CN218622291U - Foundation pit dewatering and well sealing construction structure - Google Patents

Foundation pit dewatering and well sealing construction structure Download PDF

Info

Publication number
CN218622291U
CN218622291U CN202222401955.0U CN202222401955U CN218622291U CN 218622291 U CN218622291 U CN 218622291U CN 202222401955 U CN202222401955 U CN 202222401955U CN 218622291 U CN218622291 U CN 218622291U
Authority
CN
China
Prior art keywords
well
steel pipe
galvanized steel
dewatering
foundation pit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222401955.0U
Other languages
Chinese (zh)
Inventor
毛宽红
王海龙
吴妍
解高
梁金岐
李鹏
问乐
张猛
朱坤
张帅虎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Northwest Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
Northwest Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Northwest Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical Northwest Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN202222401955.0U priority Critical patent/CN218622291U/en
Application granted granted Critical
Publication of CN218622291U publication Critical patent/CN218622291U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

The utility model relates to the technical field of foundation pit dewatering engineering, in particular to a foundation pit dewatering and well sealing construction structure, which comprises a galvanized steel pipe communicated with a dewatering well and a sealing ring; the flexible rubber filler is filled between the galvanized steel pipe and the dewatering well; the plain concrete cushion layer is arranged above the dewatering well, and a raft is arranged above the plain concrete cushion layer; the plugging steel plate is arranged at the top of the galvanized steel pipe, and the plugging steel plate and the top of the galvanized steel pipe are fixed in a full-welding mode; the utility model discloses under the state of drawing water, directly watering the micro-expansive concrete, treat the micro-expansive concrete solidification back, abandon the immersible pump, weld the shutoff steel sheet to water the micro-expansive concrete once more, thereby accomplish the shutoff to precipitation well, effectively avoid appearing the condition that concrete setting time is not enough, with the assurance well shut-in effect.

Description

Foundation pit dewatering and well sealing construction structure
Technical Field
The utility model relates to a foundation ditch precipitation engineering technical field specifically is a foundation ditch precipitation and shut-in construction structures.
Background
Traditional elevator shaft and deeper foundation ditch dewatering engineering such as sump pit, when its shut-in well, generally adopt following construction scheme. And after the submersible pump for drainage is taken out, pouring a large amount of concrete, sealing the well by utilizing the gravity action of a sufficient amount of concrete and a large amount of cement dry powder, and absorbing water by utilizing the cement dry powder to make the concrete dry and hard.
In the prior art, the following problems exist:
the method is not suitable for high water level areas and areas with large water inflow, after the submersible pump is taken out, the concrete is not solidified for enough time, the concrete is washed away, the waterproof effect is influenced, the bottom plate of the foundation is leaked, and the well sealing effect is influenced, so that the limitation exists.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a foundation ditch precipitation and shut-in construction structure to solve the problem that proposes in the above-mentioned background art.
The technical scheme of the utility model is that: a foundation pit dewatering and well sealing construction structure comprises a galvanized steel pipe communicated with a dewatering well and a steel pipe;
the flexible rubber filler is filled between the galvanized steel pipe and the dewatering well;
the plain concrete cushion layer is arranged above the dewatering well, and a raft is arranged above the plain concrete cushion layer;
the steel plate is arranged at the top of the galvanized steel pipe, and the steel plate and the top of the galvanized steel pipe are fixed in a full-welding mode.
Preferably, two stagnant water steel sheets, stagnant water steel sheet is fixed to be set up at galvanized steel pipe's circumference outer wall both ends.
Preferably, the interior of the dewatering well is filled with high-quality clay.
Preferably, the interior of the galvanized steel pipe and the upper part of the plugging steel plate are filled with micro-expansion concrete.
The utility model discloses an improve and provide a foundation ditch precipitation and shut-in construction structure here, compare with prior art, have following improvement and advantage:
the utility model discloses do not take out the immersible pump, under the state of drawing water, directly water the micro-expansive concrete, treat the micro-expansive concrete solidification back, abandon the immersible pump, weld the shutoff steel sheet to water the micro-expansive concrete once more, thereby accomplish the shutoff to precipitation well, effectively avoid appearing the condition that the concrete setting time is not enough, with the assurance well-sealing effect, and have the advantage of drawing materials simply, that construction cost is low.
Drawings
The invention is further explained below with reference to the figures and examples:
FIG. 1 is a schematic view of the state structure of the galvanized steel pipe of the utility model when the raft is worn;
FIG. 2 is a schematic view of the structure of the galvanized steel pipe of the present invention in a closed state.
Description of reference numerals:
1. a dewatering well; 2. a flexible rubber filler; 3. a galvanized steel pipe; 4. a water stop steel plate; 5. a plain concrete cushion; 6. a raft plate; 7. high-quality clay; 8. micro-expansive concrete; 9. and (5) plugging the steel plate.
Detailed Description
The present invention will be described in detail below, and it is apparent that the technical solutions in the embodiments of the present invention are described clearly and completely. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The utility model discloses an improve and provide a foundation ditch precipitation and shut-in construction structure here, the technical scheme of the utility model is:
as shown in fig. 1-2, a foundation pit dewatering and well sealing construction structure comprises a galvanized steel pipe 3 communicated with a dewatering well 1, and further comprises;
the flexible rubber filler 2 is filled between the galvanized steel pipe 3 and the dewatering well 1;
the plain concrete cushion layer 5 is arranged above the dewatering well 1, and the raft 6 is arranged above the plain concrete cushion layer 5;
the plugging steel plate 9 is arranged at the top of the galvanized steel pipe 3, and the plugging steel plate 9 is fixed with the top of the galvanized steel pipe 3 in a full-length welding mode.
Wherein the galvanized steel pipe 3 has the specification of 200mm diameter and 8mm wall thickness; the thickness of the plugging steel plate 9 is 10mm; the galvanized steel pipes 3 are 200mm higher than the top surface of the raft 6.
Furthermore, two stagnant water steel sheets 4, stagnant water steel sheet 4 are fixed to be set up at galvanized steel pipe 3's circumference outer wall both ends.
Further, the interior of the dewatering well 1 is filled with high-quality clay 7.
Furthermore, the interior of the galvanized steel pipe 3 and the upper part of the plugging steel plate 9 are filled with micro-expansion concrete 8.
The specific working method comprises the following steps: the darker foundation ditch of local elevartor shaft and sump pit, the anhydrous environment need be guaranteed in the bottom plate construction, the water level should be below 0.5m behind the precipitation, precipitation well 1 needs the drainage in succession, guarantee raft 6 waterproof system's integrality simultaneously, wear out drain pipe and water pump cable through the galvanized steel pipe 3 that sets up, galvanized steel pipe 3 that is provided with stagnant water steel sheet 4 runs through raft 6, under the state of drawing water, direct watering micro-expansion concrete 8, treat after the precipitation, abandon the well water pump, adopt shutoff steel sheet 9 to carry out the full weld shutoff to galvanized steel pipe 3, reuse micro-expansion concrete 8 and pour to 6 tops of raft, the completion is to the shutoff of precipitation well 1, the overall construction design has simple to draw materials, the benefit that construction cost is low.

Claims (4)

1. The utility model provides a foundation ditch precipitation and shut-in well construction structures, includes galvanized steel pipe (3) that are linked together with precipitation well (1), its characterized in that: also comprises the following steps;
the flexible rubber filler (2) is filled between the galvanized steel pipe (3) and the dewatering well (1);
the plain concrete cushion layer (5) is arranged above the dewatering well (1), and a raft (6) is arranged above the plain concrete cushion layer (5);
plugging steel plate (9), plugging steel plate (9) set up at the top of galvanized steel pipe (3), and plugging steel plate (9) adopts the full weld mode fixed with the top of galvanized steel pipe (3).
2. The foundation pit dewatering and well sealing construction structure as claimed in claim 1, wherein: two water stop steel plates (4), the water stop steel plates (4) are fixedly arranged at two ends of the circumferential outer wall of the galvanized steel pipe (3).
3. The foundation pit dewatering and well sealing construction structure as claimed in claim 1, wherein: the interior of the dewatering well (1) is filled with high-quality clay (7).
4. The foundation pit dewatering and well sealing construction structure as claimed in claim 1, wherein: and micro-expansion concrete (8) is filled in the galvanized steel pipe (3) and above the plugging steel plate (9).
CN202222401955.0U 2022-09-09 2022-09-09 Foundation pit dewatering and well sealing construction structure Active CN218622291U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222401955.0U CN218622291U (en) 2022-09-09 2022-09-09 Foundation pit dewatering and well sealing construction structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222401955.0U CN218622291U (en) 2022-09-09 2022-09-09 Foundation pit dewatering and well sealing construction structure

Publications (1)

Publication Number Publication Date
CN218622291U true CN218622291U (en) 2023-03-14

Family

ID=85466696

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222401955.0U Active CN218622291U (en) 2022-09-09 2022-09-09 Foundation pit dewatering and well sealing construction structure

Country Status (1)

Country Link
CN (1) CN218622291U (en)

Similar Documents

Publication Publication Date Title
CN103343543B (en) Foundation pit dewatering well pressure-reduction-type plugging method
CN109736340B (en) Dewatering device and method for guaranteeing integrity of cushion layer by reserving dewatering well on foundation slab
CN212129150U (en) Deep basal pit precipitation well block structure
CN104264700A (en) Seepage prevention construction method for light-weight precipitation well point post-cast strip of underground construction
CN109025899B (en) Well sealing device
CN218622291U (en) Foundation pit dewatering and well sealing construction structure
CN111173017A (en) Water stopping device and water stopping method for concrete pouring at bottom of reverse operation well of cyclone well
CN111593733A (en) Pile-first interpolation type jacket grouting plugging system
CN206706790U (en) Base pit dewatering system
CN216865222U (en) Bearing platform foundation structure
CN205895309U (en) Prevention of seepage water system for pitshaft driving
CN212801603U (en) Foundation pit bottom plate reserved precipitation plugging device
CN213233574U (en) A embedded structure that is used for subway station to prevent basement infiltration
CN211395718U (en) Plugging device for dewatering well
CN204174629U (en) A kind of light-duty precipitation well point ater-casting, underground building multi-way prevention plugging structure
CN104631477B (en) A kind of method that dewatering device is installed and blocked in processing foundation ditch
CN204510147U (en) Upper storage reservoir storehouse basin leakage preventing structure
CN107419811A (en) The method and its structure of basement bottom board support pile and spilled water hole waterproofing and leakage-stopping
CN210946854U (en) Anti-seepage structure of foundation pit elevator shaft
CN220598488U (en) Plugging device for deep well of building engineering after lowering underground water level
CN111042212A (en) Rear-mounted thin-wall steel pipe water draining device and method for large bottom plate anti-floating
CN218843144U (en) Deep basal pit high water pressure drop well block structure
CN104762924A (en) Upper storage reservoir basin seepage preventing method
CN213805525U (en) Underground continuous wall broken wall processing apparatus
CN111364468B (en) Bridge pile foundation concrete pouring equipment and process applied to water accumulation area

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant