CN104060622A - Method for discharging water in pint through steel bucket in pit - Google Patents
Method for discharging water in pint through steel bucket in pit Download PDFInfo
- Publication number
- CN104060622A CN104060622A CN201410332828.7A CN201410332828A CN104060622A CN 104060622 A CN104060622 A CN 104060622A CN 201410332828 A CN201410332828 A CN 201410332828A CN 104060622 A CN104060622 A CN 104060622A
- Authority
- CN
- China
- Prior art keywords
- steel drum
- water
- hole
- pit
- steel bucket
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
The invention discloses a method for discharging water in a pit through a steel bucket in the pit. According to the method for discharging water in the pit through the steel bucket in the pit, a hole is formed in the bottom of the cylindrical steel bucket (1), a gate valve (2) is installed in the orifice of the hole, waterstop rings (4) are welded to the surface of the outer wall of the steel bucket (1), the steel bucket is placed in the pit filled with centimeter-level stone (8), and then the periphery of the bottom of the steel bucket is filled with centimeter-level stone; a blind ditch is filled with dog-head-shaped stone (6), and water existing in other water leakage points is guided into the steel bucket from the orifice of the hole through the blind ditch; a water pump (3) is placed in the steel bucket so that water can be pumped. According to the method for discharging water in the pit through the steel bucket in the pit, it can be guaranteed that water falls into the steel bucket in the whole raft construction process, the whole foundation pit is in a water-free construction state, waterproof construction and other processes are greatly facilitated, the phenomenon that water leakage and cracks happen to a raft due to underground water is avoided, the concrete casting quality of the raft is guaranteed, and water discharging can be achieved conveniently and effectively.
Description
Technical field
The present invention relates to the water seal for deep foundation pit of building trade, is in a kind of hole, to cheat steel drum to fall water discharge method specifically.
Background technology
The engineering of constructing than more rich place at underground water, particularly deep-foundation pit engineering, underground water yield is larger, must take corresponding measures of preventing water to ensure carrying out smoothly of construction in construction.
The method of water seal for deep foundation pit has conventionally: water-stop curtain, well-points dewatering and gutter; But have the deficiencies such as long, complicated operation of duration and cost be higher, water-stop curtain can become very poor or almost there is no effect the stagnant water effect that is gravel layer at construction layer.
Summary of the invention
The object of the invention is to for above-mentioned deficiency of the prior art, provide and in a kind of hole, cheat steel drum and fall water discharge method.The present invention can keep whole raft plate construction stage steel drum at precipitation, make whole foundation ditch in anhydrous Construction State, advantageous particularly to waterproof construction and other operations, can not cause because of underground water the raft plate phenomenons such as cracking of leaking, when having ensured raft plate concrete pouring quality, allow yet and fall drainage works and become easily and effectively.
The present invention adopts following technical scheme to be achieved:
In a kind of hole, cheat steel drum and fall water discharge method, its step is as follows:
A. the steel drum of column type (1) bottom opening gate valve (2), steel drum (1) outer wall surface welding seal ring (4) are installed in aperture;
B. in the construction of raft plate, dig the hole of dark 800mm at the place of leaking, and fill out the centimetre stone (8) that 100mm is thick in the bottom in hole;
C. steel drum (1) is put into the hole of filling in a centimeter stone (8), then use a centimeter stone (8) to fill up steel drum (1) bottom surrounding;
D. in french drain, insert a dog stone (6), and cover with plastic sheeting (7), then by french drain, the water of other leakage points is introduced in hole and entered steel drum (1) by aperture;
E. putting into water pump (3) in steel drum (1) the inside draws water.
Described column type steel drum (1) diameter is that 800mm ~ 1200mm, wall thickness are 5mm, and height is determined by built plank thickness.
Described steel drum (1) welds one seal ring (4) along the every 3000mm of short transverse.
Feature of the present invention is:
1, water pump is put into steel drum, and hole bed mud sand can not stop up water pump.
2, when raft plate is built, water pump does not stop pumping, and in whole work progress, underground water can not impact building of raft plate.
3,, after raft plate has been built, underground water continues to extract out by the water pump in steel drum, can not cause because of underground water raft plate to leak.
4,, after raft plate curing time finishes, can be simply reach the object of sealing by closing gate valve in steel drum.
Brief description of the drawings
Fig. 1 is the principle signal face of cheating steel drum in the hole that proposes of the present invention and fall water discharge method;
Fig. 2 is the layout schematic diagram of cheating steel drum and fall water discharge method in hole;
Fig. 3 is the french drain sectional drawing of cheating steel drum and fall water discharge method in hole;
Fig. 4 is the installation sectional drawing of cheating steel drum and fall water discharge method in hole;
In figure: 1-steel drum, 2-gate valve, 3-water pump, 4-seal ring, 5-soil layer, a 6-dog stone, 7-plastic sheeting, 8-centimetre stone, 9-raft plate face.
Detailed description of the invention
Below in conjunction with accompanying drawing 1-4 and embodiment, the present invention is further elaborated.
In a kind of hole, cheat steel drum and fall water discharge method, implementation step is: make the cylindrical steel drum (1) of a diameter 800mm ~ 1200mm, the thick column type of 5mm, height is determined by built plank thickness.Steel drum (1) bottom opening is also installed gate valve (2), the long steel drum of every 3000mm (1) is along surrounding welding seal ring (4), in the construction of raft plate, dig the hole of dark 800mm at the place of leaking, and it is thick to fill out 100mm with centimetre stone (8) in bottom, the water of other leakage point is incorporated in hole by french drain, again steel drum (1) is put into the hole of filling in a centimeter stone (8), then use a centimeter stone (8) to fill up steel drum (1) bottom surrounding, in french drain, insert a dog stone (6), and cover with plastic sheeting (7).By french drain, the water of other leakage points is introduced to dell and entered by steel drum (1) bottom port, finally put into water pump (3) in steel drum (1) the inside, draw water.In whole work progress, underground water can not impact building of raft plate.
From accompanying drawing 1, in hole, to cheat steel drum and fall water discharge method, gate valve (2) is arranged on steel drum (1) bottom, and seal ring (4) is welded on steel drum (1) surrounding, and water pump (3) is put into steel drum (1) and is drawn water.
From accompanying drawing 2, seal ring (4) is welded on steel drum (1) around, and gate valve (2) is arranged on steel drum (1) bottom, can adjust open amount.
From accompanying drawing 3, a dog stone (6) fills up whole french drain along soil layer (5), then uses plastic sheeting (7) to cover french drain.
From accompanying drawing 4, centimetre stone (8) is filled out at the upper 100mm of soil layer (5) thick, and it is upper that steel drum (1) is placed on a centimeter stone (8), and centimetre stone (8) fills up along steel drum (1) bottom surrounding, and steel drum (1) top spills raft plate face (9) 50mm.
Claims (4)
1. in hole, cheat steel drum and fall a water discharge method, it is characterized in that, step is as follows:
A. adopt the steel drum (1) of column type, steel drum (1) bottom opening is also installed gate valve (2), steel drum (1) outer wall surface welding seal ring (4) in aperture;
B. in the construction of raft plate, dig the hole of dark 800mm at the place of leaking, and fill out the centimetre stone (8) that 100mm is thick in the bottom in hole;
C. steel drum (1) is put into the hole of filling in a centimeter stone (8), then use a centimeter stone (8) to fill up steel drum (1) bottom surrounding;
D. in french drain, insert a dog stone (6), and cover with plastic sheeting (7), then by french drain, the water of other leakage points is introduced in hole and entered steel drum (1) by aperture;
E. putting into water pump (3) in steel drum (1) the inside draws water.
2. in hole as claimed in claim 1, cheat steel drum and fall water discharge method, it is characterized in that, described column type steel drum (1) diameter is that 800mm ~ 1200mm, wall thickness are 5mm, and height is determined by built plank thickness.
3. in hole as claimed in claim 1, cheat steel drum and fall water discharge method, it is characterized in that, described steel drum (1) welds one seal ring (4) along the every 3000mm of short transverse.
4. in hole as claimed in claim 1, cheat steel drum and fall water discharge method, it is characterized in that, described steel drum (1) is placed on upper its top of a centimeter stone (8) and spills raft plate face (9) 50mm, and centimetre stone (8) fills up along steel drum (1) bottom surrounding.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410332828.7A CN104060622B (en) | 2014-07-14 | 2014-07-14 | Steel drum Yield rainfall relation method is cheated in a kind of hole |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410332828.7A CN104060622B (en) | 2014-07-14 | 2014-07-14 | Steel drum Yield rainfall relation method is cheated in a kind of hole |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104060622A true CN104060622A (en) | 2014-09-24 |
CN104060622B CN104060622B (en) | 2016-02-10 |
Family
ID=51548536
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410332828.7A Active CN104060622B (en) | 2014-07-14 | 2014-07-14 | Steel drum Yield rainfall relation method is cheated in a kind of hole |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104060622B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104895098A (en) * | 2015-06-24 | 2015-09-09 | 江苏省建筑科学研究院有限公司 | Piping blocking structure outside deep foundation pit underground diaphragm wall and grouting treatment method thereof |
CN105155562A (en) * | 2015-08-06 | 2015-12-16 | 河北二十冶建设有限公司 | Construction method for bottom sealing treatment of spring openings of deep foundation pit |
CN109723071A (en) * | 2019-02-23 | 2019-05-07 | 杭州昂创科技有限公司 | The construction method of the double-deck steel drum Yield rainfall relation system built in basement bottom plate rear pouring tape |
CN110847199A (en) * | 2019-11-12 | 2020-02-28 | 中国二十冶集团有限公司 | Construction method for drainage of underground water of deep foundation pit |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4592846A (en) * | 1985-09-03 | 1986-06-03 | Ppg Industries, Inc. | Method and reservoir for in-ground containment of liquid waste |
CN201679008U (en) * | 2010-04-09 | 2010-12-22 | 中国三冶集团有限公司建筑安装工程公司 | Rigid water drainage device for foundation pit |
CN102296622A (en) * | 2011-05-19 | 2011-12-28 | 周昕 | Micro-pipe bundle seepage pipe for tailings |
CN103088838A (en) * | 2013-02-05 | 2013-05-08 | 中国十七冶集团有限公司 | Open caisson sealing bottom water drainage device and construction method |
CN103174154A (en) * | 2013-03-21 | 2013-06-26 | 东莞市彩丽建筑维护技术有限公司 | Underground building bottom plate water burst well pit solid seal method and auxiliary water lowering device |
CN203639943U (en) * | 2014-01-07 | 2014-06-11 | 温州东瓯建设集团有限公司 | Basement side-closed drainage pipe |
-
2014
- 2014-07-14 CN CN201410332828.7A patent/CN104060622B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4592846A (en) * | 1985-09-03 | 1986-06-03 | Ppg Industries, Inc. | Method and reservoir for in-ground containment of liquid waste |
CN201679008U (en) * | 2010-04-09 | 2010-12-22 | 中国三冶集团有限公司建筑安装工程公司 | Rigid water drainage device for foundation pit |
CN102296622A (en) * | 2011-05-19 | 2011-12-28 | 周昕 | Micro-pipe bundle seepage pipe for tailings |
CN103088838A (en) * | 2013-02-05 | 2013-05-08 | 中国十七冶集团有限公司 | Open caisson sealing bottom water drainage device and construction method |
CN103174154A (en) * | 2013-03-21 | 2013-06-26 | 东莞市彩丽建筑维护技术有限公司 | Underground building bottom plate water burst well pit solid seal method and auxiliary water lowering device |
CN203639943U (en) * | 2014-01-07 | 2014-06-11 | 温州东瓯建设集团有限公司 | Basement side-closed drainage pipe |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104895098A (en) * | 2015-06-24 | 2015-09-09 | 江苏省建筑科学研究院有限公司 | Piping blocking structure outside deep foundation pit underground diaphragm wall and grouting treatment method thereof |
CN105155562A (en) * | 2015-08-06 | 2015-12-16 | 河北二十冶建设有限公司 | Construction method for bottom sealing treatment of spring openings of deep foundation pit |
CN109723071A (en) * | 2019-02-23 | 2019-05-07 | 杭州昂创科技有限公司 | The construction method of the double-deck steel drum Yield rainfall relation system built in basement bottom plate rear pouring tape |
CN109723071B (en) * | 2019-02-23 | 2021-02-09 | 杭州昂创科技有限公司 | Construction method of double-layer steel drum drainage system built in basement floor post-cast strip |
CN110847199A (en) * | 2019-11-12 | 2020-02-28 | 中国二十冶集团有限公司 | Construction method for drainage of underground water of deep foundation pit |
Also Published As
Publication number | Publication date |
---|---|
CN104060622B (en) | 2016-02-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109881694B (en) | Construction structure and method for plugging foundation pit substrate water and sand gushing | |
CN102797266B (en) | Well sealing waterproof construction method for dewatering well | |
CN103343543B (en) | Foundation pit dewatering well pressure-reduction-type plugging method | |
CN103334444B (en) | A kind of method for blocking of foundation pit dewatering well pressure release type | |
CN101250879B (en) | Method for processing bottom solum trickleing water of deep building pit | |
CN104711994A (en) | Foundation pit deep well rainfall and plugging construction method | |
CN103161172B (en) | Elevator shaft bottom precipitation construction method | |
CN109736340B (en) | Dewatering device and method for guaranteeing integrity of cushion layer by reserving dewatering well on foundation slab | |
CN202730786U (en) | Well-sealing waterproof construction structure of dewatering well | |
CN104695456B (en) | Construction method vertical shaft horizontal rotation jet grouting pile foundation pit lateral wall water stopping curtain | |
CN209339169U (en) | A kind of precipitation well in foundation pit plugging device | |
CN106522252A (en) | Seepage-proofing blocking mechanism and method for deep foundation pit raft dewatering well | |
CN104060622B (en) | Steel drum Yield rainfall relation method is cheated in a kind of hole | |
CN204530733U (en) | Underground construction deep-well precipitation well head plugging structure | |
CN204959781U (en) | Dewatering well plugging device | |
CN103572764A (en) | Ultra-deep manual hole digging pile dado water stop structure and construction method thereof | |
CN105484277A (en) | Component for tubular well precipitation construction in elevator foundation pit or sump and construction method | |
CN201794082U (en) | Local precipitation and drainage device for deep foundation pit | |
CN205205844U (en) | Member is used in construction of tubular well precipitation in elevator foundation ditch or sump pit | |
CN105178342B (en) | Precipitation well casing and method for blocking reserved hole of foundation pit through precipitation well casing | |
CN203768925U (en) | Seal device for dewatering well in foundation pit | |
CN206385557U (en) | The water-impervious plugging mechanism of dewatering well on deep basal pit raft plate | |
CN202108045U (en) | Sleeve pipe with anchor rod penetrating through underground continuous wall | |
CN104846837B (en) | The construction method of ultra-deep well in a kind of bright draining foundation ditch | |
CN203939038U (en) | In a kind of hole, cheat steel drum and fall dewatering installation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address |
Address after: 650501 Yunnan Province, Kunming city Wuhua District West Road No. 22 Patentee after: Yunnan Jian Jian Fourth Construction Co., Ltd. Address before: 650032 Yunnan Province, Kunming city Wuhua District West Road No. 22 Patentee before: Fourth Construction Co., Ltd. of Yunnan Architectural Engineering Group |
|
CP03 | Change of name, title or address |