CN202954824U - Underground cavern baseboard pre-buried injected hole - Google Patents

Underground cavern baseboard pre-buried injected hole Download PDF

Info

Publication number
CN202954824U
CN202954824U CN 201220582764 CN201220582764U CN202954824U CN 202954824 U CN202954824 U CN 202954824U CN 201220582764 CN201220582764 CN 201220582764 CN 201220582764 U CN201220582764 U CN 201220582764U CN 202954824 U CN202954824 U CN 202954824U
Authority
CN
China
Prior art keywords
injected hole
buried
pipe laying
hole
baseboard
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220582764
Other languages
Chinese (zh)
Inventor
薛勇
由广明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Original Assignee
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Municipal Engineering Design Insitute Group Co Ltd filed Critical Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority to CN 201220582764 priority Critical patent/CN202954824U/en
Application granted granted Critical
Publication of CN202954824U publication Critical patent/CN202954824U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model discloses an underground cavern baseboard pre-buried injected hole. The underground cavern baseboard pre-buried injected hole is characterized in that the pre-buried injected hole comprises a cushion layer injected hole buried pipe which is arranged on a plain concrete cushion layer and a baseboard injected hole buried pipe which is arranged on the baseboard. An injected hole bottom sealing device is arranged at the bottom of the baseboard injected hole buried pipe which is connected with the cushion layer injected hole buried pipe. The underground cavern baseboard pre-buried injected hole has the advantages that during the period of the completion and operation of the underground cavern, the concrete is unnecessary to chisel out while the concrete is cast, and influences on an external waterproof layer are only limited in the aperture range of the injected hole. A casting pipe is capable of simply and directly entering the underground cavern baseboard and a soil body below the concrete cushion layer to carry out casting work.

Description

The pre-buried injected hole of a kind of underground chamber base plate
Technical field
The utility model is applicable to cut and cover tunneling cast-in-situ steel reinforced concrete underground chamber structure (comprising tunnel, subway station etc.) the pre-buried injected hole of base plate.
Technical background
After underground chamber builds up, later stage closely adopts the tunneling method to implement the underground chamber of relevant purposes as shield structure etc. in its underpart, need to consider formerly to build the reserved Grouting Pipe of underground chamber base plate, in case the later stage is implemented Cavity Construction, peripheral soil layer disturbance is affected first build underground chamber foundation soil and then impact first to build cavern stable.Reserve Grouting Pipe by base plate soil layer is carried out to a kind of method that consolidation grouting guarantees first to build the stable normal use of underground chamber.
When former method is met this type of situation, generally at the base plate built-in slip casting pipe, its mouth of pipe has a segment distance (thickness is 50 ~ 250mm approximately) apart from the base plate bottom surface, this scope is cast-in-situ concrete, causes later stage slip casting to cut a hole in advance and wears this section concrete of base plate, must produce certain impact to former underplate concrete, thickness is larger, affects greatlyr, cuts also more bothersome, as outer packaging waterproof layer is set, simultaneously wayward to the influence basin of waterproofing course.
The utility model content
The purpose of utility model is to provide a kind of underground chamber base plate pre-buried injected hole, when later stage slip casting, need not cut concrete, and externally the impact of packaging waterproof layer only limits to Grouting Pipe caliber scope simultaneously.
To achieve these goals, technical solutions of the utility model are: the pre-buried injected hole of a kind of underground chamber base plate, it is characterized in that: this pre-buried injected hole comprises the bed course injected hole pipe laying that is arranged on plain concrete cushion layer and is arranged on the floor grouting hole pipe laying of base plate, pipe laying bottom, described floor grouting hole is provided with the injected hole bottom closing device, and floor grouting hole pipe laying is connected with bed course injected hole pipe laying by this injected hole bottom closing device.Pipe laying top, described floor grouting hole is provided with the injected hole lid that binds.Pipe laying top, described floor grouting hole is provided with the top cover connector, and the described injected hole lid that binds comprises and also is provided with the watertight rubber ring between described top cover and top cover connector by the top cover be threaded with the top cover connector.Described injected hole bottom closing device comprises the flange ring be enclosed within outside pipe laying bottom, floor grouting hole, and pipe laying bottom in floor grouting hole is disposed with back cover steel sheet, dividing plate and bed course, and bed course is outside equipped with flange press ring, and flange press ring is connected with flange ring.Described flange ring has been arranged circumferentially several screws, and each screw all is welded with a bolt capping, and flange press ring and bolt capping are bolted.The outer aperture waterproofing course that pastes in injected hole bottom closing device bottom.
The utility model has the advantage of: owing to needn't cutting concrete, Grouting Pipe can simple and easyly directly be inserted easily the soil body under underground chamber base plate and concrete cushion and carry out the slip casting operation, not only can control the influence basin to concrete structure and waterproofing course, and remove from and cut the concrete construction operation, can reduce the operation duration of the whole grouting and reinforcing soil body, significantly reduce the Influence to operation of first building underground chamber to having come into operation.
The accompanying drawing explanation
Fig. 1 is pre-buried injected hole sectional drawing.
Fig. 2 is that in Fig. 1, the B place is injected hole pipe laying bottom closing device sectional detail drawing (for expressing clearly, leaving the space malcompression between each member, material).
Fig. 3 is that in Fig. 1, the A place is the top view that the injected hole pipe laying binds and covers.
Fig. 4 is that the injected hole pipe laying binds and covers sectional drawing.
The specific embodiment
Below in conjunction with accompanying drawing, the utility model is further described.
The utility model is the pre-buried injected hole of a kind of underground chamber base plate, it is characterized in that: this pre-buried injected hole comprises the bed course injected hole pipe laying that is arranged on plain concrete cushion layer and is arranged on the floor grouting hole pipe laying of base plate, pipe laying bottom, described floor grouting hole is provided with the injected hole bottom closing device, and floor grouting hole pipe laying is connected with bed course injected hole pipe laying by this injected hole bottom closing device.
This pre-buried injected hole methods && steps of implementation is as follows.
1. in plain concrete cushion layer, position in accordance with regulations arranges bed course injected hole pipe laying 8(tubing and can adopt the engineering plasticity materials such as PVC, in pipe, can fill cohesive soil 17 or other material).
2. injected hole pipe laying assembly is installed on bed course injected hole pipe laying top, this pipe laying assembly is the auxiliary products that factory manufactures assembly, described injected hole pipe laying assembly comprises floor grouting hole pipe laying, and injected hole binds and covers and the injected hole bottom closing device, and its factory's manufacture and on-site assembly method step are as follows.
(1) factory manufactures
1) floor grouting hole pipe laying 9 and top cover connector 18 weld mutually;
2) the injected hole lid that binds is made by top cover 13(steel) and watertight rubber ring 14 form, top cover 13 installation that is threaded with top cover connector 18;
3) be connected to a flange ring 2 in the 9 bottom outside welds of floor grouting hole pipe laying, these flange ring 2 hoops are established several screws, and the top of each screw is welded with a bolt capping 1(and can adopts steel to make), the welding requirements sealing is not seeped water;
4) processing flange press ring 4(can adopt steel to make simultaneously), to be greater than steel pipe be floor grouting hole pipe laying 9 internal diameters to back cover steel sheet 3(diameter, is less than flange ring 2), dividing plate 5(can adopt the engineering plasticity materials such as PVC), beyond rubber ring flat-plate 12(flange press ring 4 effectively radial dimension should meet waterproofing materials paste require);
5) by floor grouting hole pipe laying 9, injected hole binds and covers and injected hole bottom closing device composition compound component, again with supporting flange press ring 4, back cover steel sheet 3, dividing plate 5, rubber ring flat-plate 12 form assemblies as product (other about seal ring, handling reinforcement shape and with steel pipe be that floor grouting hole pipe laying 9 welding etc. belong to prior art, can make according to the actual requirements).
(2) Assembling
1) back cover steel sheet 3, dividing plate 5, bed course 7(can be adopted to the foaming plastic material) insert successively pipe laying 9 bottoms, floor grouting hole, and flange press ring 4 and rubber ring flat-plate 12 are linked into an integrated entity with flat-bed machine bolt 6 and plant-manufactured compound component, form the injected hole bottom closing device, wherein to strengthen outside aperture pasting waterproofing course opposing external water pressure, prevent that outer subsides waterproofing course from damaging under high hydraulic pressure;
2) paste aperture waterproofing course 11 outside injected hole bottom closing device bottom, form injected hole pipe laying assembly.
3. paving underground chamber waterproofing course 10 above plain concrete cushion layer, build plain concrete topping 15, and wherein underground chamber waterproofing course 10 parts are laid on the rubber ring flat-plate 12 of described injected hole bottom closing device.
4. colligation underground chamber baseplate reinforcing bar according to a conventional method, build underplate concrete 16.
In the utility model, injected hole binds to cover and is threaded with the top cover connector at pipe laying top, floor grouting hole, while needing slip casting, only it need be backed out and gets final product, and the injected hole bottom closing device is to prevent into water for avoiding, and before slip casting, needs its cutter is worn.

Claims (6)

1. the pre-buried injected hole of underground chamber base plate, it is characterized in that: this pre-buried injected hole comprises the bed course injected hole pipe laying that is arranged on plain concrete cushion layer and is arranged on the floor grouting hole pipe laying of base plate, pipe laying bottom, described floor grouting hole is provided with the injected hole bottom closing device, and floor grouting hole pipe laying is connected with bed course injected hole pipe laying by this injected hole bottom closing device.
2. pre-buried injected hole as claimed in claim 1, is characterized in that, pipe laying top, described floor grouting hole is provided with the injected hole lid that binds.
3. pre-buried injected hole as claimed in claim 2, it is characterized in that, pipe laying top, described floor grouting hole is provided with the top cover connector, and the described injected hole lid that binds comprises and also is provided with the watertight rubber ring between described top cover and top cover connector by the top cover be threaded with the top cover connector.
4. pre-buried injected hole as claimed in claim 1, it is characterized in that, described injected hole bottom closing device comprises the flange ring be enclosed within outside pipe laying bottom, floor grouting hole, pipe laying bottom, floor grouting hole is disposed with back cover steel sheet, dividing plate and bed course, bed course is outside equipped with flange press ring, and flange press ring is connected with flange ring.
5. pre-buried injected hole as claimed in claim 4, is characterized in that, described flange ring has been arranged circumferentially several screws, and each screw all is welded with a bolt capping, and flange press ring and bolt capping are bolted.
6. pre-buried injected hole as claimed in claim 1, is characterized in that, the outer aperture waterproofing course that pastes in injected hole bottom closing device bottom.
CN 201220582764 2012-11-07 2012-11-07 Underground cavern baseboard pre-buried injected hole Expired - Fee Related CN202954824U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220582764 CN202954824U (en) 2012-11-07 2012-11-07 Underground cavern baseboard pre-buried injected hole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220582764 CN202954824U (en) 2012-11-07 2012-11-07 Underground cavern baseboard pre-buried injected hole

Publications (1)

Publication Number Publication Date
CN202954824U true CN202954824U (en) 2013-05-29

Family

ID=48460401

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220582764 Expired - Fee Related CN202954824U (en) 2012-11-07 2012-11-07 Underground cavern baseboard pre-buried injected hole

Country Status (1)

Country Link
CN (1) CN202954824U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103590840A (en) * 2013-11-29 2014-02-19 王威 Floor grouting method
CN104533454A (en) * 2014-12-12 2015-04-22 上海大学 Tunnel segment and assistant preparation mould of tunnel segment injected hole cover
CN105041340A (en) * 2015-08-12 2015-11-11 天津矿山工程有限公司 Structure and construction method for increasing arch crown concrete pouring speed in tunnel engineering

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103590840A (en) * 2013-11-29 2014-02-19 王威 Floor grouting method
CN104533454A (en) * 2014-12-12 2015-04-22 上海大学 Tunnel segment and assistant preparation mould of tunnel segment injected hole cover
CN105041340A (en) * 2015-08-12 2015-11-11 天津矿山工程有限公司 Structure and construction method for increasing arch crown concrete pouring speed in tunnel engineering

Similar Documents

Publication Publication Date Title
CN204080836U (en) The fast plugging device of dewatering well in a kind of building basement
CN103806438A (en) Method for embedment of grouting hole in base plate of underground chamber
CN102797266B (en) Well sealing waterproof construction method for dewatering well
CN202124865U (en) Quick plugging device for dewatering wellhead of sand-free cement pipe deep well
CN109778992B (en) Horse riding well device for pipeline construction and construction method thereof
CN206706791U (en) Base pit dewatering well plugging structure
CN205225271U (en) Shield constructs portal collar tie beam structure suitable for shield constructs end not to be had with solid
CN101787892A (en) Method for constructing maintainable tunnel waterproof system
CN102733825A (en) Method for concrete pipe segment lining structure capable of adapting to surrounding rock deformation
CN101781991A (en) Double-well type reinforcement method of shield arrival or starting end and double-well type shield arrival method
CN103161172B (en) Elevator shaft bottom precipitation construction method
CN105951857B (en) Compound impervious wall and its construction method for water conservancy project coffering
CN202954824U (en) Underground cavern baseboard pre-buried injected hole
CN104878739A (en) Drainage material assembly capable of being transversely connected with plastic drainage boards and method for constructing drainage material assembly
CN102094659A (en) Shield entry spring hinge plate sealing device
CN203145029U (en) Plugging structure for deep foundation pit dewatering well
CN204728353U (en) Piping plugging structure outside deep foundation ditch diaphragm wall
CN102345465A (en) Hooping sealing device used in shield arrival
CN214940308U (en) Device for plugging structural bottom plate precipitation well pipe
CN103485792B (en) The construction method of underground continuous wall of movable seal up a door mechanism and reserved opening within the walls
CN106567397B (en) The control method and control device of deep basal pit underground water
CN205276317U (en) Utility tunnel's steel construction
CN202370539U (en) Front tunnel face excavated soil pre-reinforcing structure of tunnel
CN112031778B (en) Construction method for shaft excavation based on multi-angle pre-reinforcement
CN201459770U (en) Joint structure between two different fender bodies in deep foundation pit

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130529

Termination date: 20211107

CF01 Termination of patent right due to non-payment of annual fee