CN102031862A - Constructing method for high-rise building elevator shaft through elevating type safety protection steel platform - Google Patents

Constructing method for high-rise building elevator shaft through elevating type safety protection steel platform Download PDF

Info

Publication number
CN102031862A
CN102031862A CN2009103076533A CN200910307653A CN102031862A CN 102031862 A CN102031862 A CN 102031862A CN 2009103076533 A CN2009103076533 A CN 2009103076533A CN 200910307653 A CN200910307653 A CN 200910307653A CN 102031862 A CN102031862 A CN 102031862A
Authority
CN
China
Prior art keywords
steel platform
construction
elevator shaft
elevator
lift
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2009103076533A
Other languages
Chinese (zh)
Inventor
杨建平
杨淑琼
张益超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fifth Bureau Third Construction Co Ltd
China Construction Fourth Bureau Third Construction Engineering Co Ltd
Original Assignee
China Construction Fourth Bureau Third Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Bureau Third Construction Engineering Co Ltd filed Critical China Construction Fourth Bureau Third Construction Engineering Co Ltd
Priority to CN2009103076533A priority Critical patent/CN102031862A/en
Publication of CN102031862A publication Critical patent/CN102031862A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Types And Forms Of Lifts (AREA)

Abstract

The invention discloses a constructing method for a high-rise building elevator shaft through an elevating type safety protection steel platform, comprising the steps of: firstly, manufacturing a steel platform matched with the size of an elevator shaft, then installing the steel platform inside the bottom layer of the elevator shaft, carrying out elevator shaft construction operation by constructors standing on the steel platform, elevating the steel platform layer by layer after the construction on the current operation layer is completed until the steel platform is elevated to the elevator shaft of the upper floor to facilitate the elevator shaft construction operation, sealing the lower elevator shaft after the steel platform is elevated, and repeating the steps until the elevator shaft construction on all the floors of the whole building is completed. The construction method is featured by safety, simplicity and convenience for operation, easiness for construction, obvious economic benefits and the like, has the greatest advantages of saving lease expense of raw materials and facilitating cost control, and is particularly suitable for high-rise buildings and multistoried buildings with longer construction periods.

Description

A kind of highrise building elevator shaft lift-type security protection steel platform construction method
Technical field
The present invention relates to a kind of construction techniques, particularly a kind of highrise building elevator shaft and duration be the security protection job practices of long multistory building elevator shaft.
Background technology
In the high-building construction process, the fall arrest of highrise building elevator shaft is the important checkpoint and the control point of safety management in the building operations.How guaranteeing the safe, economic of highrise building construction of lift well, is a quite great technical barrier.Construction is to set up from the end to the top with steel pipe scaffold in the elevator hoistways of general highrise building, and the constructor stands in and carries out the construction of lift well operation on the scaffold, and the wire rope off-load is used in the centre, and general 5 layers of off-load once.The shortcoming of this method is: owing to the mechanics bearing capacity of steel pipe self, when the support body height surpassed 50m, support body stability was insecure, and certain potential safety hazard is arranged (1).(2) generally the construction period of highrise building is longer, and steel pipe adopts lease more, and the holding time of tube material is longer, and the rent of steel pipe is bigger, is unfavorable for the saving of engineering cost.(3) it is cumbersome to set up scaffold, expends time in, and has prolonged the duration virtually.
Summary of the invention
The highrise building elevator shaft lift-type security protection steel platform construction method that provides a kind of safety good, simple to operate, good in economic efficiency is provided technical problem to be solved by this invention.
For solving the problems of the technologies described above technical scheme of the present invention: a kind of highrise building elevator shaft lift-type security protection steel platform construction method.Make a steel platform that matches with the elevator hoistways size earlier, then the steel platform is installed in the bottom elevator hoistways, the constructor stands on this steel platform and carries out the construction of lift well operation, treat successively to promote again after work layer construction finishes in the elevator hoistways of the supreme floor of steel platform and carry out the construction of lift well operation, and after promoting the steel platform, the lower elevator hoistway is sealed, until the construction of lift well of finishing whole all floors of building.
In the above-mentioned highrise building elevator shaft lift-type security protection steel platform construction method, described is after promoting the steel platform, in steel platform bottom every 3 layers at the floor levels face closure once with the sealing of lower elevator hoistway.
In the aforesaid highrise building elevator shaft lift-type security protection steel platform construction method, described is to set up steel pipe at elevator hoistways with the elevator hoistways sealing, and seals in surface layer shop template.
In the aforesaid highrise building elevator shaft lift-type security protection steel platform construction method, between between the edge of steel platform and the elevator hoistways inwall, be separated with a distance that the steel platform is freely risen.
Beneficial effect of the present invention: compared with prior art, the present invention adopts lift-type security protection steel platform to substitute traditional scaffold, needn't set up the lantern frame, only need the steel platform according to the prefabricated Steel section member of the fixed dimension of elevator shaft, the steel platform is easy to process, detachable.The steel platform can successively promote installation with tower crane along with the rising of agent structure, do not need as in the past successively set up scaffold or dismounting successively and mounting bracket, construction sequence and construction cost have been saved greatly, eliminated and set up the potential safety hazard that high-rise scaffold exists, have simple to operation, safe and practical characteristics, also save a large amount of expenses such as steel pipe lease, produced favorable economic benefit.And after adopting lift-type steel platform, the following cylindrical shell of steel platform does not need to set up the steel pipe frame sealing in the elevator shaft, only does common floor sealing every 3 layers at horizontal plane and gets final product, and can save the steel pipe rent, remarkable in economical benefits.Great advantage of the present invention is the rental charge that saves material, and is beneficial to cost control.The present invention a large amount of places that produce material of also can avoiding constructing take.During engineering construction, resident on every side and enterprises and institutions can normal life and work.Super close distance safety is passed through the success of high-rise resident's building, for later city underground engineering provides reliable decision-making foundation and technical indicator at the planning construction under the analogue, novel worker's law technology will promote the underground engineering construction technological progress, and social benefit and environmental benefit are obvious.Prove that through practice test characteristics such as safe, easy and simple to handle, easy construction that the present invention has, remarkable in economical benefits are particularly useful for the long multistory building of highrise building, construction period.
Description of drawings
Fig. 1 is the structural representation of lift-type security protection steel platform;
Fig. 2 is the A-A sectional view of Fig. 1;
Fig. 3 is the B-B sectional view of Fig. 1;
1-floor among the figure, 2-construction operation layer, 3-steel platform, 4-confining bed; 5-elevator hall.
The present invention is further illustrated below in conjunction with the drawings and specific embodiments.
The specific embodiment
Embodiment 1.Shown in Fig. 1,2 or 3, first size according to construction work elevator shaft road ties with Luo and connects steel platform that matches with the elevator hoistways size of processing.Steel platform in this example adopts shaped steel and steel plate to tie to connect by Luo and forms.Then with tower crane with steel platform allocation and transportation to the job site, and cooperate and be installed in the bottom elevator hoistways, can freely rise for guaranteeing the steel platform, between between the edge of steel platform and the elevator hoistways inwall, be separated with a distance that the steel platform is freely risen.The constructor stands on this steel platform and carries out construction operation, after treating that the work layer construction finishes, with tower crane or electric hoist the steel platform successively is promoted in the elevator hoistways of a last floor and carries out the construction of lift well operation, until the construction of lift well of finishing whole all floors of building.The steel platform is along with after agent structure up promotes, in steel platform bottom every 3 layers at the floor levels face closure once, traditional sealing way is adopted in the sealing measure, promptly sets up steel pipe at the lower elevator hoistway, and seals in surface layer shop template.
Embodiments of the present invention are not limited to the foregoing description, and the various variations of making under the prerequisite that does not break away from aim of the present invention all belong within protection scope of the present invention.

Claims (4)

1. highrise building elevator shaft lift-type security protection steel platform construction method, it is characterized in that: make a steel platform that matches with the elevator hoistways size earlier, then the steel platform is installed in the bottom elevator hoistways, the constructor stands on this steel platform and carries out the construction of lift well operation, treat successively to promote again after work layer construction finishes in the elevator hoistways of the supreme floor of steel platform and carry out the construction of lift well operation, and after promoting the steel platform, the lower elevator hoistway is sealed, until the construction of lift well of finishing whole all floors of building.
2. highrise building elevator shaft lift-type security protection steel platform construction method according to claim 1 is characterized in that: described is after promoting the steel platform, in steel platform bottom every 3 layers at the floor levels face closure once with the sealing of lower elevator hoistway.
3. highrise building elevator shaft lift-type security protection steel platform construction method according to claim 2 is characterized in that: described is to set up steel pipe at elevator hoistways with the elevator hoistways sealing, and seals in surface layer shop template.
4. highrise building elevator shaft lift-type security protection steel platform construction method according to claim 1 is characterized in that: be separated with a distance that the steel platform is freely risen between between the edge of described steel platform and the elevator hoistways inwall.
CN2009103076533A 2009-09-24 2009-09-24 Constructing method for high-rise building elevator shaft through elevating type safety protection steel platform Pending CN102031862A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009103076533A CN102031862A (en) 2009-09-24 2009-09-24 Constructing method for high-rise building elevator shaft through elevating type safety protection steel platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009103076533A CN102031862A (en) 2009-09-24 2009-09-24 Constructing method for high-rise building elevator shaft through elevating type safety protection steel platform

Publications (1)

Publication Number Publication Date
CN102031862A true CN102031862A (en) 2011-04-27

Family

ID=43885257

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009103076533A Pending CN102031862A (en) 2009-09-24 2009-09-24 Constructing method for high-rise building elevator shaft through elevating type safety protection steel platform

Country Status (1)

Country Link
CN (1) CN102031862A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104291222A (en) * 2014-09-13 2015-01-21 中建三局集团有限公司 Rigid protection and crane integration system inside super high-rise building core tube
CN104863344A (en) * 2014-02-25 2015-08-26 株式会社日立建筑系统 Lift installing device, and assembling method thereof
CN105217408A (en) * 2015-09-17 2016-01-06 中建三局第三建设工程有限责任公司 Segmentation hoisting type construction elevator mechanism and segmentation method for improving thereof
CN105937300A (en) * 2015-03-05 2016-09-14 三菱电机大楼技术服务株式会社 Liftway work platform device and liftway work platform device arranging method
CN109403608A (en) * 2018-11-20 2019-03-01 广州景兴建筑科技有限公司 A kind of building elevator shaft mouth security protection platform
CN110424710A (en) * 2019-07-31 2019-11-08 云南省建设投资控股集团有限公司 Elevator tool-type all steel operation platform construction
CN113882646A (en) * 2021-11-22 2022-01-04 中国十九冶集团有限公司 Construction protection system for high-rise building elevator shaft

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104863344A (en) * 2014-02-25 2015-08-26 株式会社日立建筑系统 Lift installing device, and assembling method thereof
CN104291222A (en) * 2014-09-13 2015-01-21 中建三局集团有限公司 Rigid protection and crane integration system inside super high-rise building core tube
CN104291222B (en) * 2014-09-13 2016-05-04 中建三局集团有限公司 The inner hard protection of a kind of high-rise building Core Walls Structure hangs integrated system with row
CN105937300A (en) * 2015-03-05 2016-09-14 三菱电机大楼技术服务株式会社 Liftway work platform device and liftway work platform device arranging method
CN105217408A (en) * 2015-09-17 2016-01-06 中建三局第三建设工程有限责任公司 Segmentation hoisting type construction elevator mechanism and segmentation method for improving thereof
CN109403608A (en) * 2018-11-20 2019-03-01 广州景兴建筑科技有限公司 A kind of building elevator shaft mouth security protection platform
CN110424710A (en) * 2019-07-31 2019-11-08 云南省建设投资控股集团有限公司 Elevator tool-type all steel operation platform construction
CN113882646A (en) * 2021-11-22 2022-01-04 中国十九冶集团有限公司 Construction protection system for high-rise building elevator shaft

Similar Documents

Publication Publication Date Title
CN102031862A (en) Constructing method for high-rise building elevator shaft through elevating type safety protection steel platform
CN103711301A (en) Construction method and device for two-track movable electric basket and lifting hoist
CN203487803U (en) Safety protection structure for elevator shaft construction
CN202370234U (en) Tool type elevator hoistway construction platform
CN202577925U (en) Lifting type platform in elevator shaft
CN205654127U (en) Portable operation protective platform of assembly type structure stairwell
CN202882376U (en) Elevator shaft template support platform
CN204059906U (en) Elevator hoistways Integral lifting type steel scaffold
CN103352579B (en) Adopt strengthening reconstruction masonry structure and the construction method of additional shelter bridge and additional elevator
CN211776076U (en) Steel construction retractable cat ladder of going to people for elevator well
CN204492173U (en) Elevator shaft integral lifting template operation platform
CN205134921U (en) Building outer wall concrete constructional column hangs construction platform
CN102733612B (en) Mounting method of electric hoist orbit
CN203320922U (en) Supporting device for forming of elevator shaft template
CN204126237U (en) A kind of elevator hoistway construction platform
CN209194970U (en) A kind of detachable vertical hoistway promotion platform of Super High
CN203145468U (en) Device for conveying flowing materials to designated floor for tower crane
CN203499232U (en) Attached lifting scaffold
CN207658895U (en) Working at height glass hanging equipment
CN202209051U (en) Discharging platform for high-rise building construction
CN202831591U (en) Special-shaped truss operation platform capable of hoisting to super high space
CN202370540U (en) Grotto bridge type construction trolley of large-span underground powerhouse
CN203201167U (en) Gallery type multi-floor residential building structure with additional elevator
CN206903178U (en) Hoisting type elevator steel platform
CN204435859U (en) Be exclusively used in the moveable platform of high-rise concrete construction of lift well

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20110427