CN102828608A - Hydraulic climbing protection device for high-rise building construction - Google Patents
Hydraulic climbing protection device for high-rise building construction Download PDFInfo
- Publication number
- CN102828608A CN102828608A CN2012103521393A CN201210352139A CN102828608A CN 102828608 A CN102828608 A CN 102828608A CN 2012103521393 A CN2012103521393 A CN 2012103521393A CN 201210352139 A CN201210352139 A CN 201210352139A CN 102828608 A CN102828608 A CN 102828608A
- Authority
- CN
- China
- Prior art keywords
- hanging seat
- hydraulic
- building construction
- color steel
- climbs
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000009435 building construction Methods 0.000 title claims abstract description 29
- 230000009194 climbing Effects 0.000 title abstract description 12
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 21
- 239000010959 steel Substances 0.000 claims abstract description 21
- 230000001681 protective effect Effects 0.000 claims description 26
- 238000007599 discharging Methods 0.000 claims description 4
- 238000013461 design Methods 0.000 abstract description 6
- 238000010276 construction Methods 0.000 description 4
- 230000007246 mechanism Effects 0.000 description 4
- 239000003921 oil Substances 0.000 description 4
- 238000011161 development Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 230000006872 improvement Effects 0.000 description 2
- 230000002093 peripheral effect Effects 0.000 description 2
- 230000004888 barrier function Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000003795 chemical substances by application Substances 0.000 description 1
- 239000004035 construction material Substances 0.000 description 1
- 239000010727 cylinder oil Substances 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000284 extract Substances 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 238000012827 research and development Methods 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 230000007306 turnover Effects 0.000 description 1
Images
Landscapes
- Emergency Lowering Means (AREA)
Abstract
The invention discloses a hydraulic climbing protection device for high-rise building construction. The hydraulic climbing protection device comprises an anchor system, a support hanging seat, a hydraulic jacking system, a color steel protection screen and a lead rail (1), wherein the support hanging seat comprises a floor slab support (2), a hanging seat (3) and a connection bolt (4) connected to the floor slab support (2) and the hanging seat (3); a bearing pin (3-1) and a sliding chute (3-2) are arranged on the hanging seat (3); the hydraulic jacking system comprises a hydraulic main machine (5) and a hydraulic cylinder (6); the color steel protection screen comprises a color steel plate (7) and an enclosure keel (8) for fixing the color steel plate (7); the enclosure keel (8) is fixed on the lead rail (1); the lead rail (1) is supported on the hanging seat (3); and the floor slab support (2) is fixed on the floor slab through the anchor system. The hydraulic climbing protection device for high-rise building construction is reasonable in structural design, strong in maneuverability, high in security, low in cost, high in work efficiency, wide in applicable position, and flexible in function expansion, is firm and durable, and is not restrained by floor height.
Description
Technical field
The present invention designs a kind of building field and uses device, is specifically related to a kind of high-building construction hydraulic pressure that is widely used in various buildings place protective device that climbs.
Background technology
Along with rapid economy development; National and even global building trade has obtained fast development, and all will build a large amount of highrise buildings, dam, bridge every year, and these engineering construction height constantly climb; Safety to building is had higher requirement; And under different building climate conditions, the peripheral safety of safeguarding had proposed requirements at the higher level, the safeguard measure of prior art when the highrise building horizontal structure was constructed; The high-altitude falling accident takes place sometimes, has brought a lot of inconvenience and potential safety hazard to construction.Therefore necessary on the basis of prior art a kind of reasonable in design of design research and development, can protect constructor's safety, security performance is better, is fit to various height buildings, the high-building construction hydraulic pressure that the has wide range of applications protective device that climbs.
Summary of the invention
Goal of the invention: the objective of the invention is provides a kind of reasonable in design in order to solve the deficiency of prior art, and security performance is high; Not limited by floor height, do not receive the weather condition restriction, easy to operate; Functions expanding is flexible, and is easy to operate, can save a large amount of human and material resources; Save the duration, high efficiency, safety, science, the practical high-building construction hydraulic pressure protective device that climbs.
Technical scheme: in order to realize above purpose, the technical scheme that the present invention takes is:
A kind of high-building construction hydraulic pressure protective device that climbs; It comprises: anchor system, support hanging seat, hydraulic jacking system, color steel protection screen and guide rail; Described support hanging seat comprises floor support, hanging seat and is connected that floor supports and the connecting bolt of hanging seat, and described hanging seat is provided with bearing pin and chute, and described hydraulic jacking system comprises hydraulic host machine and hydraulic jack; Described color steel protection screen comprise color steel and fixedly color steel go along with sb. to guard him keel; The described keel of going along with sb. to guard him are fixed on the guide rail, and described rail support is on hanging seat, and described floor supports and is fixed on the floor through anchor system.
As preferred version, the above-described high-building construction hydraulic pressure protective device that climbs, guide rail is supported on the hanging seat through the hook of the load-bearing on the guide rail.
As preferred version, the above-described high-building construction hydraulic pressure protective device that climbs, described guide rail top also is equipped with operating platform.Security performance is high, can supply the constructor to operate, and is very convenient.
As preferred version, the above-described high-building construction hydraulic pressure protective device that climbs, described guide rail bottom is fixed with discharging platform, and the discharging platform supporting capacity is total load 60Kn, makes things convenient for floor construction material turnover transhipment.
As preferred version, the above-described high-building construction hydraulic pressure protective device that climbs, described anchor system comprise the embedded part plate, climb awl and stressed bolt.Wherein the embedded part plate is cast in the concrete, through climbing awl and stressed bolt
Floor is supported and fixed on the floor, and security performance is high.
The above-described high-building construction hydraulic pressure protective device that climbs supports hanging seat and comprises that floor supports and hanging seat, and M30 links together both through connecting bolt, bears system's load jointly.Bearing pin and chute are arranged on the hanging seat, and bearing pin slides in chute, under the deadweight effect, automatically resets, and is a kind of automatic anti-drop device.When guide rail climbs; Load-bearing hook is the bearing pin jacking that makes progress, make bearing pin in chute to the oblique upper slippage, bearing pin fell to resetting automatically after the load-bearing hook was crossed bearing pin; Climb and be located on the bearing pin when guide rail is transferred, bearing pin becomes the support origin of force of the guide rail that climbs.
The above-described high-building construction hydraulic pressure protective device that climbs; Applicable to climbing of vertical surface, use the various supports hanging seat can realize climbing of inclined plane, this apparatus system can be used for tilting ± 10o; Inclination fixed slope ± 10o in front and back operates very flexible.
As preferred version, the above-described high-building construction hydraulic pressure protective device that climbs, wherein hydraulic power system comprises hydraulic host machine and hydraulic jack; Hydraulic power system adopts one to drag four configurations, and a hydraulic host machine cooperates the quadruplet hydraulic jack, and hydraulic jacking system is accomplished the lifting to the protection screen system through the oil-feed and the oil return of oil cylinder; Can promote the protection screen unit that four guide rails are formed at most, hydraulic pressure need not other crane gear from climbing in work progress at every turn; Easy to operate; Climbing speed is fast, and the high synchronism of safety factor is good, and operating efficiency is higher.
The above-described high-building construction hydraulic pressure protective device operating principle of climbing is following:
Peripheral color steel forms the security maintenance barrier of sealing round the building operations zone; Color steel is support with guide rail and the keel that are fixed on the guide rail, and guide rail is bearing on the floor of accomplishing of constructing by supporting hanging seat, the load-bearing hook on the guide rail and support the mode that the guide rail chute on the hanging seat automatically locks with machinery; Guide rail firmly is connected with the support hanging seat; Whenever all make whole system being anchored on the agent structure of safety, and under the jacking effect of hydraulic system, upwards climb automatically, safety factor is high; Easy construction, high efficiency.
The climb flow process of protective device of above-described high-building construction hydraulic pressure is:
The first step: the preparation of climbing
Railing is installed at floor edge in that color steel protection screen is about to leave, and accident takes place in case falling stop falls.
Go up to install at last layer floor (floor that construction is just accomplished) and support hanging seat, the bearing pin that supports on the hanging seat is transferred to the operating position.
Second step: connect hydraulic jack and climb guide rail
Hydraulic jack is connected on the hanging head, extracts the guide strip on both sides on the hoisting mechanism, hoisting mechanism is close to the guide rail that climbs, the guide strip on the hoisting mechanism that closes makes the hoisting mechanism fastening on the guide rail that climbs.
The 3rd step: protection screen climbs
Raise cover plate, and it is fixed with fixing wire rope.
Through the oil cylinder stretching motion, step by step color steel protection screen is promoted to next LIFT.
A unit climbs and finishes, and the oil cylinder oil return is dismantled hydraulic system to the next one unit that climbs and installed, and the operation of climbing more than the repetition is climbed until accomplishing whole color steel protection screens unit.
The 4th step: support and the hanging seat unit of removing basecoat floor edge are subsequent use.
Beneficial effect: the high-building construction hydraulic pressure provided by the invention protective device that climbs compared with prior art has the following advantages:
The high-building construction hydraulic pressure of the present invention protective device that climbs, reasonable in design, workable, control is convenient, and is sturdy and durable; Safe, cost is low, high efficiency, and it is extensive to be suitable for the orientation; Not retrained by floor height, functions expanding is flexible, and the automatic anti-drop system that is perfectly safe is easy to operate; Reducing investment outlay, save manpower, save the duration, is the building worker instrument of executing of a kind of safety, science, practicality.
Description of drawings
Fig. 1 is the climb structural representation of protective device of high-building construction hydraulic pressure of the present invention.
Fig. 2 is the climb structural representation of hydraulic jacking system in the protective device of high-building construction hydraulic pressure.
Fig. 3 supports the structural representation of hanging seat in the protective device for high-building construction hydraulic pressure climbs.
The specific embodiment:
Below in conjunction with accompanying drawing and specific embodiment; Further illustrate the present invention; Should understand these embodiment only be used to the present invention is described and be not used in the restriction scope of the present invention; After having read the present invention, those skilled in the art all fall within the application's accompanying claims institute restricted portion to the modification of the various equivalent form of values of the present invention.
Embodiment
Extremely shown in Figure 3 like Fig. 1; A kind of high-building construction hydraulic pressure protective device that climbs; It is characterized in that it comprises: anchor system, support hanging seat, hydraulic jacking system, color steel protection screen and guide rail (1), described support hanging seat comprise that floor supports (2), hanging seat (3) and is connected the connecting bolt (4) that floor supports (2) and hanging seat (3); Described hanging seat (3) is provided with bearing pin (3-1) and chute (3-2); Described hydraulic jacking system comprises hydraulic host machine (5) and hydraulic jack (6), described color steel protection screen comprise color steel (7) and fixedly color steel (7) go along with sb. to guard him keel (8), the described keel (8) of going along with sb. to guard him are fixed on the guide rail (1); Described guide rail (1) is supported on the hanging seat (3), and described floor supports (2) and is fixed on the floor through anchor system.
The above-described high-building construction hydraulic pressure protective device that climbs, described guide rail (1) top also is equipped with operating platform (9).Described guide rail (1) bottom is fixed with discharging platform (10).
The above-described high-building construction hydraulic pressure protective device that climbs, described anchor system comprise the embedded part plate, climb awl and stressed bolt.
The above only is a preferred implementation of the present invention; Should be pointed out that for those skilled in the art, under the prerequisite that does not break away from the principle of the invention; Can also make some improvement and retouching, these improvement and retouching also should be regarded as protection scope of the present invention.
Claims (4)
1. high-building construction hydraulic pressure protective device that climbs; It is characterized in that; It comprises: anchor system, support hanging seat, hydraulic jacking system, color steel protection screen and guide rail (1); Described support hanging seat comprises that floor supports (2), hanging seat (3) and is connected the connecting bolt (4) that floor supports (2) and hanging seat (3), and described hanging seat (3) is provided with bearing pin (3-1) and chute (3-2), and described hydraulic jacking system comprises hydraulic host machine (5) and hydraulic jack (6); Described color steel protection screen comprise color steel (7) and fixedly color steel (7) go along with sb. to guard him keel (8); The described keel (8) of going along with sb. to guard him are fixed on the guide rail (1), and described guide rail (1) is supported on the hanging seat (3), and described floor supports (2) and is fixed on the floor through anchor system.
2. the high-building construction hydraulic pressure according to claim 1 protective device that climbs is characterized in that described guide rail (1) top also is equipped with operating platform (9).
3. the high-building construction hydraulic pressure according to claim 1 protective device that climbs is characterized in that described guide rail (1) bottom is fixed with discharging platform (10).
4. according to each described high-building construction hydraulic pressure of claim 1 to 3 protective device that climbs, it is characterized in that described anchor system comprises the embedded part plate, climbs awl and stressed bolt.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2012103521393A CN102828608A (en) | 2012-09-21 | 2012-09-21 | Hydraulic climbing protection device for high-rise building construction |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2012103521393A CN102828608A (en) | 2012-09-21 | 2012-09-21 | Hydraulic climbing protection device for high-rise building construction |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN102828608A true CN102828608A (en) | 2012-12-19 |
Family
ID=47331900
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN2012103521393A Pending CN102828608A (en) | 2012-09-21 | 2012-09-21 | Hydraulic climbing protection device for high-rise building construction |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN102828608A (en) |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106437128A (en) * | 2016-08-30 | 2017-02-22 | 泰昌建设有限公司 | Attached arm lifting platform for high-rise building construction |
| CN107178213A (en) * | 2017-06-05 | 2017-09-19 | 中国建筑第八工程局有限公司 | The safeguard protection screen system of Steel Structure Installation |
| CN109057311A (en) * | 2018-09-11 | 2018-12-21 | 杨洪 | Attached lifting scaffold dual fail-safe catching device |
| CN110593584A (en) * | 2019-10-16 | 2019-12-20 | 四川省第六建筑有限公司 | Self-lifting unloading platform system for attached floor slab and lifting method thereof |
| CN113882701A (en) * | 2021-09-30 | 2022-01-04 | 海南第五建设工程有限公司 | Hydraulic climbing protective screen device |
| CN114704068A (en) * | 2022-06-07 | 2022-07-05 | 中铁城建集团第一工程有限公司 | Attached lifting scaffold system |
Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH08144514A (en) * | 1994-11-17 | 1996-06-04 | Hory Corp | Form device having scaffold having raising-lowering function, and construction method of concrete wall or the like by using form device having scaffold |
| CN2586771Y (en) * | 2002-09-20 | 2003-11-19 | 北京市建筑工程研究院 | Double protection adhesive guide-rail guide-seat type raise scaffold |
| CN1544783A (en) * | 2003-11-25 | 2004-11-10 | 上海市第一建筑有限公司 | Double-acting hydraulic climbing die block system |
| DE102007018853A1 (en) * | 2007-04-20 | 2008-10-30 | Doka Industrie Gmbh | Self-climbing system for use in area of construction engineering, has platform and main platform for carrying out formwork operation, and railing element is fixed below main platform and in position of self-climbing system |
| WO2008148637A1 (en) * | 2007-06-04 | 2008-12-11 | Doka Industrie Gmbh | Self-climbing system and method for pouring concrete for a girder and/or mounting a prefabricated section using a self-climbing system |
| CN101787792A (en) * | 2010-01-26 | 2010-07-28 | 北京卓良模板有限公司 | Building protection screen system |
| KR20110083186A (en) * | 2010-01-13 | 2011-07-20 | 금강공업 주식회사 | How to lift formwork scaffolding |
| CN202023360U (en) * | 2011-04-15 | 2011-11-02 | 江苏中原建设集团有限公司 | Hydraulic climbing die plate for building construction |
| CN202899596U (en) * | 2012-09-21 | 2013-04-24 | 南京道广建筑模板有限公司 | Hydraulic climbing protection screen device for construction |
-
2012
- 2012-09-21 CN CN2012103521393A patent/CN102828608A/en active Pending
Patent Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH08144514A (en) * | 1994-11-17 | 1996-06-04 | Hory Corp | Form device having scaffold having raising-lowering function, and construction method of concrete wall or the like by using form device having scaffold |
| CN2586771Y (en) * | 2002-09-20 | 2003-11-19 | 北京市建筑工程研究院 | Double protection adhesive guide-rail guide-seat type raise scaffold |
| CN1544783A (en) * | 2003-11-25 | 2004-11-10 | 上海市第一建筑有限公司 | Double-acting hydraulic climbing die block system |
| DE102007018853A1 (en) * | 2007-04-20 | 2008-10-30 | Doka Industrie Gmbh | Self-climbing system for use in area of construction engineering, has platform and main platform for carrying out formwork operation, and railing element is fixed below main platform and in position of self-climbing system |
| WO2008148637A1 (en) * | 2007-06-04 | 2008-12-11 | Doka Industrie Gmbh | Self-climbing system and method for pouring concrete for a girder and/or mounting a prefabricated section using a self-climbing system |
| KR20110083186A (en) * | 2010-01-13 | 2011-07-20 | 금강공업 주식회사 | How to lift formwork scaffolding |
| CN101787792A (en) * | 2010-01-26 | 2010-07-28 | 北京卓良模板有限公司 | Building protection screen system |
| CN202023360U (en) * | 2011-04-15 | 2011-11-02 | 江苏中原建设集团有限公司 | Hydraulic climbing die plate for building construction |
| CN202899596U (en) * | 2012-09-21 | 2013-04-24 | 南京道广建筑模板有限公司 | Hydraulic climbing protection screen device for construction |
Cited By (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106437128A (en) * | 2016-08-30 | 2017-02-22 | 泰昌建设有限公司 | Attached arm lifting platform for high-rise building construction |
| CN107178213A (en) * | 2017-06-05 | 2017-09-19 | 中国建筑第八工程局有限公司 | The safeguard protection screen system of Steel Structure Installation |
| CN107178213B (en) * | 2017-06-05 | 2023-09-01 | 中国建筑第八工程局有限公司 | Safety protection screen system for installing steel structure |
| CN109057311A (en) * | 2018-09-11 | 2018-12-21 | 杨洪 | Attached lifting scaffold dual fail-safe catching device |
| CN109057311B (en) * | 2018-09-11 | 2023-09-12 | 杨洪 | Double-safety falling protector for attached lifting scaffold |
| CN110593584A (en) * | 2019-10-16 | 2019-12-20 | 四川省第六建筑有限公司 | Self-lifting unloading platform system for attached floor slab and lifting method thereof |
| CN113882701A (en) * | 2021-09-30 | 2022-01-04 | 海南第五建设工程有限公司 | Hydraulic climbing protective screen device |
| CN114704068A (en) * | 2022-06-07 | 2022-07-05 | 中铁城建集团第一工程有限公司 | Attached lifting scaffold system |
| CN114704068B (en) * | 2022-06-07 | 2022-08-19 | 中铁城建集团第一工程有限公司 | Attached lifting scaffold system |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102828608A (en) | Hydraulic climbing protection device for high-rise building construction | |
| CN202509754U (en) | High-altitude steel structure node construction working platform | |
| CN103352559A (en) | Hanging type movable working platform for storage tank maintenance | |
| CN201635379U (en) | Safety platform for installation and construction of roof contour plate hang ceiling | |
| CN103233588B (en) | With the shift method of raft foundation building | |
| CN205046827U (en) | Movable slope face operation construction platform | |
| CN204418629U (en) | Integrated form climbs frame | |
| CN204081436U (en) | A kind of climbing frame and template integrated system | |
| CN202544379U (en) | Automatic climbing device | |
| CN204626930U (en) | Integrated lifting frame operating platform | |
| CN203531352U (en) | Hanging type movable working platform for storage tank maintenance | |
| CN203947758U (en) | Novel hydraulic automatic climbing discharging platform | |
| CN202899596U (en) | Hydraulic climbing protection screen device for construction | |
| CN110453836A (en) | inclined glass curtain wall mounting system and mounting method | |
| CN102121307B (en) | Self-stabilizing operating platform for elevator shaft | |
| CN208564047U (en) | A kind of people's Cargo Lift overhanging aisle platform | |
| CN203716062U (en) | Integral type pier body decorating hanging basket | |
| CN202831591U (en) | Special-shaped truss operation platform capable of hoisting to super high space | |
| CN203654754U (en) | Double-layered overhanging type discharging platform | |
| CN207078935U (en) | A kind of portable full circle swinging mast loop wheel machine anchor | |
| CN202000647U (en) | Base device for lifting scaffold in elevator shaft | |
| CN205894715U (en) | Light steel structure is semi -automatic under enclosed construction constructs from hoisting machine that climbs | |
| CN203499232U (en) | Attached lifting scaffold | |
| CN202672694U (en) | Circulating operation platform for hoistway construction | |
| CN209942195U (en) | Construction operation platform of high-rise hollow area |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C12 | Rejection of a patent application after its publication | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20121219 |