CN206706790U - Base pit dewatering system - Google Patents

Base pit dewatering system Download PDF

Info

Publication number
CN206706790U
CN206706790U CN201720465191.8U CN201720465191U CN206706790U CN 206706790 U CN206706790 U CN 206706790U CN 201720465191 U CN201720465191 U CN 201720465191U CN 206706790 U CN206706790 U CN 206706790U
Authority
CN
China
Prior art keywords
well casing
precast concrete
metalling
steel pipe
foundation ditch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720465191.8U
Other languages
Chinese (zh)
Inventor
高星河
刘振
肖恒
邹德华
扶蓓
李桂立
袁媛
万仁明
段士利
金宗山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gaochuang Industrial Co ltd
Original Assignee
Hi Tech Construction Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hi Tech Construction Ltd By Share Ltd filed Critical Hi Tech Construction Ltd By Share Ltd
Priority to CN201720465191.8U priority Critical patent/CN206706790U/en
Application granted granted Critical
Publication of CN206706790U publication Critical patent/CN206706790U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Filtration Of Liquid (AREA)

Abstract

It the utility model is related to base pit dewatering civil engineering field of engineering technology,More particularly, to a kind of base pit dewatering system,Including multiple dewatering wells being located in foundation ditch basis,Dewatering well includes precast concrete well casing,Filled out between precast concrete well casing outer wall and foundation ditch basis provided with filter material layer,Precast concrete well casing bottom is provided with well seat,Sediment tube is provided with above well seat,Sediment tube has been sequentially arranged above bulky grain metalling,Middle particle metalling,Little particle metalling and water filtering tank,Steel pipe is arranged with above precast concrete well casing,Inner cylinder is fixed with steel pipe bottom inwall,It is intraoral that inner cylinder gos deep into precast concrete well casing,The inner hole wall top of steel pipe is provided with retainer ring,The anti-hydrofoil ring of steel pipe external welding more than precast concrete well casing,Foundation ditch basis top is provided with the blinding concrete concordant with the precast concrete well casing mouth of pipe,Blinding concrete has been sequentially arranged above pea gravel concreten protective layer,Splash guard,Water-proof putty,Base concrete has been poured above water-proof putty.

Description

Base pit dewatering system
Technical field
Base pit dewatering civil engineering field of engineering technology is the utility model is related to, more particularly, to a kind of base pit dewatering system.
Background technology
Base pit dewatering can make the working faces such as excavation of foundation pit, supporting be in drying regime, and have and avoid Foundation Pit ground swell The advantages that water and reduction foundation pit side-wall water pressure, Method on Dewatering of Foundation Pit is more using the interior laying pumped well in around foundation ditch or full hole at present When carrying out precipitation, but carrying out base pit dewatering, substantial amounts of underground water is extracted and directly discharged, this not only waste water resource, and Aggravate municipal wastewater processing load.
The content of the invention
The purpose of this utility model is to provide a kind of base pit dewatering system, solves existing dewatering construction method water resource waste Seriously, the bad technical problem of dewatering effect.
The purpose of this utility model is realized in the following manner:Base pit dewatering system, including it is multiple be located at foundation ditch basis Interior dewatering well, the spacing between two neighboring dewatering well is 15~22m, and the dewatering well includes precast concrete well casing, in advance Filled out between concrete well pipe outer wall processed and foundation ditch basis and filter material layer, precast concrete well casing bottom are provided with well seat, well seat Top is provided with sediment tube, and sediment tube is located in precast concrete well casing, sediment tube be sequentially arranged above bulky grain metalling, Middle particle metalling, little particle metalling and water filtering tank, are arranged with steel pipe above precast concrete well casing, on steel pipe bottom inwall It is fixed with inner cylinder, inner cylinder gos deep into that precast concrete well casing is intraoral, and the inner hole wall top of steel pipe is provided with retainer ring, precast concrete The anti-hydrofoil ring of steel pipe external welding more than well casing, foundation ditch basis top are provided with the bed course concordant with the precast concrete well casing mouth of pipe Concrete, blinding concrete top are provided with pea gravel concreten protective layer, splash guard are equipped with above pea gravel concreten protective layer, Water-proof putty is provided with above splash guard, has poured base concrete above water-proof putty, anti-hydrofoil ring is in base concrete Interior, water pump is located above water filtering tank, and water pump is connected by water pipe with the gutter on the outside of foundation ditch, and it is heavy to be provided with gutter Sand pond, gutter connect with municipal pipeline.
The gutter is provided with waterwall close to the side of foundation ditch.
The bulky grain metalling uses particle diameter 10~20mm cobbles, and thickness is not less than 60cm, and middle particle metalling uses Particle diameter 4~10mm coarse sands, thickness are not less than 50cm, and little particle metalling uses particle diameter 1~3mm fine sands, and thickness is not less than 30cm.
The internal diameter of the dewatering well is 1.5m.
The thickness of the filter material layer is 0.9m.
The beneficial effects of the utility model are:Base pit dewatering can be collected and made full use of by the utility model, both be avoided The waste of water resource, while mitigate municipal wastewater processing load again;Precast concrete well casing surrounding set drainage layer and Bulky grain metalling, middle particle metalling, little particle metalling and water filtering tank have been sequentially arranged above in sediment tube, can have been prevented Sand content is exceeded in well water impacts to drainage system, effectively reduces a large amount of losses of grogs, reduces labor intensity, can Efficiency of construction is improved, saves construction cost;Later stage plugging construction is easy, and operating personnel are not required to carry out professional training, common laborer It can complete.
Brief description of the drawings
Fig. 1 is the floor plan of precipitation system.
Fig. 2 is the profile of precipitation system.
Fig. 3 is the structural representation of dewatering well.
Embodiment
As shown in Figures 1 to 3, base pit dewatering system, including multiple dewatering wells being located in foundation ditch basis, two neighboring precipitation Spacing between well is 15~22m, and the internal diameter of dewatering well is 1.5m, and dewatering well includes precast concrete well casing 20, concrete Filled out between the native outer wall of well casing 20 and foundation ditch basis 12 and use particle diameter 2~5mm medium coarse sands, filtrate provided with filter material layer 19, filter material layer 19 The thickness of layer 19 is 0.9m, and the bottom of precast concrete well casing 2 is provided with well seat 18, and the top of well seat 18 is provided with sediment tube 10, sunk Shallow lake pipe 10 is located in precast concrete well casing 20, the top of sediment tube 10 be disposed with from bottom to top bulky grain metalling 17, in Particle metalling 16, little particle metalling 15 and water filtering tank 3, water pump 5 are arranged on the top of water filtering tank 3 and are connected with water pipe 4, big Grain metalling 17 uses particle diameter 10~20mm cobbles, and thickness is not less than 60cm, and middle particle metalling 16 is thick using 4~10mm of particle diameter Sand, thickness are not less than 50cm, and little particle metalling 15 uses particle diameter 1~3mm fine sands, and thickness is not less than 30cm, precast concrete The top of well casing 20 is arranged with steel pipe 2, and steel pipe 2 is hot rolled seamless steel tube, and inner cylinder 11, inner cylinder 11 are fixed with the bottom interior wall of steel pipe 2 Go deep into that precast concrete well casing 20 is intraoral, the inner hole wall top of steel pipe 2 is provided with retainer ring 6, precast concrete well casing more than 20 The anti-hydrofoil ring 8 of the external welding of steel pipe 2, anti-hydrofoil ring 8 made using the thick steel plates of 6mm are more than, and the top of foundation ditch basis 12 is provided with The blinding concrete 13 concordant with the mouth of pipe of precast concrete well casing 20, the top of blinding concrete 13 are provided with pea gravel concreten protection Layer 14, pea gravel concreten protective layer 14 are not more than 15mm concrete, pea gravel concreten protective layer 14 for maximum size of coarse aggregate Thickness be 100mm, the top of pea gravel concreten protective layer 14 is equipped with splash guard 9, and the top of splash guard 9 is provided with water-proof putty 1, The top of water-proof putty 1 has poured base concrete 7, and the thickness of base concrete is 500~600mm, and anti-hydrofoil ring 8 is in basis In concrete seven, water pump is located above water filtering tank, and water pump 5 is connected by water pipe 4 with the gutter 23 on the outside of foundation ditch, draining Setting pot 23 is provided with ditch 22, gutter 22 connects with municipal pipeline, and gutter 22 is provided with dash close to the side of foundation ditch Wall 21.
After the completion of drawing water, water pump 5 is proposed, first a shrouding is fixed on inner cylinder 11, at casting concrete to retainer ring 6, Another shrouding and retainer ring 6 to be fixed again, casting concrete is concordant to the mouth of pipe of steel pipe 2, finally fixes ring flange and steel pipe 2, Casting concrete.
Gutter 22 connects with municipal pipeline, can collect base pit dewatering and make full use of, and has both avoided the wave of water resource Take, while mitigate municipal wastewater processing load again;Drainage layer is set and on sediment tube in the surrounding of precast concrete well casing Side is disposed with bulky grain metalling, middle particle metalling, little particle metalling and water filtering tank, can prevent from containing sand in well water The exceeded a large amount of losses for being impacted to drainage system, effectively reducing grogs are measured, reduce labor intensity, it is possible to increase construction effect Rate, save construction cost;Later stage plugging construction is easy, and operating personnel are not required to carry out professional training, and common laborer can complete.

Claims (5)

1. base pit dewatering system, including multiple dewatering wells being located in foundation ditch basis, the spacing between two neighboring dewatering well is 15~22m, it is characterised in that:The dewatering well includes precast concrete well casing, precast concrete well casing outer wall and foundation ditch basis Between fill out provided with filter material layer, precast concrete well casing bottom is provided with well seat, is provided with sediment tube above well seat, sediment tube is located at In precast concrete well casing, sediment tube be sequentially arranged above bulky grain metalling, middle particle metalling, little particle metalling and Water filtering tank, precast concrete well casing top are arranged with steel pipe, inner cylinder are fixed with steel pipe bottom inwall, inner cylinder gos deep into concrete Native well casing is intraoral, and the inner hole wall top of steel pipe is provided with retainer ring, the anti-hydrofoil of steel pipe external welding more than precast concrete well casing Ring, foundation ditch basis top are provided with the blinding concrete concordant with the precast concrete well casing mouth of pipe, set above blinding concrete There is pea gravel concreten protective layer, splash guard be equipped with above pea gravel concreten protective layer, water-proof putty is provided with above splash guard, Base concrete is poured above water-proof putty, anti-hydrofoil ring is in base concrete, and water pump is located above water filtering tank, water pump Connected by water pipe with the gutter on the outside of foundation ditch, setting pot is provided with gutter, gutter connects with municipal pipeline.
2. base pit dewatering system according to claim 1, it is characterised in that:The gutter is set close to the side of foundation ditch There is waterwall.
3. base pit dewatering system according to claim 1, it is characterised in that:The bulky grain metalling using particle diameter 10 ~ 20mm cobbles, thickness are not less than 60cm, and middle particle metalling uses particle diameter 4 ~ 10mm coarse sands, and thickness is not less than 50cm, little particle Metalling uses particle diameter 1 ~ 3mm fine sands, and thickness is not less than 30cm.
4. base pit dewatering system according to claim 1, it is characterised in that:The internal diameter of the dewatering well is 1.5m.
5. base pit dewatering system according to claim 1, it is characterised in that:The thickness of the filter material layer is 0.9m.
CN201720465191.8U 2017-04-28 2017-04-28 Base pit dewatering system Expired - Fee Related CN206706790U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720465191.8U CN206706790U (en) 2017-04-28 2017-04-28 Base pit dewatering system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720465191.8U CN206706790U (en) 2017-04-28 2017-04-28 Base pit dewatering system

Publications (1)

Publication Number Publication Date
CN206706790U true CN206706790U (en) 2017-12-05

Family

ID=60457578

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720465191.8U Expired - Fee Related CN206706790U (en) 2017-04-28 2017-04-28 Base pit dewatering system

Country Status (1)

Country Link
CN (1) CN206706790U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108277807A (en) * 2018-04-09 2018-07-13 浙江乔兴建设集团有限公司 Deep basal pit artesian water is prominent to gush decompression control water-bound
CN110725331A (en) * 2019-10-29 2020-01-24 中建七局安装工程有限公司 Foundation pit dewatering recycling system and method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108277807A (en) * 2018-04-09 2018-07-13 浙江乔兴建设集团有限公司 Deep basal pit artesian water is prominent to gush decompression control water-bound
CN110725331A (en) * 2019-10-29 2020-01-24 中建七局安装工程有限公司 Foundation pit dewatering recycling system and method

Similar Documents

Publication Publication Date Title
CN206706792U (en) Deep foundation pit precipitation well construction
CN106193132B (en) Pressure relief anti-floating system for bottom plate of deep foundation pit high-water-level building and pressure relief anti-floating method thereof
CN109371918B (en) Dam structure with permanent combination of multifunctional drainage box culvert and construction method thereof
CN103046565A (en) Draining method for ultra-deep batholith deep foundation pit
CN107326918A (en) A kind of concealed type, which passes through raft plate, can block impervious sump and its construction technology
CN206706790U (en) Base pit dewatering system
CN212900365U (en) Pipeline flow guide structure for pipeline repair
CN203768925U (en) Seal device for dewatering well in foundation pit
CN220352999U (en) Drainage structure of complex environment waste slag field
CN103174154A (en) Underground building bottom plate water burst well pit solid seal method and auxiliary water lowering device
CN107218080B (en) Underground water multi-stage filtering and draining system for deep and long-distance water-rich tunnel and construction method
CN115217163A (en) Water drainage structure of basement bottom plate and construction method of basement bottom plate
CN104328836A (en) Environmental prefabricated double-tank deep hole-type drainage shaft and construction method thereof
CN212835459U (en) Interim drainage system of foundation ditch
CN211898587U (en) Rear-mounted thin-wall steel pipe water draining device for large bottom plate anti-floating
CN212715050U (en) Anti pressure relief system that floats of basement bottom plate
CN208748792U (en) Hexagon honeycomb structure rainwater-collecting nature diacolation pond
CN111042212A (en) Rear-mounted thin-wall steel pipe water draining device and method for large bottom plate anti-floating
CN207048004U (en) A kind of coarse rack open caisson for sewage disposal system
CN209836994U (en) Drainage system for dynamic compaction area
CN110836030A (en) Clockwise and anticlockwise combined cyclone well construction method suitable for complex geological conditions
CN218622291U (en) Foundation pit dewatering and well sealing construction structure
CN211395720U (en) Foundation pit dewatering structure
CN212896421U (en) Foundation slab seals well multilayer sealing device
CN204225257U (en) A kind of environment-friendly type prefabricated pair of case deep hole type catch pit

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 450046 6 floor, 3 East International Plaza, 85 Jinshui East Road, Zheng Dong New District, Zhengzhou, Henan.

Patentee after: Gaochuang Industrial Co.,Ltd.

Address before: 450046 6 floor, 3 East International Plaza, 85 Jinshui East Road, Zheng Dong New District, Zhengzhou, Henan.

Patentee before: GAOCHUANG CONSTRUCTION Corp.,Ltd.

CP01 Change in the name or title of a patent holder
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171205

CF01 Termination of patent right due to non-payment of annual fee