CN104314106A - Underground diaphragm wall with joint water stop and filling vacancy structure and construction method thereof - Google Patents

Underground diaphragm wall with joint water stop and filling vacancy structure and construction method thereof Download PDF

Info

Publication number
CN104314106A
CN104314106A CN201410634172.4A CN201410634172A CN104314106A CN 104314106 A CN104314106 A CN 104314106A CN 201410634172 A CN201410634172 A CN 201410634172A CN 104314106 A CN104314106 A CN 104314106A
Authority
CN
China
Prior art keywords
diaphragm wall
underground diaphragm
induration
cyclotomy
depth
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410634172.4A
Other languages
Chinese (zh)
Inventor
王剑非
王晓燕
殷华富
杨少真
李志平
周成明
王晓曙
杨世相
王自忠
郑云刚
孟应磊
周麟
杨成
苏兰忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YANTAI CONSTRUCTION ENGINEERING FOUNDATION ENGINEERING Co Ltd
YUNNAN NO3 CONSTRUCTIONAL ENGINEERING Co Ltd
YUNNAN CONSTRUCTION ENGINEERING GROUP Co Ltd
Original Assignee
YANTAI CONSTRUCTION ENGINEERING FOUNDATION ENGINEERING Co Ltd
YUNNAN NO3 CONSTRUCTIONAL ENGINEERING Co Ltd
YUNNAN CONSTRUCTION ENGINEERING GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YANTAI CONSTRUCTION ENGINEERING FOUNDATION ENGINEERING Co Ltd, YUNNAN NO3 CONSTRUCTIONAL ENGINEERING Co Ltd, YUNNAN CONSTRUCTION ENGINEERING GROUP Co Ltd filed Critical YANTAI CONSTRUCTION ENGINEERING FOUNDATION ENGINEERING Co Ltd
Priority to CN201410634172.4A priority Critical patent/CN104314106A/en
Publication of CN104314106A publication Critical patent/CN104314106A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/16Arrangement or construction of joints in foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits

Abstract

Disclosed are an underground diaphragm wall with a joint water stop and filling vacancy structure and a construction method thereof. The underground diaphragm wall with the joint water stop and filling vacancy structure comprises serially connected underground diaphragm walls (1) in a foundation trench, joints (3) between the adjacent underground diaphragm walls, and consolidated objects (2) jetted on joint portions outside the foundation trench; the consolidated objects (2) are big cutting circle shaped, the diameters of the big cutting circles are 0.6-1.0m, the depths of the big cutting circles are the same with those of the underground diaphragm walls (1), and secant (4) lengths of the big cutting circles are transverse overlapping lengths of the consolidated objects (2) and the underground diaphragm walls (1) and are no less than 500mm. The underground diaphragm wall with the joint water stop and filling vacancy structure can effectively solve construction deficiencies of joints unevenness of adjacent slot walls, water leakage and the like in the underground diaphragm walls, meanwhile cement and sodium silicate seriflux are utilized as injecting paste materials, coagulation time of the cement paste is decreased, the cement paste is prevented to be eroded by underground water and is not easy to consolidate, and water shutoff and seepage-proofing performance of rotary jet consolidated objects are obviously improved.

Description

A kind of with joint seal and the fill a vacancy diaphragm wall of structure and construction method thereof
Technical field
The invention belongs to architecture Foundation Pit Engineering technical field, be specifically related to a kind of band joint seal and fill a vacancy structure diaphragm wall and construction method thereof.
Background technology
Along with the fast development of urban construction, deep-foundation pit engineering gets more and more, and also become increasingly complex changeable, various pattern foundation pit supporting structure mode is emerged in large numbers thereupon.Diaphragm wall because of its Construction Vibration little, wall stiffness is large, good integrity, and speed of application is fast, and can economize the cubic metre of earth and stone, the advantages such as applicability is strong, are widely used in domestic deep-foundation pit engineering field in recent years.Diaphragm wall is constructed in conjunction with contrary sequence method usually, is specially adapted to foundation pit supporting project Deformation control being required to larger urban architecture close quarters.But the construction technology comparatively special because of it and method, in its work progress, if construction method is improper or construction geology condition is special, be easy to occur that adjacent slot section body of wall seam such as can not be alignd and leak at the constructional deficiency.
Summary of the invention
The object of the invention is to overcome diaphragm wall joint seal and problem of filling a vacancy, one is provided can effectively to solve in construction of diaphragm wall process, leaking and the band joint seal of Construction defect problem and the diaphragm wall of structure of filling a vacancy of adjacent slot section seaming position.The present invention also provides the construction method of this diaphragm wall.
The technical scheme realizing the object of the invention is as follows:
With joint seal and the diaphragm wall of structure of filling a vacancy, include the seam between the diaphragm wall connected continuously in foundation ditch, adjacent continuous wall, have induration being positioned at the seam crossing spray outside foundation ditch; Described induration is large cyclotomy shape, and cutting greatly diameter of a circle is 0.6 ~ 1.0m, and the degree of depth is identical with the degree of depth of diaphragm wall, and the transverse lap length of the scant length of large cyclotomy and induration and diaphragm wall is not less than 500mm.
With the construction method of joint seal with the diaphragm wall of structure of filling a vacancy, construction method is as follows:
1. determine to adopt single pipe method or double tube method or tri-tube method churning induration, first determine diameter and the degree of depth of large cyclotomy induration, large cyclotomy diameter range is 0.6 ~ 1.0m and the degree of depth is identical with the degree of depth of diaphragm wall,
2. outside foundation ditch, the cloth hole site of rotary-spraying construction is determined in the place of positive butt joint; The scant length that cloth hole site meets large cyclotomy is not less than 500mm;
3. prepare cement-silicate slurries as injecting paste material, described cement-silicate slurries mix water glass in cement slurry, and the water/binder ratio of cement slurry is 0.75:1 ~ 1:1, and water glass incorporation is 2% ~ 4% of cement slurry weight;
4., after diaphragm wall steady quality, adopt single pipe method or double tube method or the positive butt joint of tri-tube method to carry out jet grouting pile construction in the cloth hole site determined, form the induration of large cyclotomy shape.
Beneficial effect of the present invention is:
(1) high pressure jet grouting method churning induration is adopted at the body of wall seaming position that diaphragm wall is adjacent, injecting paste material fully can fill the hole of seaming position under High Pressure, effectively can solve the uneven and constructional deficiency problem such as to leak of adjacent slot section body of wall seam in construction of diaphragm wall process.
(2) with cement-silicate slurries for injecting paste material, select water glass as injecting paste material fast coagulating early strength agent and injecting paste material impervious agent, the setting time of cement paste can be reduced, prevent cement paste by underground water erosion unsuitable consolidation, and the water blockoff barrier performance of churning induration can be significantly improved.
Accompanying drawing explanation
Fig. 1 is that the present invention adopts the diaphragm wall joint seal of churning induration and structural representation of filling a vacancy;
Fig. 2 is the A-A generalized section of Fig. 1;
Fig. 3 is the B-B generalized section of Fig. 1;
Fig. 4 is churning induration cloth hole of the present invention schematic diagram.
Detailed description of the invention
Below by drawings and Examples, the present invention is described in further detail, but protection scope of the present invention is not limited to described content.
As shown in Figure 1, Figure 2, Figure 3 shows, a kind of diaphragm wall with joint seal and structure of filling a vacancy of the present invention includes the seam 3 between the diaphragm wall 1 connected continuously in foundation ditch, adjacent continuous wall, has induration 2 being positioned at the seam crossing spray outside foundation ditch; Described induration 2 is large cyclotomy shape, and cutting greatly diameter of a circle is 0.6 ~ 1.0m, and the degree of depth is identical with the degree of depth of diaphragm wall 1, and secant 4 length and the induration 2 of large cyclotomy are not less than 500mm with the transverse lap length of diaphragm wall 1.
Of the present invention a kind of as follows with the construction method of the diaphragm wall of structure of filling a vacancy with joint seal:
1. determine to adopt single pipe method or double tube method or tri-tube method churning induration 2, first according to construction place exploration report and diaphragm wall designing requirement, determine diameter and the degree of depth of large cyclotomy induration, large cyclotomy diameter range is 0.6 ~ 1.0m and the degree of depth is identical with the degree of depth of diaphragm wall 1;
2. as shown in Figure 4, outside foundation ditch, the cloth hole site 5 of rotary-spraying construction is determined in the place of positive butt joint 3; Its cloth hole site 5 is adjacent with seam 3, and concrete spacing distance is determined according to the diameter of induration 2, and meets induration 2 and be not less than 500mm with the lap position length of diaphragm wall 1 and secant 4 length of large cyclotomy;
3. prepare cement-silicate slurries as injecting paste material, described cement-silicate slurries mix water glass in cement slurry, and the water/binder ratio of cement slurry is 0.75:1 ~ 1:1, and water glass incorporation is 2% ~ 4% of cement slurry weight;
4., after diaphragm wall 1 steady quality, adopt single pipe method or double tube method or the positive butt joint of tri-tube method to carry out jet grouting pile construction in the cloth hole site determined, form the induration 2 of large cyclotomy shape.
Single pipe method of the present invention or double tube method or tri-tube method are existing construction techniques.
The present invention adopts high pressure jet grouting equipment and technology, with cement-silicate slurries for injecting paste material, carries out high pressure jet grouting, form the churning induration 2 of large cyclotomy shape in the other cloth hole site 4 determined of diaphragm wall 1 seam 3 facing to seam.Injecting paste material fully can fill the hole of seam 3 position under high-pressure injection effect, effectively solves leaking and Construction defect problem of seam 3 position.

Claims (2)

1. one kind with joint seal and the diaphragm wall of structure of filling a vacancy, include the diaphragm wall (1) connected continuously, the seam (3) between adjacent continuous wall that are positioned at foundation ditch, it is characterized in that there is induration (2) being positioned at the seam crossing spray outside foundation ditch; Described induration (2) is large cyclotomy shape, cutting greatly diameter of a circle is 0.6 ~ 1.0m, the degree of depth is identical with the degree of depth of diaphragm wall (1), and secant (4) length of large cyclotomy and induration (2) are not less than 500mm with the transverse lap length of diaphragm wall (1).
2. a kind of with the construction method of joint seal with the diaphragm wall of structure of filling a vacancy as claimed in claim 1, it is characterized in that, construction method is as follows:
1. determine to adopt single pipe method or double tube method or tri-tube method churning induration (2), first determine diameter and the degree of depth of large cyclotomy induration, large cyclotomy diameter range is 0.6 ~ 1.0m and the degree of depth is identical with the degree of depth of diaphragm wall (1);
2. outside foundation ditch, the cloth hole site (5) of rotary-spraying construction is determined in the place of positive butt joint (3); Secant (4) length that cloth hole site meets large cyclotomy is not less than 500mm;
3. prepare cement-silicate slurries as injecting paste material, described cement-silicate slurries mix water glass in cement slurry, and the water/binder ratio of cement slurry is 0.75:1 ~ 1:1, and water glass incorporation is 2% ~ 4% of cement slurry weight;
4., after diaphragm wall (1) steady quality, adopt single pipe method or double tube method or the positive butt joint of tri-tube method to carry out jet grouting pile construction in the cloth hole site determined, form the induration (2) of large cyclotomy shape.
CN201410634172.4A 2014-11-12 2014-11-12 Underground diaphragm wall with joint water stop and filling vacancy structure and construction method thereof Pending CN104314106A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410634172.4A CN104314106A (en) 2014-11-12 2014-11-12 Underground diaphragm wall with joint water stop and filling vacancy structure and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410634172.4A CN104314106A (en) 2014-11-12 2014-11-12 Underground diaphragm wall with joint water stop and filling vacancy structure and construction method thereof

Publications (1)

Publication Number Publication Date
CN104314106A true CN104314106A (en) 2015-01-28

Family

ID=52369408

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410634172.4A Pending CN104314106A (en) 2014-11-12 2014-11-12 Underground diaphragm wall with joint water stop and filling vacancy structure and construction method thereof

Country Status (1)

Country Link
CN (1) CN104314106A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105804107A (en) * 2016-05-10 2016-07-27 吉林大学 High-pressure-jetting and anti-seepage treatment method for triple tube of joint of underground diaphragm wall
CN105862872A (en) * 2016-04-05 2016-08-17 中铁十局集团第四工程有限公司 Deep foundation pit support structure joint water stop construction method
CN106013257A (en) * 2016-06-28 2016-10-12 中铁二院重庆勘察设计研究院有限责任公司 Active and passive integrated water stop outer pasting type water stop strap structure used for construction seam
CN107268688A (en) * 2017-05-19 2017-10-20 中铁隧道集团有限公司 I-shaped steel joint of diaphragm wall reinforces the construction method of sealing
CN110080309A (en) * 2019-05-15 2019-08-02 广州穗岩土木科技股份有限公司 A kind of processing method of underground continuous wall connector waterproof
CN114032966A (en) * 2021-11-27 2022-02-11 韶关市第一建筑工程有限公司 Underground continuous wall joint water seepage treatment method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09177108A (en) * 1995-12-25 1997-07-08 Bridgestone Corp Beltlike water stop
CN101168963A (en) * 2007-11-05 2008-04-30 上海市第二市政工程有限公司 Large depth underground continuous wall water-stop joint device
CN103114609A (en) * 2013-02-06 2013-05-22 上海市机械施工有限公司 Connection device of new and old underground diaphragm walls and construction method
CN204174643U (en) * 2014-11-12 2015-02-25 云南建工集团有限公司 A kind of with the diaphragm wall of joint seal with structure of filling a vacancy

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09177108A (en) * 1995-12-25 1997-07-08 Bridgestone Corp Beltlike water stop
CN101168963A (en) * 2007-11-05 2008-04-30 上海市第二市政工程有限公司 Large depth underground continuous wall water-stop joint device
CN103114609A (en) * 2013-02-06 2013-05-22 上海市机械施工有限公司 Connection device of new and old underground diaphragm walls and construction method
CN204174643U (en) * 2014-11-12 2015-02-25 云南建工集团有限公司 A kind of with the diaphragm wall of joint seal with structure of filling a vacancy

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105862872A (en) * 2016-04-05 2016-08-17 中铁十局集团第四工程有限公司 Deep foundation pit support structure joint water stop construction method
CN105804107A (en) * 2016-05-10 2016-07-27 吉林大学 High-pressure-jetting and anti-seepage treatment method for triple tube of joint of underground diaphragm wall
CN106013257A (en) * 2016-06-28 2016-10-12 中铁二院重庆勘察设计研究院有限责任公司 Active and passive integrated water stop outer pasting type water stop strap structure used for construction seam
CN107268688A (en) * 2017-05-19 2017-10-20 中铁隧道集团有限公司 I-shaped steel joint of diaphragm wall reinforces the construction method of sealing
CN107268688B (en) * 2017-05-19 2020-09-01 中铁隧道集团有限公司 Construction method for reinforcing and sealing I-shaped steel joint of underground continuous wall
CN110080309A (en) * 2019-05-15 2019-08-02 广州穗岩土木科技股份有限公司 A kind of processing method of underground continuous wall connector waterproof
CN114032966A (en) * 2021-11-27 2022-02-11 韶关市第一建筑工程有限公司 Underground continuous wall joint water seepage treatment method

Similar Documents

Publication Publication Date Title
CN104405410B (en) A kind of constructing structure and construction method on reinforcing shield tunnel end stratum
CN104314106A (en) Underground diaphragm wall with joint water stop and filling vacancy structure and construction method thereof
CN103526766B (en) Method for plugging relief well of deep foundation pit
CN111119940B (en) Grouting construction treatment method
CN106759297A (en) A kind of construction method of support pile and three pipe high-pressure rotary jet grouting pile deep basal pits
CN102286985A (en) Method for constructing dual high-pressure jet grouting pile waterproof curtain
CN109024641A (en) Triple tube double-liquid rotary spray is used for the construction method of deep basal pit leak stopping
CN108086296B (en) Dynamic and static combined grouting foundation reinforcing construction method
CN103696416B (en) A kind of method for processing foundation
CN203924137U (en) A kind of diaphragm wall serious leakage plugging structure
CN105484269A (en) Leakage prevention construction method of foundation pit support structure under blasting condition
CN106284295A (en) Multichannel high-pressure vibro-grouting jet groutinl construction method
CN105064335A (en) Ultrahigh pressure rotary jet grouting method suitable for sandy cobble stratum shield end well reinforcement
CN204418184U (en) High-pressure rotary jet grouting pile double-jacket tube drilling construction device
CN103741723A (en) Joint waterproof structure of underground diaphragm wall of underground substation
CN104988914A (en) Cast-in-situ bored pile breakage processing method under water area environment
CN205369234U (en) Freeze high pressure jet grouting pile
CN102174818A (en) Controlled impermeable leaking stoppage grout-extruding water-stopping technology of strong water permeable stratum of quaternary system
CN103604000B (en) River sea bottom steel push pipe docking method of construction
CN203639952U (en) Underground diaphragm wall joint waterproof structure of underground substation
CN203769805U (en) Grouting blowout prevention system for eliminating underwater shield liquefied soil layer
CN113266417A (en) Construction method of karst cave pile foundation
CN204174643U (en) A kind of with the diaphragm wall of joint seal with structure of filling a vacancy
CN207567755U (en) The rigid joint of ultra-deep ground-connecting-wall integrates water-stopping system
CN109537612A (en) A kind of porous impact stirring diaphram wall Barrier Technology and its construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Wang Jianfei

Inventor after: Wang Xiaoyan

Inventor after: Yin Huafu

Inventor after: Yang Shaozhen

Inventor after: Li Zhiping

Inventor after: Zhou Chengming

Inventor after: Wang Xiaoshu

Inventor after: Li Chunyan

Inventor after: Zheng Yungang

Inventor before: Wang Jianfei

Inventor before: Zheng Yungang

Inventor before: Meng Yinglei

Inventor before: Zhou Lin

Inventor before: Yang Cheng

Inventor before: Su Lanzhong

Inventor before: Wang Xiaoyan

Inventor before: Yin Huafu

Inventor before: Yang Shaozhen

Inventor before: Li Zhiping

Inventor before: Zhou Chengming

Inventor before: Wang Xiaoshu

Inventor before: Yang Shixiang

Inventor before: Wang Zizhong

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: WANG JIANFEI WANG XIAOYAN YIN HUAFU YANG SHAOZHEN LI ZHIPING ZHOU CHENGMING WANG XIAOSHU YANG SHIXIANG WANG ZIZHONG ZHENG YUNGANG MENG YINGLEI ZHOU LIN YANG CHENG SU LANZHONG TO: WANG JIANFEI WANG XIAOYAN YIN HUAFU YANG SHAOZHEN LI ZHIPING ZHOU CHENGMING WANG XIAOSHU LI CHUNYAN ZHENG YUNGANG

C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20150128