CN109537611A - A kind of civil air defense constructions and installations pipe well plugging structure - Google Patents

A kind of civil air defense constructions and installations pipe well plugging structure Download PDF

Info

Publication number
CN109537611A
CN109537611A CN201811486874.7A CN201811486874A CN109537611A CN 109537611 A CN109537611 A CN 109537611A CN 201811486874 A CN201811486874 A CN 201811486874A CN 109537611 A CN109537611 A CN 109537611A
Authority
CN
China
Prior art keywords
steel bushing
plate
steel
pipe well
seal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811486874.7A
Other languages
Chinese (zh)
Inventor
甘伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Civil Air Defense Architectural Design Institute
Original Assignee
Anhui Civil Air Defense Architectural Design Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Civil Air Defense Architectural Design Institute filed Critical Anhui Civil Air Defense Architectural Design Institute
Priority to CN201811486874.7A priority Critical patent/CN109537611A/en
Publication of CN109537611A publication Critical patent/CN109537611A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/10Restraining of underground water by lowering level of ground water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
    • E02D31/025Draining membranes, sheets or fabric specially adapted therefor, e.g. with dimples
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder
    • E02D2300/002Concrete
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0026Metals
    • E02D2300/0029Steel; Iron

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Building Environments (AREA)

Abstract

The invention discloses a kind of civil air defense constructions and installations pipe well plugging structures, including pipe well, the first steel bushing is provided with above the pipe well, the bottom of first steel bushing is welded with the first seal ring, the top of first steel bushing is welded with the second steel bushing, the second seal ring is welded between first steel bushing and second steel bushing, the top of the pipe well is provided with the first steel deck-plate, first steel deck-plate and first seal ring weld, the second steel deck-plate is provided in second steel bushing, second steel deck-plate is located at the top of second seal ring.The utility model has the advantages that being welded between the first steel bushing and the second steel bushing and the first steel bushing and pipe well that pass through setting by seal ring, realization blocks deep basal pit large diameter tube well;The waterproof effect of concrete ensure that using multi layer waterproof measure by the first seal plate and the second seal plate that are arranged in the first steel bushing, structure is simple, and plugging effect is obvious.

Description

A kind of civil air defense constructions and installations pipe well plugging structure
Technical field
The present invention relates to Technology for Civil Air Defence Projects field more particularly to a kind of civil air defense constructions and installations pipe well plugging structures.
Background technique
For a long time, China's majority deep-foundation pit engineering can encounter level of ground water mistake during carrying out earth excavation Situation high, surface water capacity is excessive, and be to be effectively improved working condition, guarantee construction safety, it usually needs use well-points dewatering Measure come improve construction the soil body stability, intensity, enhancing soil mass of foundation pit anti-current sand, piping, artesian water ability, to reduce The lateral pressure that building enclosure is applied.Currently, for the precipitation problem in deep pit construction, can according to water level, The measures such as deep well points, light well point, electro-osmosis well point, ejector well point are respectively adopted in the difference of situations such as matter.
Currently used closure dewatering well method is direct filling concrete, rubble, concrete drier etc., this closure mode Plugging effect it is poor, block imprecision, or even repeatedly block it is unsuccessful, in addition, blocking time is long, low efficiency.
Summary of the invention
For the problems in the relevant technologies, the present invention proposes a kind of civil air defense constructions and installations pipe well plugging structure, to overcome existing phase Above-mentioned technical problem present in the technology of pass.
The technical scheme of the present invention is realized as follows:
A kind of civil air defense constructions and installations pipe well plugging structure, including pipe well are provided with the first steel bushing above the pipe well, described The bottom of first steel bushing is welded with the first seal ring, and the top of first steel bushing is welded with the second steel bushing, and described The second seal ring is welded between one steel bushing and second steel bushing, the top of the pipe well is provided with the first steel deck-plate, First steel deck-plate and first seal ring weld, and are provided with the second steel deck-plate in second steel bushing, and described second Steel deck-plate is located at the top of second seal ring, and the inner wall of second steel deck-plate and second steel bushing is fully welded company It connects, the inside of first steel bushing is sequentially installed with support construction one and support construction two, the support construction from top to bottom One is located at the lower section of second seal ring, and the support construction one and the top of the support construction two are corresponding to be equipped with the One seal plate and the second seal plate, the periphery of first steel bushing are provided with waterproof roll, on one end of the waterproof roll It turns over and is closely bonded with the outer wall of first steel bushing.
Further, the underfill of the pipe well has graded sand and stone, positioned at the face seal filling addressed with sandstone There is concrete.
Further, the first concrete dry bed of material, institute are filled between second steel deck-plate and first seal plate It states between the first seal plate and second seal plate filled with the second concrete dry bed of material, second seal plate and described the The third concrete dry bed of material is filled between one steel deck-plate.
Further, the periphery of first steel bushing and second steel bushing is disposed with basic bottom from top to bottom Plate, microlith concrete cover and foundation concrete bed course.
Further, the periphery of the pipe well is provided with concrete cushion, the concrete cushion and first sealing Waterproof protective layer is provided between ring.
The beneficial effects of the present invention are: passing through the first steel bushing of setting and the second steel bushing and the first steel bushing and pipe It is welded between well by seal ring, realization blocks deep basal pit large diameter tube well;Pass through what is be arranged in the first steel bushing First seal plate and the second seal plate ensure that the waterproof effect of concrete using multi layer waterproof measure, and structure is simple, block Effect is obvious.
Detailed description of the invention
It in order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, below will be to institute in embodiment Attached drawing to be used is needed to be briefly described, it should be apparent that, the accompanying drawings in the following description is only some implementations of the invention Example, for those of ordinary skill in the art, without creative efforts, can also obtain according to these attached drawings Obtain other attached drawings.
Fig. 1 is a kind of structural schematic diagram of civil air defense constructions and installations pipe well plugging structure.
In figure:
1, pipe well;2, the first steel deck-plate;3, the first seal ring;4, foundation concrete bed course;5, the second concrete dry bed of material;6, thin Stone concrete cover;7, the first steel bushing;8, the second seal ring;9, the second steel bushing;10, the second steel deck-plate;11, the first concrete Siccative layer;12, the first seal plate;13, support construction one;14, the second seal plate;15, support construction two;16, third concrete Siccative layer;17, waterproof protective layer;18, concrete;19 and match sandstone;20, concrete cushion;21, waterproof roll;22, basic Backing plate.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.
In the description of the present invention, it is to be understood that, term " on ", "lower", "front", "rear", "left", "right", "top", The orientation or positional relationship of the instructions such as "bottom", "inner", "outside" is to be based on the orientation or positional relationship shown in the drawings, merely to just In description the present invention and simplify description, rather than the device or element of indication or suggestion meaning must have a particular orientation, with Specific orientation construction and operation, therefore be not considered as limiting the invention.
According to an embodiment of the invention, providing a kind of civil air defense constructions and installations pipe well plugging structure.
Referring to Fig.1, civil air defense constructions and installations pipe well plugging structure according to an embodiment of the present invention, including pipe well 1, the pipe well 1 Top is provided with the first steel bushing 7, and the bottom of first steel bushing 7 is welded with the first seal ring 3, first steel bushing 7 Top be welded with the second steel bushing 9, be welded with the second seal ring between first steel bushing 7 and second steel bushing 9 8, the top of the pipe well 1 is provided with the first steel deck-plate 2, and first steel deck-plate 2 is welded with first seal ring 3, described The second steel deck-plate 10 is provided in second steel bushing 9, second steel deck-plate 10 is located at the top of second seal ring 8, and Second steel deck-plate 10 is fully welded with the inner wall of second steel bushing 9 and connect, and the inside of first steel bushing 7 is from top to bottom It is sequentially installed with support construction 1 and support construction 2 15, the support construction 1 is located under second seal ring 8 Side, the support construction 1 with the top of the support construction 2 15 is corresponding is equipped with the first seal plate 12 and the second sealing Plate 14, the periphery of first steel bushing 7 are provided with waterproof roll 21, and one end of the waterproof roll 21 turns over and described first The outer wall of steel bushing 7 closely bonds.
In one embodiment, the underfill of the pipe well 1 has graded sand and stone 19, positioned at addressing the table with sandstone 19 Face sealing is filled with concrete 18.
In one embodiment, the first concrete is filled between second steel deck-plate 10 and first seal plate 12 Siccative layer 11, is filled with the second concrete dry bed of material 5 between first seal plate 12 and second seal plate 14, and described the The third concrete dry bed of material 16 is filled between two seal plates 14 and first steel deck-plate 2.
In one embodiment, the periphery of first steel bushing 7 and second steel bushing 9 is set gradually from top to bottom There are sole plate 22, microlith concrete cover 6 and foundation concrete bed course 4.
In one embodiment, the periphery of the pipe well 1 is provided with concrete cushion 20, the concrete cushion 20 and institute It states and is provided with waterproof protective layer 17 between the first seal ring 3.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto, Anyone skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.

Claims (5)

1. a kind of civil air defense constructions and installations pipe well plugging structure, which is characterized in that including pipe well (1), be provided with above the pipe well (1) The bottom of first steel bushing (7), first steel bushing (7) is welded with the first seal ring (3), first steel bushing (7) Top is welded with the second steel bushing (9), is welded with second between first steel bushing (7) and second steel bushing (9) and is stopped The top of water ring (8), the pipe well (1) is provided with the first steel deck-plate (2), first steel deck-plate (2) and first sealing Ring (3) welding, second steel bushing (9) is interior to be provided with the second steel deck-plate (10), and second steel deck-plate (10) is located at described The top of second seal ring (8), and second steel deck-plate (10) is fully welded with the inner wall of second steel bushing (9) and connect, institute The inside for stating the first steel bushing (7) is sequentially installed with support construction one (13) and support construction two (15), the branch from top to bottom Support structure one (13) is located at the lower section of second seal ring (8), the support construction one (13) and the support construction two (15) top correspondence is equipped with the first seal plate (12) and the second seal plate (14), the periphery of first steel bushing (7) It is provided with waterproof roll (21), one end of the waterproof roll (21) is turned over closely glues with the outer wall of first steel bushing (7) It connects.
2. a kind of civil air defense constructions and installations pipe well plugging structure according to claim 1, which is characterized in that the bottom of the pipe well (1) Portion is filled with graded sand and stone (19), is filled with concrete (18) positioned at the face seal with sandstone (19) is addressed.
3. a kind of civil air defense constructions and installations pipe well plugging structure according to claim 1, which is characterized in that second steel deck-plate (10) the first concrete dry bed of material (11), first seal plate (12) and institute are filled between first seal plate (12) It states between the second seal plate (14) filled with the second concrete dry bed of material (5), second seal plate (14) and first steel The third concrete dry bed of material (16) is filled between cover board (2).
4. a kind of civil air defense constructions and installations pipe well plugging structure according to claim 1, which is characterized in that first steel bushing (7) with second steel bushing (9) periphery be disposed with from top to bottom sole plate (22), microlith concrete cover (6) and Foundation concrete bed course (4).
5. a kind of civil air defense constructions and installations pipe well plugging structure according to claim 1, which is characterized in that outside the pipe well (1) It encloses and is provided with concrete cushion (20), waterproof guarantor is provided between the concrete cushion (20) and first seal ring (3) Sheath (17).
CN201811486874.7A 2018-12-06 2018-12-06 A kind of civil air defense constructions and installations pipe well plugging structure Pending CN109537611A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811486874.7A CN109537611A (en) 2018-12-06 2018-12-06 A kind of civil air defense constructions and installations pipe well plugging structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811486874.7A CN109537611A (en) 2018-12-06 2018-12-06 A kind of civil air defense constructions and installations pipe well plugging structure

Publications (1)

Publication Number Publication Date
CN109537611A true CN109537611A (en) 2019-03-29

Family

ID=65852989

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811486874.7A Pending CN109537611A (en) 2018-12-06 2018-12-06 A kind of civil air defense constructions and installations pipe well plugging structure

Country Status (1)

Country Link
CN (1) CN109537611A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112681371A (en) * 2020-12-10 2021-04-20 中铁十二局集团有限公司 Construction and plugging method for pouring preformed hole in top plate of subway station

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007009564A (en) * 2005-06-30 2007-01-18 East Japan Railway Co Water filling pipe structure of return underground water and condensate well structure
CN101215837A (en) * 2008-01-11 2008-07-09 江苏南通二建集团有限公司 Fast plugging device for deep foundation pit precipitation well
CN203768926U (en) * 2014-04-08 2014-08-13 江苏扬州建工建设集团有限公司 Basement deep well plugging device
CN204199311U (en) * 2014-11-10 2015-03-11 汕头市建安实业(集团)有限公司 Plugging dewatering well structure
CN204343312U (en) * 2014-12-15 2015-05-20 中国建筑一局(集团)有限公司 A kind of plugging device of precipitation well in foundation pit
CN206706791U (en) * 2017-04-28 2017-12-05 高创建设股份有限公司 Base pit dewatering well plugging structure
CN209603160U (en) * 2018-12-06 2019-11-08 安徽省人防建筑设计研究院 A kind of civil air defense constructions and installations pipe well plugging structure

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007009564A (en) * 2005-06-30 2007-01-18 East Japan Railway Co Water filling pipe structure of return underground water and condensate well structure
CN101215837A (en) * 2008-01-11 2008-07-09 江苏南通二建集团有限公司 Fast plugging device for deep foundation pit precipitation well
CN203768926U (en) * 2014-04-08 2014-08-13 江苏扬州建工建设集团有限公司 Basement deep well plugging device
CN204199311U (en) * 2014-11-10 2015-03-11 汕头市建安实业(集团)有限公司 Plugging dewatering well structure
CN204343312U (en) * 2014-12-15 2015-05-20 中国建筑一局(集团)有限公司 A kind of plugging device of precipitation well in foundation pit
CN206706791U (en) * 2017-04-28 2017-12-05 高创建设股份有限公司 Base pit dewatering well plugging structure
CN209603160U (en) * 2018-12-06 2019-11-08 安徽省人防建筑设计研究院 A kind of civil air defense constructions and installations pipe well plugging structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112681371A (en) * 2020-12-10 2021-04-20 中铁十二局集团有限公司 Construction and plugging method for pouring preformed hole in top plate of subway station

Similar Documents

Publication Publication Date Title
CN103343543B (en) Foundation pit dewatering well pressure-reduction-type plugging method
CN104534167B (en) The drag reduction method of thixotropic slurry
CN103981898B (en) A kind of inverse underground engineering construction method done of overall open cut node
CN103526766B (en) Method for plugging relief well of deep foundation pit
CN109881694A (en) A kind of constructing structure blocked for foundation pit substrate Sand and method
CN107620312A (en) High hydraulic pressure precipitation well construction and hydrostatic slip casting method for blocking in a kind of Metro station excavation
CN204312099U (en) Tunnel Gushing based on environmental protection prevents and treats system
CN103334444A (en) Decompression type blocking method for foundation pit dewatering well
CN106121722A (en) A kind of method quickly constructing fire dam
CN208965598U (en) The Anti-seeping technology structure of grout curtain and underground chamber intersection area
CN103397845A (en) Method of controlling building settlement caused by penetration of jacked pipe through grout replacement
CN104314106A (en) Underground diaphragm wall with joint water stop and filling vacancy structure and construction method thereof
CN209603160U (en) A kind of civil air defense constructions and installations pipe well plugging structure
CN109025899B (en) Well sealing device
CN109537611A (en) A kind of civil air defense constructions and installations pipe well plugging structure
CN203175569U (en) Steel tube piece tunnel portal water-proof sealing structure in shield-driven tunnel breakthrough
CN108360542A (en) Waterproof between piles curtain combination stake side sleeve valve barrel grouting water stop construction method
CN204941551U (en) A kind of subway station of Curve Pipe Jacking supporting and protection structure enlarging shield-tunneling construction
CN104712145A (en) Grouting method for middle embedded grouting water stop belt
CN106988330B (en) Base pit engineering soft soil foundation is layered dewatering construction structure and construction method
CN204420369U (en) A kind of linkage structure of large-caliber drainage pipeline
CN204212180U (en) A kind of reinforcing cage for basement plugging dewatering well
CN103174154A (en) Underground building bottom plate water burst well pit solid seal method and auxiliary water lowering device
CN211874508U (en) Plugging device and plugging structure used in subway tunnel invert lining repairing operation
CN204626420U (en) A kind of flag-shaped foundation pit enclosure structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination