CN203145468U - Device for conveying flowing materials to designated floor for tower crane - Google Patents
Device for conveying flowing materials to designated floor for tower crane Download PDFInfo
- Publication number
- CN203145468U CN203145468U CN2013201252320U CN201320125232U CN203145468U CN 203145468 U CN203145468 U CN 203145468U CN 2013201252320 U CN2013201252320 U CN 2013201252320U CN 201320125232 U CN201320125232 U CN 201320125232U CN 203145468 U CN203145468 U CN 203145468U
- Authority
- CN
- China
- Prior art keywords
- floor
- lag
- tower crane
- edge
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model discloses a device for conveying flowing materials to a designated floor for a tower crane. The device for conveying the flowing materials to the designated floor for the tower crane is characterized in that a U-shaped groove (2) which is arranged in the edge of a construction floor (1) is included, the U-shaped groove (2) is obliquely arranged, one end of the U-shaped groove (2) is connected with the edge of the construction floor (1) through an expansion bolt, the other end of the U-shaped groove (2) extends out of a scaffold (3), the middle-upper portion of the U-shaped groove (2) is provided with a set of flying rings (4), and the flying rings (4) are connected with the edge of an upper layer floor (6) through steel wire ropes (5). As proved by practical tests, the device for conveying the flowing materials to the designated floor for the tower crane has the advantages of being safe, easy and simple to operate, easy to construct, remarkable in economical benefit and the like, and is particularly suitable for high-rise buildings, supper high-rise buildings and multi-story buildings with complex decoration engineering construction.
Description
Technical field
The utility model relates to and a kind ofly for tower crane fluent material is transported to the device of designated floor, belongs to technical field of buildings.
Background technology
In highrise building decorative engineering work progress, mobile ornament materials freight volume such as mortar is huge, and the transportation that how to guarantee ornament materials such as mortar is a difficult problem always.The main manpower that relies on of the mortar transportation of general highrise building draws trolley to the construction elevator vertical transport, and the shortcoming of this transportation resources is: because every trolley can only load and transport 0.05 cube of mortar at most, need the labour big.Construction elevator can't satisfy freight volume.In highrise building decorative engineering work progress, because the duration of a project is more and more tighter, various ornament materials all need be transported to construction layer, and construction elevator is difficult to satisfy the transport of materials requirement.Because the mortar transportation need be purchased trolley, is unfavorable for saving engineering cost.Because construction elevator transport power anxiety causes the mortar traffic requirements to wait in line unavoidably, easily cause the mortar quality to descend.Mortar easily splashes down to ground in the trolley transportation, influences the engineering civilized construction.
Summary of the invention
The purpose of this utility model is, provides a kind of and for tower crane fluent material is transported to the device of designated floor, to solve mobile ornament materials transportation inconvenience such as mortar, ineffective problem.To overcome the deficiencies in the prior art.
The technical solution of the utility model:
A kind ofly for tower crane fluent material is transported to the device of designated floor, comprises the U-lag that is located at construction floor edge, U-lag is obliquely installed, and an end of U-lag is connected through the edge of expansion bolt with the floor of constructing, and the other end of U-lag extends outside the scaffold; The middle and upper part of U-lag is provided with one group of suspension ring, and suspension ring are connected through the edge of wire rope with the upper strata floor.
In the aforementioned means, described one group of suspension ring symmetry is located at the U-lag both sides, and suspension ring are connected with the edge V font of upper strata floor through wire rope.
In the aforementioned means, described wire rope is connected with the embedded bar of upper floor panel edges.
Compared with prior art, the utility model adopts the U-lag discharging to substitute traditional trolley roping, has saved the acquisition expenses of artificial and trolley, has accelerated programming, and economic benefit is obvious.The utility model only needs according to the prefabricated steel plate U-lag of story height, U-lag easy installation and removal.
The steel platform can successively promote installation with tower crane along with the rising of agent structure, do not need as in the past successively set up scaffold or dismounting successively and mounting bracket, construction sequence and construction cost have been saved greatly, eliminated and set up the potential safety hazard that high-rise scaffold exists, have simple to operation, safe and practical characteristics, also save a large amount of expenses such as steel pipe lease, produced favorable economic benefit.
Great advantage of the present utility model is to save artificial and trolley acquisition expenses, is beneficial to cost control.The utility model also can avoid mobile ornament materials such as decorative engineering construction period mortar to take the construction elevator time too much and other materials can't be transported to the problem of construction floor.During engineering construction, resident on every side and enterprises and institutions can normal life and work.Novel worker's law technology will promote the progress of high-level structure construction technology, and social benefit and environmental benefit are obvious.Prove through practice test, the utlity model has characteristics such as safe, easy and simple to handle, easy construction, remarkable in economical benefits, be particularly useful for high level, super highrise building, the comparatively complicated multistory building of decorative engineering construction.
Description of drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the front view of Fig. 1;
Fig. 3 is the right view of Fig. 2.
Being labeled as of accompanying drawing: 1-construction floor, 2-U shape groove, 3-scaffold, 4-suspension ring, 5-wire rope, 6-upper strata floor, 7-embedded bar, 8-tower crane, 9-discharge tank.
The specific embodiment
The utility model is described in further detail below in conjunction with accompanying drawing, but not as to any restriction of the present utility model.
The utility model is according to following a kind of tower crane that adopts the method that fluent material is transported to designated floor to be constituted, as shown in Figure 1 to Figure 3, this method is the U-lag that inclination is set at construction floor edge, U-lag stretches out from the edge of scaffold, the discharge tank of tower crane unloads fluent material to the U-lag upper end, and fluent material slips to the floor of constructing by the U-lag that tilts.The U-lag bottom that tilts is through being bolted to construction floor edge, and the U-lag middle and upper part of inclination is provided with suspension ring, is connected with the edge of upper strata floor by the wire rope that ties up on the suspension ring.The wire rope (see figure 3) that is in the shape of the letter V is connected with the edge of upper strata floor, to improve the stability of U-lag.
Of the present utility model a kind of device that fluent material is transported to designated floor for tower crane according to the said method formation, as shown in Figure 1 to Figure 3, this device comprises the U-lag 2 that is located at construction floor 1 edge, U-lag 2 is obliquely installed, one end of U-lag 2 is connected through the edge of expansion bolt with construction floor 1, and the other end of U-lag 2 extends outside the scaffold 3; The middle and upper part of U-lag 2 is provided with one group of suspension ring 4, and suspension ring 4 are connected through the edge of wire rope 5 with upper strata floor 6.Described one group of suspension ring 4 symmetry are located at U-lag 2 both sides, and suspension ring 4 are connected with the edge V font of upper strata floor 6 through wire rope 5.Wire rope 5 is connected with the embedded bar 7 at upper strata floor 6 edges.
The course of work of the present utility model and principle
The utility model only needs to press Fig. 1 and installs when work, notices during installation that U-lag 2 can not be fixed on the scaffold, in order to avoid plant lotus in scaffold formation, influences construction safety.When construction layer needed material, the discharge tank 9 that free-flowing material will be housed by tower crane 8 winched to the top that U-lag 2 stretches out the scaffold part.By artificial or automatically the base plate of discharge tank 9 is opened, material flow is slipped to construction layer by U-lag 2 to U-lag 2.Very easy to use.Though the utility model is simple in structure, method is very ingenious, has well solved the transportation difficult problem of ornament materials such as mortar.
Claims (3)
1. one kind is used for the device that tower crane is transported to fluent material designated floor, it is characterized in that: comprise the U-lag (2) that is located at construction floor (1) edge, U-lag (2) is obliquely installed, one end of U-lag (2) is connected through the edge of expansion bolt with construction floor (1), and the other end of U-lag (2) extends outside the scaffold (3); The middle and upper part of U-lag (2) is provided with one group of suspension ring (4), and suspension ring (4) are connected through the edge of wire rope (5) with upper strata floor (6).
2. the device that fluent material is transported to designated floor for tower crane according to claim 1, it is characterized in that: described one group of suspension ring (4) symmetry is located at U-lag (2) both sides, and suspension ring (4) are connected with the edge V font of upper strata floor (6) through wire rope (5).
3. according to claim 2ly for tower crane fluent material is transported to the device of designated floor, it is characterized in that: described wire rope (5) is connected with the embedded bar (7) at upper strata floor (6) edge.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013201252320U CN203145468U (en) | 2013-03-19 | 2013-03-19 | Device for conveying flowing materials to designated floor for tower crane |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013201252320U CN203145468U (en) | 2013-03-19 | 2013-03-19 | Device for conveying flowing materials to designated floor for tower crane |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203145468U true CN203145468U (en) | 2013-08-21 |
Family
ID=48973007
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2013201252320U Expired - Fee Related CN203145468U (en) | 2013-03-19 | 2013-03-19 | Device for conveying flowing materials to designated floor for tower crane |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203145468U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108149930A (en) * | 2017-12-26 | 2018-06-12 | 中国十七冶集团有限公司 | A kind of moving concrete pours chute device |
-
2013
- 2013-03-19 CN CN2013201252320U patent/CN203145468U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108149930A (en) * | 2017-12-26 | 2018-06-12 | 中国十七冶集团有限公司 | A kind of moving concrete pours chute device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202881852U (en) | Suspension bridge cable installation system | |
CN103711301A (en) | Construction method and device for two-track movable electric basket and lifting hoist | |
CN203808484U (en) | Integrated cantilevered and attached external scaffolding | |
CN203487803U (en) | Safety protection structure for elevator shaft construction | |
CN102031862A (en) | Constructing method for high-rise building elevator shaft through elevating type safety protection steel platform | |
CN102828608A (en) | Hydraulic climbing protection device for high-rise building construction | |
CN204418013U (en) | Bridge flange plate is constructed self-propelled cantilever hanging basket | |
CN204754160U (en) | Rail mounted removes work platform | |
CN203998713U (en) | A kind of gig and elevator system | |
CN203145468U (en) | Device for conveying flowing materials to designated floor for tower crane | |
CN202658867U (en) | Overhanging construction platform | |
CN202882376U (en) | Elevator shaft template support platform | |
CN202039851U (en) | Lifting device of shaft sleeve inner wall construction assembling template | |
CN205348963U (en) | A security fence for building site | |
CN201649654U (en) | Discharging platform for high-rise building construction | |
CN202181898U (en) | Special hanging scaffold for sheathing and building inner-layer well wall in vertical shaft sinking construction | |
CN204126237U (en) | A kind of elevator hoistway construction platform | |
CN104060827A (en) | Method and device for transporting flowing material to assigned floor by tower crane | |
CN203938968U (en) | The auxiliary hanging basket of installation of continuous beam arch suspension rod bottom anchored end | |
CN204112692U (en) | Simple and easy lift-type wellbore operations platform | |
CN202672694U (en) | Shaft construction circulation operating platform | |
CN203499232U (en) | Attached lifting scaffold | |
CN203977844U (en) | A kind of for the fixing steel pipe iron wire fastener of building trade | |
CN208235587U (en) | A kind of large-span deep foundation pit underground power house rack assembling construction platform | |
CN102777038B (en) | U-shaped slot unloading construction method for high buildings |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130821 Termination date: 20170319 |