mobile tyre 7.This seven part is formed entirety by hold-down bolt, is simultaneously also convenient to on-the-spot dismounting and assembled due to bolts.
Form an isosceles trapezoid platform structure by crossbeam 2 and a point limb 1, the end face on isosceles trapezoid platform structure top and the bottom surface of bottom are made up of crossbeam 2, and four angles of end face and bottom surface are connected by point limb 1 is corresponding respectively.The height of whole travelling bridge is 9.5 meters, and the planar dimension of bottom surface is 5 meters * 5 meters, and the planar dimension of end face is 5 meters * 2 meters, and point limb 1 is 80 ° with the angle of bottom surface.End face is furnished with guide rail 4, and the pulley 5 that suspension hook is housed is arranged on guide rail 4, can slide along guide rail 4.Pull bar 6 is equipped with on guide rail 4 tops.Between point limb 1 of the left and right sides of former and later two faces of isosceles trapezoid platform structure, arranged crosswise has lacing 3, and isosceles trapezoid platform structural base is equipped with mobile tyre 7.
In conjunction with Fig. 4~Fig. 7, the step of the Hoisting Program of the removable detachable latticed steel structure independence suspension bracket that the utility model provides is as follows:
1) after the framework of suspension bracket is completed by factory's oneself making, be transported to scene.Winching to flooring by tower crane carries out assembled, then in place to Hoisting Position by manually drawing.After in place, unload mobile tyre, make suspension bracket directly be located in flooring.
2) due to approximately 3.8 tons of the maximum lift heavys of the steel member that adopts this suspension bracket to lift, first must steel member 8 be allocated and transported to the flooring of needs lifting by tower crane, then steel member 8 is hauled by this suspension bracket by Hydraulic trolley, adopt again 5t chain block 9 that steel member is sling, finally by pulley, in place member slippage, whereabouts, correction etc. are completed to installation.In Fig. 7, A place represents that steel member 8 is with regard to site.
3) after having lifted, with jack, lifting framework jack-up is set up to mobile tyre, move to next Hoisting Position, complete the lifting of next member by above-mentioned lifting operation.
4) complete after the lifting component of a flooring, lifting framework is taken apart, winch to region, the middle Room, treat that last layer flooring structure construction is complete, with tower crane, framework is hung on to flooring assembled, prepare the lifting component of next flooring.
Along with completing smoothly of New World famous-object city project stiffened steel structure engineering lifting, this removable, the safety of detachable suspension bracket, practicality, economy are proved.Obviously, this interim suspension bracket, in corresponding engineering, is particularly worth promoting in the time that conventional hoisting crane cannot be born lifting task.

Claims (4)

1. a removable detachable latticed steel structure independence suspension bracket, it is characterized in that: comprise the isosceles trapezoid platform structure being formed by crossbeam (2) and point limb (1), the end face of isosceles trapezoid platform structure is provided with guide rail (4), the pulley (5) that suspension hook is housed is located at guide rail (4) above slidably, and guide rail (4) top is provided with pull bar (6); On former and later two faces of isosceles trapezoid platform structure, intersect and be furnished with lacing (3), the bottom of isosceles trapezoid platform structure is provided with mobile tyre (7).
2. the removable detachable latticed steel structure independence suspension bracket of one as claimed in claim 1, it is characterized in that: the end face of described isosceles trapezoid platform structure and bottom surface form by described crossbeam (2), four angles of the end face of described isosceles trapezoid platform structure and bottom surface are connected by described point of limb (1) is corresponding respectively.
3. the removable detachable latticed steel structure independence suspension bracket of one as claimed in claim 1 or 2, it is characterized in that: the height of described isosceles trapezoid platform structure is 9.5 meters, the bottom surface of described isosceles trapezoid platform structure is of a size of 5 meters × 5 meters, and the end face of described isosceles trapezoid platform structure is of a size of 5 meters × 2 meters.
4. the removable detachable latticed steel structure independence suspension bracket of one as claimed in claim 3, is characterized in that: the angle of the bottom surface of described isosceles trapezoid platform structure and described point of limb (1) is 80 °.
CN201320761205.2U 2013-11-27 2013-11-27 Movable and detachable lattice type independent hanging bracket for steel structure Expired - Lifetime CN203612870U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320761205.2U CN203612870U (en) 2013-11-27 2013-11-27 Movable and detachable lattice type independent hanging bracket for steel structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320761205.2U CN203612870U (en) 2013-11-27 2013-11-27 Movable and detachable lattice type independent hanging bracket for steel structure

Publications (1)

Publication Number Publication Date
CN203612870U true CN203612870U (en) 2014-05-28

Family

ID=50765529

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320761205.2U Expired - Lifetime CN203612870U (en) 2013-11-27 2013-11-27 Movable and detachable lattice type independent hanging bracket for steel structure

Country Status (1)

Country Link
CN (1) CN203612870U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110040632A (en) * 2019-04-01 2019-07-23 杭州通达集团有限公司 A kind of segmental hoisting construction method of large span section steel beam

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110040632A (en) * 2019-04-01 2019-07-23 杭州通达集团有限公司 A kind of segmental hoisting construction method of large span section steel beam

Similar Documents

Publication Publication Date Title
CN201943007U (en) Constant amplitude frame beam crane capable of being used in combination with movable support frame
CN203821720U (en) High-altitude large roof panel installing tool trolley
CN203255892U (en) Heightened gantry type crane
CN110258352A (en) The steel reinforced concrete combined bridge construction method that two bridgings are done
CN102777037B (en) Simple and practical hoisting construction method of long-span steel girder
CN205382488U (en) Water conservancy project concrete dam body job -specific formwork
CN204625045U (en) A kind of steel structure hoisting door shaped stent formula hanging apparatus
CN205874987U (en) Simply put up bridge crane
CN203612870U (en) Movable and detachable lattice type independent hanging bracket for steel structure
CN204057696U (en) A kind of gate type portal gantry
CN202744961U (en) Lifting mechanism for anti-falling beam check block
CN105625732A (en) Supporting-free construction method of ultrahigh overhung steel-structure truss
CN201722937U (en) Sliding platform for installation of net rack
CN205934730U (en) Installation device of wave form steel web
CN211713715U (en) Synchronous dislocation method construction hanging basket device for corrugated steel web suspension casting bridge
CN107288354B (en) Construction method for overall displacement of gantry crane
CN203638979U (en) Device for mounting tank floor in low-temperature storage tank
CN203755153U (en) Simply supported plate bridge bottom plate maintenance construction moving operation platform
CN202465115U (en) Double main beam gantry crane
CN106276599A (en) Possesses the tower crane of illumination highlights function
CN201952736U (en) Auxiliary pier movable bracket for assisting invariable-amplitude beam erecting crane in erecting steel box girder
CN201665821U (en) Crown block used for bridge erecting machine
CN205187694U (en) Novel tower crane equipment
CN203372999U (en) Combined hoisting device of crane girder
CN204690594U (en) A kind of simple and easy door frame of the Slidable for the installation of framing type steel box-girder crossbeam

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant