CN205187694U - Novel tower crane equipment - Google Patents

Novel tower crane equipment Download PDF

Info

Publication number
CN205187694U
CN205187694U CN201520812319.4U CN201520812319U CN205187694U CN 205187694 U CN205187694 U CN 205187694U CN 201520812319 U CN201520812319 U CN 201520812319U CN 205187694 U CN205187694 U CN 205187694U
Authority
CN
China
Prior art keywords
arm
davit
tower crane
tower
crane equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520812319.4U
Other languages
Chinese (zh)
Inventor
陈大兴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuxi Gangsheng Port Machinery Co Ltd
Original Assignee
Wuxi Gangsheng Port Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuxi Gangsheng Port Machinery Co Ltd filed Critical Wuxi Gangsheng Port Machinery Co Ltd
Priority to CN201520812319.4U priority Critical patent/CN205187694U/en
Application granted granted Critical
Publication of CN205187694U publication Critical patent/CN205187694U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a novel tower crane equipment, include basic built -in fitting, concrete landfill district, body of the tower, rotation mechanism, play to rise hoist engine, balancing piece, balance arm, balance arm pull rod, davit pull rod, davit, change width of cloth dolly, lifting hook and climbing mechanism, the body of the tower bottom is provided with a plurality of basis built -in fitting, climbing mechanism is installed to the body of the tower lateral wall, rotation mechanism is installed just to body of the tower one end rotation mechanism surface mounting has balance arm and a davit, and the davit is located balance arm one end, the davit lateral wall is installed and is become width of cloth dolly just it is provided with lifting hook to become width of cloth dolly bottom, this stable in structure connects closely, and the balancing piece can balance the heavy object quality of davit one end in the working process to reach the balanced safety of guaranteeing, improved work efficiency, easy operation, life is of a specified duration, has good operating condition, can bring considerable economic benefits, is fit for the promotion conference and uses.

Description

A kind of novel tower crane equipment
Technical field
The utility model relates to a kind of novel tower crane, and particularly the novel tower crane equipment of one, belongs to lifting technique field.
Background technology
Traveling tower crane can be divided into again rail mounted, rubber-tyred, truck mounted, crawler type four kinds according to the difference of running gear.Rail-mounted tower crane tower body is fixed on walking underframe, can run, good stability on ad hoc track, and can walk by on-load, work efficiency is high, is thus widely used in building installation engineering.Rubber-tyred, truck mounted and crawler-mounted tower crane rail-free device, conveniently moving, but can not on-load walking, less stable, seldom produce at present.Fixed base tower crane is according to the difference of installation position, be divided into again attachment jack up and inner climbing type two kinds, attachment self-raising tower crane can raise with building and raise, be applicable to skyscraper, the horizontal load transmitted by hoisting crane is only born in building structure, convenient attachment, but it is many to take structural steel; Inner climbing type hoisting crane is at interior of building, and climb by a set of bracket and elevator system, jacking is more loaded down with trivial details, but it is few to take structural steel, and do not need installing basis, all deadweight and load are born by building.
Current many suspension hooks come with some shortcomings part, many tower crane structures are stable not, well can not balance arm in working process, and laying of balance block is unreasonable, the safety in working process can not be guaranteed, therefore we have proposed a kind of novel tower crane equipment for the problems referred to above.
Utility model content
The technical problems to be solved in the utility model overcomes existing defect, a kind of novel tower crane equipment is provided, this Stability Analysis of Structures connects closely, balance block can the weight quality of arm one end in balancing work process, thus reach balance guarantee safety, and improve work efficiency, simple to operate, service life is of a specified duration, effectively can solve the problem in background technology.
In order to solve the problems of the technologies described above, the utility model provides following technical scheme:
A kind of novel tower crane equipment of the utility model, comprises basic built-in fitting, cement concrete landfill district, tower body, swing type mechanism, the winch that hoists, balance block, equilibrium arm, equilibrium arm pull bar, arm pull bar, arm, amplitude variation trolley, load hook and lifting body; Described tower body bottom is provided with several basic built-in fittings; Described tower body sidewall is provided with lifting body; Described tower body one end is provided with swing type mechanism and described swing type mechanism surface is provided with equilibrium arm and arm, and described arm is positioned at equilibrium arm one end; Described arm sidewall is provided with amplitude variation trolley and described amplitude variation trolley bottom is provided with load hook.
Further, it is inner that described basic built-in fitting bottom is installed on cement concrete landfill district, and described cement concrete landfill district landfill cement concrete.
Further, described equilibrium arm sidewall is provided with the winch that hoists, and described equilibrium arm inside is steel support structure.
Further, described equilibrium arm one end is provided with several balance blocks.
Further, described swing type mechanism top is connected with the equilibrium arm pull bar being installed on equilibrium arm surface.
Further, described arm and the arm pull bar compact siro spinning technology being connected to swing type mechanism top.
The beneficial effect that compared with prior art the utility model reaches is:
This Stability Analysis of Structures connects closely, and balance block can the weight quality of arm one end in balancing work process, thus reaches balance and ensure safety, improve work efficiency, simple to operate, service life is of a specified duration, there is good service conditions, considerable economic benefit can be brought, be applicable to promotion conference and use.
Accompanying drawing explanation
Accompanying drawing is used to provide further understanding of the present utility model, and forms a part for specification sheets, is used from explanation the utility model, does not form restriction of the present utility model with embodiment one of the present utility model.
In the accompanying drawings:
Fig. 1 is the integral structure schematic diagram described in the utility model embodiment;
Number in the figure: 1, basic built-in fitting; 2, cement concrete landfill district; 3, tower body; 4, swing type mechanism; 5, hoist winch; 6, balance block; 7, equilibrium arm; 8, equilibrium arm pull bar; 9, arm pull bar; 10, arm; 11, amplitude variation trolley; 12, load hook; 13, lifting body.
Detailed description of the invention
Below in conjunction with accompanying drawing, preferred embodiment of the present utility model is described, should be appreciated that preferred embodiment described herein is only for instruction and explanation of the utility model, and be not used in restriction the utility model.
Embodiment: as shown in Figure 1, a kind of novel tower crane equipment of the utility model, comprises basic built-in fitting 1, cement concrete landfill district 2, tower body 3, swing type mechanism 4, the winch 5 that hoists, balance block 6, equilibrium arm 7, equilibrium arm pull bar 8, arm pull bar 9, arm 10, amplitude variation trolley 11, load hook 12 and lifting body 13; Described tower body 3 bottom is provided with several basic built-in fittings 1; Described tower body 3 sidewall is provided with lifting body 13; Described tower body 3 one end is provided with swing type mechanism 4 and described swing type mechanism 4 surface is provided with equilibrium arm 7 and arm 10, and described arm 10 is positioned at equilibrium arm 7 one end; Described arm 10 sidewall is provided with amplitude variation trolley 11 and described amplitude variation trolley 11 bottom is provided with load hook 12.
As a kind of technical optimization scheme of the present utility model: it is inner that described basic built-in fitting 1 bottom is installed on cement concrete landfill district 2, and described cement concrete landfill district 2 landfill cement concrete; Described equilibrium arm 7 sidewall is provided with the winch 5 that hoists, and described equilibrium arm 7 inside is steel support structure; Described equilibrium arm 7 one end is provided with several balance blocks 6; Described swing type mechanism 4 top is connected with the equilibrium arm pull bar 8 being installed on equilibrium arm 7 surface; Described arm 10 and arm pull bar 9 compact siro spinning technology being connected to swing type mechanism 4 top.
In use, in lifting operation process, special messenger must be had to command, and special messenger looks after power supply to the utility model, and special messenger operates hydraulic efficiency pressure system, special messenger's binding bolt.NOT operation personnel must not climb up the service platform of climbing frame, more must not the pump of primer fluid pressing system, threshold switch or other electrical equipment.Lifting operation should be tried one's best and be carried out by day.Extraordinary circumstances when night work, need must have sufficient illumination; When wind-force is more than level Four, lifting operation must not be carried out.In operation process as wind-force strengthen suddenly time, jacking must be stopped immediately, and fastening bolt.Cable should be loosened in advance before jacking, play length slightly larger than total climb altitude, and perform the fastening work of cable drum; In jacking process, swing type mechanism should be braked, forbid slewing tower and other operations.As found fault in jacking process, should stop operation immediately, proceeding again after pending; Before and after each jacking, must conscientiously get ready and inspection work.Whether as prescribed torsion is fastening conscientiously will to check each tie bolt time special after jacking, and whether the gap of climbing frame roller and tower-body standard section adjusts, and whether control lever gets back to midway location, and whether the power supply of hydraulic efficiency pressure system cuts off.
Last it is noted that the foregoing is only preferred embodiment of the present utility model, be not limited to the utility model, although be described in detail the utility model with reference to previous embodiment, for a person skilled in the art, it still can be modified to the technical scheme described in foregoing embodiments, or carries out equivalent replacement to wherein portion of techniques feature.All within spirit of the present utility model and principle, any amendment done, equivalent replacement, improvement etc., all should be included within protection domain of the present utility model.

Claims (6)

1. a novel tower crane equipment, comprises basic built-in fitting (1), cement concrete landfill district (2), tower body (3), swing type mechanism (4), the winch that hoists (5), balance block (6), equilibrium arm (7), equilibrium arm pull bar (8), arm pull bar (9), arm (10), amplitude variation trolley (11), load hook (12) and lifting body (13); It is characterized in that, described tower body (3) bottom is provided with several basic built-in fittings (1); Described tower body (3) sidewall is provided with lifting body (13); Described tower body (3) one end is provided with swing type mechanism (4) and described swing type mechanism (4) surface is provided with equilibrium arm (7) and arm (10), and described arm (10) is positioned at equilibrium arm (7) one end; Described arm (10) sidewall is provided with amplitude variation trolley (11) and described amplitude variation trolley (11) bottom is provided with load hook (12).
2. the novel tower crane equipment of one according to claim 1, is characterized in that, it is inner that described basic built-in fitting (1) bottom is installed on cement concrete landfill district (2), and described cement concrete landfill district (2) landfill cement concrete.
3. the novel tower crane equipment of one according to claim 1, is characterized in that, described equilibrium arm (7) sidewall is provided with the winch that hoists (5), and described equilibrium arm (7) inside is steel support structure.
4. the novel tower crane equipment of one according to claim 1, is characterized in that, described equilibrium arm (7) one end is provided with several balance blocks (6).
5. the novel tower crane equipment of one according to claim 1, is characterized in that, described swing type mechanism (4) top is connected with the equilibrium arm pull bar (8) being installed on equilibrium arm (7) surface.
6. the novel tower crane equipment of one according to claim 1, is characterized in that, described arm (10) and arm pull bar (9) compact siro spinning technology being connected to swing type mechanism (4) top.
CN201520812319.4U 2015-10-21 2015-10-21 Novel tower crane equipment Expired - Fee Related CN205187694U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520812319.4U CN205187694U (en) 2015-10-21 2015-10-21 Novel tower crane equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520812319.4U CN205187694U (en) 2015-10-21 2015-10-21 Novel tower crane equipment

Publications (1)

Publication Number Publication Date
CN205187694U true CN205187694U (en) 2016-04-27

Family

ID=55780710

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520812319.4U Expired - Fee Related CN205187694U (en) 2015-10-21 2015-10-21 Novel tower crane equipment

Country Status (1)

Country Link
CN (1) CN205187694U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105174077A (en) * 2015-10-21 2015-12-23 无锡港盛重型装备有限公司 Novel tower crane equipment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105174077A (en) * 2015-10-21 2015-12-23 无锡港盛重型装备有限公司 Novel tower crane equipment

Similar Documents

Publication Publication Date Title
CN102139832B (en) Gantry crane device with lengthways and transverse traveling functions and hoisting method
CN1765729A (en) Hydraulic automatic balanced crane installment
CN104192681B (en) A kind of building hoist integration actuating device
CN203834369U (en) Device capable of being rotated by 360 degrees and vertically lifted for bridge
CN205187694U (en) Novel tower crane equipment
CN205616467U (en) Novel monospar gantry crane
CN202390116U (en) High-intensity small-tonnage hoist
CN204162319U (en) High strength crane-car
CN201176372Y (en) Novel demountable traveling mast crane
CN105645275A (en) Cable hoisting crane and construction method thereof
CN105174077A (en) Novel tower crane equipment
CN204958213U (en) Gantry crane
CN202729645U (en) Tower crane with elevator
CN202322118U (en) Rigid telescopic hydraulic separate counter weight crane
CN204162320U (en) Facilitate the crane-car of operation at night
CN209306826U (en) A kind of twin beams semi-door type tipper
CN207209840U (en) A kind of Multifunctional suspension bracket
CN206692230U (en) A kind of skyscraper row is hung
CN111285229A (en) Super high-rise power distribution room equipment hoisting engineering construction structure
CN206109992U (en) Bridge bottom surface construction platform
CN105439009A (en) Crane tower with double hoisting ends
CN205634685U (en) Cable crane hoist
CN201990401U (en) Gate-type lifting device with vertically and horizontally-travelling functions
CN205346600U (en) Big plate -girder hoist and mount specialized tool
CN204727495U (en) A kind of large-tonnage cable carries hoisting crane

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160427