CN104631477B - A kind of method that dewatering device is installed and blocked in processing foundation ditch - Google Patents

A kind of method that dewatering device is installed and blocked in processing foundation ditch Download PDF

Info

Publication number
CN104631477B
CN104631477B CN201410803685.3A CN201410803685A CN104631477B CN 104631477 B CN104631477 B CN 104631477B CN 201410803685 A CN201410803685 A CN 201410803685A CN 104631477 B CN104631477 B CN 104631477B
Authority
CN
China
Prior art keywords
steel pipe
rubber
water collector
preservation cotton
foundation ditch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410803685.3A
Other languages
Chinese (zh)
Other versions
CN104631477A (en
Inventor
孙成帅
马方
马一方
陈刚
姜懿珊
白珂
左英伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Original Assignee
Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd filed Critical Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Priority to CN201410803685.3A priority Critical patent/CN104631477B/en
Publication of CN104631477A publication Critical patent/CN104631477A/en
Application granted granted Critical
Publication of CN104631477B publication Critical patent/CN104631477B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The method that dewatering device is installed and blocked in foundation ditch is handled the invention discloses a kind of, is comprised the following steps:Manufacture aquifer;Water collector is embedded to aquifer;Water pump is set inside water collector;The upper end winding rubber and plastic heat-preservation cotton of foundation ditch template outside steel pipe, then tighten with tape winding;Form the concrete around water collector and rubber and plastic heat-preservation cotton;Remove rubber and plastic heat-preservation cotton;Form plugging device;Finally, with concrete formation sump.This method is applied to high and low hydraulic pressure Yield rainfall relation in foundation ditch, and this method is practical, and application effect is good, and durability is strong, and waterproof, bed course, the concrete construction quality in later stage can be effectively ensured.

Description

A kind of method that dewatering device is installed and blocked in processing foundation ditch
Technical field
The invention belongs to technical field of buildings, pacify more particularly to dewatering device in a kind of processing foundation ditch in construction Dress and the method for closure.
Background technology
With the continuous improvement of current architectural design level, the continuing to develop of construction technology, functional requirement is used to building Lifting, present architectural design more and more tends to high-rise, Super High and along with the intelligence of multi-layer underground cell structure etc. The design that can be built.At the same time, the foundation construction stage catchment, the construction of Yield rainfall relation it is more and more universal, and construction stage at present Precipitation more use the bright row of bright ditch, there is limitation in construction, and can not quickly handle the clean and later stage for ponding in foundation ditch does not have Effective closure method causes waterproof, bed course, the concrete construction quality in later stage unqualified always, therefore needs a kind of precipitation to apply now Work method, can effectively make the ponding of foundation ditch discharge and can block sump when needing closure.
The content of the invention
It is an object of the invention to avoid the imperfection due to Dewatering, caused by waterproof, bed course, concrete construction matter The problem of measuring unqualified.In view of the above-mentioned problems, handling the side that dewatering device is installed and blocked in foundation ditch the invention provides a kind of Method, this method is applied to high and low hydraulic pressure Yield rainfall relation in foundation ditch, and this method is practical, and application effect is good, and durability is strong, can be with Waterproof, bed course, the concrete construction quality in later stage is effectively ensured.
The method of installation and the closure of dewatering device, comprises the following steps in the processing foundation ditch of the present invention:
Manufacture aquifer;Aquifer is made up of the rubble of unified size;It is preferred that, rubble size is 40mm;Macome-scale More than the cellular hole of steel pipe in water collector, uniformly it is layered in the square heatable adobe sleeping platform that the underground length of side is 1200mm;
Water collector is embedded to aquifer;Water pump is set inside water collector;Wherein, water collector includes steel pipe, rigid waterproofing Wing ring and cellular hole, rigid waterproofing wing boxing are connected on the outside of steel pipe, and cellular hole is provided with steel pipe, and water pump is put In the inside of steel pipe;It is preferred that, steel pipe is preferably DN300mm;It is preferred that, away from welding rigid waterproofing at steel pipe nozzle 1250mm Wing ring;It is preferred that, rigid waterproofing wing ring thickness is 8mm, and interior diameter is 326mm;
The upper end winding rubber and plastic heat-preservation cotton of foundation ditch template outside steel pipe, then tighten with tape winding;Wherein, base is made When cheating template, rubber and plastic heat-preservation cotton is wound under template to template, the thickness after the winding of rubber and plastic heat-preservation cotton is reached 200mm, height 300mm is reached, then tightens with tape winding;
Form the concrete around water collector and rubber and plastic heat-preservation cotton;
Remove rubber and plastic heat-preservation cotton;
Form plugging device;Wherein, plugging device includes ring flange, rubber blanket, blank flange and bolt, blank flange position In the top of ring flange, rubber blanket is placed between ring flange and blank flange, and the surrounding of ring flange and blank flange is provided with spiral shell Keyhole, ring flange and blank flange are fixed by the bolt connection through bolt hole, and ring flange is welded on steel pipe;It is preferred that, method Blue disk is DN300mm;
Finally, with concrete formation sump.
The present invention advantageous effects be:Browser at the bottom of the catchment steel pipe uniformly breaks into cellular hole, is embedded to aquifer, directly Footpath is more than honeycomb structure hole dia, it is ensured that water smoothly flows into water collector, prevents debris from entering again;Rubber is wound under template to template Heat-preservation cotton is moulded, then winding is tightened with tape, excavated by manual work chisel is not needed during such later stage closure, was not both affected the appearance, and not Influence mechanism;Special plugging device is provided with, effectively can be blocked water seal after tightening;A rigidity is welded at steel pipe Anti- hydrofoil ring, SBS waterproof rolls are pasted at the anti-hydrofoil ring of rigidity, can effectively suppress underground water and be oozed from outer tube wall again when pre-buried Leakage.
Brief description of the drawings
The pre-buried profile of water collector in the method that Fig. 1 is installed and blocked for dewatering device in the processing foundation ditch of the present invention.
The Water collector structure signal used in the method that Fig. 2 is installed and blocked for dewatering device in the processing foundation ditch of the present invention Figure.
The plugging device structure used in the method that Fig. 3 is installed and blocked for dewatering device in the processing foundation ditch of the present invention is shown It is intended to.
Fig. 4 is that the sump completion of the method formation that dewatering device is installed and blocked in the processing foundation ditch using the present invention is cutd open Face figure.
Embodiment
The method that dewatering device is installed and blocked in processing foundation ditch in order to further appreciate that the present invention, below by way of implementation Example, and coordinate accompanying drawing to be described as follows in detail to technical scheme and its advantage.
The method of installation and the closure of dewatering device, comprises the following steps in the processing foundation ditch of the present invention:
As shown in figure 1, manufacture aquifer 5;
Aquifer 5 is made up of the rubble of unified size, and rubble size is 40mm, and macome-scale is necessarily more than the honeycomb of steel pipe Shape hole 10, is uniformly layered in the square heatable adobe sleeping platform that the underground length of side is 1200mm (rigid waterproof sleeve is embedded in underground together), Its reclaimed water can rapidly be collected, and can effectively prevent debris from entering in water collector, it is to avoid suction pump 6 is pumped into debris and damaged It is bad.
Water collector is embedded to aquifer 5;Water pump 6 is set inside water collector;
As shown in Figure 1, 2, water collector includes steel pipe 1, rigid waterproofing wing ring 2 and cellular hole 10, rigid waterproofing wing ring 2 It is welded on the outside of steel pipe 1, steel pipe 1 and is provided with cellular hole 10, water pump 6 is placed in the inside of steel pipe 1.The water collector can have Effect prevents water from outer wall of steel pipe leak.Steel pipe 1 is preferably DN300mm.In one embodiment, away from the mouth of pipe 1250mm of steel pipe 1 Place's welding rigid waterproofing wing ring 2.In one embodiment, the thickness of rigid waterproofing wing ring 2 is 8mm, and interior diameter is 326mm.
In the upper end winding rubber and plastic heat-preservation cotton 4 of steel pipe 1, then tighten with tape winding;
When making foundation ditch template, 300mm winds rubber and plastic heat-preservation cotton 4 under template to template, makes after the winding of rubber and plastic heat-preservation cotton 4 Thickness reach 200mm, highly reach 300mm, then tighten with tape winding, thus, plugging device be installed in the later stage, no Excavated by manual work is needed to dig, it is ensured that the stability attractive in appearance and foundation pit structure during installation.
Form the concrete 3 around water collector and rubber and plastic heat-preservation cotton 4;
Remove rubber and plastic heat-preservation cotton 4;
Form plugging device;
As shown in figure 3, wherein, plugging device includes ring flange 7, rubber blanket 9, blank flange 8 and bolt 11, blank flange 8 are located at the top of ring flange 7, and rubber blanket 9 is placed between ring flange 7 and blank flange 8, the surrounding of ring flange 7 and blank flange 8 Bolt hole is provided with, ring flange 7 and blank flange 8 are connected by the bolt 11 through bolt hole, and ring flange 7 is welded on steel pipe On 1.Ring flange 7 can be DN300mm.The bearing capacity of the plugging device is strong, effectively can block water seal, prevent leak; Pour after solidifying soil, durability is strong, increase service life.
Finally, with the formation sump of concrete 3, as shown in Figure 4.
The foundation ditch of the sump is integrally rationally divided into some regions, while carrying out precipitation.
The present invention advantageous effects be:Compared with conventional precipitation steel pipe built-in process, steel is used conventional precipitation more Pipe punching is directly embedded to underground, and the present invention is that browser at the bottom of the catchment steel pipe uniformly breaks into cellular hole 2mm, is embedded to aquifer 5, stores Water layer 5 is the stone that size is 40mm, and diameter is more than honeycomb structure hole dia, it is ensured that water smoothly flows into water collector, prevents miscellaneous again Thing enters;Compared with conventional precipitation steel pipe built-in process, during conventional embedded steel tube, steel pipe all fills dead with concrete under template, Present invention 300mm under template to template, winding rubber and plastic heat-preservation cotton 4, the thickness after reaches 200mm, highly reaches 300mm, Winding is tightened with tape again, excavated by manual work chisel is not needed during such later stage closure, was not both affected the appearance, and do not influence mechanism; Compared with the method for blocking of conventional sump, conventional closure directly fills dead with concrete or is welded with iron plate, present invention design There is special plugging device, plugging device, can after tightening by ring flange 7, rubber blanket 9 and blank flange 8 are constituted, bolt 11 is constituted So that effectively water seal to be blocked;Compared with conventional precipitation Steel Pipe Design, conventional precipitation steel pipe does not have any measures of preventing water, this hair It is bright that the anti-hydrofoil ring of a rigidity is welded at steel pipe 1250mm, paste SBS waterproof rolls when pre-buried at the anti-hydrofoil ring of rigidity again, Effectively suppress underground water from outer tube wall seepage.
Above-described embodiment is only intended to clearly illustrate example of the present invention, and not limitation of the invention.It is right For those skilled in the art, can also be made on the basis of above-described embodiment it is other it is various forms of combination, change or Modification, protection scope of the present invention is defined by claim.

Claims (1)

1. a kind of method for handling installation and the closure of dewatering device in foundation ditch, it is characterised in that comprise the following steps:
Manufacture aquifer;Aquifer is made up of the rubble of unified size;
Water collector is embedded to aquifer;Water pump is set inside water collector;Wherein, water collector includes steel pipe, rigid waterproofing wing ring With cellular hole, rigid waterproofing wing boxing is connected on the outside of steel pipe, cellular hole is provided with steel pipe, and water pump is placed in steel The inside of pipe;
The upper end winding rubber and plastic heat-preservation cotton of foundation ditch template outside steel pipe, then tighten with tape winding;
Form the concrete around water collector and rubber and plastic heat-preservation cotton;
Remove rubber and plastic heat-preservation cotton;
Form plugging device;Wherein, plugging device includes ring flange, rubber blanket, blank flange and bolt, and blank flange is located at method The top of blue disk, rubber blanket is placed between ring flange and blank flange, and the surrounding of ring flange and blank flange is provided with bolt hole, Ring flange and blank flange are fixed by the bolt connection through bolt hole, and ring flange is welded on steel pipe;
Finally, with concrete formation sump, wherein, the rubble size of aquifer is 40mm;Macome-scale is more than in water collector The cellular hole of steel pipe, is uniformly layered in the square heatable adobe sleeping platform that the underground length of side is 1200mm, steel pipe is DN300mm, away from steel Rigid waterproofing wing ring is welded at pipe mouth of pipe 1250mm, rigid waterproofing wing ring thickness is 8mm, and interior diameter is 326mm, rubber and plastic heat-preservation cotton Thickness after winding is 200mm, is highly 300mm, and ring flange is DN300mm.
CN201410803685.3A 2014-12-23 2014-12-23 A kind of method that dewatering device is installed and blocked in processing foundation ditch Expired - Fee Related CN104631477B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410803685.3A CN104631477B (en) 2014-12-23 2014-12-23 A kind of method that dewatering device is installed and blocked in processing foundation ditch

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410803685.3A CN104631477B (en) 2014-12-23 2014-12-23 A kind of method that dewatering device is installed and blocked in processing foundation ditch

Publications (2)

Publication Number Publication Date
CN104631477A CN104631477A (en) 2015-05-20
CN104631477B true CN104631477B (en) 2017-10-31

Family

ID=53210675

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410803685.3A Expired - Fee Related CN104631477B (en) 2014-12-23 2014-12-23 A kind of method that dewatering device is installed and blocked in processing foundation ditch

Country Status (1)

Country Link
CN (1) CN104631477B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106498962B (en) * 2016-11-28 2019-01-11 中国神华能源股份有限公司 Shallow underground water collecting and drainage system and construction method
CN107090840A (en) * 2017-04-26 2017-08-25 中建三局集团有限公司 A kind of drainage well closing mode of pre-buried annulus

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB369464A (en) * 1931-05-20 1932-03-24 Vincent Gluckstein Method of, and apparatus for, determining and lowering the head of water around a water-logged site
JPS5813819A (en) * 1981-07-19 1983-01-26 Kato Seisakusho:Kk Lowering work for ground water level
CN101768976B (en) * 2009-12-29 2011-04-06 中建城市建设发展有限公司 Base pit dewatering and water saving device and construction method thereof
CN102433886A (en) * 2011-09-27 2012-05-02 天津住宅集团建设工程总承包有限公司 Construction method for adding water lowering well in water collecting well
CN202450536U (en) * 2011-12-29 2012-09-26 青岛新华友建工集团股份有限公司 Shallow dewatering and plugging construction device in foundation pit
CN103343543B (en) * 2013-07-09 2015-06-24 中国一冶集团有限公司 Foundation pit dewatering well pressure-reduction-type plugging method
CN203514333U (en) * 2013-10-23 2014-04-02 中天建设集团有限公司 Basement soleplate precipitation well mouth blocking sleeve

Also Published As

Publication number Publication date
CN104631477A (en) 2015-05-20

Similar Documents

Publication Publication Date Title
CN202970602U (en) Plugging structure of high-rise building deep foundation pit large water volume tube well
CN103993615B (en) Large-drawdown pipe well plugging structure and construction method thereof
CN109736340B (en) Dewatering device and method for guaranteeing integrity of cushion layer by reserving dewatering well on foundation slab
CN206706791U (en) Base pit dewatering well plugging structure
CN102797266A (en) Well sealing waterproof construction method for dewatering well
CN103498486A (en) Method for blocking post-cast strip downcast pipe well through sleeve pipe
CN206298900U (en) A kind of diaphram wall built-in type steel encloses purlin plug system
CN105780792B (en) A kind of foundation pit high water head Dewatering by pressure reduction well shut-in well method and structure of shunting in a well
CN103382722B (en) Concrete foundation slab restoring method for preformed water collecting well for higher underground hydraulic pressure
CN109025899B (en) Well sealing device
CN104631477B (en) A kind of method that dewatering device is installed and blocked in processing foundation ditch
CN201794082U (en) Local precipitation and drainage device for deep foundation pit
CN204080839U (en) A kind of Yield rainfall relation device
CN204491645U (en) A kind of deep foundation pit precipitation well-sealing device
CN203855990U (en) Big pipe shaft block structure that falls
CN109750684B (en) Multipurpose dewatering well structure and manufacturing method thereof
CN104060622A (en) Method for discharging water in pint through steel bucket in pit
CN203514332U (en) Casing for blocking dewatering tube well of post-cast strip
CN108867676A (en) A kind of shut off tool and its construction method at round sump foundation pit bottom
CN212801603U (en) Foundation pit bottom plate reserved precipitation plugging device
CN207452927U (en) Caisson drainage arrangement in a kind of super foundation
CN210369005U (en) Water drainage device for building pile hole
CN203213129U (en) Controllable non-return drainer
CN104060636B (en) Pressure release anti-float method during high water level regional architecture foundation construction and device
CN209837068U (en) Non-penetrating local downcomer structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 230000 building 3, 262 Heping Road, Yaohai District, Hefei City, Anhui Province

Patentee after: No 6 Construction Co.,Ltd. of China Construction Fourth Engineering Bureau

Address before: 230011 building 3, 262 Heping Road, Yaohai District, Hefei City, Anhui Province

Patentee before: CHINA CONSTRUCTION 4TH ENGINEERING BUREAU, 6TH Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171031