CN206706792U - Deep foundation pit precipitation well construction - Google Patents

Deep foundation pit precipitation well construction Download PDF

Info

Publication number
CN206706792U
CN206706792U CN201720467394.0U CN201720467394U CN206706792U CN 206706792 U CN206706792 U CN 206706792U CN 201720467394 U CN201720467394 U CN 201720467394U CN 206706792 U CN206706792 U CN 206706792U
Authority
CN
China
Prior art keywords
precast concrete
well casing
metalling
steel pipe
concrete well
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720467394.0U
Other languages
Chinese (zh)
Inventor
许为林
王延信
王旭
邓飞亚
王付广
祁真真
刘凯翔
郑小雪
万仁明
刘颖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gaochuang Industrial Co ltd
Original Assignee
Hi Tech Construction Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hi Tech Construction Ltd By Share Ltd filed Critical Hi Tech Construction Ltd By Share Ltd
Priority to CN201720467394.0U priority Critical patent/CN206706792U/en
Application granted granted Critical
Publication of CN206706792U publication Critical patent/CN206706792U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

Base pit dewatering civil engineering field of engineering technology is the utility model is related to, more particularly, to a kind of deep foundation pit precipitation well construction.Including precast concrete well casing and foundation ditch basis, precast concrete well casing is located in foundation ditch basis, filled out between precast concrete well casing outer wall and foundation ditch basis provided with filter material layer, precast concrete well casing bottom is provided with well seat, sediment tube is provided with above the well seat, sediment tube is located in precast concrete well casing, sediment tube has been sequentially arranged above bulky grain metalling, middle particle metalling, little particle metalling and water filtering tank, steel pipe is arranged with above precast concrete well casing, inner cylinder is fixed with steel pipe bottom inwall, it is intraoral that inner cylinder gos deep into precast concrete well casing, the inner hole wall top of steel pipe is provided with retainer ring, the anti-hydrofoil ring of steel pipe external welding more than precast concrete well casing, foundation ditch basis top is provided with the blinding concrete concordant with the precast concrete well casing mouth of pipe.

Description

Deep foundation pit precipitation well construction
Technical field
Base pit dewatering civil engineering field of engineering technology is the utility model is related to, more particularly, to a kind of deep foundation pit precipitation well knot Structure.
Background technology
Base pit dewatering mainly includes two methods of catch pit precipitation method and well-point dewatering method, and wherein well-point dewatering method has Displacement is big, precipitation is deep (15~50m), the features such as not limited by soil property, and suitable for rich groundwater, foundation ditch is deep (> 10m), The big engineering lowering level of ground water of foundation ditch floor space.Well-point dewatering method is before excavation of foundation pit, in foundation ditch surrounding construction certain amount Dewatering well, in the lower weld filter pipe (well) of dewatering well, the underground water in well is extracted out using pumping equipment, makes to be dug The soil method that remains drying regime, its main flow is:Well point measurement and positioning -- dig a well mouth -- Hospice Center cylinder rig is just -- drilling -- changes mud --- hanging installation well casing, filter pipe (the well) --- gravel of backfill filter pipe (well) between hole wall for position --- well-flushing --- water pump, installation pumping control circuit are divided into well casing --- tries the normal work of dewatering well of drawing water to filter layer Make --- precipitation, which finishes, pulls out well casing --- shut-in well.
Problems be present in well-points dewatering:
1)Because the water of dewatering well is mixed with impurity and mud, when being drawn water by water pump, usually there is impurity The situation of water pump is blocked with mud, so as to have influence on drainage procedure;
2)After water pump stops dewatering operation in dewatering well, because underground water hydraulic pressure acts on, if not complete in a short time Water burst phenomenon will occur into plugging dewatering well, so as to influence the closure quality of dewatering well, cause later stage structure base slab seepage, transport Row order section station internal water accumulation phenomenon, reduce structure durability the problems such as.
The content of the invention
The purpose of this utility model is to provide a kind of deep foundation pit precipitation well construction, is easy to block, can effectively avoid impurity and Mud blocks water pump, so as to improve the drainage efficiency in work progress.
The purpose of this utility model is realized in the following manner:Deep foundation pit precipitation well construction, including precast concrete well Pipe and foundation ditch basis, precast concrete well casing are located in foundation ditch basis, filled out between precast concrete well casing outer wall and foundation ditch basis Provided with filter material layer, precast concrete well casing bottom is provided with well seat, sediment tube is provided with above the well seat, sediment tube is positioned at pre- In concrete well processed, sediment tube has been sequentially arranged above bulky grain metalling, middle particle metalling, little particle metalling and filter Water tank, precast concrete well casing top are arranged with steel pipe, inner cylinder are fixed with steel pipe bottom inwall, inner cylinder gos deep into precast concrete Well casing is intraoral, and the inner hole wall top of steel pipe is provided with retainer ring, the anti-hydrofoil ring of steel pipe external welding more than precast concrete well casing, Foundation ditch basis top is provided with the blinding concrete concordant with the precast concrete well casing mouth of pipe, is provided with above blinding concrete thin Stone concrete protective layer, pea gravel concreten protective layer top are equipped with splash guard, water-proof putty, waterproof are provided with above splash guard Base concrete is poured above putty, anti-hydrofoil ring is in base concrete.
The filter material layer uses particle diameter 2~5mm medium coarse sands.
The thickness of the pea gravel concreten protective layer is 100mm, and the thickness of base concrete is 500~600mm.
The pea gravel concreten protective layer is the concrete that maximum size of coarse aggregate is not more than 15mm.
The anti-hydrofoil ring, which uses, is more than the thick steel plate making of 6mm.
The steel pipe is hot rolled seamless steel tube.
The bulky grain metalling uses particle diameter 10~20mm cobbles, and thickness is not less than 60cm, and middle particle metalling uses Particle diameter 4~10mm coarse sands, thickness are not less than 50cm, and little particle metalling uses particle diameter 1~3mm fine sands, and thickness is not less than 30cm.
The beneficial effects of the utility model are:Drainage layer is set and on sediment tube in the surrounding of precast concrete well casing Side is disposed with bulky grain metalling, middle particle metalling, little particle metalling and water filtering tank, can prevent from containing sand in well water The exceeded a large amount of losses for being impacted to drainage system, effectively reducing grogs are measured, reduce labor intensity, it is possible to increase construction effect Rate, save construction cost;Later stage plugging construction is easy, and operating personnel are not required to carry out professional training, and common laborer can complete.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
Embodiment
As shown in figure 1, deep foundation pit precipitation well construction, including precast concrete well casing 20 and foundation ditch basis 12, concrete Native well casing 20 is located in foundation ditch basis 12, is filled out between the outer wall of precast concrete well casing 20 and foundation ditch basis 12 provided with filter material layer 19, Filter material layer 19 uses particle diameter 2~5mm medium coarse sands, and the bottom of precast concrete well casing 2 is provided with well seat 18, and the top of well seat 18 is provided with Sediment tube 10, sediment tube 10 are located in precast concrete well casing 20, and the top of sediment tube 10 is disposed with bulky grain from bottom to top Metalling 17, middle particle metalling 16, little particle metalling 15 and water filtering tank 3, suction pump 5 be arranged on the top of water filtering tank 3 and with Drinking-water pipe 4 connects, and bulky grain metalling 17 uses particle diameter 10~20mm cobbles, and thickness is not less than 60cm, middle particle metalling 16 Using particle diameter 4~10mm coarse sands, thickness is not less than 50cm, and little particle metalling 15 is not small using particle diameter 1~3mm fine sands, thickness In 30cm, the top of precast concrete well casing 20 is arranged with steel pipe 2, and steel pipe 2 is hot rolled seamless steel tube, is consolidated in the bottom interior wall of steel pipe 2 Surely there is an inner cylinder 11, inner cylinder 11 gos deep into that precast concrete well casing 20 is intraoral, and the inner hole wall top of steel pipe 2 is provided with retainer ring 6, prefabricated The anti-hydrofoil ring 8 of the external welding of steel pipe 2 of concrete well more than 20, anti-hydrofoil ring 8 are made using the thick steel plates of 6mm are more than, foundation ditch The top of basis 12 is provided with the blinding concrete 13 concordant with the mouth of pipe of precast concrete well casing 20, and the top of blinding concrete 13 is set There is pea gravel concreten protective layer 14, pea gravel concreten protective layer 14 is the concrete that maximum size of coarse aggregate is not more than 15mm, carefully The thickness of stone concrete protective layer 14 is 100mm, and the top of pea gravel concreten protective layer 14 is equipped with splash guard 9, the top of splash guard 9 Water-proof putty 1 is provided with, the top of water-proof putty 1 has poured base concrete 7, and the thickness of base concrete is 500~600mm, Anti- hydrofoil ring 8 is in base concrete 7.
After the completion of drawing water, suction pump 5 is proposed, first a shrouding is fixed on inner cylinder 11, casting concrete to retainer ring 6 Place, then another shrouding and retainer ring 6 are fixed, casting concrete is concordant to the mouth of pipe of steel pipe 2, finally consolidates ring flange and steel pipe 2 It is fixed, casting concrete.
Drainage layer is set in the surrounding of precast concrete well casing and has been sequentially arranged above bulky grain rubble in sediment tube Layer, middle particle metalling, little particle metalling and water filtering tank, it can prevent in well water that sand content is exceeded and shadow is caused to drainage system Ring, effectively reduce a large amount of losses of grogs, reduce labor intensity, it is possible to increase efficiency of construction, save construction cost;Later stage seals Stifled easy construction, operating personnel are not required to carry out professional training, and common laborer can complete.

Claims (7)

1. deep foundation pit precipitation well construction, including precast concrete well casing and foundation ditch basis, precast concrete well casing are located at foundation ditch base In plinth, filled out between precast concrete well casing outer wall and foundation ditch basis and filter material layer, precast concrete well casing bottom are provided with well Seat, it is characterised in that:Sediment tube is provided with above the well seat, sediment tube is located in precast concrete well casing, above sediment tube It is disposed with bulky grain metalling, middle particle metalling, little particle metalling and water filtering tank, square set on precast concrete well casing Provided with steel pipe, inner cylinder is fixed with steel pipe bottom inwall, inner cylinder gos deep into that precast concrete well casing is intraoral, the inner hole wall top of steel pipe Be provided with retainer ring, the anti-hydrofoil ring of steel pipe external welding more than precast concrete well casing, foundation ditch basis top be provided with it is prefabricated The concordant blinding concrete of the concrete well mouth of pipe, blinding concrete top are provided with pea gravel concreten protective layer, microlith coagulation Splash guard is equipped with above protective soil layer, water-proof putty is provided with above splash guard, basic coagulation has been poured above water-proof putty Soil, anti-hydrofoil ring are in base concrete.
2. deep foundation pit precipitation well construction according to claim 1, it is characterised in that:The filter material layer uses 2 ~ 5mm of particle diameter Medium coarse sand.
3. deep foundation pit precipitation well construction according to claim 1, it is characterised in that:The thickness of the pea gravel concreten protective layer Spend for 100mm, the thickness of base concrete is 500~600mm.
4. deep foundation pit precipitation well construction according to claim 1, it is characterised in that:The pea gravel concreten protective layer is thick Maximum aggregate size is not more than 15mm concrete.
5. deep foundation pit precipitation well construction according to claim 1, it is characterised in that:The anti-hydrofoil ring, which uses, is more than 6mm Thick steel plate makes.
6. deep foundation pit precipitation well construction according to claim 1, it is characterised in that:The steel pipe is hot rolled seamless steel tube.
7. deep foundation pit precipitation well construction according to claim 1, it is characterised in that:The bulky grain metalling uses particle diameter 10 ~ 20mm cobbles, thickness are not less than 60cm, and middle particle metalling uses particle diameter 4 ~ 10mm coarse sands, and thickness is not less than 50cm, small Grain metalling uses particle diameter 1 ~ 3mm fine sands, and thickness is not less than 30cm.
CN201720467394.0U 2017-04-28 2017-04-28 Deep foundation pit precipitation well construction Expired - Fee Related CN206706792U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720467394.0U CN206706792U (en) 2017-04-28 2017-04-28 Deep foundation pit precipitation well construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720467394.0U CN206706792U (en) 2017-04-28 2017-04-28 Deep foundation pit precipitation well construction

Publications (1)

Publication Number Publication Date
CN206706792U true CN206706792U (en) 2017-12-05

Family

ID=60459398

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720467394.0U Expired - Fee Related CN206706792U (en) 2017-04-28 2017-04-28 Deep foundation pit precipitation well construction

Country Status (1)

Country Link
CN (1) CN206706792U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111350191A (en) * 2020-03-04 2020-06-30 中交第三航务工程勘察设计院有限公司 Bucket type foundation structure pumping system and construction process thereof
CN111456056A (en) * 2020-04-29 2020-07-28 中冶建工集团有限公司 Construction method of dewatering well in deep foundation pit
CN111456054A (en) * 2020-04-14 2020-07-28 山东大学 Pipe well structure suitable for high-permeability alluvial stratum, precipitation construction system and precipitation construction method
CN113106995A (en) * 2021-04-10 2021-07-13 上海友海建设工程有限公司 Strong drainage system of ultra-large deep foundation pit and construction method thereof
CN113668585A (en) * 2021-09-03 2021-11-19 中建安装集团南京建设有限公司 Open caisson structure for deep and large water intaking in high-pressure water area and construction method
CN114263201A (en) * 2021-12-23 2022-04-01 中建八局第二建设有限公司 Finished product self-flowing dewatering deep well pipe and construction method thereof

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111350191A (en) * 2020-03-04 2020-06-30 中交第三航务工程勘察设计院有限公司 Bucket type foundation structure pumping system and construction process thereof
CN111350191B (en) * 2020-03-04 2021-08-31 中交第三航务工程勘察设计院有限公司 Bucket type foundation structure pumping system and construction process thereof
CN111456054A (en) * 2020-04-14 2020-07-28 山东大学 Pipe well structure suitable for high-permeability alluvial stratum, precipitation construction system and precipitation construction method
CN111456054B (en) * 2020-04-14 2021-04-30 山东大学 Pipe well structure suitable for high-permeability alluvial stratum, precipitation construction system and precipitation construction method
CN111456056A (en) * 2020-04-29 2020-07-28 中冶建工集团有限公司 Construction method of dewatering well in deep foundation pit
CN113106995A (en) * 2021-04-10 2021-07-13 上海友海建设工程有限公司 Strong drainage system of ultra-large deep foundation pit and construction method thereof
CN113668585A (en) * 2021-09-03 2021-11-19 中建安装集团南京建设有限公司 Open caisson structure for deep and large water intaking in high-pressure water area and construction method
CN114263201A (en) * 2021-12-23 2022-04-01 中建八局第二建设有限公司 Finished product self-flowing dewatering deep well pipe and construction method thereof

Similar Documents

Publication Publication Date Title
CN206706792U (en) Deep foundation pit precipitation well construction
CN101768976B (en) Base pit dewatering and water saving device and construction method thereof
CN104711994A (en) Foundation pit deep well rainfall and plugging construction method
CN103046565B (en) Draining method for ultra-deep batholith deep foundation pit
CN107059903A (en) Bottom plate plugging dewatering well construction method is worn in foundation ditch
CN102433886A (en) Construction method for adding water lowering well in water collecting well
CN207512745U (en) A kind of caisson device and its foundation pit structure
CN206706791U (en) Base pit dewatering well plugging structure
CN103967028A (en) Immersed tube drainage structure and method for handling suddenly-produced foundation pit water bursting and fountains through immersed tube drainage structure
CN111441374B (en) Quick plugging construction method for high-water-pressure deep foundation pit dewatering well
LU500273B1 (en) New comprehensive dewatering and drainage method and drainage device for mudstone subway station
CN101713197A (en) Method for sealing foundation pit pressure reduction well
CN104179189A (en) Dewatering and drainage structure of foundation pit deep drop area and construction method thereof
CN110318410A (en) A kind of deep basal pit chance artesian water is prominent to gush decompression drought stress construction method
CN108755723A (en) A kind of removable dewatering well well mouth sealing device and slip casting plugging construction method
CN108571020B (en) Concrete bottom plate pouring method for confined water surging pressure reduction and water control of deep foundation pit
CN107059904B (en) A kind of underground pipe gallery ponding well excavation method
CN204174631U (en) A kind of foundation ditch falls the water drainage structure in dark region
CN201567582U (en) Rainwater saving device of foundation pit
CN105178342B (en) Precipitation well casing and method for blocking reserved hole of foundation pit through precipitation well casing
CN203768925U (en) Seal device for dewatering well in foundation pit
CN211898541U (en) Guide wall structure for reinforced structure of air shaft initial end head
CN206706790U (en) Base pit dewatering system
CN112176954A (en) Construction method for newly excavated channel
CN106869153A (en) A kind of method of the quick soft soil foundation treatment of well-points dewatering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 450046 6 floor, 3 East International Plaza, 85 Jinshui East Road, Zheng Dong New District, Zhengzhou, Henan.

Patentee after: Gaochuang Industrial Co.,Ltd.

Address before: 450046 6 floor, 3 East International Plaza, 85 Jinshui East Road, Zheng Dong New District, Zhengzhou, Henan.

Patentee before: GAOCHUANG CONSTRUCTION Corp.,Ltd.

CP01 Change in the name or title of a patent holder
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171205

CF01 Termination of patent right due to non-payment of annual fee