CN206706791U - Base pit dewatering well plugging structure - Google Patents

Base pit dewatering well plugging structure Download PDF

Info

Publication number
CN206706791U
CN206706791U CN201720467386.6U CN201720467386U CN206706791U CN 206706791 U CN206706791 U CN 206706791U CN 201720467386 U CN201720467386 U CN 201720467386U CN 206706791 U CN206706791 U CN 206706791U
Authority
CN
China
Prior art keywords
steel pipe
dewatering well
concrete
ring
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720467386.6U
Other languages
Chinese (zh)
Inventor
曹功皓
田来春
张跃杰
韩小盈
周伟华
祁真真
乔平
吕严严
王璟涛
王曦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
High founding Limited by Share Ltd
Original Assignee
Hi Tech Construction Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hi Tech Construction Ltd By Share Ltd filed Critical Hi Tech Construction Ltd By Share Ltd
Priority to CN201720467386.6U priority Critical patent/CN206706791U/en
Application granted granted Critical
Publication of CN206706791U publication Critical patent/CN206706791U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

Base pit dewatering civil engineering field of engineering technology is the utility model is related to, more particularly, to a kind of base pit dewatering well plugging structure.Including dewatering well, foundation ditch basis and steel pipe, steel pipe is set in outside dewatering well, inner cylinder is fixed with steel pipe bottom inwall, it is intraoral that inner cylinder gos deep into dewatering well, the inner hole wall top of steel pipe is provided with retainer ring, inner cylinder and retainer ring top are fixed with shrouding, steel duct fills C50 concrete, the anti-hydrofoil ring of steel pipe external welding more than dewatering well, ring flange is fixed with the top of steel pipe, foundation ditch basis top is provided with the blinding concrete concordant with dewatering well well head, pea gravel concreten protective layer is provided with above blinding concrete, waterproof roll is equipped with above pea gravel concreten protective layer, base concrete has been poured above waterproof roll, anti- hydrofoil ring is in base concrete, it is C50 concrete above steel pipe.

Description

Base pit dewatering well plugging structure
Technical field
Base pit dewatering civil engineering field of engineering technology is the utility model is related to, blocks and ties more particularly, to a kind of base pit dewatering well Structure.
Background technology
With the horizontal continuous improvement of current architectural design, the continuous development of construction technology, functional requirement is used to building Lifting, present architectural design more and more tends to high-rise, Super High and along with the intelligence of multi-layer underground cell structure etc. The design that can be built.At the same time, the foundation construction stage catchment, the construction of Yield rainfall relation it is more and more common, and current construction stage Precipitation precipitation is carried out using well-point dewatering method construction more, so as to the construction on excavation of foundation pit and basis, but the water in dewatering well After pump stops dewatering operation, because underground water hydraulic pressure acts on, if will occur without completion plugging dewatering well in a short time Water burst phenomenon, so as to influence the closure quality of dewatering well, cause later stage structure base slab seepage, operation phase station internal water accumulation phenomenon, The problems such as reducing structure durability.
The content of the invention
The purpose of this utility model is to provide a kind of base pit dewatering well plugging structure, blocks reliable in quality, and construction cost is low, Structure durability is good.
The purpose of this utility model is realized in the following manner:Base pit dewatering well plugging structure, including dewatering well, foundation ditch Basis and steel pipe, steel pipe are set in outside dewatering well, are fixed with inner cylinder on steel pipe bottom inwall, and it is intraoral that inner cylinder gos deep into dewatering well, steel The inner hole wall top of pipe is provided with retainer ring, and inner cylinder and retainer ring top are fixed with shrouding, and steel duct fills C50 concrete, The anti-hydrofoil ring of steel pipe external welding more than dewatering well, ring flange is fixed with the top of steel pipe, and foundation ditch basis top is provided with and dropped The concordant blinding concrete of well well head, blinding concrete top are provided with pea gravel concreten protective layer, pea gravel concreten protection Layer top is equipped with waterproof roll, has poured base concrete above waterproof roll, anti-hydrofoil ring is in base concrete, steel It is C50 concrete above pipe.
The shrouding is fixed on by way of welding on retainer ring or inner cylinder.
The shrouding is fixed in retainer ring or inner cylinder by bolt assembly.
The thickness of the pea gravel concreten protective layer is 100mm, and the thickness of base concrete is 500~600mm.
The ring flange is bolted on steel pipe.
The pea gravel concreten protective layer is the concrete that maximum size of coarse aggregate is not more than 15mm.
The anti-hydrofoil ring, which uses, is more than the thick steel plate making of 6mm.
The steel pipe is hot rolled seamless steel tube.
The beneficial effects of the utility model are:First, plugging dewatering well structure can be prefabricated in advance in factory, ensure that product Quality;2nd, the material used is common used material in construction, and the cost of material is low, and its cost is quite cheap;3rd, good water-proof effect, Multi layer waterproof construction measure is employed, can guarantee that the waterproof effect of concrete floor, there is larger economic benefit and society to imitate Benefit;4th, plugging structure is transported to scene, plugging construction method is easy, and operating personnel are not required to carry out professional training, and common laborer is It can complete;5th, speed of application is fast, does not influence the construction of other processes, nor affects on construction speed.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
Embodiment
As shown in figure 1, base pit dewatering well plugging structure, including dewatering well 10, foundation ditch basis 12 and steel pipe 2, steel pipe 2 are heat Seamless steel pipe is rolled, steel pipe 2 is set in outside dewatering well 10, and inner cylinder 11 is fixed with the bottom interior wall of steel pipe 2, and inner cylinder 11 gos deep into dewatering well 10 is intraoral, and the inner hole wall top of steel pipe 2 is provided with retainer ring 6, and inner cylinder 11 and the top of retainer ring 6 are fixed with shrouding 1, in steel pipe 2 Portion's filling C50 concrete 4, the anti-hydrofoil ring 8 of the external welding of steel pipe 2 of dewatering well more than 10, anti-hydrofoil ring 8 is using more than 6mm thickness Steel plate makes, and the top of steel pipe 2 is fixed with ring flange 5, and ring flange 5 is fixed on steel pipe 2 by bolt 3, on foundation ditch basis 12 Side is provided with the blinding concrete 13 concordant with the well head of dewatering well 10, and the top of blinding concrete 13 is provided with pea gravel concreten protection Layer 14, the thickness of pea gravel concreten protective layer 14 is 100mm, and pea gravel concreten protective layer 14 is not more than for maximum size of coarse aggregate 15mm concrete, the top of pea gravel concreten protective layer 14 are equipped with waterproof roll 9, and it is mixed that the top of waterproof roll 9 has poured basis Solidifying soil 7, the thickness of base concrete 7 is 500~600mm, and anti-hydrofoil ring 8 is in base concrete 7, and the top of steel pipe 2 is C50 Concrete.
Shrouding 1 can be both fixed on retainer ring 6 or inner cylinder 11 by way of welding, can be consolidated again by bolt assembly It is scheduled on retainer ring 6 or inner cylinder 11.Pour and hang Mo Liu around steel pipe 2 before base concrete 7 and set 800mm*800mm*300mm's Square hole, the absolute altitude at the top of steel pipe 2 is not less than 100mm away from the absolute altitude of base concrete layer 11, to ensure the construction party of mounting flange 5 Just.C50 is poured in part and retainer ring above section and base concrete at the endoporus of steel pipe 2 between two shroudings to mix Solidifying soil 4 can water level lowering well sealing, it is convenient and swift, base pit dewatering well envelope can be improved with quick closure base pit dewatering well enclosed construction Close the successful enclosed of structure.

Claims (8)

1. base pit dewatering well plugging structure, including dewatering well, foundation ditch basis and steel pipe, it is characterised in that:Steel pipe is set in precipitation Outside well, inner cylinder is fixed with steel pipe bottom inwall, inner cylinder gos deep into that dewatering well is intraoral, and the inner hole wall top of steel pipe is provided with fixation Ring, inner cylinder and retainer ring top are fixed with shrouding, steel duct filling C50 concrete, and steel pipe outside weld more than dewatering well is taken over control Hydrofoil ring, ring flange being fixed with the top of steel pipe, foundation ditch basis top is provided with the blinding concrete concordant with dewatering well well head, Pea gravel concreten protective layer is provided with above blinding concrete, waterproof roll, waterproof are equipped with above pea gravel concreten protective layer Base concrete is poured above coiled material, anti-hydrofoil ring is in base concrete, is C50 concrete above steel pipe.
2. base pit dewatering well plugging structure according to claim 1, it is characterised in that:The shrouding is by way of welding It is fixed on retainer ring or inner cylinder.
3. base pit dewatering well plugging structure according to claim 1, it is characterised in that:The shrouding is consolidated by bolt assembly It is scheduled on retainer ring or inner cylinder.
4. base pit dewatering well plugging structure according to claim 1, it is characterised in that:The pea gravel concreten protective layer Thickness is 100mm, and the thickness of base concrete is 500~600mm.
5. base pit dewatering well plugging structure according to claim 1, it is characterised in that:The ring flange is bolted On steel pipe.
6. base pit dewatering well plugging structure according to claim 1, it is characterised in that:The pea gravel concreten protective layer is Maximum size of coarse aggregate is not more than 15mm concrete.
7. base pit dewatering well plugging structure according to claim 1, it is characterised in that:The anti-hydrofoil ring, which uses, to be more than Steel plate thick 6mm makes.
8. base pit dewatering well plugging structure according to claim 1, it is characterised in that:The steel pipe is hot rolling seamless steel Pipe.
CN201720467386.6U 2017-04-28 2017-04-28 Base pit dewatering well plugging structure Active CN206706791U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720467386.6U CN206706791U (en) 2017-04-28 2017-04-28 Base pit dewatering well plugging structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720467386.6U CN206706791U (en) 2017-04-28 2017-04-28 Base pit dewatering well plugging structure

Publications (1)

Publication Number Publication Date
CN206706791U true CN206706791U (en) 2017-12-05

Family

ID=60457749

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720467386.6U Active CN206706791U (en) 2017-04-28 2017-04-28 Base pit dewatering well plugging structure

Country Status (1)

Country Link
CN (1) CN206706791U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108425372A (en) * 2018-05-03 2018-08-21 中国建筑第二工程局有限公司 A kind of protective device and foundation pit shut-in well method for the uninterrupted precipitation in foundation pit part
CN108517886A (en) * 2018-05-14 2018-09-11 中铁广州工程局集团有限公司 A kind of high hydraulic pressure plugging dewatering well method of high water level
CN109537611A (en) * 2018-12-06 2019-03-29 安徽省人防建筑设计研究院 A kind of civil air defense constructions and installations pipe well plugging structure
CN110700788A (en) * 2019-09-29 2020-01-17 魏海虎 Broken water pipe reinforcing device
CN113152619A (en) * 2021-03-09 2021-07-23 周洪涛 Underground water diversion and drainage structure in concrete pouring process and construction method thereof
CN113482025A (en) * 2021-07-15 2021-10-08 海通建设集团有限公司 Deep foundation pit dewatering well plugging structure and construction method thereof

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108425372A (en) * 2018-05-03 2018-08-21 中国建筑第二工程局有限公司 A kind of protective device and foundation pit shut-in well method for the uninterrupted precipitation in foundation pit part
CN108517886A (en) * 2018-05-14 2018-09-11 中铁广州工程局集团有限公司 A kind of high hydraulic pressure plugging dewatering well method of high water level
CN109537611A (en) * 2018-12-06 2019-03-29 安徽省人防建筑设计研究院 A kind of civil air defense constructions and installations pipe well plugging structure
CN110700788A (en) * 2019-09-29 2020-01-17 魏海虎 Broken water pipe reinforcing device
CN113152619A (en) * 2021-03-09 2021-07-23 周洪涛 Underground water diversion and drainage structure in concrete pouring process and construction method thereof
CN113482025A (en) * 2021-07-15 2021-10-08 海通建设集团有限公司 Deep foundation pit dewatering well plugging structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN206706791U (en) Base pit dewatering well plugging structure
CN105178344B (en) The construction method of the built-in anti-float anchor rod plugging structure of sole plate precipitation of deep well
CN101768976B (en) Base pit dewatering and water saving device and construction method thereof
CN204343312U (en) A kind of plugging device of precipitation well in foundation pit
CN206706792U (en) Deep foundation pit precipitation well construction
CN105019919B (en) Tunnel and its construction method for transmitting fluid
CN206916753U (en) A kind of water sealing structure of diaphram wall and its seam crossing
CN203145029U (en) Plugging structure for deep foundation pit dewatering well
CN105862928A (en) Post-cast strip outer wall in-advance water stopping treatment structure and construction process thereof
CN201943086U (en) Underground building wall body
CN104652495B (en) Internal support of foundation pit column and base plate node waterproof construction technology
CN112832279A (en) Waterproof structure and method for dewatering well of underground foundation pit
CN210163948U (en) Construction system for pouring post-cast strip of basement roof
CN201567582U (en) Rainwater saving device of foundation pit
CN105735323B (en) The inverse deep footing groove enclosing structure for making to combine with Percussion Piles of spray anchor and its construction method
CN203768925U (en) Seal device for dewatering well in foundation pit
CN104975607A (en) Offshore area local deep foundation pit stanching pit construction method
CN209040133U (en) Well-covering device for dewatering well suitable for rich groundwater region
CN205776282U (en) A kind of immersed tube tunnel rebuilds cofferdam structure
CN209397743U (en) New-old concrete works intersection stitches waterproof construction
CN107326924A (en) Outer wall of underground structure HCMW engineering methods overlap wall and its construction method
CN204827469U (en) A tunnel for transmission fluid
CN103993609B (en) The multi-functional fast hard concrement manual repair foundation pit waterproof curtain of silicon ash sand guide drainage
CN207812509U (en) Bottom plate post-poured strip waterproof structure
CN203514332U (en) Casing for blocking dewatering tube well of post-cast strip

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 450046 6 floor, 3 East International Plaza, 85 Jinshui East Road, Zheng Dong New District, Zhengzhou, Henan.

Patentee after: High founding Limited by Share Ltd

Address before: 450046 6 floor, 3 East International Plaza, 85 Jinshui East Road, Zheng Dong New District, Zhengzhou, Henan.

Patentee before: Hi Tech construction Limited by Share Ltd

CP01 Change in the name or title of a patent holder